CN104695517B CN201510122627.9A CN201510122627A CN104695517B CN 104695517 B CN104695517 B CN 104695517B CN 201510122627 A CN201510122627 A CN 201510122627A CN 104695517 B CN104695517 B CN 104695517B
Authority
CN
China
Prior art keywords
section
water seal
seal body
draining
transverse tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510122627.9A
Other languages
Chinese (zh)
Other versions
CN104695517A (en
Inventor
林国强
程宏伟
邱寿华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Qunzhiying Housing Technology Co ltd
Original Assignee
English Science And Technology Casting Co Ltd Of Guizhou Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=53343029&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN104695517(B) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by English Science And Technology Casting Co Ltd Of Guizhou Group filed Critical English Science And Technology Casting Co Ltd Of Guizhou Group
Priority to CN201510122627.9A priority Critical patent/CN104695517B/en
Publication of CN104695517A publication Critical patent/CN104695517A/en
Application granted granted Critical
Publication of CN104695517B publication Critical patent/CN104695517B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

A building drainage concentrator relates to a drainage concentrator applied to toilets, balconies and kitchens. The building drainage concentrator consists of a stand pipe drainage section (1), a horizontal pipe drainage concentrating section (2) and a water seal component (3). A horizontal surface (9) of the horizontal pipe drainage concentrating section (2) and an inner wall below are planes or cambered surfaces approximate to planes. A maximum distance of a horizontal opening (15) of a channel (13) on the top of the concentrating section of the horizontal pipe drainage concentrating section (2) that is communicated with the stand pipe drainage section (1) is greater than a maximum distance of a vertical opening (16). The top of the water seal component (3) on one side of the horizontal surface (9) is communicated with the bottom of the water seal component; a floor drain cover (23) is arranged above the water seal component. The minimal distance L between the outside of the upper portion (18) of the water seal component and the outer wall of the adjacent stand pipe drainage section is ranging from 40mm to 450mm. The lowest end at the inlet of a horizontal pipe port (44) is higher than the horizontal surface (9). In case of the floor drains are installed, the building drainage concentrator is able to use the toilet, the kitchen and the balcony when the water is drained at the same floor of the building, without any fall slabs or slightly descending floors.

