CN104680311B - Emergency broadcase system scheduling controlling scheme generation method - Google Patents
Emergency broadcase system scheduling controlling scheme generation method Download PDFInfo
- Publication number
- CN104680311B CN104680311B CN201510059634.9A CN201510059634A CN104680311B CN 104680311 B CN104680311 B CN 104680311B CN 201510059634 A CN201510059634 A CN 201510059634A CN 104680311 B CN104680311 B CN 104680311B
- Authority
- CN
- China
- Prior art keywords
- region
- task
- resource
- information field
- publishing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 17
- 230000001788 irregular Effects 0.000 claims description 8
- 238000006243 chemical reaction Methods 0.000 claims description 6
- 238000010276 construction Methods 0.000 abstract description 5
- 230000009471 action Effects 0.000 abstract description 2
- 230000000694 effects Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000009472 formulation Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 230000004913 activation Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 230000005180 public health Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
- G06Q50/265—Personal security, identity or safety
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Computer Security & Cryptography (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of emergency broadcase system scheduling controlling scheme generation methods, include the following steps:S1, the Resources list and task record are obtained from database;S2, according in the Resources list and task record maximum issue region is calculated with the relevant information field in region;S3, according in the Resources list and task record time match result is calculated with the information field of time correlation;S4, according in the Resources list and task record resource matched result is obtained with the relevant information field of resource;S5, language matching result is broadcast according to obtaining original with the relevant information field of language in the Resources list and task record;S6, several schemes are obtained to four kinds of results progress permutation and combination;Scheme that four kinds meet actual demand is filtered out in S7, several schemes obtained from step S6 for policymaker's decision.The present invention can aid decision person real-time, quickly and accurately formulate emergency command scheme, for emergent broadcast construction have great booster action.
Description
Technical field
The invention belongs to emergency broadcase system technical fields, and in particular to a kind of emergency broadcase system scheduling controlling scheme life
At the design of method.
Background technology
Emergent broadcast refers to occurring in Emergent Public Events such as natural calamity, accident, public health and social safeties
When, government issues emergency message with broadcast mode to the public, provides information service, assist disaster relief rescue a kind of authoritative channel and
Important means is the important content of the national construction of Emergent Public Events Emergency System and System Construction of preventing and reducing natural disasters, and is town and country base
The important content of this public service.
Emergency command scheduling controlling scheme is also known as contingency plan, be for ensure it is rapid, orderly, be effectively directed to and occurred
Or the accident that may occur, control broadcast is carried out using broadcasting equipment, to have the function that broadcast early warning, is avoided as possible
The generation of event damages caused by reducing it.The emergency scheme pre-established according to relevant laws and regulations is exactly
In order to cope with the Broadcasting Control instruction of various accidents.
With the continuous expansion of emergency broadcase system construction scale, rational emergency command is selected for various accidents
Scheme becomes the most important thing of its development, especially for the incident area of the accidents such as this earthquake of Sichuan Province, mud-rock flow
Domain, can in the shortest time, fast and effeciently to formulate corresponding emergency command scheme be vital.But at present in this side
The application technology in face is not still very ripe, and at present for the formulation of emergency command scheme, most area mainly still relies on
Decision is manually carried out according to the emergency data of acquisition, covering surface is not wide enough, the broadcasting frequency is not high enough, less pertinence is strong, causes
For the broadcast of accident cannot reach in real time, fast and accurately effect, this causes the property and safety of country, the people
Great harm.
Invention content
The purpose of the present invention is to solve cannot reach real-time, fast for the formulation of emergency command scheme in the prior art
A kind of the problem of fast, accurate effect, it is proposed that emergency broadcase system scheduling controlling scheme generation method.
The technical scheme is that:A kind of emergency broadcase system scheduling controlling scheme generation method, which is characterized in that packet
Include following steps:
S1, the Resources list and task record are obtained from database;
S2, according in the Resources list and task record maximum issue region is calculated with the relevant information field in region;
S3, according in the Resources list and task record time match result is calculated with the information field of time correlation;
S4, according in the Resources list and task record resource matched result is obtained with the relevant information field of resource;
S5, language matching result is broadcast according to obtaining original with the relevant information field of language in the Resources list and task record;
S6, it language matching result is broadcast to maximum issue region, time match result, resource matched result and original arranges
Row combination obtains several emergency broadcase system scheduling controlling schemes;
S7, actual conditions and relevant national standard according to different regions, several emergent broadcasts obtained from step S6
Scheme that four kinds meet actual demand is filtered out in system call control program for policymaker's decision.
Further, include Regular Task publishing region, irregular task publishing region with the relevant information field in region
With resource overlay area;Information field with time correlation includes task issuing time, task execution duration and equipment operation letter
Breath;Include task publication means, device resource type, default publications channel and default frequency with the relevant information field of resource;
Include task publication language and programme language with the relevant information field of language.
Further, step S2 specifically includes following steps:
S21, input the Resources list and task record;
S22, resource overlay area in the Resources list is judged whether within task publishing region, if in task advertisement
The judgement of Regular Task publishing region is then carried out within domain, and step S21 is re-started if not within task publishing region;
S23, judge whether the task publishing region in task record is Regular Task publishing region according to region dictionary, if
Task publishing region is Regular Task publishing region, then compartmentalization point is carried out to it according to province, city, county's standard;If task is issued
Region is irregular task publishing region, then carries out GIS conversions to it, obtain optimal publishing region;
S24, by the optimal publishing region obtained in step S23 with carry out the Regular Task publishing region after compartmentalization point into
Row merges, and obtains formal publishing region;
S25, the formal publishing region obtained in step S24 is matched with resource overlay area by region ID, is obtained
To maximum issue region.
Further, the GIS conversions in step S23 are to be issued task not using relevant figure layer analysis tool in GIS
Regular domain is scaled smallest size region, then further according to the relationship between superior and subordinate of administrative region, will meet merging condition most
Small-scale region merging technique is the maximum zone of convergency, as optimal publishing region.
Further, the resource matched result in step S5 includes default resource matching and all resource matched, acquiescence money
Source matching is used in the equipment release tasks that within the scope of task issuing time and itself also works in normal operation, all resources
Matching is used in all devices release tasks within the scope of task issuing time.
The beneficial effects of the invention are as follows:The present invention utilizes computer software technology, according to the actual conditions of different geographical, knot
It closes relevant business demand and has formulated a variety of typical emergency command schemes.These emergency command schemes are before accident generation
Or when occurring, emergency command personnel can be efficiently assisted to carry out the final decision of scheme, finally by the approach of emergent broadcast
The local masses for notifying accident to occur or occur in advance, reach the final purpose for saving people's life and property safety, have
In real time, fast and accurately technique effect has great booster action for the construction of emergent broadcast.
Description of the drawings
Fig. 1 is emergency broadcase system scheduling controlling scheme generation method main flow chart provided by the invention.
Fig. 2 is the particular flow sheet of step of embodiment of the present invention S2.
Fig. 3 is time match of embodiment of the present invention task and equipment service chart.
Specific implementation mode
The embodiment of the present invention is further described below in conjunction with the accompanying drawings.
The present invention provides a kind of emergency broadcase system scheduling controlling scheme generation method, main flow chart as shown in Figure 1,
Include the following steps:
S1, the Resources list and task record are obtained from database.
Wherein, the Resources list and task record include with region, time, resource, the relevant information field of language, with region
Relevant information field includes Regular Task publishing region, irregular task publishing region and resource overlay area;With time phase
The information field of pass includes task issuing time, task execution duration and equipment operation information;With the relevant information field of resource
Including task publication means, device resource type, default publications channel and default frequency;Include with the relevant information field of language
Task issues language and programme language.
