CN104696658B - 无应力管廊系统 - Google Patents
无应力管廊系统 Download PDFInfo
- Publication number
- CN104696658B CN104696658B CN201510093975.8A CN201510093975A CN104696658B CN 104696658 B CN104696658 B CN 104696658B CN 201510093975 A CN201510093975 A CN 201510093975A CN 104696658 B CN104696658 B CN 104696658B
- Authority
- CN
- China
- Prior art keywords
- compensation mechanism
- mounting rack
- length
- pipeline
- mechanism mounting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L51/00—Expansion-compensation arrangements for pipe-lines
Abstract
一种无应力管廊系统,它由若干根安装在支架(2)上的管道(1)组成,支架(2)上安装的每根管道(1)均间隔设置有用于防止其热胀冷缩损坏的长度补偿机构(3),其特征是所述的长度补偿机构(3)由四个旋转补偿器(5)及连接管件(6)组成,所述的管道(1)均活动支承在固定于地面的支架(2)上以便于更换和维护,所述的长度补偿机构(3)至少沿管道长度方向定位在补偿机构安装架(4)上,即长度补偿机构(3)在补偿机构安装架(4)上不能沿管道长度方向移动,补偿机构安装架(4)固定安装在地面基础上。本发明运行过程中无应力产生,补偿距离长,结构简单,投资少,效率高。
Description
技术领域
本发明涉及石化管道安装技术,尤其是一种石化、油气输送管廊结构,具体地说是一种利用旋转补偿器作为补偿单元的、对管路系统仅存在重力载荷,无轴向载荷(管道长度方向推力)的无应力管廊系统。
背景技术
传统的管廊上管道布置方式有五种,如图1-6所示,它们均采用自然补偿,管道应力大,管廊结构复杂,用钢量大,造价高。
①补偿量小,每隔40~60m就需要设置一组;
②为了保证足够的补偿量,自然补偿的臂长需要很长,导致土建占地面积大,土建规模大,一次投资高;
③大量的自然补偿需要使用大量弯头和管道延长米,一次投资高,而且运行中温降压降大,运行成本高;
④占用空间大,占用其他管道管位,导致一些不需补偿的管道也不得不做补偿。
⑤对于已成型的管廊,新增管道不能随意布置;
⑥在运行时,管道始终处于应力状态,数量越多,管道应力叠加越大;
⑦支管一般开在靠近主管固定点处,开口处是应力集中点。
如图6所示,为了使补偿得以进行,补偿段两侧的管道需要焊接在支架上以形成补偿施力点,由于实际运行过程中管道轴向推力巨大,因此要求安装管道的支架进行整体连接,也就是说相邻的支架之间必须用连接板(斜撑)进行整体加固,钢材耗量大。
发明内容
本发明的目的是针对现有的管廊系统存在的应力大、补偿距离小、占地大、耗材量高、投资、运营成本高、结构复杂、施工周期长等问题,设计一种无推力、安全性高、造价低、施工方便、施工周期短的无应力管廊系统。
本发明的技术方案是:
一种无应力管廊系统,它由若干根安装在支架2上的管道1组成,支架2上安装的每根管道1均间隔设置有用于防止其热胀冷缩损坏的长度补偿机构3,其特征是所述的长度补偿机构3由四个旋转补偿器5及连接管件6组成,所述的管道1均活动支承在固定于地面的支架2上以便于更换和维护,所述的长度补偿机构3至少沿管道长度方向定位在补偿机构安装架4上,即长度补偿机构3在补偿机构安装架4上不能沿管道长度方向移动,补偿机构安装架4固定安装在地面基础上。
所述的长度补偿机构3通过连接管件6焊接在补偿机构安装架4上。
所述的长度补偿机构3通过连接管件6上安装的限位件实现在补偿机构安装架4上沿沿管道长度方向的定位。
所述的限位件为与补偿机构安装架4相配的焊接在连接管件6上的两件定位杆、定位块或定位片,所述的两件定位杆、定位块或定位片组成一个插口,插口架插在补偿机构安装架4上。
所述的定位杆、定位块或定位片通过紧固件或焊接固定在补偿机构安装架4上。
相邻长度补偿机构3之间的距离至少为200。
所述的支架2为由悬索7牵引的框架结构,管道1活动铺设在所述的框架结构上;所述的补偿机构安装架4固定安装在地面基础上,它单独设立或与悬索塔基一体化设置。
所述的框架结构为单层或多层结构。
本发明的有益效果:
本发明是一种全柔性补偿管道布置,支撑管管的支架受力单一,管廊跨度大、结构简单。
1.偿量大,补偿距离可达200~500m;