Description

A kind of construction drainage manifold
Technical field
The present invention relates to a kind of draining manifold for building, collect particularly to a kind of toilet, balcony, draining for kitchen use Device.
Background technology
At present, building co-layer draining toilet, kitchen, balcony, in the case of setting floor drain, are both needed to drop floor or local Fall floor, the pipeline below drainage fixture easily blocks, overhaul and be difficult, and floor drain water seal is easily dried up, smelly in drainage pipeline Gas, harmful gass, small worm etc. easily run affects living-hygienic environment into room.
Content of the invention
It is an object of the invention to overcoming existing technological deficiency, provide in a kind of co-layer draining in building using health Between, kitchen, balcony in the case of setting floor drain all need not any fall floor or plate that edges down, the pipeline below drainage fixture is difficult Blocking, maintenance are easy, and floor drain water seal is difficult to dry up and foul smell, harmful gass, small worm etc. can be made to be difficult to run into room, can improve people Occupy a kind of construction drainage manifold of living-hygienic environment.
Construction drainage manifold of the present invention, collects section (2) and water seal body by standpipe draining section (1), transverse tube draining Component (3) is constituted.The upper and lower connection of standpipe draining section (1);Transverse tube draining collects the side that section (2) is located at standpipe draining section (1), Middle vacancy is connected with the middle vacancy of standpipe draining section (1), and it is flat that transverse tube draining collects the plane of structure (9) of section (2) and the inwall of lower section Face or close to plane or cambered surface;The angle of the upper interface (4) of plane and standpipe draining section (1) between 80 °~100 °, arrange by transverse tube Water collects section (2) and is more than 1500mm with the cross-sectional area of the connectivity part opening (10) of standpipe draining section (1)2;Connection standpipe draining The transverse tube draining of section (1) collects to have in section (2) and collects a section top passage (13);Collect section top passage (13) highest end face The distance that low spot a and transverse tube draining collect the inwall c of section (2) bottom end closure is more than 60mm less than 150mm;Lead to from collecting section top The minimum point a horizontal section of the highest end face in road (13) plays water seal body member lower exit d point horizontal section terminal and is formed Transverse tube draining collect in the volumetric ratio water seal body member lower of the interior intracavity of section (2) from collecting a section most significant end for top passage (13) The water seal body component that the minimum point a horizontal section starting point in face is formed to water seal body member lower exit d point horizontal section terminal Big more than 1 times of volume in bottom;And a point and transverse tube draining collect the closed front being formed between the inwall c point of section (2) bottom The volume of container is more than 140000mm3;Collect section minimum point a of top passage (13) highest end face and collect Duan Heng with transverse tube draining What the inwall in face (9) was formed collects section top passage (13) is in the ultimate range of transverse opening (15) more than vertical openings (16) Ultimate range, transverse opening (15) greatest length is more than 65mm and is less than 250mm, and it is little that vertical openings (16) greatest length is more than 10mm In 80mm, and form passage section area more than 1500mm2Less than 15000mm2;Transverse tube draining collects the plane of structure (9) of section (2) There is water seal body component (3) side, and water seal body component (3) connects up and down, and top (18) exceed plane of structure (9) in more than 5mm, have above Drain cover (23), drain cover (23) is separable with water seal body member upper (18), and middle part (19) and transverse tube draining collect section (2) it is tightly connected, bottom (20) are located in the cavity that the transverse tube draining below plane of structure (9) collects;Transverse tube draining collects the horizontal stroke of section The floor height h of the upper surface in face (9) and lower end closed is between 100mm~200mm;The outer wall of water seal body member upper (18) Outer wall minimum range l of the close standpipe draining section of Bian Yuxiang is between 40mm~450mm;The bottom of water seal body component (3) goes out Mouthful place d less than collecting section minimum point a for top passage highest end face, with collect section minimum point a of top passage highest end face away from Be less than 100mm from more than 20mm, at the lower part outlet of water seal body component d and draining collect the bottom c of cavity inner wall of section away from It is less than 100mm from more than 10mm;Transverse tube draining collects the transverse tube interface accessing standpipe draining section (1) above the plane of structure (9) of section (44), the porch least significant end of transverse tube interface (44) collects the plane of structure (9) of section, the entrance of transverse tube interface (44) higher than transverse tube draining Direction and horizontal sextant angle are between ± 10 °, and transverse tube draining collects section angle between 80 °~100 °.
The bottom (20) of construction drainage manifold water seal body component of the present invention and the middle part (19) of water seal body component Integrated member, the internal diameter of middle part (19) lower end (31) of water seal body be more than water seal body member lower (20) lower end external diameter and Less than the external diameter of water seal body member lower (20) upper end (33), fluted on the external diameter of water seal body member lower (20) upper end (33) (34), there is rubber ring (35) in groove (34), rubber ring (35) is located in the inwall of (19) in the middle part of water seal body component;When need examine When repairing, clearing up transverse tube draining and collect section (2), only the bottom (20) of water seal body component need to be pulled out from the middle part (19) of water seal body component Go out, (in water seal body member lower (20) upper end (33), having handle), when bottom (20) the insertion water seal body structure water seal body component During middle part (19) of part, water seal body member lower (20) upper end (33) can be limited in middle part (19) lower end (31) of water seal body, and On the external diameter of water seal body member lower (20) upper end (33) fluted (34) in rubber ring (35) make water seal body bottom upper end (33) outer wall seals up the inwall at the middle part of water seal body.