S2, maximum issue region is calculated according to the relevant information field in region;
This step particular flow sheet is as shown in Fig. 2, include the following steps:
S21, input the Resources list and task record;
S22, resource overlay area in the Resources list is judged whether within task publishing region, if in task advertisement
The judgement of Regular Task publishing region is then carried out within domain, and step S21 is re-started if not within task publishing region;
S23, judge whether the task publishing region in task record is Regular Task publishing region according to region dictionary, if
Task publishing region is Regular Task publishing region, then compartmentalization point is carried out to it according to province, city, county's standard;If task is issued
Region is irregular task publishing region, then carries out GIS conversions to it, obtain optimal publishing region;
Wherein, GIS conversions are to be scaled task publication irregular area most using relevant figure layer analysis tool in GIS
The smallest size region merging technique for meeting merging condition is by small-scale region then further according to the relationship between superior and subordinate of administrative region
The maximum zone of convergency, as optimal publishing region.
S24, by the optimal publishing region obtained in step S23 with carry out the Regular Task publishing region after compartmentalization point into
Row merges, and obtains formal publishing region;
S25, the formal publishing region obtained in step S24 is matched with resource overlay area by region ID, is obtained
To maximum issue region.
S3, time match result is calculated according to the information field of time correlation:As shown in figure 3, according to task publication
Initial time, end time, the publication frequency obtain task run figure as shown in the figure with the period, further according to equipment in the Resources list
Relevant information obtains equipment service chart, judges which sets eventually by whether operation hours in task broadcasts the period
It is standby to need to be issued activation instruction.
S4, resource matched result is obtained according to the relevant information field of resource:First to the resource in the Resources list into
Row is sorted out, such as cable digital TV, terrestrial DTV, the sound broadcast of village of village, medium wave broadcast, satellite-signal, then by appointing
Business publication means determine the type of resource response, while being confirmed whether only default resource by the default setting of resource to match
Equipment is issued, and two spike-type cultivars matching result is finally obtained, as follows respectively:
If only default resource equipment is issued, resource matched result matches for default resource, i.e., when equipment is in
Within the scope of task issuing time and itself is also when normal operation works, and in this period, we can enable this equipment
Our task is issued, to just carry out the matching of default resource, miscellaneous equipment is successively similarly;
If more than default resource equipment is issued, resource matched result is all resource matched, as long as exist
In the selected time zone for needing release tasks, no matter the equipment works whether normal operation, we are by all regions
Equipment wake up so that the task can be released timely.
S5, basis obtain original with the relevant information field of language and broadcast language matching result:Input has acquiescence in systems
The resource type and task for issuing channel, default frequency and programme language issue language, calculate original and broadcast language matching result.Institute
Meaning original broadcasts language matching, exactly checks task publication language and the original with default publications channel and default frequency in the Resources list
Broadcast whether programme language matches.
S6, it language matching result is broadcast to maximum issue region, time match result, resource matched result and original arranges
Row combination obtains several emergency broadcase system scheduling controlling schemes.
S7, actual conditions and relevant national standard according to different regions, several emergent broadcasts obtained from step S6
Scheme that four kinds meet actual demand is filtered out in system call control program for policymaker's decision, such as:
Scheme 1:Using maximum issue region, time range is not considered, all resources of matching, do not consider that language matches;
Scheme 2:Using affiliated publishing region, time range, all resources of matching, consideration language matching are not considered;
Scheme 3:Using affiliated publishing region, time range, matching default resource, consideration language matching are not considered;
Scheme 4:Using affiliated publishing region, consider time range, matching default resource, consideration language matching.
Those of ordinary skill in the art will understand that the embodiments described herein, which is to help reader, understands this hair
Bright principle, it should be understood that protection scope of the present invention is not limited to such specific embodiments and embodiments.This field
Those of ordinary skill can make according to the technical disclosures disclosed by the invention various does not depart from the other each of essence of the invention
The specific variations and combinations of kind, these variations and combinations are still within the scope of the present invention.