2.旋转补偿器的臂长不需要很长,可利用管道借位(图9),不需额外增加土建,节约一次投资。
3.长距离补偿只需要使用少量弯头,也无需大量的管道延长米,节约一次投资,而且运行中温降压降小,节能减排效果明显,大大提高经济效益;
4.对于已成型的管廊,新增管道布置方式灵活,可在适当位置增加补偿;
5.在运行时,管道处于无应力状态,大大增加管道寿命,而且也减小了土建规模,节约一次投资;
6.支管布置方便,可在支管处利用旋转补偿器消除应力,支管可以开在主管任意位置。
附图说明
图1是现有管廊布置结构之一的正视(a)和俯视图(b)。
图2是现有管廊布置结构之二的正视(a)和俯视图(b)。
图3是现有管廊布置结构之三的正视(a)和俯视图(b)。
图4是现有管廊布置结构之四的正视(a)和俯视图(b)。
图5是现有管廊布置结构之五的俯视图。
图6是现有管廊布置结构立体示意图。
图7是本发明的钢结构管廊系统示意图(a为正视,b为A-A剖视图)。
图8是本发明的悬索结构管廊系统示意图(a为正视,b为A-A剖视图)。。
图9是本发明的一个管廊系统立体结构示意图。
图10是采用本发明技术的全柔性补偿结构之一的俯视(a)和正视结构示意图(b)。
图11是采用本发明技术的全柔性补偿结构之二的俯视结构示意图。
图12是采用本发明技术的全柔性补偿结构之三的俯视结构示意图。
具体实施方式
下面结合附图和实施例对本发明作进一步的说明。
实施例一。
如图7、9所示。
一种无应力管廊系统,它由若干根安装在支架2上的管道1组成,支架2上安装的每根管道1均间隔设置有用于防止其热胀冷缩损坏的长度补偿机构3,相邻长度补偿机构3之间的长度可为60米以上,其中以200米以上最为经济,最长可达500米。每个长度补偿机构3均由四个旋转补偿器5及连接管件6组成,连接管件6由弯头601和连接管602组成,为了节约占地面积,各长度补偿机构均错位布置,仅占用高度空间而减少了横向占地面积,使得延长米很小,仅为传统管廊延长米的三分之一到十分之一。图9中每层其有四个管道,其中两根管道的长度补偿机构从一侧转向另一侧,另两根管道的长度补偿机构的布置正好相反,这样可使延长米略大于两根管道的直径,节约占地面积十分明显。所述的管道1均活动支承在固定于地面的钢结构支架2(如图7)上以便于更换和维护,所述的长度补偿机构3至少沿管道长度方向定位在补偿机构安装架4(图9中全部依靠垂直于补偿机构安装架4的连接管602实现)上,即长度补偿机构3在补偿机构安装架4上不能沿管道1的长度方向移动,补偿机构安装架4固定安装在地面基础上。长度方向定位可通过以下几种方式之一加以实现:
1.通过连接管602焊接在补偿机构安装架4上。
2.通过连接管602上安装的限位件实现在补偿机构安装架4上沿管道长度方向的定位。所述的限位件可为与补偿机构安装架4相配的焊接在连接管602上的两件定位杆、定位块或定位片,所述的两件定位杆、定位块或定位片组成一个插口,插口架插在补偿机构安装架4上。为了防止横向移动,具体过门和过路时还可使所述的定位杆、定位块或定位片通过紧固件或焊接固定在补偿机构安装架4上。
图10是图9的正视和俯视结构示意图。
作为本实施例的拓展,根据管道走向及支管连接的需要,还可采用图11、图12的布置方式。
实施例二。
如图8所示。
本实施例与实施例一的区别是取消了活动支承管道的支架2,改用悬索带悬吊框架来代替支架,管道平铺在框架结构上,框架结构可为单层或多层结构,悬索塔可建在两个长度补偿机构3之间,这种情况适用于管道重量较轻,长度补偿机构长度较大(如400米、500米等),当相邻长度补偿机构3之间的距离较小时,也可直接将悬索塔与长度补偿机构的固定支架合二为一。
本发明未涉及部分均与现有技术相同或可采用现有技术加以实现。
Claims (1)
1.一种无应力管廊系统,它由若干根安装在支架(2)上的管道(1)组成,支架(2)上安装的每根管道(1)均间隔设置有用于防止其热胀冷缩损坏的长度补偿机构(3),其特征是所述的长度补偿机构(3)由四个旋转补偿器(5)及连接管件(6)组成,所述的管道(1)均活动支承在固定于地面的支架(2)上以便于更换和维护,所述的长度补偿机构(3)至少沿管道长度方向定位在补偿机构安装架(4)上,即长度补偿机构(3)在补偿机构安装架(4)上不能沿管道长度方向移动,补偿机构安装架(4)固定安装在地面基础上;所述的长度补偿机构(3)通过连接管件(6)焊接在补偿机构安装架(4)上;所述的长度补偿机构(3)通过连接管件(6)上安装的限位件实现在补偿机构安装架(4)上沿沿管道长度方向的定位;所述的限位件为与补偿机构安装架(4)相配的焊接在连接管件(6)上的两件定位杆、定位块或定位片,所述的两件定位杆、定位块或定位片组成一个插口,插口架插在补偿机构安装架(4)上;相邻长度补偿机构(3)之间的距离至少为200米;所述的定位杆、定位块或定位片通过紧固件或焊接固定在补偿机构安装架(4)上;所述的支架(2)为由悬索(7)牵引的框架结构,管道(1)活动铺设在所述的框架结构上;所述的补偿机构安装架(4)固定安装在地面基础上,它单独设立或与悬索塔基一体化设置; 