CN104713112A - Boiler dust removal circular processing system - Google Patents

Boiler dust removal circular processing system Download PDF

Info

Publication number
CN104713112A
CN104713112A CN201310680910.4A CN201310680910A CN104713112A CN 104713112 A CN104713112 A CN 104713112A CN 201310680910 A CN201310680910 A CN 201310680910A CN 104713112 A CN104713112 A CN 104713112A
Authority
CN
China
Prior art keywords
water
pump
tank
boiler
communicated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310680910.4A
Other languages
Chinese (zh)
Other versions
CN104713112B (en
Inventor
杨军
刘华台
李枝才
王继新
安华军
汤永红
张熔炉
王志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tobacco Guizhou Industrial Co Ltd
Original Assignee
China Tobacco Guizhou Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tobacco Guizhou Industrial Co Ltd filed Critical China Tobacco Guizhou Industrial Co Ltd
Priority to CN201310680910.4A priority Critical patent/CN104713112B/en
Publication of CN104713112A publication Critical patent/CN104713112A/en
Application granted granted Critical
Publication of CN104713112B publication Critical patent/CN104713112B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention provides a boiler dust removal circular processing system. The boiler dust removal circular processing system comprises a main dust remover, an auxiliary dust remover, a reaction tank, a sedimentation tank, a pump chamber water collecting tank and a water cut-off safety protection device. The water cut-off safety protection device is used for independently starting any main circulating water pump and/or auxiliary circulating water pump. The boiler dust removal circular processing system has the following advantages that the water cut-off safety protection device enables any one in all the circulating water pumps to be independently started; two or more circulating water pumps can also be started simultaneously; the operation of the entire set of system is not limited by the water cut-off safety protection device; when the circulating water pumps break down or cannot operate or operate idly or stop due to breakdowns, an electromagnetic valve is started, water is supplied to the boiler dust removers, a sound-light alarm is given out to remind an operator of the breakdown of equipment, and standby water is controlled; when the circulating water pumps operate idly or stop due to the breakdowns, the standby water is automatically supplied, so that the demand for boiler dust removal water is met, and the safe and economical operation of a boiler is protected.

Description

Boiler dusting circulating treating system
Technical field
The present invention relates to boiler circulating water treatment field, particularly relate to a kind of boiler dusting circulating treating system.
Background technology
Boiler dust remover is that flue gas enters venturi by flue, sprayed into uniformly by water at the entrance of throat, due to flue gas high-speed motion, therefore the water sprayed into is melted into the ash material in tiny water smoke wet flue gas by it, like this, ash material and water droplet just there occurs to collide and condense, and the dust material that especially material footpath is tiny can be water-soluble by water smoke.
Boiler dust remover is applicable to the flue gas ash removal smoke-eliminating desulfurizing of fire coal, oil burning boiler, kiln, has that resistance is low, mounting arrangements is flexible, the features such as desulfuration efficiency is high, long service life.
Boiler dust remover can be divided into by principle difference: sound wave dust separator, pulse dust collector, Steam Dust device, sack cleaner etc.
Existing boiler dusting recirculated water control system bad environments, seriously corroded, fault rate is also high, rule stream filler forbids lack of water to be run, as once lack of water, the rule stream filler fusing of Chimney crack, devulcanizer inside will be caused, the potential safety hazard such as cause the ventilation of boiler flue not smooth, impact to the safety and economic operation of the life of worker and boiler.
Existing boiler dusting circulating treating system cannot realize controlling separately main deduster and assisted dust-collecting device, recycles in all dedusters to make cycle water energy.
Summary of the invention
The shortcoming of prior art in view of the above, the object of the present invention is to provide a kind of boiler dusting circulating treating system, cannot control separately all dedusters for solving in prior art, the problem that recirculated water recycles in all dedusters cannot be made.
For achieving the above object and other relevant objects, the invention provides a kind of boiler dusting circulating treating system, comprise: main deduster and assisted dust-collecting device, reaction tank, sedimentation basin, pump house collecting-tank, to cut off the water supply safety guard, the sewage draining exit of described main deduster and assisted dust-collecting device is communicated to the water inlet of reaction tank, the delivery port of described reaction tank is communicated to the water inlet of sedimentation basin, the delivery port of described sedimentation basin is communicated to pump house collecting-tank, the delivery port of described pump house collecting-tank is communicated to the water inlet of described main deduster by main backflow water pump, the delivery port of described pump house collecting-tank is communicated to the water inlet of described assisted dust-collecting device by auxiliary reflux water pump, the water inlet of described main deduster is provided with no water protector, described safety guard of cutting off the water supply is for starting separately arbitrary main backflow water pump and/or auxiliary reflux water pump.
As preferred embodiment; described safety guard of cutting off the water supply comprises three two two and logical turns round sub-change-over switch SA; start knob SB1; stop knob SB2; auxiliary reclay KA; zero line binding post com, turns round described in the inlet wire of described no water protector and outlet are connected on respectively on sub-change-over switch, PLC gets 12 volts of power supplys through described turn round sub-change-over switch SA after receive startup power supply as auxiliary reflux water pump on auxiliary reflux starting mode of pump button.
As preferred embodiment; described safety guard of cutting off the water supply comprises electrode points Pressure gauge P, auxiliary reclay KA, magnetic valve; audible-visual annunciator, time-delay relay KT, be connected to 220V both ends of power through described electrode points Pressure gauge P after described time-delay relay KT, auxiliary reclay KA, magnetic valve, audible-visual annunciator parallel connection.
As preferred embodiment, described audible-visual annunciator is arranged on operating room, and described magnetic valve is arranged on water pipe for subsequent use, and described electrode points Pressure gauge P is arranged on backflow water pump junction house steward.
As preferred embodiment, described main deduster comprises a deduster, No. two dedusters.
As preferred embodiment, described sedimentation basin comprises first stage precipitation tank and second-level settling pond, and the delivery port of described first stage precipitation tank is communicated to the water inlet of second-level settling pond, and the delivery port of described second-level settling pond is communicated to described pump house collecting-tank.
As preferred embodiment, described each deduster passes through cross current for subsequent use to alternate source.
As preferred embodiment, in described reaction tank, there is lime conveyer, and mixer.
As mentioned above, a kind of boiler dusting circulating treating system of the present invention, have following beneficial effect: safety guard of cutting off the water supply makes all backflow water pumps can start arbitrary separately, also can start two or multiple stage simultaneously, whole system runs and does not limit by no water protector; When reflux water pump have fault not operate, pump or the fault stop jumping of fanning the air time; start magnetic valve; supply water to boiler dust remover; send sound and light alarm simultaneously; remind operating personnel equipment to break down, water for subsequent use is controlled, when water circulating pump fans the air pump or fault stop jumping; water for subsequent use is opened automatically, meets the safety and economic operation of boiler dusting water and protection boiler.