Claims (5)
1. a kind of emergency broadcase system scheduling controlling scheme generation method, which is characterized in that include the following steps:
S1, the Resources list and task record are obtained from database;Described the Resources list and task record include with region, when
Between, resource, the relevant information field of language, with the relevant information field in region include Regular Task publishing region, irregular appoint
Business publishing region and resource overlay area;Information field with time correlation include task issuing time, task execution duration and
Equipment operation information;With the relevant information field of resource include task publication means, device resource type, default publications channel and
Default frequency;Include task publication language and programme language with the relevant information field of language;
S2, according in the Resources list and task record maximum issue region is calculated with the relevant information field in region;
S3, according in the Resources list and task record time match result is calculated with the information field of time correlation;
S4, according in the Resources list and task record resource matched result is obtained with the relevant information field of resource;
S5, language matching result is broadcast according to obtaining original with the relevant information field of language in the Resources list and task record;
S6, it language matching result is broadcast to maximum issue region, time match result, resource matched result and original carries out arrangement group
Conjunction obtains several emergency broadcase system scheduling controlling schemes.
2. emergency broadcase system scheduling controlling scheme generation method according to claim 1, which is characterized in that further packet
Include step:
S7, actual conditions and relevant national standard according to different regions, several emergency broadcase systems obtained from step S6
Scheme that four kinds meet actual demand is filtered out in scheduling controlling scheme for policymaker's decision.
3. emergency broadcase system scheduling controlling scheme generation method according to claim 1, which is characterized in that the step
S2 specifically includes following steps:
S21, input the Resources list and task record;
S22, judge resource overlay area in the Resources list whether within task publishing region, if task publishing region it
The judgement of Regular Task publishing region is inside then carried out, step S21 is re-started if not within task publishing region;
S23, judge whether the task publishing region in task record is Regular Task publishing region according to region dictionary, if task
Publishing region is Regular Task publishing region, then compartmentalization point is carried out to it according to province, city, county's standard;If task publishing region
For irregular task publishing region, then GIS conversions are carried out to it, obtains optimal publishing region;
S24, the optimal publishing region obtained in step S23 is closed with the Regular Task publishing region after compartmentalization divides is carried out
And obtain formal publishing region;
S25, the formal publishing region obtained in step S24 is matched with resource overlay area by region ID, is obtained most
Big publishing region.
4. emergency broadcase system scheduling controlling scheme generation method according to claim 3, which is characterized in that the step
GIS conversions in S23 are that task publication irregular area is scaled smallest size using relevant figure layer analysis tool in GIS
The smallest size region merging technique for meeting merging condition is maximum poly- then further according to the relationship between superior and subordinate of administrative region by region
Close region, as optimal publishing region.
5. emergency broadcase system scheduling controlling scheme generation method according to claim 1, which is characterized in that the step
Resource matched result in S5 include default resource matching and it is all resource matched;The default resource matching is used in task
Within the scope of issuing time and itself is also in the equipment release tasks of normal operation work;All resource matched are used in are appointed
All devices release tasks within the scope of issuing time of being engaged in.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510059634.9A CN104680311B (en) | 2015-02-05 | 2015-02-05 | Emergency broadcase system scheduling controlling scheme generation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510059634.9A CN104680311B (en) | 2015-02-05 | 2015-02-05 | Emergency broadcase system scheduling controlling scheme generation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104680311A CN104680311A (en) | 2015-06-03 |
CN104680311B true CN104680311B (en) | 2018-07-27 |
Family
ID=53315319
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510059634.9A Active CN104680311B (en) | 2015-02-05 | 2015-02-05 | Emergency broadcase system scheduling controlling scheme generation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104680311B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105391507A (en) * | 2015-10-12 | 2016-03-09 | 成都九十度工业产品设计有限公司 | Emergency broadcasting text information data analyzing method and system |
CN105703860B (en) * | 2016-03-15 | 2018-10-02 | 北京数码视讯科技股份有限公司 | A kind of emergent broadcast method and device |
CN106603179B (en) * | 2017-01-03 | 2019-04-02 | 北京数码视讯科技股份有限公司 | Emergent broadcast Screening germplasm method and system |
CN108197165A (en) * | 2017-12-15 | 2018-06-22 | 南京熊猫电子股份有限公司 | A kind of emergent broadcast regional choice dispatch control method |
CN110545150A (en) * | 2018-05-28 | 2019-12-06 | 南京熊猫电子股份有限公司 | Information release control method for emergency broadcast using scheduling plan |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101840439A (en) * | 2010-05-25 | 2010-09-22 | 天津大学 | Emergency situation recommending method based on emergency incident and emergency response plan |
CN102831510A (en) * | 2012-09-11 | 2012-12-19 | 中国长江三峡集团公司 | Emergency response dispatching method and system based on three-level command mode of enterprise |
CN103810560A (en) * | 2013-11-01 | 2014-05-21 | 北京交通大学 | Emergency resource scheduling method for emergencies of rail transit |
-
2015
- 2015-02-05 CN CN201510059634.9A patent/CN104680311B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101840439A (en) * | 2010-05-25 | 2010-09-22 | 天津大学 | Emergency situation recommending method based on emergency incident and emergency response plan |
CN102831510A (en) * | 2012-09-11 | 2012-12-19 | 中国长江三峡集团公司 | Emergency response dispatching method and system based on three-level command mode of enterprise |
CN103810560A (en) * | 2013-11-01 | 2014-05-21 | 北京交通大学 | Emergency resource scheduling method for emergencies of rail transit |
Non-Patent Citations (2)
Title |
---|
关于应急广播调度控制系统的设计;李翔 等;《2013国际传输与覆盖研讨会论文集》;20131023;第115-119页 * |
应急广播指令设计思路;赵翮;《广播与电视技术》;20141115;第41卷(第11期);第91-94页 * |
Also Published As
Publication number | Publication date |
---|---|
CN104680311A (en) | 2015-06-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104680311B (en) | Emergency broadcase system scheduling controlling scheme generation method | |
WO2006069199A3 (en) | Personal credit management and monitoring system and method | |
Shaw | Post disaster recovery: Issues and challenges | |
Zamuda et al. | Federal adaptation and mitigation programs supporting Community investment in electricity resilience to extreme weather | |
Laugé et al. | The role of critical infrastructures’ interdependencies on the impacts caused by natural disasters | |
Rudari | RASOR Project: Rapid analysis and spatialisation of risk, from hazard to risk using EO data | |
CN110232355A (en) | A kind of gas station's business revenue monitoring method and system | |
TW200701198A (en) | Method for executing scheduled record task | |
Selva et al. | From regional to site specific SPTHA through inundation simulations: a case study for three test sites in Central Mediterranean | |
Huang et al. | Urban resilience assessment to flood risk using PSR model and system dynamics | |
Sorensen et al. | Warnings and human response in the Oroville Dam crisis, February 2017 | |
CN106341261A (en) | Remote alarm method and device | |
Zaniboni et al. | Risk Assessment Methodology for Cascading Earthquake and Tsunami Impact Applied to the Town of Augusta (Eastern Sicily, Italy) | |
Parisi et al. | Cascading disasters in the huge coastal aquifer of Salento (Apulia region, Southern Italy) ensuing droughts | |
Necmioglu et al. | Challenges and requirements for near-field tsunami warning in the Aegean Sea and Eastern Mediterranean | |
Dottori et al. | Satellites, tweets, forecasts: the future of flood disaster management? | |
Mavrova-Guirguinova et al. | Rossitsa River Basin: Flood Hazard and Risk Identification | |
Yang et al. | Responding to extreme weather with innovative urban social governance mechanisms driven by complex adaptive systems theory: The 7.20 Zhengzhou flood | |
Mazzoleni et al. | When the Levee Breaks: Cascading Effects | |
Baag et al. | Determination of megathrust rupture processes using 3D Green functions for tsunami early warning | |
Vanacore et al. | The Puerto Rico Component of the National Tsunami Hazard and Mitigation Program (PR-NTHMP) | |
Daniels et al. | Earthquake Similarity through Graphical Modeling of Arrival Time Data | |
Tyagi et al. | Multi Hazard Risk and Vulnerability Assessment of an Urban Agglomeration Under Climate Change | |
Cheng et al. | Multi-segment Rupture Probabilities on the Xianshuihe Fault Zone, Southwestern China | |
Omira et al. | Tsunamis along the Peru-Chile Trench: analysing the effect of co-seismic deformation on tsunami inundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |