CN104715102A - 基于二分法的智能电能表负荷曲线的设计方法 - Google Patents

基于二分法的智能电能表负荷曲线的设计方法 Download PDF

Info

Publication number
CN104715102A
CN104715102A CN201410833835.5A CN201410833835A CN104715102A CN 104715102 A CN104715102 A CN 104715102A CN 201410833835 A CN201410833835 A CN 201410833835A CN 104715102 A CN104715102 A CN 104715102A
Authority
CN
China
Prior art keywords
data
time
dichotomy
flash
datum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410833835.5A
Other languages
English (en)
Other versions
CN104715102B (zh
Inventor
潘玉刚
李维特
姚徐旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Holley Technology Co Ltd
Original Assignee
Holley Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Holley Technology Co Ltd filed Critical Holley Technology Co Ltd
Priority to CN201410833835.5A priority Critical patent/CN104715102B/zh
Publication of CN104715102A publication Critical patent/CN104715102A/zh
Application granted granted Critical
Publication of CN104715102B publication Critical patent/CN104715102B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector

Landscapes

  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

设计一种基于二分法的智能电能表负荷曲线的设计方法,通过读取智能电能表中的一般FLASH单元中的每页数据加以实现,包括:1>以每页的头N个字节作为索引区,每位代表数据是否有效,如果从有效变无效则把1写成0。这为往前设置时间使数据失效提供基础;2>设定数据的初始状态是0,否则进行取反;3>为了实现数据可搜索,把最早的一条数据在FLASH中的位置和时间、最近的一条数据在FLASH中的位置和时间进行存储,这些位置和时间为二分法提供范围基础;4>压缩前述4个字节时间和位置内容。以时间为轴进行二分法搜索;5>通过二分法找到大于设置时间点的数据;6>读取尾位置,头位置及数据时间点,这三个数据点输入通过二分法找到大于等于读取数据时间点的点。

Description

基于二分法的智能电能表负荷曲线的设计方法
技术领域
本发明涉及一种基于二分法的智能电能表负荷曲线的设计方法。
技术背景
负荷曲线作为当前三相智能电能表的必备要求,在分析电网质量中发挥非常重要的作用。而表计实时性稳定性要求较高,所以对表计的开发效率提出很大的要求。而负荷曲线存储数据大的特点要求我们有更好的设计方法来改善存储和查询的效率。故提出一种基于二分法的智能电能表负荷曲线的设计方法。
国网对智能表负荷曲线的要求有:通信读取数据的方法是指定时间读N条数据的方式,当电能表修改时间时,同一时间点不出现多个数据。而传统的设计是置标志逐一查询,由于负荷曲线的条数是10万条以上,这样复杂了系统的可操作性而且效率极差。而总结国网对负荷曲线时间的要求是连续且不可重复的,这个定义给二分法必须要求有规律的排序提供了条件。只要搜索17次就能找到对应的时间点,所以以时间为轴的二分法的负荷曲线设计方法可大大提高负荷曲线的效率。
发明内容:
本发明解决前述缺陷,设计一种基于二分法的智能电能表负荷曲线的设计方法,通过读取智能电能表中的一般FLASH单元中的每页数据加以实现,包括:1>以每页的头N个字节作为索引区,每位代表数据是否有效,如果从有效变无效则把1写成0。这为往前设置时间使数据失效提供基础;2>设定数据的初始状态是0,否则进行取反;3>为了实现数据可搜索,把最早的一条数据在FLASH中的位置和时间、最近的一条数据在FLASH中的位置和时间进行存储,这些位置和时间为二分法提供范围基础;4>压缩前述4个字节时间和位置内容。以时间为轴进行二分法搜索;5>通过二分法找到大于设置时间点的数据;6>读取尾位置,头位置及数据时间点,这三个数据点输入通过二分法找到大于等于读取数据时间点的点。
本发明具备以下特点:1、对电能表的执行效率高,可操作性强;2、采用一般系列FLASH单元成本较低,制造供应商可选择性强。
具体实施方式
在当前小型数据存储方案中,25系列FLASH由于其廉价的优势在应用的越来越广泛,逐步超过,EEPROM,铁电,45系列的FLASH,但是其也有弊端,就是25系列FLASH擦除必须是以页为单位(如MX25L3206E以4K个byte为一页),写操作以位为最小单位只能1写成0。这样就带来一个问题,如果一页有10个数据有效,一擦除就10个数据都失效了,如果一页只设计一个有效数据则大大浪费了存储空间。不能达到随意使任意个数据失效的目的。所以本发明提出索引设计,以每页的头N个字节作为索引区,每位代表数据是否有效,如果从有效变无效则把1写成0。这为往前设置时间使数据失效提供基础。
一般认为数据的初始状态是0,而FLASH的初始状态为1。所以在应用上进行取反设计。为了实现数据可搜索,把最早的一条数据在FLASH中的位置和时间(尾位置,尾时间)、最近的一条数据在FLASH中的位置和时间(头位置,头时间)存下来。这个位置和时间为二分法提供范围基础。压缩的4字节时间+数据内容。方便以时间为轴的二分法搜索。由于智能表支持设置时间功能,而二分法的基础必须是时间连续,所以在往前设置时间的时候必须要让大于设置时间点数据失效。失效的方法是:通过二分法找到大于设置时间点数据。国网DL/T 645—2007规约可以通过指定时间读取N条负荷曲线。这里也通过二分法来实现。实现的方法是:尾位置,头位置,读取数据时间点,三个数据点输入通过二分法找到大于等于读取数据时间点的点。

Claims (1)

1.基于二分法的智能电能表负荷曲线的设计方法,通过读取智能电能表中的一般FLASH单元中的每页数据加以实现,其特征在于包括:
1>以每页的头N个字节作为索引区,每位代表数据是否有效,如果从有效变无效则把1写成0;
这为往前设置时间使数据失效提供基础;
2>设定数据的初始状态是0,否则进行取反;
3>为了实现数据可搜索,把最早的一条数据在FLASH中的位置和时间、最近的一条数据在FLASH中的位置和时间进行存储,这些位置和时间为二分法提供范围基础;
4>压缩前述4个字节时间和位置内容;
以时间为轴进行二分法搜索;
5>通过二分法找到大于设置时间点的数据;
6>读取尾位置,头位置及数据时间点,这三个数据点输入通过二分法找到大于等于读取数据时间点的点。
CN201410833835.5A 2014-12-30 2014-12-30 基于二分法的智能电能表负荷曲线的设计方法 Active CN104715102B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410833835.5A CN104715102B (zh) 2014-12-30 2014-12-30 基于二分法的智能电能表负荷曲线的设计方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410833835.5A CN104715102B (zh) 2014-12-30 2014-12-30 基于二分法的智能电能表负荷曲线的设计方法

Publications (2)

Publication Number Publication Date
CN104715102A true CN104715102A (zh) 2015-06-17
CN104715102B CN104715102B (zh) 2018-05-08

Family

ID=53414427

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410833835.5A Active CN104715102B (zh) 2014-12-30 2014-12-30 基于二分法的智能电能表负荷曲线的设计方法

Country Status (1)

Country Link
CN (1) CN104715102B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105045537A (zh) * 2015-08-04 2015-11-11 国网浙江兰溪市供电公司 电表参数数据的擦写方法、在电表存储设备中搜索电力线参数的方法以及一种电表
CN105319527A (zh) * 2015-11-23 2016-02-10 中国电力科学研究院 一种电能表负荷记录测试方法
CN107102820A (zh) * 2017-04-17 2017-08-29 北京得瑞领新科技有限公司 一种nand闪存设备的数据处理方法及装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110041037A1 (en) * 2009-08-11 2011-02-17 Texas Memory Systems, Inc. FLASH-based Memory System with Static or Variable Length Page Stripes including Data Protection Information and Auxiliary Protection Stripes
CN102063379A (zh) * 2010-12-28 2011-05-18 天津市亚安科技电子有限公司 一种flash存储器的数据存储方法
CN102339254A (zh) * 2011-06-17 2012-02-01 杭州炬华科技股份有限公司 用于智能电能表的flash数据存储方法
CN102520242A (zh) * 2011-12-12 2012-06-27 宁夏隆基宁光仪表有限公司 一种电能表负荷曲线的记录方法
CN103020323A (zh) * 2013-01-15 2013-04-03 山东大学 一种基于未知长度二分查找的闪存数据检索存储的方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110041037A1 (en) * 2009-08-11 2011-02-17 Texas Memory Systems, Inc. FLASH-based Memory System with Static or Variable Length Page Stripes including Data Protection Information and Auxiliary Protection Stripes
CN102063379A (zh) * 2010-12-28 2011-05-18 天津市亚安科技电子有限公司 一种flash存储器的数据存储方法
CN102339254A (zh) * 2011-06-17 2012-02-01 杭州炬华科技股份有限公司 用于智能电能表的flash数据存储方法
CN102520242A (zh) * 2011-12-12 2012-06-27 宁夏隆基宁光仪表有限公司 一种电能表负荷曲线的记录方法
CN103020323A (zh) * 2013-01-15 2013-04-03 山东大学 一种基于未知长度二分查找的闪存数据检索存储的方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
SANG-WON LEE.ET AL.: ""Design of flash-based DBMS:an in-page logging approach"", 《SIGMOD"PROCEEDINGS OF THE 2007 ACM SIGMOD INTERNATIONAL CONFERENCE ON MANAGEMENT OF DATA》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105045537A (zh) * 2015-08-04 2015-11-11 国网浙江兰溪市供电公司 电表参数数据的擦写方法、在电表存储设备中搜索电力线参数的方法以及一种电表
CN105319527A (zh) * 2015-11-23 2016-02-10 中国电力科学研究院 一种电能表负荷记录测试方法
CN105319527B (zh) * 2015-11-23 2019-03-22 中国电力科学研究院 一种电能表负荷记录测试方法
CN107102820A (zh) * 2017-04-17 2017-08-29 北京得瑞领新科技有限公司 一种nand闪存设备的数据处理方法及装置

Also Published As

Publication number Publication date
CN104715102B (zh) 2018-05-08

Similar Documents

Publication Publication Date Title
CN103488704B (zh) 一种数据存储方法及装置
TWI510923B (zh) 資料儲存裝置以及快閃記憶體控制方法
JP2013037517A5 (zh)
CN105849706A (zh) 用于管理逻辑到物理地址映射的储存模块和方法
CN104715102A (zh) 基于二分法的智能电能表负荷曲线的设计方法
US20140281353A1 (en) Hardware-based pre-page walk virtual address transformation
GB2475362A (en) Method and apparatus for wireless digital content management
JP6527951B2 (ja) データバックアップ装置及び方法
WO2015020900A3 (en) Method and device for error correcting code (ecc) error handling
US20180364938A1 (en) Extent-based data location table management
CN103678603A (zh) 多源异构数据高效汇聚存取架构系统
CN102446184A (zh) 一种基于时间序列的工业数据存储及索引方法
CN105159616A (zh) 一种磁盘空间管理方法及装置
GB2507447A (en) Protecting network entity data while preserving network properties
CN104252526A (zh) 基于冗余消除的遥测存储方法
MY180992A (en) Memory latency management
CN104516822A (zh) 一种内存访问方法和设备
CN103064794B (zh) 实现mpls标签高效管理的方法
CN104360976A (zh) 一种ddr接口的数据编解码方法
CN203133675U (zh) 高密度服务器
CN102215037B (zh) 一种延迟信号产生电路
CN104731716A (zh) 一种数据存储方法
CN108614781B (zh) 基于NANDflash的有效数据查找方法和NANDflash存储设备
CN204241913U (zh) 一种气象站控制电路
CN201378177Y (zh) 一种电能计量芯片内的防潜动电路

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: HOLLEY Technology Park No. 181 310023 Hangzhou city Zhejiang District of Yuhang province Wuchang Avenue

Applicant after: HOLLEY METERING LIMITED

Address before: HOLLEY Technology Park No. 181 310023 Hangzhou city Zhejiang District of Yuhang province Wuchang Avenue

Applicant before: Holley Metering Ltd.

COR Change of bibliographic data
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20150617

Assignee: Hangzhou Zichuan Technology Co.,Ltd.

Assignor: Holley Technology Co.,Ltd.

Contract record no.: X2021330000156

Denomination of invention: Design method of load curve of intelligent watt hour meter based on Dichotomy

Granted publication date: 20180508

License type: Common License

Record date: 20210828

Application publication date: 20150617

Assignee: Hangzhou Huazheng New Energy Technology Co.,Ltd.

Assignor: Holley Technology Co.,Ltd.

Contract record no.: X2021330000158

Denomination of invention: Design method of load curve of intelligent watt hour meter based on Dichotomy

Granted publication date: 20180508

License type: Common License

Record date: 20210828

Application publication date: 20150617

Assignee: Hangzhou Minhong Technology Co.,Ltd.

Assignor: Holley Technology Co.,Ltd.

Contract record no.: X2021330000157

Denomination of invention: Design method of load curve of intelligent watt hour meter based on Dichotomy

Granted publication date: 20180508

License type: Common License

Record date: 20210828