每个长度补偿机构(3)均由四个旋转补偿器(5)及连接管件(6)组成,连接管件(6)由弯头(601)和连接管(602)组成,为了节约占地面积,各长度补偿机构均错位布置,仅占用高度空间而减少了横向占地面积,使得延长米很小,仅为传统管廊延长米的三分之一到十分之一;每层共有四个管道,其中两根管道的长度补偿机构从一侧转向另一侧,另两根管道的长度补偿机构的布置正好相反,这样能使延长米略大于两根管道的直径,节约占地面积十分明显;所述的管道(1)均活动支承在固定于地面的钢结构支架(2)上以便于更换和维护,所述的长度补偿机构(3)至少沿管道长度方向定位在补偿机构安装架(4)上,即长度补偿机构(3)在补偿机构安装架(4)上不能沿管道(1)的长度方向移动,补偿机构安装架(4)固定安装在地面基础上。
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510093975.8A CN104696658B (zh) | 2015-03-03 | 2015-03-03 | 无应力管廊系统 |
PCT/CN2016/075312 WO2016138856A1 (zh) | 2015-03-03 | 2016-03-02 | 无应力管廊系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510093975.8A CN104696658B (zh) | 2015-03-03 | 2015-03-03 | 无应力管廊系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104696658A CN104696658A (zh) | 2015-06-10 |
CN104696658B true CN104696658B (zh) | 2019-02-22 |
Family
ID=53344061
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510093975.8A Active CN104696658B (zh) | 2015-03-03 | 2015-03-03 | 无应力管廊系统 |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN104696658B (zh) |
WO (1) | WO2016138856A1 (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104696658B (zh) * | 2015-03-03 | 2019-02-22 | 江苏宏鑫管道工程设计有限公司 | 无应力管廊系统 |
CN107327633A (zh) * | 2017-06-02 | 2017-11-07 | 安徽奥睿德科技发展有限公司 | 一种用于地下管廊中固定管道的装配式支架 |
DE102018215227A1 (de) * | 2018-09-07 | 2020-03-12 | Krones Ag | Medienverteiler für Rundläufermaschine und Füllmaschine |
CN113623462B (zh) * | 2021-08-04 | 2023-12-22 | 北京市公用工程设计监理有限公司 | 一种综合管廊燃气管道固定装置及方法 |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS556555U (zh) * | 1978-06-26 | 1980-01-17 | ||
US6521126B2 (en) * | 2001-05-01 | 2003-02-18 | David K. Wyness | Pipe gallery for water filtration systems |
CN1975226A (zh) * | 2006-08-11 | 2007-06-06 | 宋章根 | 地埋式管道的无支撑、长距离补偿方法及其系统 |
CN201087773Y (zh) * | 2007-08-15 | 2008-07-16 | 中国恩菲工程技术有限公司 | 氧化铝厂长距离赤泥管道 |
CN101260959A (zh) * | 2008-04-15 | 2008-09-10 | 宋章根 | 应力消除装置 |
DE102010031449A1 (de) * | 2010-07-16 | 2012-01-19 | Flagsol Gmbh | Rohrleitungsanordnung |
CN102278560A (zh) * | 2011-07-01 | 2011-12-14 | 江苏宏鑫旋转补偿器科技有限公司 | 基于旋转补偿器的封闭型石油石化火炬水平管线变形补偿系统 |
CN203836473U (zh) * | 2014-03-28 | 2014-09-17 | 赛鼎工程有限公司 | 一种用于蒸汽管道自然补偿的管路 |
CN204554206U (zh) * | 2015-03-03 | 2015-08-12 | 江苏宏鑫旋转补偿器科技有限公司 | 无应力管廊系统 |
CN104696658B (zh) * | 2015-03-03 | 2019-02-22 | 江苏宏鑫管道工程设计有限公司 | 无应力管廊系统 |
-
2015
- 2015-03-03 CN CN201510093975.8A patent/CN104696658B/zh active Active
-
2016
- 2016-03-02 WO PCT/CN2016/075312 patent/WO2016138856A1/zh active Application Filing
Also Published As
Publication number | Publication date |
---|---|
WO2016138856A1 (zh) | 2016-09-09 |
CN104696658A (zh) | 2015-06-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104696658B (zh) | 无应力管廊系统 | |
CN202074119U (zh) | 圆形管廊支架及圆形管廊 | |
CN104265306A (zh) | 一种市政盾构隧道 | |
CN205859360U (zh) | 管道弯头支撑装置 | |
CN209604683U (zh) | 多管道固定支架 | |
CN204554206U (zh) | 无应力管廊系统 | |
CN208886228U (zh) | 一种平移旋转综合补偿结构及热力管道 | |
CN202390827U (zh) | 一种在地面下支撑和固定管线的热棒 | |
CN105546259A (zh) | 一种智能自动限位补偿器 | |
CN203571233U (zh) | 一种大跨度x型空间拱形管道支架 | |
CN210566938U (zh) | 一种用于管道补偿的装置 | |
CN204113300U (zh) | 市政隧道 | |
CN206859260U (zh) | 管廊抗大推力支架结构 | |
CN204420311U (zh) | 一种供热直埋热水弧形管道 | |
CN207261829U (zh) | 管道支撑装置 | |
CN206706828U (zh) | 一种波纹钢综合管廊可变位支架连接结构 | |
CN208417768U (zh) | 建筑管道加固结构 | |
CN206337582U (zh) | 一种钢制综合管廊的支撑装置 | |
CN207864777U (zh) | 一种用于地下综合管廊内燃气排管的支架系统 | |
CN205745827U (zh) | 一种固定液压阀的支架 | |
CN205048062U (zh) | 一种用于蒸汽管道自然补偿的管路 | |
CN203703477U (zh) | 一种具有双重补偿功能的排气管道 | |
CN210661665U (zh) | 一种市政施工用管道支撑装置 | |
CN102294667A (zh) | 具有高度调节功能的紧固装置 | |
CN115059802B (zh) | 一种大型煤气管道水平推力优化装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20151203 Address after: 214212, Jiangsu province Yixing City Stone Town, big sharp Village Applicant after: Jiangsu Hongxin Pipeline Engineering Design Co., Ltd. Address before: 214212 West Industrial Park, Wan Shi Town, Wuxi, Jiangsu, Yixing Applicant before: Jiangsu Hongxin Revolving Compensator Technology Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |