CN104695967B - Ring grid beam device and its installation method for shield launching - Google Patents

Ring grid beam device and its installation method for shield launching Download PDF

Info

Publication number
CN104695967B
CN104695967B CN201510031610.2A CN201510031610A CN104695967B CN 104695967 B CN104695967 B CN 104695967B CN 201510031610 A CN201510031610 A CN 201510031610A CN 104695967 B CN104695967 B CN 104695967B
Authority
CN
China
Prior art keywords
steel
jack
foreboard
grid beam
back plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510031610.2A
Other languages
Chinese (zh)
Other versions
CN104695967A (en
Inventor
赖伟文
林清基
郭清华
王安益
吴阿强
吴琨城
黄文豪
王科伟
韩庄
刘芝建
杜洪华
龙珍
何振宁
王辉
王星钧
赖凯
曾灿斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tunnel Construction Group Co ltd Guangdong
Guangxi Huahongwei Construction Engineering Co ltd
Original Assignee
CHINA TUNNEL CONSTRUCTION Co Ltd GUANGDONG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA TUNNEL CONSTRUCTION Co Ltd GUANGDONG filed Critical CHINA TUNNEL CONSTRUCTION Co Ltd GUANGDONG
Priority to CN201510031610.2A priority Critical patent/CN104695967B/en
Publication of CN104695967A publication Critical patent/CN104695967A/en
Application granted granted Critical
Publication of CN104695967B publication Critical patent/CN104695967B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses the ring grid beam device and its installation method for shield launching, if it includes the steel rings grid beam that dry plate arc component is spliced and multiple jack for being distributed of even circumferential along steel rings grid beam, two end faces of the arc component are provided with steel foreboard and steel back plate, the jack is located between steel foreboard and steel back plate, the jack matched with jack is provided with the steel foreboard and stretches out hole, jack stretches out the external diameter of the diameter more than jack external part in hole.It can be realized by the regulation of jack and be in pressured state between steel bushing and portal all the time, it is to avoid opposition destruction portal structure during shield launching, crisis construction safety.The present invention can be used for shield launching construction in need provide counter-force process in, its easy installation and removal, by place restrict it is small, repeat utilize.

Description

Ring grid beam device and its installation method for shield launching
Technical field
The present invention relates to a kind of ring grid beam device for shield launching, a kind of installation side of ring grid beam device is further related to Method.
Background technology
National underground track traffic library development is in a high-speed development period and typically uses shield construction, due to ground Iron planning often lags behind underground utilities planning, and metro shield originating terminal is frequently present of the underground utilities for being difficult to move and changing, and construction Region is often in downtown urban land, requires high to civilized construction degree, so a kind of pollution of research and development is small, be not required to ground reinforcing Shield launching technology turns into trend of the times.According to shield launching principle, in this Originating Technique, it is by a closed steel bushing Shield machine provides confined space and originates thrust, it is important that wherein it is how to solve counter-force regulation problem.
The content of the invention
The purpose of the present invention, is to provide a kind of ring grid beam device for shield launching, it has quick, safety, height Imitate and limited small by job site space.
A kind of installation method of ring grid beam device is also provided.
The present invention solve its technical problem solution be:For the ring grid beam device of shield launching, it includes some The steel rings grid beam that piece arc component is spliced and multiple jack of the even circumferential distribution along steel rings grid beam, it is described Two end faces of arc component are provided with steel foreboard and steel back plate, the jack be located at steel foreboard and steel back plate it Between, the jack matched with jack is provided with the steel foreboard and stretches out hole.
As the further improvement of above-mentioned technical proposal, multiple steels are provided between the steel foreboard and steel back plate Deep floor.
As the further improvement of above-mentioned technical proposal, connection reinforcing bar is welded between two steel deep floors, The jack is welded on connection reinforcing bar.
As the further improvement of above-mentioned technical proposal, the spiral shell for being connected with steel bushing is provided with the steel back plate Keyhole.
As the further improvement of above-mentioned technical proposal, the quantity of the arc component is 2 or 4.
As the further improvement of above-mentioned technical proposal, a thousand pieces of gold amount of serving as a fill-in in each arc component is 5 or 10.
A kind of installation method of ring grid beam device, it comprises the following steps,
1)Steel foreboard, steel deep floor and steel back plate are welded into arc component successively;
2)Jack is being welded to connect reinforcing bar;
3)The position of adjustment jack causes jack external part is stretched out behind hole through the jack on steel foreboard will even The two ends for connecing reinforcing bar are respectively welded at steel deep floor;
4)Annular construction member is hung to fixing bolt after the correct position of steel bushing successively from the bottom up to be connected on steel bushing.
The beneficial effects of the invention are as follows:The present invention can be realized by the regulation of jack to be located all the time between steel bushing and portal In pressured state, it is to avoid opposition destruction portal structure during shield launching, crisis construction safety.The present invention can be used Need to provide in the process of counter-force in shield launching construction, its easy installation and removal is restricted small by place, repeats and utilize.
Brief description of the drawings
Technical scheme in order to illustrate the embodiments of the present invention more clearly, makes required in being described below to embodiment Accompanying drawing is briefly described.Obviously, described accompanying drawing is a part of embodiment of the present invention, rather than is all implemented Example, those skilled in the art on the premise of not paying creative work, can also obtain other designs according to these accompanying drawings Scheme and accompanying drawing.
Structural representation when Fig. 1 is present invention work;
Fig. 2 is the front view of the present invention;
Fig. 3 is the side view of the present invention.
Embodiment
The technique effect of the design of the present invention, concrete structure and generation is carried out below with reference to embodiment and accompanying drawing clear Chu, it is fully described by, to be completely understood by the purpose of the present invention, feature and effect.Obviously, described embodiment is this hair Bright a part of embodiment, rather than whole embodiments, based on embodiments of the invention, those skilled in the art is not paying The other embodiment obtained on the premise of creative work, belongs to the scope of protection of the invention.In addition, be previously mentioned in text All connection/annexations, not singly refer to component and directly connect, and refer to be added deduct by adding according to specific implementation situation Few couple auxiliary, to constitute more excellent draw bail.
1~Fig. 3 of reference picture, for the ring grid beam device of shield launching, is spliced if it includes dry plate arc component 10 Steel rings grid beam 1 and along steel rings grid beam 1 even circumferential be distributed multiple jack 2, it is preferable that jack 2 be liquid Jack is pressed, two end faces of the arc component 10 are provided with steel foreboard 3 and steel back plate 4, and the jack 2 is located at steel Between foreboard 3 and steel back plate 4, the jack matched with jack 2 is provided with the steel foreboard 3 and stretches out hole, preferably , the center line of jack external part is overlapped with the center line that jack stretches out hole.Jack stretches out the diameter in hole more than very heavy Push up the external diameter of external part.
It can be realized by the regulation of jack 2 and be in pressured state between steel bushing 8 and portal all the time, it is to avoid shield machine begins Opposition destruction portal structure during hair, crisis construction safety.The present invention can be used for needing to carry in shield launching construction For in the process of counter-force, its easy installation and removal is restricted small by place, repeats and utilize.
It is further used as preferred embodiment, being provided with multiple steels between the steel foreboard 3 and steel back plate 4 adds Strong floor 6, the connective stability between steel foreboard 3 and steel back plate 4 is improved by steel deep floor 6.Steel ribs The bolt hole for connecting two arc components 10 of jingle bell is additionally provided with plate 6.After arc component 10 is lifted in place, pass through steel Two adjacent arc components 10 are connected by the reserved bolt hole of deep floor 6 processed.
It is further used as preferred embodiment, connection reinforcing bar 5, institute is welded between two steel deep floors 6 State jack 2 to be welded on connection reinforcing bar 5, such connected mode is simple, also allow for adjusting the position of jack 2 so that thousand The external part on jin top 2 can stretch out hole through jack.
It is further used as preferred embodiment, the bolt for being connected with steel bushing 8 is provided with the steel back plate 4 Hole 7, is so easy to after arc component 10 is pulled down be used for shield launching next time, saves cost of manufacture.
It is further used as preferred embodiment, the quantity of the arc component 10 is 2 or 4.
It is further used as preferred embodiment, the amount of serving as a fill-in of a thousand pieces of gold in each arc component 10 is 5 or 10.
A kind of installation method of ring grid beam device, it comprises the following steps,
1)Steel foreboard 3, steel deep floor 6 and steel back plate 4 are welded into several arc components 10 successively;
2)Jack 2 is being welded to connect reinforcing bar 5;
3)The position of adjustment jack 2 causes jack external part is stretched out behind hole through the jack on steel foreboard 3 will The two ends of connection reinforcing bar 5 are respectively welded at steel deep floor 6;
4)Annular construction member is hung to fixing bolt after the correct position of steel bushing 8 successively from the bottom up and is connected to steel bushing 8 On, two adjacent arc components 10 are linked together by the bolt hole 7 on steel deep floor 6.
After initiator device integral installation is finished, the counter-force according to required for the shield launching calculated, by adjusting 4 groups The thrust of jack 2 is there is provided the counter-force required for shield launching, when thrust is adjusted, and notes above and below guarantee and symmetrical The force balance of jack 2.
Above is the better embodiment to the present invention is illustrated, but the invention is not limited to the reality Apply example, those skilled in the art can also make a variety of equivalent modifications or replace on the premise of without prejudice to spirit of the invention Change, these equivalent modifications or replacement are all contained in the application claim limited range.