Accompanying drawing explanation
Fig. 1 is shown as the structural representation of the embodiment of the present invention.
Fig. 2 is shown as the weak current part circuit diagram of the safety guard of cutting off the water supply of the embodiment of the present invention.
Fig. 3 is shown as the strong power part circuit diagram of the safety guard of cutting off the water supply of the embodiment of the present invention.
Piece mark explanation
1 main deduster
No. 101 dedusters
102 No. two dedusters
103 No. three dedusters
2 assisted dust-collecting devices
3 reaction tanks
4 sedimentation basins
41 first stage precipitation tank
42 second-level settling ponds
5 pump house collecting-tanks
6 no water protectors
7 lime silos
8 hoppers
9 water pipes for subsequent use
10 chimneys
11 operating rooms
12 audible-visual annunciators
13 magnetic valves
What SA tri-two two was logical turns round sub-change-over switch
SB1 starts knob
SB2 stops knob
KA auxiliary reclay
Com zero line binding post
P electrode points Pressure gauge
KA auxiliary reclay
KT time-delay relay
Detailed description of the invention
Below by way of specific instantiation, embodiments of the present invention are described, those skilled in the art the content disclosed by this description can understand other advantages of the present invention and effect easily.The present invention can also be implemented or be applied by detailed description of the invention different in addition, and the every details in this description also can based on different viewpoints and application, carries out various modification or change not deviating under spirit of the present invention.
Refer to Fig. 1 to Fig. 3.It should be noted that, the diagram provided in the present embodiment only illustrates basic conception of the present invention in a schematic way, then only the assembly relevant with the present invention is shown in graphic but not component count, shape and size when implementing according to reality is drawn, it is actual when implementing, and the kenel of each assembly, quantity and ratio can be a kind of change arbitrarily, and its assembly layout kenel also may be more complicated.Structure, ratio, size etc. that this description institute accompanying drawings illustrates, content all only in order to coordinate description to disclose, understand for person skilled in the art scholar and read, and be not used to limit the enforceable qualifications of the present invention, therefore the not technical essential meaning of tool, the adjustment of the modification of any structure, the change of proportionate relationship or size, do not affecting under effect that the present invention can produce and the object that can reach, still all should drop on disclosed technology contents and obtain in the scope that can contain.Simultaneously, quote in this description as " on ", D score, "left", "right", " centre " and " one " etc. term, also only for ease of understanding of describing, and be not used to limit the enforceable scope of the present invention, the change of its relativeness or adjustment, under changing technology contents without essence, when being also considered as the enforceable category of the present invention.
Before the embodiment of the present invention is described in detail, first applied environment of the present invention is described.Existing boiler dusting recirculated water control system only designs for recycling after the dust waste water process of main deduster, assisted dust-collecting device operationally can only use the alternate sources such as well water for a long time, in order to reduce the water consumption of assisted dust-collecting device, can consider that main deduster wastewater reuse pipeline draws is connected on auxiliary furnace deduster, because by no water protector restriction, (whole system operation needs the no water protector be arranged on main deduster water pipe to collect water pipe hydraulic signal, and auxiliary furnace does not have no water protector, auxiliary furnace uses recirculated water, main deduster no water protector is needed to provide hydraulic signal, so only have recirculated water to enter main deduster simultaneously, main deduster no water protector is made to send hydraulic signal, a whole set of sewage disposal could run, assisted dust-collecting device could use recirculated water, only has shunting like this to meet no water protector, make discharge can not meet assisted dust-collecting water demand from face, only have and supplement with a part of well water the needs meeting assisted dust-collecting.
System cloud gray model restricts by no water protector, and use lime desulfurization bad environments, seriously corroded, fault rate is also high, as main recirculation water pump breaks down, the alternate sources such as well water just can only be used as boiler dusting water, and the water after causing process qualified is arranged outward.
Rule stream filler forbids lack of water to be run, as once lack of water, will cause Chimney crack, the rule stream filler of devulcanizer inside melts, the potential safety hazard such as cause the ventilation of boiler flue not smooth, impacts to the safety and economic operation of the life of worker and boiler.
Refer to Fig. 1-Fig. 3, the invention provides a kind of boiler dusting circulating treating system, comprise: main deduster 1 and assisted dust-collecting device 2, reaction tank 3, sedimentation basin 4, pump house collecting-tank 5, to cut off the water supply safety guard, the sewage draining exit of described main deduster and assisted dust-collecting device is communicated to the water inlet of reaction tank, the delivery port of described reaction tank is communicated to the water inlet of sedimentation basin, the delivery port of described sedimentation basin is communicated to pump house collecting-tank, the delivery port of described pump house collecting-tank is communicated to the water inlet of described main deduster by main backflow water pump, the delivery port of described pump house collecting-tank is communicated to the water inlet of described assisted dust-collecting device by auxiliary reflux water pump, the water inlet of described main deduster is provided with no water protector 6, described safety guard of cutting off the water supply is for starting separately arbitrary main backflow water pump and/or auxiliary reflux water pump.In the present embodiment, assisted dust-collecting device 2 is No. three dedusters 103.
Described main deduster comprises a deduster 101, No. two dedusters 102.10 is chimney.
Described safety guard of cutting off the water supply comprises three two two and logical turns round sub-change-over switch SA, starts knob SB 1, stop knob SB 2auxiliary reclay KA; zero line binding post com, turns round described in the inlet wire of described no water protector and outlet are connected on respectively on sub-change-over switch, PLC gets 12 volts of power supplys through described turn round sub-change-over switch SA after receive startup power supply as auxiliary reflux water pump on auxiliary reflux starting mode of pump button.
As shown in Figure 2, operation principle is: logical turn round sub-switch S A for two three two, PLC gets 12 volts of power supplys, get to manually when turning round sub-switch, short circuit no water protector, simultaneously to system supplymentary backflow water pump 12 volts of startup power supplies, after system cloud gray model, 3 backflow water pumps can start arbitrary separately, also can start two or three backflow water pumps simultaneously; Get to automatically, switch series is connected on no water protector loop, disconnects 12 volts of startup power supplies of auxiliary reflux water pump simultaneously.
Described safety guard of cutting off the water supply comprises electrode points Pressure gauge P, auxiliary reclay KA, magnetic valve 13; audible-visual annunciator 12, time-delay relay KT, be connected to 220V both ends of power through described electrode points Pressure gauge P after described time-delay relay KT, auxiliary reclay KA, magnetic valve 13, audible-visual annunciator parallel connection.
In Fig. 3, L is 220 volts of power supply terminals, and N is zero terminal, and P is electrode points Pressure gauge, and KA is auxiliary reclay, and KT is time delays relay, and KT1 is time delay normally opened contact, and KA1 is auxiliary reclay normally opened contact, and KA2 is auxiliary reclay normally opened contact.
Circuit connecting mode is: get 220 power supplys, and enter electrode points Pressure gauge normally opened contact respectively, normally opened contact out meets time delays relay K T, enters time-delay relay normally opened contact simultaneously, and normally opened contact out enters audible-visual annunciator and magnetic valve.
Operation principle is: when reflux water pump have fault not operate, pump or the fault stop jumping of fanning the air time, hydraulic pressure is not had in pipe, electrode points connects normally-closed contact, after time delays relay K T obtains electric time delay 30 seconds (waiting for that inner pipe water pressure is stablized, false alarm during imitative starting of pump station), normally opened contact closes, auxiliary reclay KA obtains electric adhesive, starts water control system magnetic valve 13 for subsequent use, supplies water to boiler dust remover, audible-visual annunciator sends sound and light alarm signal simultaneously, reminds operating personnel's equipment to break down.
Described audible-visual annunciator is arranged on operating room 11, and described magnetic valve is arranged on water pipe 9 for subsequent use, and described electrode points Pressure gauge P is arranged on backflow water pump junction house steward.
Described sedimentation basin comprises first stage precipitation tank 41 and second-level settling pond 42, and the delivery port of described first stage precipitation tank is communicated to the water inlet of second-level settling pond, and the delivery port of described second-level settling pond is communicated to described pump house collecting-tank.
Described each deduster passes through cross current for subsequent use to alternate source.Alternate source in case of emergency can be used as well water etc.
Lime conveyer and mixer is had in described reaction tank.Lime conveyer is provided with lime silo 7, hopper 8.
As mentioned above, safety guard of cutting off the water supply of the present invention makes all backflow water pumps can start arbitrary separately, also can start two or multiple stage simultaneously, and whole system runs and do not limit by no water protector; When reflux water pump have fault not operate, pump or the fault stop jumping of fanning the air time; start magnetic valve; supply water to boiler dust remover; send sound and light alarm simultaneously; remind operating personnel equipment to break down, water for subsequent use is controlled, when water circulating pump fans the air pump or fault stop jumping; water for subsequent use is opened automatically, meets the safety and economic operation of boiler dusting water and protection boiler.
Above-described embodiment is illustrative principle of the present invention and effect thereof only, but not for limiting the present invention.Any person skilled in the art scholar all without prejudice under spirit of the present invention and category, can modify above-described embodiment or changes.Therefore, such as have in art usually know the knowledgeable do not depart from complete under disclosed spirit and technological thought all equivalence modify or change, must be contained by claim of the present invention.

Claims (8)

1. a boiler dusting circulating treating system, it is characterized in that, comprise: main deduster and assisted dust-collecting device, reaction tank, sedimentation basin, pump house collecting-tank, to cut off the water supply safety guard, the sewage draining exit of described main deduster and assisted dust-collecting device is communicated to the water inlet of reaction tank, the delivery port of described reaction tank is communicated to the water inlet of sedimentation basin, the delivery port of described sedimentation basin is communicated to pump house collecting-tank, the delivery port of described pump house collecting-tank is communicated to the water inlet of described main deduster by main backflow water pump, the delivery port of described pump house collecting-tank is communicated to the water inlet of described assisted dust-collecting device by auxiliary reflux water pump, the water inlet of described main deduster is provided with no water protector, described safety guard of cutting off the water supply is for starting separately arbitrary main backflow water pump and/or auxiliary reflux water pump.
2. boiler dusting circulating treating system according to claim 1; it is characterized in that: described in safety guard of cutting off the water supply comprise three two two and logical turn round sub-change-over switch SA; start knob SB1; stop knob SB2; auxiliary reclay KA; zero line binding post com; turn round on sub-change-over switch SA described in the inlet wire of described no water protector and outlet are connected on respectively, PLC gets 12 volts of power supplys through described turn round sub-change-over switch SA after receive startup power supply as auxiliary reflux water pump on auxiliary reflux starting mode of pump button.
3. boiler dusting circulating treating system according to claim 2; it is characterized in that: described in safety guard of cutting off the water supply comprise electrode points Pressure gauge P, auxiliary reclay KA, magnetic valve; audible-visual annunciator, time-delay relay KT, be connected to 220V both ends of power through described electrode points Pressure gauge P after described time-delay relay KT, auxiliary reclay KA, magnetic valve, audible-visual annunciator parallel connection.
4. boiler dusting circulating treating system according to claim 3, is characterized in that: described audible-visual annunciator is arranged on operating room, described magnetic valve is arranged on water pipe for subsequent use, and described electrode points Pressure gauge P is arranged on backflow water pump junction house steward.
5. boiler dusting circulating treating system according to claim 1, is characterized in that: described main deduster comprises a deduster, No. two dedusters.
6. boiler dusting circulating treating system according to claim 1, it is characterized in that: described sedimentation basin comprises first stage precipitation tank and second-level settling pond, the delivery port of described first stage precipitation tank is communicated to the water inlet of second-level settling pond, and the delivery port of described second-level settling pond is communicated to described pump house collecting-tank.
7. boiler dusting circulating treating system according to claim 1, is characterized in that: described each deduster passes through cross current for subsequent use to alternate source.
8. boiler dusting circulating treating system according to claim 1, is characterized in that: have lime conveyer and mixer in described reaction tank.
CN201310680910.4A 2013-12-13 2013-12-13 Boiler dust removal circular processing system Active CN104713112B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310680910.4A CN104713112B (en) 2013-12-13 2013-12-13 Boiler dust removal circular processing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310680910.4A CN104713112B (en) 2013-12-13 2013-12-13 Boiler dust removal circular processing system

Publications (2)

Publication Number Publication Date
CN104713112A true CN104713112A (en) 2015-06-17
CN104713112B CN104713112B (en) 2017-01-18

Family

ID=53412671

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310680910.4A Active CN104713112B (en) 2013-12-13 2013-12-13 Boiler dust removal circular processing system

Country Status (1)

