CN104717866A - Electric equipment mounting box frame - Google Patents
Electric equipment mounting box frame Download PDFInfo
- Publication number
- CN104717866A CN104717866A CN201310695893.1A CN201310695893A CN104717866A CN 104717866 A CN104717866 A CN 104717866A CN 201310695893 A CN201310695893 A CN 201310695893A CN 104717866 A CN104717866 A CN 104717866A
- Authority
- CN
- China
- Prior art keywords
- power consumption
- consumption equipment
- casing
- tank tower
- mounting ear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Patch Boards (AREA)
Abstract
The invention provides an electric equipment mounting box frame. The electric equipment mounting box frame comprises a supporting frame (10) and a box (20), the supporting frame (10) is fixedly arranged on the ground and comprises a plurality of longitudinal beams (11), the longitudinal beams (11) are arranged in parallel and form mounting space, the box (20) is used for allowing electric equipment to be mounted, and the box (20) is fixedly arranged in the mounting space. By means of the electric equipment mounting box frame, when electricity workers mount the electric equipment in narrow alleys or tunnels, the electric equipment is not directly mounted on house walls of residents any more, and is mounted in the electric equipment mounting box frame, and the problem that site selection is difficult when the electric equipment is mounted is solved.
Description
Technical field
The present invention relates to power equipment installing area, in particular to a kind of power consumption equipment, tank tower is installed.
Background technology
Change the one-storey house area of the Beijing City of electricity at enforcement coal, wall tank tower generally hangs over courtyard doorway, and only for installing wall case.Other power consumption equipment connects power supply from wall case, also will have the circuit that a section unsettled, and actual use is also dangerous.
One-storey house area in Beijing City, when carrying out intelligent meter concentrator and installing, installment work generally can be subject to the dual restriction of geographical environment and technical indicator.Therefore, installment work has very large difficulty in addressing.Therefore, the installation Site Selection of concentrator case and concentrator has many uncertain factors.
Summary of the invention
The present invention aims to provide a kind of power consumption equipment and installs tank tower, to solve the problem of the addressing difficulty when installing power consumption equipment in prior art.
To achieve these goals, according to an aspect of the present invention, provide a kind of power consumption equipment and install tank tower, comprising: bracing frame, be fixedly installed on the ground, bracing frame comprises many longerons, and many longerons be arranged in parallel and form installing space; And casing, for installing power consumption equipment, casing is fixed in installing space.
Further, casing comprises mounting ear, and mounting ear is fixedly installed on bracing frame.
Further, casing has multiple mounting ear, mounting ear is welded and fixed and is connected on bracing frame.
Further, casing has multiple mounting ear, mounting ear is bolted to connection on bracing frame.
Further, the setting height(from bottom) of mounting ear on bracing frame is adjustable.
Further, bracing frame comprises the tie-beam for strengthening bracing frame intensity, and tie-beam is connected between two adjacent longerons.
Further, be provided with the installing rack for installing power consumption equipment in casing, power consumption equipment is removably mounted on installing rack.
Further, the switch gate of casing is provided with watch window.
Further, casing is provided with line outlet, power consumption equipment be connected to power supply with electric wire by line outlet.
Apply technical scheme of the present invention, this power consumption equipment is installed tank tower and is comprised: bracing frame and casing.Bracing frame is fixedly installed on ground upper support frame and comprises many longerons, and many longerons be arranged in parallel and form installing space; Casing is for installing power consumption equipment, and casing is fixed in installing space.Apply this power consumption equipment and tank tower is installed, in work about electric power personnel install power equipment in narrow and small lane or tunnel, no longer power equipment is directly installed on the house wall of resident, and be mounted in power consumption equipment installation tank tower, solve the problem of addressing difficulty when installing power consumption equipment.
Accompanying drawing explanation
The accompanying drawing forming a part of the present invention is used to provide a further understanding of the present invention, and schematic description and description of the present invention, for explaining the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 shows the uncovered structural representation that power consumption equipment of the present invention installs the embodiment of tank tower; And
Fig. 2 show power consumption equipment of the present invention install tank tower embodiment have lid structural representation.
Reference numeral:
10, bracing frame; 11, longeron; 12, tie-beam; 20, casing; 21, mounting ear; 22, installing rack; 23, watch window.
Embodiment
Hereinafter also describe the present invention in detail with reference to accompanying drawing in conjunction with the embodiments.It should be noted that, when not conflicting, the embodiment in the application and the feature in embodiment can combine mutually.
As shown in Figure 1, according to embodiments of the invention, this power consumption equipment is installed tank tower and is comprised bracing frame 10 and casing 20.Bracing frame 10 is fixedly installed on the ground, and bracing frame 10 comprises many longerons 11, and many longerons 11 be arranged in parallel and form supporting and space; Casing 20 is for installing power consumption equipment, and casing 20 is fixed in installing space.
Apply this power consumption equipment and tank tower is installed, in work about electric power personnel install power equipment in narrow and small lane or tunnel, no longer power equipment is directly installed on the house wall of resident, and be mounted in the casing 20 of power consumption equipment installation tank tower, solve the problem of addressing difficulty when installing power consumption equipment, also reduce the friction produced because of erection unit addressing between work about electric power personnel and resident in the course of work simultaneously.
Casing 20 includes mounting ear 21, mounting ear 21 is fixedly mounted on bracing frame 10.
In conjunction with shown in Figure 2, preferably, casing 20 has mounting ear 21, mounting ear 21 is provided with multiple.Mounting ear 21 is used to install casing 20, is evenly distributed to the support force of casing 20; And the use cost of mounting ear 21 is comparatively cheap, what reduce power consumption equipment installation tank tower installs and uses cost.Conveniently make casing 20 be fixed on bracing frame 10 by mounting ear 21 quickly, mounting ear 21 is weldingly fixed on casing 20, and mounting ear 21 is weldingly fixed on bracing frame 10.
More preferably, mounting ear 21 is weldingly fixed on casing 20, and then mounting ear 21 is fixedly installed on bracing frame 10 by fastening bolt.By fastening bolt fixed installation ear 21, be conveniently to be installed by power consumption equipment in tank tower removes at needs, power consumption equipment can be installed tank tower and disassemble by staff quickly, thus conveniently installs the carrying of tank tower to power consumption equipment or deposit.
Because power consumption equipment needs to be installed in different places, the requirement for height of different places to power consumption equipment installation tank tower also can be different, and preferably, the setting height(from bottom) of mounting ear 21 on bracing frame 10 is adjustable.Like this, casing 20 just can select most preferred setting height(from bottom) according to the difference of actual installation addressing.
Particularly, the longeron 11 of bracing frame 10 is connected with tie-beam 12, and longeron 11 is fixedly installed on the ground, and tie-beam 12 is connected between two adjacent longerons 11.Tie-beam 12 is intensity strengthening parts of longeron 11, and tie-beam 12 can strengthen the intensity that power consumption equipment installs the bracing frame 10 of tank tower.
Particularly, quickly and easily power consumption equipment is arranged on power consumption equipment to enable work about electric power personnel and installs in tank tower, power consumption equipment is installed in tank tower and is provided with installing rack 22, and installing rack 22 is for installing power consumption equipment.Power consumption equipment is directly arranged on installing rack 22 by work about electric power personnel.Replace more easily time conveniently in work about electric power personnel use procedure afterwards, power consumption equipment breaks down, power consumption equipment is removably mounted on installing rack 22.
After power consumption equipment installs on installing rack 22, the switch gate of casing 20 keeps normally closed, this is to not allow the extraneous power consumption equipment directly contacted in casing 20 in routine use, cause the damage of power consumption equipment, also being get an electric shock to prevent resident from accidentally contacting the power consumption equipment in casing 20 simultaneously, then causing infliction of body.Switch gate due to casing 20 keeps normally closed, very inconvenient when the working condition of the power consumption equipment in work about electric power personal observations casing 20, therefore on the switch gate of casing 20, be provided with watch window 23, then transparent glass plate be arranged on watch window 23.Work about electric power personnel, by the watch window 23 on switch gate, clearly can observe the situation in casing 20, the potential faults in Timeliness coverage casing 20, thus carry out timely, necessary maintenance to power consumption equipment.
Preferably, casing 20 is provided with line outlet, power consumption equipment be communicated to power supply with electric wire by line outlet.In order to more reasonably arrange the circuit of power consumption equipment, more preferably, line outlet is opened in the bottom of casing 20.Such line outlet is arranged, and has both optimized the line arrangement with electric wire, and also effectively prevent rainwater and enter in casing 20 from line outlet, cause the short circuit of power consumption equipment.
As can be seen from the above description, the above embodiments of the present invention achieve following technique effect:
Apply this power consumption equipment and tank tower is installed, in work about electric power personnel install power equipment in narrow and small lane or tunnel, no longer power equipment is directly installed on the house wall of resident, and be mounted in power consumption equipment installation tank tower, solve the problem of addressing difficulty when installing power consumption equipment, also reduce the friction produced because of erection unit addressing between work about electric power personnel and resident in the course of work simultaneously.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.
Claims (9)
1. power consumption equipment installs a tank tower, it is characterized in that, comprising:
Bracing frame (10), is fixedly installed on the ground, and support frame as described above (10) comprises many longerons (11), and described many longerons (11) be arranged in parallel and form installing space; And
Casing (20), for installing power consumption equipment, described casing (20) is fixed in described installing space.
2. power consumption equipment according to claim 1 installs tank tower, and it is characterized in that, described casing (20) comprises mounting ear (21), and described mounting ear (21) is fixedly installed on support frame as described above (10).
3. power consumption equipment according to claim 2 installs tank tower, and it is characterized in that described casing (20) having multiple described mounting ear (21), described mounting ear (21) is welded and fixed and is connected on support frame as described above (10).
4. power consumption equipment according to claim 2 installs tank tower, and it is characterized in that, described casing (20) has multiple described mounting ear (21), described mounting ear (21) is bolted to connection on support frame as described above (10).
5. the power consumption equipment according to claim 3 or 4 installs tank tower, and it is characterized in that, the setting height(from bottom) of described mounting ear (21) on support frame as described above (10) is adjustable.
6. power consumption equipment according to claim 5 installs tank tower, it is characterized in that, support frame as described above (10) comprises the tie-beam (12) for strengthening support frame as described above (10) intensity, and described tie-beam (12) is connected between two adjacent described longerons (11).
7. the power consumption equipment according to claim 3 or 4 installs tank tower, and it is characterized in that, be provided with the installing rack (22) for installing described power consumption equipment in described casing (20), described power consumption equipment is removably mounted on described installing rack (22).
8. power consumption equipment according to claim 7 installs tank tower, it is characterized in that, the switch gate of described casing (20) is provided with watch window (23).
9. power consumption equipment according to claim 8 installs tank tower, and it is characterized in that, (20) are provided with line outlet with described casing, described power consumption equipment be connected to power supply with electric wire by described line outlet.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310695893.1A CN104717866A (en) | 2013-12-17 | 2013-12-17 | Electric equipment mounting box frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310695893.1A CN104717866A (en) | 2013-12-17 | 2013-12-17 | Electric equipment mounting box frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104717866A true CN104717866A (en) | 2015-06-17 |
Family
ID=53416677
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310695893.1A Pending CN104717866A (en) | 2013-12-17 | 2013-12-17 | Electric equipment mounting box frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104717866A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1442032A (en) * | 2000-07-17 | 2003-09-10 | 星河科技有限公司 | High expandable internet super server |
EP1577461A1 (en) * | 2002-11-06 | 2005-09-21 | Twelcon Electronica, S.L. | Special urban transformation center |
CN101068455A (en) * | 2007-07-10 | 2007-11-07 | 汪述普 | Well electric cabinet |
CN201294697Y (en) * | 2008-11-25 | 2009-08-19 | 中国电子科技集团公司第二十八研究所 | Open type frame |
-
2013
- 2013-12-17 CN CN201310695893.1A patent/CN104717866A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1442032A (en) * | 2000-07-17 | 2003-09-10 | 星河科技有限公司 | High expandable internet super server |
EP1577461A1 (en) * | 2002-11-06 | 2005-09-21 | Twelcon Electronica, S.L. | Special urban transformation center |
CN101068455A (en) * | 2007-07-10 | 2007-11-07 | 汪述普 | Well electric cabinet |
CN201294697Y (en) * | 2008-11-25 | 2009-08-19 | 中国电子科技集团公司第二十八研究所 | Open type frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106522592B (en) | Equipment GIS's portable armour dress dustproof shed of hanging | |
CN102923099A (en) | Modularized box type charging and battery swapping station | |
US20140062188A1 (en) | Solar Retrofit Pole | |
CN205030763U (en) | Intelligent express cabinet | |
CN203729624U (en) | Box body fixing belt antenna rising and falling integrated square cabin type base station | |
CN100463590C (en) | Well electric cabinet | |
CN203814106U (en) | Electric device installing box rack | |
CN202896539U (en) | Modularized box-type charging and battery swap station | |
CN104717866A (en) | Electric equipment mounting box frame | |
CN210165954U (en) | Long-distance Bluetooth total station | |
CN209874961U (en) | Separate pull-out type fireproof door | |
CN204967088U (en) | Modular assembly formula transformer substation | |
CN204633159U (en) | Detachable weather shield electrical control cubicles | |
CN203950193U (en) | A kind of groundwater monitoring station | |
CN215681439U (en) | Indoor distribution box | |
CN204464759U (en) | The bunker screen of display prefabricated cabin before a kind of front wiring | |
CN206041211U (en) | Emergency lighting divides distribution device | |
CN204832290U (en) | Electric meter box | |
CN205979074U (en) | Electromechanical device installation frame | |
CN204809684U (en) | Looped netowrk cabinet convenient to overhaul | |
CN205231462U (en) | Kilowatt -hour meter mounting structure | |
CN206250741U (en) | A kind of cable branch box of glass steel material | |
JP3196223U (en) | Pillar cubicle type power receiving equipment | |
CN205566876U (en) | Nuclear power station containment is outer with regard to domain cabinet equipment | |
CN201063995Y (en) | Underground electric cabinet |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150617 |