Claims (1)

1. the installation method of a kind of ring grid beam device for shield launching, if ring grid beam device splices including dry plate arc component Steel rings grid beam and along steel rings grid beam even circumferential be distributed multiple jack, two of the arc component End face is provided with steel foreboard and steel back plate, and the jack is located between steel foreboard and steel back plate, the steel foreboard On be provided with the jack matched with jack and stretch out hole, be provided with multiple steels between the steel foreboard and steel back plate Connection reinforcing bar is welded between deep floor, two steel deep floors, the jack is welded on connection reinforcing bar, institute State the bolt hole being provided with steel back plate for being connected with steel bushing, it is characterised in that:It comprises the following steps,
1)Steel foreboard, steel deep floor and steel back plate are welded into arc component successively;
2)Jack is welded on connection reinforcing bar;
3)The position of adjustment jack causes jack external part to connect steel after stretching out hole through the jack on steel foreboard The two ends of muscle are respectively welded at steel deep floor;
4)Annular construction member is hung to fixing bolt after the correct position of steel bushing successively from the bottom up to be connected on steel bushing.
CN201510031610.2A 2015-01-21 2015-01-21 Ring grid beam device and its installation method for shield launching Expired - Fee Related CN104695967B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510031610.2A CN104695967B (en) 2015-01-21 2015-01-21 Ring grid beam device and its installation method for shield launching

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510031610.2A CN104695967B (en) 2015-01-21 2015-01-21 Ring grid beam device and its installation method for shield launching

Publications (2)

Publication Number Publication Date
CN104695967A CN104695967A (en) 2015-06-10
CN104695967B true CN104695967B (en) 2017-10-10

Family

ID=53343467

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510031610.2A Expired - Fee Related CN104695967B (en) 2015-01-21 2015-01-21 Ring grid beam device and its installation method for shield launching

Country Status (1)

Country Link
CN (1) CN104695967B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105927242B (en) * 2016-07-11 2018-01-23 辽宁北铁建工有限责任公司 The originating method of the small-sized quick initiator device of TBM rock rippers

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3613140A1 (en) * 1986-04-18 1987-10-22 Wayss & Freytag Ag Transversely deformable tube ring for tunnel tubes which can be jacked
CN100572750C (en) * 2006-12-30 2009-12-23 广东省基础工程公司 A kind of job practices of shield launching
CN201424941Y (en) * 2009-06-15 2010-03-17 广东华隧建设股份有限公司 Device for airtight starting and reaching of shield machine
CN103032078B (en) * 2012-12-08 2015-01-21 中铁十二局集团第二工程有限公司 Parallel construction method for shield arrival tunnel portal ring beam and shield crossing station
CN103953353B (en) * 2014-04-23 2015-12-23 中铁十五局集团有限公司 Shield launching reaction frame and installation and application thereof
CN104033157B (en) * 2014-06-10 2016-04-20 中铁建设投资集团有限公司 For the packaged type counter-force equipment of launching shaft

Also Published As

Publication number Publication date
CN104695967A (en) 2015-06-10

Similar Documents

Publication Publication Date Title
CN106760507B (en) Cast-in-place column and its construction method in a kind of civil construction
CN104695967B (en) Ring grid beam device and its installation method for shield launching
CN101314937B (en) Construction method and apparatus of vertically rotating arch case downside
CN205822215U (en) A kind of adjustable cofferdam support means
CN205348963U (en) A security fence for building site
CN106287117A (en) A kind of adjustable type pumping plant machine unit support
CN204570684U (en) A kind of anchor head of Recyclable anchor rope is fixed and guiding device
CN206647683U (en) The buffer unit of petroleum pipeline bending place impulsive force can be reduced
CN206220534U (en) The pump line support meanss of concrete pumping equipment
CN206069255U (en) A kind of architectural engineering Pipe installing lifting device
CN205477626U (en) Middle -size and small -size section shaft is gone into well and is taken off sediment device
CN205502013U (en) Stock static pile counterforce device
CN204435421U (en) A kind of assembling manhole
CN104344086A (en) Pipeline buttress device and use method
CN103335172A (en) Oil platform pipeline protection tube capable of meeting different pipe diameters
CN107010529B (en) Derrick branch erects the application method of piece tooling hanging code
CN204059542U (en) Novel plastic manhole
CN207974135U (en) A kind of assembled steel pile pile conversion equipment
CN206053394U (en) The passive protection net that a kind of shackle is coupled
CN207362706U (en) Load carrying type hanging basket operating platform
CN207211174U (en) A kind of recoverable dewatering well well casing device
CN204662629U (en) A kind of overflow well derrick
CN201507142U (en) Stabilizing device of high-voltage telegraph pole
CN202401386U (en) Cable bridge for frame bridge
CN204849808U (en) Basis is assembled in prefabrication of large -scale tower machine concrete

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: Room 1308, 13th floor, Traffic Bureau Building, 95 Yingbin Avenue, Xinhua Street, Huadu District, Guangzhou City, Guangdong Province

Patentee after: CHINA TUNNEL CONSTRUCTION GROUP CO.,LTD. GUANGDONG

Address before: 510620 Tianhe District, Guangzhou, Tianhe Road, No. 101, Industrial Bank building, layer 9,

Patentee before: CHINA TUNNEL CONSTRUCTION Co.,Ltd. GUANGDONG

CP03 Change of name, title or address
TR01 Transfer of patent right

Effective date of registration: 20190905

Address after: Eight carp Pumiao town of Yongning District of Nanning City Industrial Park, No. 12 the Guangxi Zhuang Autonomous Region Cao Road 530299

Co-patentee after: CHINA TUNNEL CONSTRUCTION GROUP CO.,LTD. GUANGDONG

Patentee after: GUANGXI HUAHONGWEI CONSTRUCTION ENGINEERING Co.,Ltd.

Address before: Room 1308, 13th floor, Traffic Bureau Building, 95 Yingbin Avenue, Xinhua Street, Huadu District, Guangzhou City, Guangdong Province

Patentee before: CHINA TUNNEL CONSTRUCTION GROUP CO.,LTD. GUANGDONG