Skyscraper use in toilet draining manifold of the present invention, water seal body member lower (20) and water seal body component Middle part (19) is not integrated member, and in the middle part of water seal body component, the internal diameter of (19) lower end (31) is more than under water seal body member lower (20) The external diameter at end, and it is less than the external diameter of water seal body member lower (20) upper end (33), on (19) lower end (31) in the middle part of water seal body component Surface is contacted with the lower surface of water seal body member lower (20) upper end (33), and is all plane, when water seal body member lower (20) After (19) in the middle part of insertion water seal body component, the following table face seal of water seal body member lower (20) upper end (33) under gravity Live the upper surface of (19) lower end (31) in the middle part of water seal body component.
Skyscraper use in toilet draining manifold of the present invention, (19) lower end (31) internal diameter in the middle part of water seal body component On have 2 grooves (39), the diameter of groove (39) is less than the lower surface external diameter of water seal body member lower (20) upper end (33);Water seal 2 salient points (40), the external diameter of salient point (40) and size is had to be respectively less than the internal diameter of groove (39) on the outer wall of body member lower (20) And size, but the internal diameter more than (19) lower end (31) in the middle part of water seal body component, the upper surface of salient point (40) is under water seal body component Thickness is identical or slightly larger up and down with (19) lower end (31) in the middle part of water seal body component for the distance of lower surface of portion (20) upper end (33), convex The external diameter of point (40), the internal diameter of groove (39) are respectively less than the external diameter of water seal body member lower (20) upper end (33) lower surface, thus, After (19) in the middle part of water seal body component are inserted in water seal body member lower (20), rotate water seal body member lower (20) upper end (33), the upper surface of salient point (40) is stuck in the lower surface of (19) lower end (31) in the middle part of water seal body component, water seal body member lower (20) upper end (33) lower surface seals up in the middle part of the upper surface of (19) lower end (31) and water seal body component in the middle part of water seal body component (19) 2 grooves (39) on lower end (31) internal diameter;Again due in the middle part of water seal body member lower (20) and water seal body component (19) It is not overall, so water seal body component (20) rotation can be extracted when transverse tube draining collects and produces blocking in section (2), be easy to clear Logical transverse tube draining collects the tamper in section (2);Internal diameter due to (19) lower end (31) in the middle part of water seal body component is more than water seal body The external diameter of member lower (20) lower end, and it is less than the external diameter of water seal body member lower (20) upper end (33), thus stifled when having cleared up After (19) in the middle part of bottom (20) the insertion water seal body component of water seal body component, in the middle part of water seal body component, (31) of lower end limit plug thing Make (33) of water seal body member lower (20) upper end, and due to (19) lower end (31) upper surface and water seal in the middle part of water seal body component The lower surface of body member lower upper end (33) contacts, and is all plane, so, when water seal is inserted in water seal body member lower (20) After (19) in the middle part of body component, under gravity, the salable firmly water seal of the lower surface of water seal body member lower (20) upper end (33) The upper surface of (19) lower end (31) in the middle part of body component, and 2 grooves (39) are had on (19) lower end (31) in the middle part of water seal body component, recessed The diameter of groove (39) is less than the external diameter of the lower surface of water seal body member lower (20) upper end (33), and thus, groove (39) will not shadow The sealing to (19) lower end (31) upper surface in the middle part of water seal body component for the lower surface of Xiangshui County's envelope body member lower (20) upper end (33); Due to the upper surface of the salient point (40) in water seal body member lower (20) and the distance of the lower surface of upper end (33) and water seal body structure In the middle part of part, the upper and lower thickness of (19) lower end (31) internal diameter is identical or slightly larger, so when rotating upper end (33), the following table of upper end (33) Face can seal up the upper surface of lower end (31).
Construction drainage manifold of the present invention, water seal body component (3) below drain cover (23) has during draining certainly The dynamic draining check device (36) opened, be automatically switched off after drained water.When ground or other utensils are from water seal body component (3) top Automatically open up during draining, be automatically switched off after drained water, the water seal evaporation that transverse tube draining collects in section can be reduced simultaneously, and prevent worm Mus climb into room at water seal.
Construction drainage manifold of the present invention, transverse tube draining collects section (2) and standpipe draining section (1) connectivity part opening (10) top end opening end face (11) is less than the horizontal section of plane of structure (9) inwall.Transverse tube draining collect section (2) collect floor drain etc. its Before entering standpipe draining section (1) after the water of his drainage fixture, transverse tube draining at water seal body means outlet collects section bottom interior wall c And collect the inclined-plane passage being formed between section minimum point a of top passage highest end face quickly to go out through less than plane of structure (9) inwall The transverse tube draining of horizontal section collects section (2) and the top end opening end face (11) of standpipe draining section (1) connectivity part opening (10) Stop, so that fluidised form is changed, it is broken that top end opening end face (11) makes the moisture film of original fluidised form produce, and makes inflow standpipe draining section Current will not form the ventilation that moisture film blocks in pipeline, and then improve the drainability of standpipe, simultaneously because connectivity part opening (10) top end opening end face (11) is less than the water vent of top in the horizontal section of plane of structure (9) inwall, standpipe draining section (1) not Easily flow into transverse tube draining and collect section.
Construction drainage manifold transverse tube draining of the present invention collects section (2) and connects on the passage of standpipe draining section (1) There is channel interface (24), accessing the channel interface (24) at dilatation is lateral access, and when channel interface (24) draining, water flows through Side path forms lateral state and enters formation rotate counterclockwise inflow lower section pipeline in (7) at straight section dilatation, will not produce water Film blocks the aerofluxuss in pipe;Transverse tube draining outside the connectivity part opening (10) of standpipe draining section (1) collects the side wall of section passage On have skew back face e, before transverse tube draining collects and enters standpipe draining section (1) after section (2) collects the water of other drainage fixture such as floor drain, At water seal body means outlet, transverse tube draining collects section bottom interior wall c and collects between section minimum point a of top passage highest end face The inclined-plane passage being formed quickly is gone out, and it is broken that top end opening end face (11) makes the moisture film of original fluidised form produce, and skew back face e then makes Broken current flow sideways into standpipe draining section (1) with counterclockwise, and rotation in the presence of dilatation section guide vane (6) flows into Lower section pipeline, makes drainage effect more preferable.
A kind of top (18) of construction drainage manifold water seal body component of the present invention, the lower section of drain cover (23) have One or more can be used for being connected other drainage fixture in interface (30) between ± 10 ° for the angle with horizontal direction, because with horizontal stroke Bank of tubes water collects section (2) and connects, and current enter standpipe draining section (1) and connected drainage fixture after converging all need not separately set water Seal apparatus, thus line clogging can be reduced.
Construction drainage manifold of the present invention, standpipe draining section (1) outer wall collects section (2) outer wall with transverse tube draining On have more than one or more anti-hydrofoil ring (37), when product bury floor in when can prevent ground leak.
Internal diameter is had to be more than the interface that 25mm is less than 55mm on construction drainage manifold drain cover (23) of the present invention (38), can be used for connecting the connection of the drainage fixture such as washing machine, washbasin, vegetable sink.
Construction drainage manifold of the present invention, it is to be separately made that standpipe draining section (1) and transverse tube draining collect section (2) Connect molding afterwards, water seal body component and transverse tube draining collect after section (2) is separately made and connect into.
When the present invention is used in building, upper and lower soil stack connects upper and lower interface (4), (5), and transverse tube draining collects section (2) bury with concrete floor in, transverse tube draining collect section (2) be located at standpipe draining section (1) side, with standpipe drain pipe (1) connect, the open section area of connectivity part opening (10) is more than 1500mm2, thus can ensure that transverse tube draining collects section (2) Interior drain discharge, can make the flow-shape direction entering in standpipe draining section (2) change again, to reach more preferable draining effect Really;Transverse tube draining collects the angle of the plane of structure (9) of section and the upper interface (4) of standpipe draining section (1) between 80 °~100 °, by This it is ensured that when standpipe draining section (1) connects standpipe draining, transverse tube draining collects section (2) ground plane or utensil draining,;Transverse tube Section distance of the minimum point a transverse opening of top passage highest end face of collecting that draining collects below a section plane of structure (9) is more than vertically The distance of opening, the greatest length of transverse opening is more than 65mm and is less than 250mm, and vertical openings greatest length is less than more than 10mm 80mm, thus, is guaranteeing to reduce the total height that transverse tube draining collects the bottom h to closing for section (2) plane of structure, is guaranteeing water seal again In the case of being highly more than or equal to 50mm, can ensure that the minimum widith of runner cross-sectional area and runner again, so that transverse tube draining is collected Section bury (2) in floor when, in the case of will not exposing floor, ensure again to reach a certain amount of drain discharge, and can really Protect and can discharge larger debris, (be thus formed in guaranteeing width of flow path and drainage section area with the unobstructed performance guaranteeing draining In the case of, to increase runner transverse width, to reduce the technical method of vertical height, make transverse tube draining collect a section plane of structure (9) on earth The height h in face is minimized);Collect section minimum point a of top passage highest end face and draining collects the inwall c of section bottom end closure Distance is less than 150mm more than 60mm, thus after water seal body component (3) and transverse tube draining collect section (2) sealing and fix, water seal body The exit d of member lower (20) and the water seal height collecting the discrepancy in elevation formation between section minimum point a of top passage highest end face It can be ensured that the exit d of bottom (20) has to the runner collecting between section bottom interior wall c is more than when requiring between 50mm~100mm 10mm height, unobstructed to guarantee drain discharge and draining, and due to from collecting the minimum of section highest end face of top passage (13) The transverse tube draining that point a horizontal section plays the formation of water seal body member lower exit d point horizontal section terminal collects section (2) inner chamber From the minimum point a horizontal section starting point collecting section highest end face of top passage (13) in interior volumetric ratio water seal body member lower Big more than 1 times of the volume in water seal body member lower being formed to water seal body member lower exit d point horizontal section terminal, and The volume that a point and transverse tube draining collect the container of closed front being formed between the inwall c point of section (2) bottom end closure is more than 140000mm3, this constructs the water seal that