Country Link
CN (1) CN104713112B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2363775Y (en) * 1998-08-14 2000-02-16 徐东升 Compound multipipe water-film desulfurizing deduster
CN2605917Y (en) * 2003-03-19 2004-03-10 龙际银 Dustproof environmental protection system
CN101017019A (en) * 2006-02-11 2007-08-15 德州亚太集团有限公司 Water-break protection device of air-conditioning unit using water as heat transfer medium
CN201404847Y (en) * 2009-05-25 2010-02-17 株洲硬质合金集团有限公司 Water-interruption protector of wet grinding machine
US20110089583A1 (en) * 2008-06-09 2011-04-21 Jae Ouk Jung Dust removing and cooling apparatus
CN202648456U (en) * 2012-06-21 2013-01-02 安徽红星阀门有限公司 Automatic water cutoff protection system of electric induction furnace
CN103432888A (en) * 2013-09-05 2013-12-11 申安云 Flue gas denitration, desulfuration and dedusting integrated equipment of industrial boiler
CN203577530U (en) * 2013-10-18 2014-05-07 合肥市田源精铸有限公司 Water inlet mechanism of boiler dust removal system
KR101446584B1 (en) * 2011-01-17 2014-10-02 (주)부경에너지텍 Carbon dioxide collection and carbon dioxide response removal device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2363775Y (en) * 1998-08-14 2000-02-16 徐东升 Compound multipipe water-film desulfurizing deduster
CN2605917Y (en) * 2003-03-19 2004-03-10 龙际银 Dustproof environmental protection system
CN101017019A (en) * 2006-02-11 2007-08-15 德州亚太集团有限公司 Water-break protection device of air-conditioning unit using water as heat transfer medium
US20110089583A1 (en) * 2008-06-09 2011-04-21 Jae Ouk Jung Dust removing and cooling apparatus
CN201404847Y (en) * 2009-05-25 2010-02-17 株洲硬质合金集团有限公司 Water-interruption protector of wet grinding machine
KR101446584B1 (en) * 2011-01-17 2014-10-02 (주)부경에너지텍 Carbon dioxide collection and carbon dioxide response removal device
CN202648456U (en) * 2012-06-21 2013-01-02 安徽红星阀门有限公司 Automatic water cutoff protection system of electric induction furnace
CN103432888A (en) * 2013-09-05 2013-12-11 申安云 Flue gas denitration, desulfuration and dedusting integrated equipment of industrial boiler
CN203577530U (en) * 2013-10-18 2014-05-07 合肥市田源精铸有限公司 Water inlet mechanism of boiler dust removal system

Also Published As

Publication number Publication date
CN104713112B (en) 2017-01-18

Similar Documents

Publication Publication Date Title
CN104392585B (en) A kind of combustion gas interlink alarm system and method thereof
CN203265224U (en) Exhaust gas conveying pipe for environmental protection equipment
CN106247536A (en) A kind of air cleaner and the monitoring method in filter screen life-span thereof
CN104713112A (en) Boiler dust removal circular processing system
CN204147706U (en) Dying setting machine waste gas two-stage spray high-voltage electrostatic treating device
CN203017969U (en) Intelligent flue gas desulphurization and purification control system
CN205252754U (en) Air purifier
CN203430555U (en) Down-hole draw shaft automatic dust clearing system
CN203155079U (en) Absorption tower gypsum slurry discharging system of wet flue gas desulfurization system
CN203140375U (en) High-strength turbulent flow cleaning device
CN203990707U (en) Experimental operation table air cleaning system
CN204644305U (en) A kind of protector preventing producer gas generator stokehold feed bin coal gas and dust leakage
CN103683891A (en) Frequency converter control circuit and method and speed control system
CN210102754U (en) Safety monitoring system in transfer station
CN207363695U (en) Water curtain generation equipment start-stop device, water curtain generation equipment
CN204122254U (en) The electrostatic precipitation cinerary device improved
CN205002200U (en) High -efficiency lampblack purifier
CN220968688U (en) Safe and environment-friendly polycarboxylate water reducer production waste gas treatment device
CN208887386U (en) A kind of water-cooling system automatically switches and automatic water-replenishing device
CN204710832U (en) A kind of flyash gathering-device
CN203727957U (en) Automatic cleaning device of measuring hopper
CN219024615U (en) Lampblack purifying device additionally provided with spraying function
CN103939926B (en) A kind of sleeve kiln waste gas flue ash discharge control method
CN213221614U (en) Power plant seawater desulfurization system
CN203717018U (en) Belt coal flow automatic spray and dust suppression control device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant