CN104697504B - Method and device for observing layered settlement of high fill earth - Google Patents

Method and device for observing layered settlement of high fill earth Download PDF

Info

Publication number
CN104697504B
CN104697504B CN201510120150.0A CN201510120150A CN104697504B CN 104697504 B CN104697504 B CN 104697504B CN 201510120150 A CN201510120150 A CN 201510120150A CN 104697504 B CN104697504 B CN 104697504B
Authority
CN
China
Prior art keywords
reinforcing bar
steel pipe
backfill
cross
steel frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510120150.0A
Other languages
Chinese (zh)
Other versions
CN104697504A (en
Inventor
李昌成
孙萍
田炜
高翔
刘晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chang Lu Construction Work Group Co Ltd
Original Assignee
Chang Lu Construction Work Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chang Lu Construction Work Group Co Ltd filed Critical Chang Lu Construction Work Group Co Ltd
Priority to CN201510120150.0A priority Critical patent/CN104697504B/en
Publication of CN104697504A publication Critical patent/CN104697504A/en
Application granted granted Critical
Publication of CN104697504B publication Critical patent/CN104697504B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C5/00Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Road Repair (AREA)

Abstract

The invention specifically provides a method and a device for observing layered settlement of high fill earth, and aims at solving the problem that the height settlement data of the existing high fill earth cannot be observed and so that the potential risk cannot be early found out. The method comprises the steps of a, fixing a cross channel steel frame of which the center is fixed with a reinforcing steel bar body, observing the number and record; b, backfilling and rolling by layers, and recording the settlement value; c, continuously connecting when the backfilled earth reaches the top end of the reinforcing steel bar body; d, arranging the cross channel steel frame I when backfilling to reach the height of a second observing point, wherein a steel pipe body is fixed in the center of the cross channel steel frame I; recording the observing number; e, continuously backfilling rolling by layering, and recording the settlement value of each observing point; f, continuously connecting the steel pipe body when the backfilled earth reaches the top end of the steel pipe body; g, repeating steps from d to f when the earth is backfilled to reach the height of a third observing point until the backfilling and rolling are done. With the adoption of the method and the device, the layered observing of a plurality of observing points in vertical direction during backfilling can be achieved.

Description

High roadbed soil body layered settlement observation method and device
Technical field
The present invention relates to construction settlement observation technology, specially a kind of high roadbed soil body layered settlement observation method and Device.
Background technology
Architectural engineering high roadbed place would generally occur larger sedimentation, and generally existing infall process is longer and uneven The problems such as sedimentation, the safety and stability of various engineering structures is affected larger, therefore, sedimentation to engineering structure foundation soil body, especially It is that delaminating deposition feature is monitored having very important significance.
The method monitoring foundation soil body delaminating deposition at present, is after the completion of the backfill of high roadbed place, at the shallower place of ground Setting observation station, is only capable of observing the settling data on backfill groundwork top the settlement number it is impossible to height each in backfilling process According to being observed, and then the compaction rate of the high roadbed soil body cannot be ensured, stability is poor, there is potential safety hazard.
Content of the invention
The present invention cannot be observed to its each height settling data leading to presence to solve the existing high roadbed soil body A kind of problem that potential safety hazard can not find in advance, there is provided high roadbed soil body layered settlement observation method and device.
The present invention adopts the following technical scheme that realization: high roadbed soil body layered settlement observation method, is walked using following Rapid: when first step observation station being installed at a, the initial absolute altitude of backfill, interim fixed cross U-steel frame, the center of cross U-steel frame is fixed There is the reinforcing bar body of vertical placement, with reference to chi observed reading and recorded with the external world by reinforcing bar body top;B, it is layered back Fill out and roll, often backfill one layer, all observed by reinforcing bar bodies top, the settling amount of record first step observation station;C, work as backfill Floor height close to reinforcing bar body top when, in piece reinforcing bar body of reinforcing bar body top continued access, make the reinforcing bar body top at top It is always positioned above back fill course;When d, backfill reach the height that need to install second step observation station, placement cross U-steel frame i, ten The center of word U-steel frame i is fixed with the steel pipe body being enclosed within reinforcing bar body, the observed reading on record steel pipe body top;E, continue Continuous back-filling in layers rolls, and is observed by the steel pipe body top at reinforcing bar body top and top, records each observation station Settling amount;F, when the floor height of backfill is close to steel pipe body top, in piece steel pipe body of steel pipe body top continued access, make top The steel pipe body top in portion is always positioned above back fill course;When g, backfill reach the height that need to install the 3rd step observation station, press Step d-f repeatable operation rolls and completes to backfill, in backfilling process, the reinforcing bar body top at top and the steel pipe of its outside top Body top is in step condition all the time.
During operation, determine the number of settlement observation point according to the area of plane of embankment, determine that sedimentation is seen according to backfill thickness The step number of measuring point, can obtain the data of backfilling process and layered settlement observation using the method, and can also continue in the completed Tracking observation.
High roadbed soil body layered settlement observation method device, including the cross channel-section steel being arranged at the initial absolute altitude of backfill Frame, the center of cross U-steel frame is fixed with the reinforcing bar being vertically formed by connecting by some reinforcing bar bodies, is provided with some outside reinforcing bar The steel pipe of mutual socket, and every steel pipe is all vertically to be formed by connecting by some steel pipe bodies, steel pipe bottom from inside to outside according to Secondary be fixed with the cross U-steel frame i arranging from down to up, and all cross U-steel frame i are respectively positioned on above cross U-steel frame.
The process step of the invention rationally reliable it is achieved that in backfilling process vertical multiple observation stations observation, and And tracking observation can be continued in the completed, it is effectively guaranteed the stability of the high roadbed soil body, prevented potential safety hazard, simultaneously There is process is simple, easy to operate and low cost.
Brief description
Fig. 1 is the structural representation of the present invention.
In figure: 1- cross U-steel frame, 2- reinforcing bar body, 3- steel pipe body, 4- cross U-steel frame i, 5- straight screw sleeve.
Specific embodiment
High roadbed soil body layered settlement observation method, using following steps: install the first step at a, the initial absolute altitude of backfill and see During measuring point, interim fixed cross U-steel frame 1, the center of cross U-steel frame 1 is fixed with the reinforcing bar body 2 of vertical placement, by steel Muscle body 2 top and is recorded with reference to chi observed reading with the external world;B, carry out back-filling in layers and roll, often backfill one layer, all by steel Muscle body 2 top is observed, the settling amount of record first step observation station;C, when the floor height of backfill is close to reinforcing bar body 2 top, In reinforcing bar body piece reinforcing bar body 2 of 2 top continued access, reinforcing bar body 2 top at top is made to be always positioned above back fill course;d、 When backfill reaches the height that need to install second step observation station, place cross U-steel frame i4, the center of cross U-steel frame i4 is fixed with It is enclosed within the steel pipe body 3 on reinforcing bar body 2, the observed reading on record steel pipe body 3 top;E, continuation back-filling in layers roll, and lead to Cross reinforcing bar body 2 top and steel pipe body 3 top at top to be observed, record the settling amount of each observation station;F, work as backfill Soil floor height close to steel pipe body 3 top when, in steel pipe body piece steel pipe body 3 of 3 top continued access, make the steel pipe body at top 3 tops are always positioned above back fill course;When g, backfill reach the height that need to install the 3rd step observation station, by step d-f repeatedly Operate to roll to backfill and complete, in backfilling process, reinforcing bar body 2 top at top and steel pipe body 3 top of its outside top All the time it is in step condition.
High roadbed soil body layered settlement observation method device, including the cross U-steel frame being arranged at the initial absolute altitude of backfill 1, the center of cross U-steel frame 1 is fixed with the reinforcing bar being vertically formed by connecting by some reinforcing bar bodies 2, is provided with some outside reinforcing bar The steel pipe of mutual socket, and every steel pipe is all vertically to be formed by connecting by some steel pipe bodies 3, steel pipe bottom from inside to outside according to Secondary be fixed with the cross U-steel frame i4 arranging from down to up, and all cross U-steel frame i4 are respectively positioned on above cross U-steel frame 1.
In specific implementation process, the top that should keep top rebars body 2 during backfill is higher than backfill face more than 300mm, with Convenient connection;The discrepancy in elevation of adjacent two step observation stations should be greater than 200mm;When all observation station installations, when reaching designed elevation, For convenience of protecting and observing, the reinforcing bar body 2 at top need to be adjusted to 100mm with the steel pipe body 3 top discrepancy in elevation;Adjacent reinforcing bar is originally Connected by straight screw sleeve 5 between body 2.

