CN104712855A - Grouting mixed cement slurry and pipe structure - Google Patents
Grouting mixed cement slurry and pipe structure Download PDFInfo
- Publication number
- CN104712855A CN104712855A CN201310671084.7A CN201310671084A CN104712855A CN 104712855 A CN104712855 A CN 104712855A CN 201310671084 A CN201310671084 A CN 201310671084A CN 104712855 A CN104712855 A CN 104712855A
- Authority
- CN
- China
- Prior art keywords
- cement slurry
- parts
- core pipe
- grouting
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L9/00—Rigid pipes
- F16L9/14—Compound tubes, i.e. made of materials not wholly covered by any one of the preceding groups
- F16L9/153—Compound tubes, i.e. made of materials not wholly covered by any one of the preceding groups comprising only layers of metal and concrete with or without reinforcement
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B28/00—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
- C04B28/02—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
- C04B28/04—Portland cements
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Inorganic Chemistry (AREA)
- Materials Engineering (AREA)
- Structural Engineering (AREA)
- Organic Chemistry (AREA)
- Curing Cements, Concrete, And Artificial Stone (AREA)
Abstract
The invention discloses grouting mixed cement slurry and a pipe structure. The grouting mixed cement slurry comprises the following components in parts by weight: 700 parts of water, 150 parts of bentonite, 75 parts of 425# general silicate cement, 74 parts of talcum powder, 0.5 part of polyacrylamide additive and 0.5 part of carboxymethylcellulose additive. The pipe structure comprises a PE core pipe, an outer pipe sleeve and a cement slurry filling layer, wherein the PE core pipe is inserted in the outer pipe sleeve; and the grouting mixed cement slurry according to claim 1 is cast in the cement slurry filling layer formed between the PE core pipe and the outer pipe sleeve. The grouting mixed cement slurry and the pipe structure can preferably satisfy the mounting, use and maintenance requirements of the PE core pipe. The mixed cement slurry is high in fluidity, and is convenient to be installed; and a cured coagulation adopts a crisp block structure, and has the advantages of proper hardness, good fixing effect, capability of easy stripping and convenience for use and maintenance.
Description
Technical field
The present invention relates to the technical field of injecting paste material and pipeline configuration, particularly relate to a kind of grouting blended cement slurries and pipeline configuration.
Background technique
Existing PE(polyethylene) insert in sleeve pipe in core pipe, between sleeve pipe and PE core pipe, adopt cement grout to fill, the coagulative hardness level of cement grout can cause larger impact to the mounting, commissioning and maintenance of PE core pipe.Cement grout is coagulative too hard, and PE core pipe is easily aging, and later period maintenance construction inconvenience.Cement grout is coagulative too soft, and the fixed effect of PE core pipe in sleeve pipe is poor.
Therefore, the applicant is devoted to develop a kind of grouting blended cement slurries and pipeline configuration, meets PE installation of core pipe, operation and maintenance demand preferably.
Summary of the invention
Because the above-mentioned deficiency of prior art, the present invention proposes a kind ofly to meet PE installation of core pipe, the grouting blended cement slurries of operation and maintenance demand and pipeline configuration preferably.
For achieving the above object, the present invention proposes a kind of grouting blended cement slurries, comprise following component, each component by weight: 700 parts, water, bentonite clay 150 parts, No. 425 ordinary Portland cements 75 parts, French chalk 74 parts, polyacrylamide additive 0.5 part and carboxymethyl cellulose additive 0.5 part.
The invention allows for a kind of pipeline configuration, comprise PE core pipe, outer tube sleeve and cement slurry packed layer, described PE core pipe is plugged in outer tube sleeve, adopts above-mentioned grouting blended cement slurries to be filled between described PE core pipe and described outer tube sleeve and forms described cement slurry packed layer.
Further, described outer tube sleeve is cast iron pipe box.
Grouting blended cement slurries of the present invention and pipeline configuration, can meet PE installation of core pipe, operation and maintenance demand preferably.The pH value of blended cement slurries is about 8-9, the slurries presetting time is 4-5 hour, good fluidity, be convenient to install, the coagulant after solidification is crisp block structure, and hardness is moderate, good fixing effect, can peel off easily again, easy to use and maintenance, use is filled in the slip casting being used as packed layer when the very applicable PE of being applied in core pipe is plugged in outer tube sleeve.
Be described further below with reference to the technique effect of accompanying drawing to design of the present invention, concrete structure and generation, to understand object of the present invention, characteristic sum effect fully.
Accompanying drawing explanation
Fig. 1 is the structural representation of embodiment two pipeline configuration.
Embodiment
Embodiment one:
The present embodiment proposes a kind of grouting blended cement slurries, comprise following component, each component by weight: 700 parts, water, bentonite clay 150 parts, No. 425 ordinary Portland cements 75 parts, French chalk 74 parts, polyacrylamide additive 0.5 part and carboxymethyl cellulose additive 0.5 part.
Exemplary, 700 kilograms, water, bentonite clay 150 kilograms, No. 425 ordinary Portland cements 75 kilograms, French chalk 74 kilograms, polyacrylamide additive 0.5 kilogram and carboxymethyl cellulose additive 0.5 kilogram can be adopted to carry out the blended cement slurries of proportioning mixed configuration one ton, this slurries presetting time is 4-5 hour, good fluidity, very easy to use, and these blended cement slurries condensation after coagulant hardness moderate, in crisp block structure, namely fixing needs are met, be convenient to again later stage stripping needs, be especially suitable as pipeline and fill.
Of course, in other specific embodiments, according to the blended cement slurries of the required weight of above-mentioned weight configuration, can also repeat no more herein.
Embodiment two:
Fig. 1 is the structural representation of embodiment two pipeline configuration.As shown in Figure 1, the present embodiment also proposed a kind of pipeline configuration, comprise PE core pipe 100, outer tube sleeve 200 and cement slurry packed layer 300, PE core pipe 100 is plugged in outer tube sleeve 200, adopts grouting blended cement slurries described in embodiment one to be filled between PE core pipe 100 and outer tube sleeve 200 and forms described cement slurry packed layer 300.Exemplary, outer tube sleeve 200 adopts cast iron pipe box.
Adopt grouting blended cement slurries and the pipeline configuration of the present embodiment, PE installation of core pipe, operation and maintenance demand can be met preferably.The pH value of blended cement slurries is about 8-9, the slurries presetting time is 4-5 hour, good fluidity, be convenient to install, the coagulant after solidification is crisp block structure, and hardness is moderate, good fixing effect, can peel off easily again, easy to use and maintenance, use is filled in the slip casting being used as packed layer when the very applicable PE of being applied in core pipe is plugged in outer tube sleeve.
More than describe preferred embodiment of the present invention in detail.Should be appreciated that those of ordinary skill in the art just design according to the present invention can make many modifications and variations without the need to creative work.Therefore, all technician in the art, all should by the determined protection domain of claims under this invention's idea on the basis of existing technology by the available technological scheme of logical analysis, reasoning, or a limited experiment.
Claims (3)
1. grouting blended cement slurries, it is characterized in that: comprise following component, each component by weight: 700 parts, water, bentonite clay 150 parts, No. 425 ordinary Portland cements 75 parts, French chalk 74 parts, polyacrylamide additive 0.5 part and carboxymethyl cellulose additive 0.5 part.
2. a pipeline configuration, it is characterized in that: comprise PE core pipe, outer tube sleeve and cement slurry packed layer, described PE core pipe is plugged in outer tube sleeve, adopts grouting blended cement slurries according to claim 1 to be filled between described PE core pipe and described outer tube sleeve and forms described cement slurry packed layer.
3. pipeline configuration as claimed in claim 2, is characterized in that: described outer tube sleeve is cast iron pipe box.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310671084.7A CN104712855A (en) | 2013-12-11 | 2013-12-11 | Grouting mixed cement slurry and pipe structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310671084.7A CN104712855A (en) | 2013-12-11 | 2013-12-11 | Grouting mixed cement slurry and pipe structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104712855A true CN104712855A (en) | 2015-06-17 |
Family
ID=53412437
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310671084.7A Pending CN104712855A (en) | 2013-12-11 | 2013-12-11 | Grouting mixed cement slurry and pipe structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104712855A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111004003A (en) * | 2019-11-22 | 2020-04-14 | 安徽春雨安全科技有限公司 | High-rate quick-setting type mining hole sealing material and using method thereof |
CN112097013A (en) * | 2020-09-01 | 2020-12-18 | 青岛远通达中通能源集团有限公司 | Direct-buried heat-insulating pipe and preparation method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1587775A (en) * | 2004-08-18 | 2005-03-02 | 武汉大学 | Steel skeleton composite pipe |
CN101182139A (en) * | 2007-11-12 | 2008-05-21 | 华南理工大学 | Masonry cement having higher strength and water retention |
CN101260303A (en) * | 2008-04-16 | 2008-09-10 | 上海市第二市政工程有限公司 | Macromolecular mud and configuration system thereof |
CN201121780Y (en) * | 2007-12-06 | 2008-09-24 | 合肥工业大学 | Steel pipe-FRP pipe internally filled concrete composite structure |
CN101269938A (en) * | 2008-04-29 | 2008-09-24 | 武汉理工大学 | Tunnel backing cloth slip casting material capable of preventing duct piece float upward and preparation method thereof |
CN101440272A (en) * | 2007-11-22 | 2009-05-27 | 中国神华能源股份有限公司 | Leaking stoppage material of coal car and preparation thereof |
CN202074142U (en) * | 2011-05-30 | 2011-12-14 | 福建振云塑业股份有限公司 | Large-caliber plastic-concrete composite pipe material for ground buried water discharge and pollution discharge |
-
2013
- 2013-12-11 CN CN201310671084.7A patent/CN104712855A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1587775A (en) * | 2004-08-18 | 2005-03-02 | 武汉大学 | Steel skeleton composite pipe |
CN101182139A (en) * | 2007-11-12 | 2008-05-21 | 华南理工大学 | Masonry cement having higher strength and water retention |
CN101440272A (en) * | 2007-11-22 | 2009-05-27 | 中国神华能源股份有限公司 | Leaking stoppage material of coal car and preparation thereof |
CN201121780Y (en) * | 2007-12-06 | 2008-09-24 | 合肥工业大学 | Steel pipe-FRP pipe internally filled concrete composite structure |
CN101260303A (en) * | 2008-04-16 | 2008-09-10 | 上海市第二市政工程有限公司 | Macromolecular mud and configuration system thereof |
CN101269938A (en) * | 2008-04-29 | 2008-09-24 | 武汉理工大学 | Tunnel backing cloth slip casting material capable of preventing duct piece float upward and preparation method thereof |
CN202074142U (en) * | 2011-05-30 | 2011-12-14 | 福建振云塑业股份有限公司 | Large-caliber plastic-concrete composite pipe material for ground buried water discharge and pollution discharge |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111004003A (en) * | 2019-11-22 | 2020-04-14 | 安徽春雨安全科技有限公司 | High-rate quick-setting type mining hole sealing material and using method thereof |
CN112097013A (en) * | 2020-09-01 | 2020-12-18 | 青岛远通达中通能源集团有限公司 | Direct-buried heat-insulating pipe and preparation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107859053A (en) | A kind of detachable compressor grouting formula | |
CN101161983B (en) | Method for improving cementing plugging effect | |
WO2008048717A3 (en) | Method of manufacture and installation of flowable thermal backfills | |
CN103803910A (en) | Gap filler | |
CN104712855A (en) | Grouting mixed cement slurry and pipe structure | |
AU7658298A (en) | Method and grouting composition for filling cracks in stone and concrete constructions | |
CN103803895A (en) | Gap filler | |
CN204551547U (en) | Outer wall of basement vertical ater-casting plugging device | |
CN204174786U (en) | Height-adjustable precast and assembled reinforced concrete shear wall slab | |
CN107235688A (en) | A kind of GIL pipe galleries behind waterproof grout material and its grouting method | |
CN103803911A (en) | Gap filler | |
CN104911999A (en) | Construction method for deeply burying anchor | |
CN204533836U (en) | Pipeline through-flooring leakage-resistant device | |
CN102182481B (en) | Anchor rope grouting-stop plug | |
CN204083520U (en) | Pipeline runs through concrete floor waterproof construction | |
CN204357460U (en) | A kind of hollow slip casting is without vertical rib resin anchor | |
CN208056648U (en) | A kind of grout sleeve device | |
CN204357464U (en) | A kind of hollow grouting anchor | |
CN101503944A (en) | Cementing method for gas storage well casing tube | |
CN101672181A (en) | Controllable cement backfilling grouting method | |
CN204402526U (en) | A kind of recoverable anchor pole | |
CN103195062B (en) | The method of pile grouting | |
CN202039360U (en) | Grout-stopping plug for anchorage cables | |
CN103486338B (en) | Pillar waterproof blocking device worn by a kind of cable | |
CN205863837U (en) | A kind of dark wire terminal box |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150617 |