the pressure oscillation survivable transverse tube draining that soil stack is formed can be made to collect intracavity in section, Thus improving the draining safety that transverse tube draining collects section;Transverse tube draining collects the upper surface of section (2) and the bottom surface h of lower end closed Height between 100mm~200mm when, after water seal body component (3) sealing is fixed transverse tube draining and collected section (2), true Guarantor meets water seal height and is more than 50mm, width of flow path more than 10mm, drainage section area more than 1500mm2In the case of can be suitably used for Total height is in the concrete floor of 100mm~200mm;The close standpipe of the Bian Yuxiang of the outer wall of water seal body member upper (18) Outer wall minimum range l of draining section (1), between 40mm~450mm, thus after installing draining manifold, can be stood draining The isolation ornament such as effective ceramic tile, cement encases, and does not affect the draining of the floor drain (23) on plane of structure opening, water seal body component Bottom (20) is collected in the cavity below section (2) positioned at transverse tube draining, and at lower part outlet d be less than collect a section top passage highest Minimum point a of end face, is less than 100mm with collecting section minimum point a distance of top passage highest end face more than 20mm, thus works as water Envelope body component (3) is fixed after transverse tube draining collects section (2), water seal body member lower exit d with collect section top passage The drop of minimum point a of high end face forms the tall and big water seal being less than 100mm in 20mm, is run into room, water with isolating harmful gass D and draining at the lower part outlet of envelope body component collects the bottom c distance of section cavity inner wall and is less than 100mm more than 10mm, thus really Water conservation envelope lower section runner be more than 10mm be less than 100mm, and the top (18) of water seal body component away from plane of structure (9) be more than 5mm so that Do ground decoration layer after installing, the top of water seal body component can be made to be suitable for the ground decoration of different materials different-thickness Layer.Transverse tube draining collects at top standpipe draining section (1) dilatation of section (2) transverse tube interface (44), and transverse tube interface (44) can For connecting other drainage fixture;The outer wall of the least significant end of transverse tube interface (44) is higher than the plane of structure (9) collecting section, transverse tube interface (44) entrance towards and horizontal sextant angle between ± 10 °, be thus used for ground when transverse tube draining collects section (2) and is embedded on the floor in Leakage or during other utensil drainings, transverse tube interface (44) can basset, and is easy to connect other sanitary apparatus, transverse tube interface with collect The angle of section plane of structure (9), between 80 °~100 °, collects the drain cover of water seal body member upper (18) in section when transverse tube draining (23) or water seal body component upper interface (30) the discharge surface water or during other utensil drainings, transverse tube interface (30) is unlikely to bury Enter body of wall, be easy to connect the drainage fixture that transverse tube Yan Qiang lays.
Brief description
Fig. 1 is present configuration schematic diagram.
Fig. 2 is Fig. 1 top view.
Fig. 3 is Fig. 1 front appearance figure.
Fig. 4 is Fig. 1 side external view.
Fig. 5 collects the minimum point a point section section plan view of section top passage highest end face.
Fig. 6 is present configuration decomposing schematic representation.
Fig. 7 is water seal body component upward view of the present invention.
Fig. 8 is the structural decomposition diagram after present invention application.
Fig. 9 is the structural decomposition diagram (floor drain cover strip interface) after present invention application.
Figure 10 is present configuration schematic diagram (the multiple interface of water seal body component band).
Figure 11 is Figure 10 top view.
Specific embodiment
The present invention will be further described below in conjunction with the accompanying drawings, but is not limited to embodiment.
Embodiment 1
As shown in Fig. 1,2,3,4,5, construction drainage manifold of the present invention is converged by standpipe draining section 1, transverse tube draining Collect section 2 and water seal body component 3 is constituted.The upper and lower connection of standpipe draining section 1;Transverse tube draining collects section 2 and is located at standpipe draining section 1 Side, middle vacancy is connected with the middle vacancy of standpipe draining section 1, and it is flat that transverse tube draining collects the plane of structure 9 of section 2 and the inwall of lower section Face, the angle with the upper interface 4 of standpipe draining section 1 is 90 °;Transverse tube draining collects the connectivity part opening of section 2 and standpipe draining section 1 10 cross-sectional area is 3000mm2;The transverse tube draining of connection standpipe draining section 1 collects to have in section 2 and collects a section top passage 13;Converge The distance of the inwall c that minimum point a of highest end face of collection section top passage 13 collects section 2 bottom end closure with transverse tube draining is 85mm, and from collecting the minimum point a horizontal section of section top passage 13 highest end face to water seal body member lower exit d level The cavity volume that section transverse tube draining only collects in section is compared on water seal body component from collecting section top passage 13 highest end face Minimum point a horizontal section stop big 3 times of cavity volume to water seal body member lower exit d horizontal section, and a point and transverse tube are arranged The volume that water collects the container of closed front being formed between the inwall c point of section 2 bottom end closure is 300000mm3;Collect section top The opening that minimum point a of end passage 13 highest end face and transverse tube draining collect the inwall formation of section plane of structure 9 is in that transverse opening 15 is long Spend for 100mm, vertical openings 16 length h is 35mm, the cross-sectional area forming passage is 3500mm2, because transverse opening 15 is long Spend for 100mm, vertical openings 16 length is 35mm, so when draining manifold is embedded in floor, collecting a section top passage To bury below 13 with floor in the middle of, ground is not likely to produce leak;Transverse tube draining collects the upper surface of plane of structure 9 of section and lower end seal The floor height h closing is 125mm;The outer wall of the outer wall side of water seal body member upper 18 and mutually close standpipe draining section is apart from l In 120mm;Water seal body component 3 is upper and lower connection, and bottom 20 external diameter is 65mm, and at lower part outlet, d is less than and collects a section top passage 50mm at minimum point a of highest end face, is formed the water seal of 50mm, the bottom of water seal body component by the drop between this and d The distance that exit d and draining collect the bottom c of cavity inner wall of section is 30mm, and middle part 19 sealing is fixed transverse tube draining and collected Section, top 18 is located above the outer wall of plane of structure 9, is 20mm apart from the outer wall of plane of structure 9;There are drain cover 23, drain cover in top 18 23 is separable with top 18, and transverse tube draining collects has transverse tube interface at the dilatation of standpipe draining section 1 of plane of structure 9 top of section 44, the least significant end of transverse tube interface 44 collects the plane of structure 925mm of section, entrance direction and the level of transverse tube interface 44 higher than transverse tube draining Angle is+2 °, and the angle collecting section with transverse tube draining is 90 °.
Embodiment 2
As shown in fig. 6, the bottom 20 of construction drainage manifold water seal body component of the present invention and water seal body component Middle part 19 is not integrated member, the internal diameter of middle part 19 lower end 31 of water seal body be more than water seal body member lower 20 lower end external diameter and Less than the external diameter of water seal body member lower 20 upper end 33, fluted 34 on the outer wall of water seal body member lower 20 upper end 33, groove There is rubber ring 35, rubber ring 35 is located in 19 inwall in the middle part of water seal body component in 34;Collect when needing maintenance, cleaning transverse tube draining During section 2, only the bottom 20 of water seal body component need to be extracted from the middle part 19 of water seal body component, (water seal body member lower 20 upper end Have handle on 33), when the bottom 20 of water seal body component being inserted the middle part 19 of water seal body component, middle part 19 lower end of water seal body 31 can limit water seal body member lower 20 upper end 33, and fluted 34 on the external diameter of water seal body member lower 20 upper end 33 in Rubber ring 35 makes water seal body bottom upper end 33 outer wall seal up the inwall at the middle part of water seal body, and remaining is with embodiment 1.
Embodiment 3
As shown in Figure 6,7, skyscraper use in toilet draining manifold water seal body member lower of the present invention 20 with In the middle part of water seal body component, 19 is not integrated member, and in the middle part of water seal body component, the internal diameter of 19 lower ends 31 is 70mm, under water seal body component The external diameter of portion 20 lower end is 68mm, and the external diameter of water seal body member lower 20 upper end 33 is 86mm, 19 lower ends in the middle part of water seal body component 31 upper surfaces are contacted with the lower surface of water seal body member lower 20 upper end 33, and are all plane, 19 lower ends in the middle part of water seal body component 2 grooves 39, a diameter of 76mm of groove are had, arc length is 10mm, the outer wall of water seal body member lower 20 has 2 salient points on 31 40, the external diameter of salient point 40 is 75mm, and arc length is 9mm, and in the middle part of water seal body component, the thickness up and down of lower end 31 is 3.5mm, salient point 40 The distance of the lower surface to water seal body member lower 20 upper end 33 for the upper surface be 3.52mm.Remaining is with embodiment 1.
Embodiment 4
As shown in figure 1, having row on the water seal body component 3 of construction drainage manifold water drain cover 23 lower section of the present invention The draining check device 36 automatically opening up during water, being automatically switched off after drained water, remaining is with embodiment 2,3.
Embodiment 5
As a shown in Figure 6, construction drainage manifold transverse tube draining of the present invention collects section 2 with standpipe draining section 1 even The top end opening end face 11 of logical place opening 10 is less than the horizontal section 30mm of plane of structure 9 inwall.Transverse tube draining collects section 2 and standpipe row The bottom end opening end face of water section 1 connectivity part opening 10 is less than and collects a section top passage minimum point a point 35mm, and remaining is with embodiment 4.
Embodiment 6
As shown in Fig. 1,4, construction drainage manifold of the present invention draining of the present invention manifold transverse tube draining converges Collection section 2 connects channel interface 24 on the passage of standpipe draining section 1, accessing the channel interface 24 at dilatation is laterally to access, and stands The transverse tube draining in connectivity part opening 10 outside of bank of tubes water section 1 collects has skew back face e on the channel interface 24 side wall of section.
Embodiment 7
As shown in Figure 10,11, the top 18 of construction drainage manifold water seal body component of the present invention, drain cover 23 There is one or more and horizontal direction lower section in interface 30 between ± 10 ° for the angle, and remaining is with embodiment 6.
Embodiment 8
As shown in Figure 5,6, construction drainage manifold standpipe draining section 1 of the present invention is collected section 2 with transverse tube draining and is Connection molding after being separately made, straight section dilatation 7 and funnel-form dilatation 8 connect molding, water seal body component 2 and transverse tube after being separately made Draining collects connection molding after section 2 is separately made.Collect a section top passage 13, a point and the inclined-plane e of plane of structure 9 lower section are overall structure Part collects section 2 with transverse tube draining and is connected molding for after being separately made.Remaining is with embodiment 7.
The foregoing is only presently preferred embodiments of the present invention, only in order to technical scheme to be described rather than to it Limited, although being described in detail to the present invention with reference to preferred embodiment, those of ordinary skill in the art should Understand: all any modification, equivalent and improvement made within the spirit and principles in the present invention etc., should be included in this Within bright protection domain.

Claims (11)

1. a kind of construction drainage manifold it is characterised in that: section (2) and water seal body are collected by standpipe draining section (1), transverse tube draining Component (3) is constituted;The upper and lower connection of standpipe draining section (1);Transverse tube draining collects the side that section (2) is located at standpipe draining section (1), Middle vacancy is connected with the middle vacancy of standpipe draining section (1), and it is flat that transverse tube draining collects the plane of structure (9) of section (2) and the inwall of lower section Face or close to plane or cambered surface, the angle of the upper interface (4) of plane and standpipe draining section (1) is between 80 °~100 °;Transverse tube is arranged Water collects section (2) and is more than 1500mm with the cross-sectional area of the connectivity part opening (10) of standpipe draining section (1)2;Connection standpipe draining The transverse tube draining of section (1) collects to have in section (2) and collects a section top passage (13);Collect section highest end face of top passage (13) The distance that minimum point a and transverse tube draining collect the inwall c of section (2) bottom end closure is more than 60mm less than 150mm;From collecting a section top The minimum point a horizontal section of the highest end face of passage (13) plays water seal body member lower exit d point horizontal section terminal shape The transverse tube draining becoming collects in the volumetric ratio water seal body member lower of the interior intracavity of section (2) from collecting a section highest for top passage (13) The water seal body structure that the minimum point a horizontal section starting point of end face is formed to water seal body member lower exit d point horizontal section terminal Big more than 1 times of volume in part bottom, and a point and transverse tube draining collect the outer wall being formed between the inwall c of section (2) bottom end closure The volume of the container of closing is more than 140000mm3;Collect section minimum point a of highest end face of top passage (13) and transverse tube draining Collect a section plane of structure (9) inwall formed opening be in transverse opening (15) ultimate range be more than vertical openings (16) maximum away from From, the length of transverse opening (15) is more than 65mm and is less than 250mm, and the length of vertical openings (16) is more than 10mm and is less than 80mm, and Form passage section area and be more than 1500mm2Less than 15000mm2;There is water seal the side that transverse tube draining collects the plane of structure (9) of section (2) Body component (3), water seal body component connects up and down, and top (18) exceed plane of structure (9) in more than 5mm, have drain cover (23), ground above Cancellation Missed (23) is separable with water seal body member upper (18), and the middle part (19) of water seal body component and transverse tube draining collect section (2) it is tightly connected, the transverse tube draining that bottom (20) are located at below plane of structure (9) collects in the cavity of section;Transverse tube draining collects section The floor height h of the upper surface of plane of structure (9) and lower end closed is between 100mm~200mm;The outside on top (18) with mutually close Standpipe draining section outer wall minimum range l between 40mm~450mm;At water seal body component (3) lower part outlet, d is less than and collects Minimum point a of Duan Dingduan passage highest end face, is less than more than 20mm with collecting a section minimum point a distance for top passage highest end face 100mm, d and transverse tube draining at the lower part outlet of water seal body component collects the distance of the inwall c of section (2) bottom end closure more than 10mm Less than 100mm;Transverse tube draining collects the transverse tube interface (44) accessing standpipe draining section (1) above the plane of structure (9) of section, transverse tube connects The least significant end of mouth (44) porch collects the plane of structure (9) of section, the entrance direction of transverse tube interface (44) and level higher than transverse tube draining The angle in direction is between ± 10 °, and transverse tube draining collects section angle between 80 °~100 °.
2. a kind of construction drainage manifold according to claim 1 it is characterised in that: the bottom (20) of water seal body component with The middle part (19) of water seal body component is not integrated member, and the internal diameter of middle part (19) lower end (31) of water seal body component is more than water seal body The external diameter of member lower (20) lower end and be less than the external diameter of water seal body member lower (20) upper end (33), water seal body member lower (20) on the outer wall of upper end (33) fluted (34), in groove (34), there is rubber ring (35), rubber ring (35) is located at water seal body structure In the inwall of (19) in the middle part of part.
3. a kind of construction drainage manifold according to claim 1 it is characterised in that: water seal body member lower (20) and water In the middle part of envelope body component, (19) are not integrated members, and in the middle part of water seal body component, the internal diameter of (19) lower end (31) is more than under water seal body component The external diameter of portion (20) lower end, and it is less than the external diameter of water seal body member lower (20) upper end (33), under (19) in the middle part of water seal body component End (31) upper surface is contacted with the lower surface of water seal body member lower (20) upper end (33), and is all plane.
4. a kind of construction drainage manifold according to claim 3, on (19) lower end (31) internal diameter in the middle part of water seal body component There are 2 grooves (39), the diameter of groove (39) is less than the lower surface external diameter of water seal body member lower (20) upper end (33), water seal body 2 salient points (40) are had on the outer wall of member lower (20), the external diameter of salient point (40) is less than the internal diameter of groove (39), but be more than water seal The internal diameter of (19) lower end (31) in the middle part of body component, the size being smaller in size than groove (39) of salient point (40), the upper table of salient point (40) In the middle part of the distance of the lower surface to water seal body member lower (20) upper end (33) for the face and water seal body component, (19) lower end (31) is upper and lower Thickness is identical or slightly larger, and the external diameter of salient point (40), the internal diameter of groove (39) are respectively less than water seal body member lower (20) upper end (33) The external diameter of lower surface.
5. a kind of construction drainage manifold according to claim 4 it is characterised in that: the water seal body below drain cover (23) The draining check device (36) automatically opening up during draining, being automatically switched off after drained water is had on component (3).
6. a kind of construction drainage manifold according to claim 5 it is characterized in that: transverse tube draining collects section (2) and standpipe The top end opening end face (11) of draining section (1) connectivity part opening (10) is less than the horizontal section of plane of structure (9) inwall.
7. a kind of construction drainage manifold according to claim 6 it is characterised in that: transverse tube draining collect section (2) connect Channel interface (24) is had on the passage of standpipe draining section (1), the channel interface (24) accessing standpipe draining section (1) is laterally to connect Enter, the transverse tube draining outside the connectivity part opening (10) of standpipe draining section (1) collects skew back face e on the side wall of section passage.
8. a kind of construction drainage manifold according to claim 7 it is characterised in that the top (18) of water seal body component, There is one or more and horizontal direction the lower section of Cancellation Missed (23) in interface (30) between ± 10 ° for the angle.
9. a kind of construction drainage manifold according to claim 8 it is characterised in that: on standpipe draining section (1) outer wall and Transverse tube draining collects one or more anti-hydrofoil ring (37) on section (2) outer wall.
10. a kind of construction drainage manifold according to claim 9 it is characterised in that: drain cover has internal diameter big on (23) It is less than the interface (38) of 55mm in 25mm.
A kind of 11. construction drainage manifolds according to claim 10 it is characterised in that: standpipe draining section (1) and transverse tube Draining is collected section (2) and is collected after section (2) is separately made with transverse tube draining and be connected for connecting molding, water seal body component after being separately made Molding, a section top passage (13), a point and skew back face e were integrated member and transverse tube draining collects section collecting below plane of structure (9) (2) for connecting molding after being separately made.
CN201510122627.9A 2015-03-20 2015-03-20 Building drainage concentrator Active CN104695517B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510122627.9A CN104695517B (en) 2015-03-20 2015-03-20 Building drainage concentrator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510122627.9A CN104695517B (en) 2015-03-20 2015-03-20 Building drainage concentrator

Publications (2)

Publication Number Publication Date
CN104695517A CN104695517A (en) 2015-06-10
CN104695517B true CN104695517B (en) 2017-01-25

Family

ID=53343029

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510122627.9A Active CN104695517B (en) 2015-03-20 2015-03-20 Building drainage concentrator

Country Status (1)

Country Link
CN (1) CN104695517B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113529873A (en) * 2020-04-13 2021-10-22 孙银奎 Drainage pipe for building convenient to overhaul

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH073853A (en) * 1993-06-22 1995-01-06 Sekisui Chem Co Ltd Concentric joint and drain piping structure by use thereof
KR100796352B1 (en) * 2006-11-10 2008-01-21 조혜란 Drainage piping structure of apatrment house
KR20080017112A (en) * 2006-08-21 2008-02-26 고재언 Korea ko total toilet sleeve system (kkttss)
CN102839724A (en) * 2012-09-26 2012-12-26 昆明群之英科技有限公司 Same floor draining joint for building
CN203080629U (en) * 2013-03-12 2013-07-24 浙江中财管道科技股份有限公司 Stand pipe water collector

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204919713U (en) * 2015-03-20 2015-12-30 贵州群之英科技铸造有限公司 Building drainage manifold

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH073853A (en) * 1993-06-22 1995-01-06 Sekisui Chem Co Ltd Concentric joint and drain piping structure by use thereof
KR20080017112A (en) * 2006-08-21 2008-02-26 고재언 Korea ko total toilet sleeve system (kkttss)
KR100796352B1 (en) * 2006-11-10 2008-01-21 조혜란 Drainage piping structure of apatrment house
CN102839724A (en) * 2012-09-26 2012-12-26 昆明群之英科技有限公司 Same floor draining joint for building
CN203080629U (en) * 2013-03-12 2013-07-24 浙江中财管道科技股份有限公司 Stand pipe water collector

Also Published As

Publication number Publication date
CN104695517A (en) 2015-06-10

Similar Documents

Publication Publication Date Title
CN104695514B (en) Embedded type drainage concentrator for building
CN104695515B (en) Volume-expanded drainage concentrator for toilet of building
CN109162338A (en) A kind of assembled architecture embedding pipe fittings
CN204703277U (en) A kind of building spiral-flow type draining manifold
CN104727430B (en) Spiral-flow type drainage converging device for building
CN204919713U (en) Building drainage manifold
CN104695517B (en) Building drainage concentrator
CN204919701U (en) Spiral flow drained water collector for building kitchenes
CN204919710U (en) Construct pre -buried formula drainage manifold
CN104727431B (en) A kind of building balcony draining manifold
CN204703275U (en) A kind of building balcony expanding type draining manifold
CN204919712U (en) High -rise building is drainage manifold for bathroom
CN204919711U (en) Building dilatation formula drainage manifold for bathroom
CN204919709U (en) High -rise building for kitchen use drainage manifold
CN204703276U (en) A kind of building pre-buried type balcony draining manifold
CN104727432B (en) A kind of building balcony expanding type draining manifold
CN104727429B (en) A kind of building built-in type balcony draining manifold
CN104695516B (en) Drainage concentrator for high-rise building toilet
CN204919762U (en) Building bathroom, kitchen, balcony are used with a layer drainage joint
CN104763022B (en) A kind of building spiral-flow type draining manifold for kitchen use
CN209308138U (en) A kind of assembled architecture embedding pipe fittings
CN204919772U (en) Construct no dilatation formula drainage manifold
CN104712051B (en) Building dilatation-free type drainage gathering device
CN204919771U (en) Building drainage manifold for balcony
CN104712024B (en) A kind of skyscraper draining manifold for kitchen use

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 553203 Magu Industrial Park, Hezhang County, Bijie Prefecture, Guizhou Province

Patentee after: Guizhou qunzhiying Housing Technology Co.,Ltd.

Address before: 553203 Magu Industrial Park, Hezhang County, Bijie Prefecture, Guizhou Province

Patentee before: GUIZHOU QUNZHIYING SCIENCE & TECHNOLOGY CASTING CO.,LTD.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 553203 Magu Industrial Park, Hezhang County, Bijie Prefecture, Guizhou Province

Patentee after: Guizhou qunzhiying Housing Technology Co.,Ltd.

Address before: 553203 Magu Industrial Park, Hezhang County, Bijie Prefecture, Guizhou Province

Patentee before: GUIZHOU QUNZHIYING SCIENCE & TECHNOLOGY CASTING CO.,LTD.

CP01 Change in the name or title of a patent holder