Claims (2)

1. a kind of high roadbed soil body layered settlement observation method it is characterised in that: adopt at following steps: a, the initial absolute altitude of backfill When first step observation station is installed, interim fixed cross U-steel frame (1), the center of cross U-steel frame (1) is fixed with vertical placement Reinforcing bar body (2), with reference to chi observed reading and is recorded with the external world by reinforcing bar body (2) top;B, carry out back-filling in layers and roll, Often backfill one layer, all observed by reinforcing bar body (2) top, the settling amount of record first step observation station;C, when the layer of backfill High close to reinforcing bar body (2) top when, in piece reinforcing bar body (2) of reinforcing bar body (2) top continued access, make the reinforcing bar body at top (2) top is always positioned above back fill course;When d, backfill reach the height that need to install second step observation station, place cross channel-section steel Frame i(4), cross U-steel frame i(4) center be fixed with the steel pipe body (3) being enclosed within reinforcing bar body (2), record steel pipe body (3) observed reading on top;E, continuation back-filling in layers roll, by steel pipe body (3) top at reinforcing bar body (2) top and top End is observed, and records the settling amount of each observation station;F, when the floor height of backfill is close to steel pipe body (3) top, in steel Piece steel pipe body (3) of tube body (3) top continued access, makes steel pipe body (3) top at top be always positioned above back fill course; When g, backfill reach the height that need to install the 3rd step observation station, roll to backfill by step d-f repeatable operation and complete, backfilling process In, reinforcing bar body (2) top at top and steel pipe body (3) top of its outside top are in step condition all the time.
2. the high roadbed soil body layered settlement observation method device described in a kind of claim 1 it is characterised in that: include setting Cross U-steel frame (1) at the initial absolute altitude of backfill, the center of cross U-steel frame (1) is fixed with is erected by some reinforcing bar bodies (2) To the reinforcing bar being formed by connecting, outside reinforcing bar, it is provided with the steel pipe of some mutual sockets, and every steel pipe is all by some steel pipes originally Body (3) is vertically formed by connecting, and steel pipe bottom from inside to outside is fixed with the cross U-steel frame i(4 arranging from down to up successively), and All cross U-steel frame i(4) it is respectively positioned on above cross U-steel frame (1).
CN201510120150.0A 2015-03-19 2015-03-19 Method and device for observing layered settlement of high fill earth Active CN104697504B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510120150.0A CN104697504B (en) 2015-03-19 2015-03-19 Method and device for observing layered settlement of high fill earth

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510120150.0A CN104697504B (en) 2015-03-19 2015-03-19 Method and device for observing layered settlement of high fill earth

Publications (2)

Publication Number Publication Date
CN104697504A CN104697504A (en) 2015-06-10
CN104697504B true CN104697504B (en) 2017-02-01

Family

ID=53344875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510120150.0A Active CN104697504B (en) 2015-03-19 2015-03-19 Method and device for observing layered settlement of high fill earth

Country Status (1)

Country Link
CN (1) CN104697504B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105424910B (en) * 2015-12-11 2017-05-03 天津城建大学 Device for measuring layered settlement of soil mass
CN108225261B (en) * 2017-12-13 2020-04-21 山东大学 Pile top and pile end settlement simultaneous observation device and method for pile foundation model test
CN109579658B (en) * 2019-01-25 2024-05-24 国网安徽省电力有限公司建设分公司 Device and method for monitoring layered settlement of high-fill soil body
CN110029648A (en) * 2019-03-26 2019-07-19 昆明理工大学 A kind of deep settlement measurement device and application method for deep Backfill Foundation
CN110595414A (en) * 2019-09-27 2019-12-20 徐州中国矿大岩土工程新技术发展有限公司 Rock-soil body layered monitoring mark and construction method
CN112556640A (en) * 2020-11-27 2021-03-26 杨锡武 Testing arrangement that high fill road bed or earth and rockfill dam layered settlement
CN114134763A (en) * 2021-11-30 2022-03-04 中铁第四勘察设计院集团有限公司 Short-circuit foundation structure of embankment and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0344412A1 (en) * 1988-05-28 1989-12-06 Schmidt, Paul Process and device for the continuous measuring of the relative height of a long object driven into the earth
CN1570291A (en) * 2004-04-23 2005-01-26 贵阳铝镁设计研究院 Method for making foundation piles in high embankment region
CN1673694A (en) * 2005-04-25 2005-09-28 湖南大学 Earthwork filling body settlement observation instrument
CN202403703U (en) * 2012-01-10 2012-08-29 中国建筑第八工程局有限公司 Settlement observation mark
CN202494442U (en) * 2012-03-27 2012-10-17 上海市电力公司 Stratum layering and settlement measuring device
CN103994753A (en) * 2014-06-13 2014-08-20 太原理工大学 Layered settlement device and layered settlement measuring method for loess filler high fill embankment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0344412A1 (en) * 1988-05-28 1989-12-06 Schmidt, Paul Process and device for the continuous measuring of the relative height of a long object driven into the earth
CN1570291A (en) * 2004-04-23 2005-01-26 贵阳铝镁设计研究院 Method for making foundation piles in high embankment region
CN1673694A (en) * 2005-04-25 2005-09-28 湖南大学 Earthwork filling body settlement observation instrument
CN202403703U (en) * 2012-01-10 2012-08-29 中国建筑第八工程局有限公司 Settlement observation mark
CN202494442U (en) * 2012-03-27 2012-10-17 上海市电力公司 Stratum layering and settlement measuring device
CN103994753A (en) * 2014-06-13 2014-08-20 太原理工大学 Layered settlement device and layered settlement measuring method for loess filler high fill embankment

Also Published As

Publication number Publication date
CN104697504A (en) 2015-06-10

Similar Documents

Publication Publication Date Title
CN104697504B (en) Method and device for observing layered settlement of high fill earth
CN202433536U (en) Physical model testing system for tunnel-penetrated ground crack zone
CN104963705B (en) A kind of underground space tunneling construction method
CN106066920A (en) The overlapping tunnel shield-tunneling construction numerical analysis method to underpining Influence of Pile Foundation up and down
CN204257101U (en) A kind of tunnel teaching experiment model
Yang et al. Research of jacking force of densely arranged pipe jacks process in pipe-roof pre-construction method
CN103115821B (en) The in-situ test system of lane side obturation load-carrying properties and method of testing thereof
CN113863330B (en) Ultra-deep foundation pit narrow fertilizer groove concrete backfill structure and construction method
CN113339064B (en) Multidimensional active control method for regulating and controlling tunnel vector deformation through flexible body expansion
CN103971585B (en) The simulating test device of gob-side entry retaining anchoring pack wall load-carrying properties and method of testing
CN101967832B (en) Method for treating bottom structure of building in substation
CN202814388U (en) Device for tunnel pipe shed support deformation testing
CN204439062U (en) High roadbed soil body layered settlement observation device
Ran et al. Long-term monitoring and safety evaluation of a metro station during deep excavation
CN209841546U (en) Pipe jacking experiment box
CN108930323B (en) Pipe jacking construction method
CN204401485U (en) The construction structure of high roadbed draining Steel Corrugated Pipe Culvert
CN110990929A (en) Simple calculation method for radial maximum displacement of diaphragm wall in excavation stage
CN109187203B (en) In-situ testing device and method for deep rock stress fidelity
CN115450267B (en) Relay installation and burying structure and method for earth-rock dam settling tube
Wang et al. Analysis of the influence of geometrical parameters of circular steel pipe with flange plate on the jacking force
CN204283440U (en) Shallow-depth-excavation tunnel supporting status monitoring structure
CN210919057U (en) Shield excavation and soil body settlement monitoring simulation test platform
CN110210145B (en) Single pile settlement calculation method for grouting filling pile after squeezing and expanding support plate
CN203720032U (en) Particle flow displacement regulation and uniform distribution load test device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant