CN104680311B - Emergency broadcase system scheduling controlling scheme generation method - Google Patents

Emergency broadcase system scheduling controlling scheme generation method Download PDF

Info

Publication number
CN104680311B
CN104680311B CN201510059634.9A CN201510059634A CN104680311B CN 104680311 B CN104680311 B CN 104680311B CN 201510059634 A CN201510059634 A CN 201510059634A CN 104680311 B CN104680311 B CN 104680311B
Authority
CN
China
Prior art keywords
region
task
resource
information field
publishing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510059634.9A
Other languages
Chinese (zh)
Other versions
CN104680311A (en
Inventor
袁俊
彭宇
李天兴
谭亚林
王博
邓良军
苏欧
胡文蓉
何文
闫世博
彭森
汪勇强
李英玲
张亚茹
宋美蓉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Jiuzhou Electronic Information System Co Ltd
Original Assignee
Chengdu Jiuzhou Electronic Information System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Jiuzhou Electronic Information System Co Ltd filed Critical Chengdu Jiuzhou Electronic Information System Co Ltd
Priority to CN201510059634.9A priority Critical patent/CN104680311B/en
Publication of CN104680311A publication Critical patent/CN104680311A/en
Application granted granted Critical
Publication of CN104680311B publication Critical patent/CN104680311B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services
    • G06Q50/265Personal security, identity or safety

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Computer Security & Cryptography (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of emergency broadcase system scheduling controlling scheme generation methods, include the following steps:S1, the Resources list and task record are obtained from database;S2, according in the Resources list and task record maximum issue region is calculated with the relevant information field in region;S3, according in the Resources list and task record time match result is calculated with the information field of time correlation;S4, according in the Resources list and task record resource matched result is obtained with the relevant information field of resource;S5, language matching result is broadcast according to obtaining original with the relevant information field of language in the Resources list and task record;S6, several schemes are obtained to four kinds of results progress permutation and combination;Scheme that four kinds meet actual demand is filtered out in S7, several schemes obtained from step S6 for policymaker's decision.The present invention can aid decision person real-time, quickly and accurately formulate emergency command scheme, for emergent broadcast construction have great booster action.

Description

Emergency broadcase system scheduling controlling scheme generation method
Technical field
The invention belongs to emergency broadcase system technical fields, and in particular to a kind of emergency broadcase system scheduling controlling scheme life At the design of method.
Background technology
Emergent broadcast refers to occurring in Emergent Public Events such as natural calamity, accident, public health and social safeties When, government issues emergency message with broadcast mode to the public, provides information service, assist disaster relief rescue a kind of authoritative channel and Important means is the important content of the national construction of Emergent Public Events Emergency System and System Construction of preventing and reducing natural disasters, and is town and country base The important content of this public service.
Emergency command scheduling controlling scheme is also known as contingency plan, be for ensure it is rapid, orderly, be effectively directed to and occurred Or the accident that may occur, control broadcast is carried out using broadcasting equipment, to have the function that broadcast early warning, is avoided as possible The generation of event damages caused by reducing it.The emergency scheme pre-established according to relevant laws and regulations is exactly In order to cope with the Broadcasting Control instruction of various accidents.
With the continuous expansion of emergency broadcase system construction scale, rational emergency command is selected for various accidents Scheme becomes the most important thing of its development, especially for the incident area of the accidents such as this earthquake of Sichuan Province, mud-rock flow Domain, can in the shortest time, fast and effeciently to formulate corresponding emergency command scheme be vital.But at present in this side The application technology in face is not still very ripe, and at present for the formulation of emergency command scheme, most area mainly still relies on Decision is manually carried out according to the emergency data of acquisition, covering surface is not wide enough, the broadcasting frequency is not high enough, less pertinence is strong, causes For the broadcast of accident cannot reach in real time, fast and accurately effect, this causes the property and safety of country, the people Great harm.
Invention content
The purpose of the present invention is to solve cannot reach real-time, fast for the formulation of emergency command scheme in the prior art A kind of the problem of fast, accurate effect, it is proposed that emergency broadcase system scheduling controlling scheme generation method.
The technical scheme is that:A kind of emergency broadcase system scheduling controlling scheme generation method, which is characterized in that packet Include following steps:
S1, the Resources list and task record are obtained from database;
S2, according in the Resources list and task record maximum issue region is calculated with the relevant information field in region;
S3, according in the Resources list and task record time match result is calculated with the information field of time correlation;
S4, according in the Resources list and task record resource matched result is obtained with the relevant information field of resource;
S5, language matching result is broadcast according to obtaining original with the relevant information field of language in the Resources list and task record;
S6, it language matching result is broadcast to maximum issue region, time match result, resource matched result and original arranges Row combination obtains several emergency broadcase system scheduling controlling schemes;
S7, actual conditions and relevant national standard according to different regions, several emergent broadcasts obtained from step S6 Scheme that four kinds meet actual demand is filtered out in system call control program for policymaker's decision.
Further, include Regular Task publishing region, irregular task publishing region with the relevant information field in region With resource overlay area;Information field with time correlation includes task issuing time, task execution duration and equipment operation letter Breath;Include task publication means, device resource type, default publications channel and default frequency with the relevant information field of resource; Include task publication language and programme language with the relevant information field of language.
Further, step S2 specifically includes following steps:
S21, input the Resources list and task record;
S22, resource overlay area in the Resources list is judged whether within task publishing region, if in task advertisement The judgement of Regular Task publishing region is then carried out within domain, and step S21 is re-started if not within task publishing region;
S23, judge whether the task publishing region in task record is Regular Task publishing region according to region dictionary, if Task publishing region is Regular Task publishing region, then compartmentalization point is carried out to it according to province, city, county's standard;If task is issued Region is irregular task publishing region, then carries out GIS conversions to it, obtain optimal publishing region;
S24, by the optimal publishing region obtained in step S23 with carry out the Regular Task publishing region after compartmentalization point into Row merges, and obtains formal publishing region;
S25, the formal publishing region obtained in step S24 is matched with resource overlay area by region ID, is obtained To maximum issue region.
Further, the GIS conversions in step S23 are to be issued task not using relevant figure layer analysis tool in GIS Regular domain is scaled smallest size region, then further according to the relationship between superior and subordinate of administrative region, will meet merging condition most Small-scale region merging technique is the maximum zone of convergency, as optimal publishing region.
Further, the resource matched result in step S5 includes default resource matching and all resource matched, acquiescence money Source matching is used in the equipment release tasks that within the scope of task issuing time and itself also works in normal operation, all resources Matching is used in all devices release tasks within the scope of task issuing time.
The beneficial effects of the invention are as follows:The present invention utilizes computer software technology, according to the actual conditions of different geographical, knot It closes relevant business demand and has formulated a variety of typical emergency command schemes.These emergency command schemes are before accident generation Or when occurring, emergency command personnel can be efficiently assisted to carry out the final decision of scheme, finally by the approach of emergent broadcast The local masses for notifying accident to occur or occur in advance, reach the final purpose for saving people's life and property safety, have In real time, fast and accurately technique effect has great booster action for the construction of emergent broadcast.
Description of the drawings
Fig. 1 is emergency broadcase system scheduling controlling scheme generation method main flow chart provided by the invention.
Fig. 2 is the particular flow sheet of step of embodiment of the present invention S2.
Fig. 3 is time match of embodiment of the present invention task and equipment service chart.
Specific implementation mode
The embodiment of the present invention is further described below in conjunction with the accompanying drawings.
The present invention provides a kind of emergency broadcase system scheduling controlling scheme generation method, main flow chart as shown in Figure 1, Include the following steps:
S1, the Resources list and task record are obtained from database.
Wherein, the Resources list and task record include with region, time, resource, the relevant information field of language, with region Relevant information field includes Regular Task publishing region, irregular task publishing region and resource overlay area;With time phase The information field of pass includes task issuing time, task execution duration and equipment operation information;With the relevant information field of resource Including task publication means, device resource type, default publications channel and default frequency;Include with the relevant information field of language Task issues language and programme language.
S2, maximum issue region is calculated according to the relevant information field in region;
This step particular flow sheet is as shown in Fig. 2, include the following steps:
S21, input the Resources list and task record;
S22, resource overlay area in the Resources list is judged whether within task publishing region, if in task advertisement The judgement of Regular Task publishing region is then carried out within domain, and step S21 is re-started if not within task publishing region;
S23, judge whether the task publishing region in task record is Regular Task publishing region according to region dictionary, if Task publishing region is Regular Task publishing region, then compartmentalization point is carried out to it according to province, city, county's standard;If task is issued Region is irregular task publishing region, then carries out GIS conversions to it, obtain optimal publishing region;
Wherein, GIS conversions are to be scaled task publication irregular area most using relevant figure layer analysis tool in GIS The smallest size region merging technique for meeting merging condition is by small-scale region then further according to the relationship between superior and subordinate of administrative region The maximum zone of convergency, as optimal publishing region.
S24, by the optimal publishing region obtained in step S23 with carry out the Regular Task publishing region after compartmentalization point into Row merges, and obtains formal publishing region;
S25, the formal publishing region obtained in step S24 is matched with resource overlay area by region ID, is obtained To maximum issue region.
S3, time match result is calculated according to the information field of time correlation:As shown in figure 3, according to task publication Initial time, end time, the publication frequency obtain task run figure as shown in the figure with the period, further according to equipment in the Resources list Relevant information obtains equipment service chart, judges which sets eventually by whether operation hours in task broadcasts the period It is standby to need to be issued activation instruction.
S4, resource matched result is obtained according to the relevant information field of resource:First to the resource in the Resources list into Row is sorted out, such as cable digital TV, terrestrial DTV, the sound broadcast of village of village, medium wave broadcast, satellite-signal, then by appointing Business publication means determine the type of resource response, while being confirmed whether only default resource by the default setting of resource to match Equipment is issued, and two spike-type cultivars matching result is finally obtained, as follows respectively:
If only default resource equipment is issued, resource matched result matches for default resource, i.e., when equipment is in Within the scope of task issuing time and itself is also when normal operation works, and in this period, we can enable this equipment Our task is issued, to just carry out the matching of default resource, miscellaneous equipment is successively similarly;
If more than default resource equipment is issued, resource matched result is all resource matched, as long as exist In the selected time zone for needing release tasks, no matter the equipment works whether normal operation, we are by all regions Equipment wake up so that the task can be released timely.
S5, basis obtain original with the relevant information field of language and broadcast language matching result:Input has acquiescence in systems The resource type and task for issuing channel, default frequency and programme language issue language, calculate original and broadcast language matching result.Institute Meaning original broadcasts language matching, exactly checks task publication language and the original with default publications channel and default frequency in the Resources list Broadcast whether programme language matches.
S6, it language matching result is broadcast to maximum issue region, time match result, resource matched result and original arranges Row combination obtains several emergency broadcase system scheduling controlling schemes.
S7, actual conditions and relevant national standard according to different regions, several emergent broadcasts obtained from step S6 Scheme that four kinds meet actual demand is filtered out in system call control program for policymaker's decision, such as:
Scheme 1:Using maximum issue region, time range is not considered, all resources of matching, do not consider that language matches;
Scheme 2:Using affiliated publishing region, time range, all resources of matching, consideration language matching are not considered;
Scheme 3:Using affiliated publishing region, time range, matching default resource, consideration language matching are not considered;
Scheme 4:Using affiliated publishing region, consider time range, matching default resource, consideration language matching.
Those of ordinary skill in the art will understand that the embodiments described herein, which is to help reader, understands this hair Bright principle, it should be understood that protection scope of the present invention is not limited to such specific embodiments and embodiments.This field Those of ordinary skill can make according to the technical disclosures disclosed by the invention various does not depart from the other each of essence of the invention The specific variations and combinations of kind, these variations and combinations are still within the scope of the present invention.

Claims (5)

1. a kind of emergency broadcase system scheduling controlling scheme generation method, which is characterized in that include the following steps:
S1, the Resources list and task record are obtained from database;Described the Resources list and task record include with region, when Between, resource, the relevant information field of language, with the relevant information field in region include Regular Task publishing region, irregular appoint Business publishing region and resource overlay area;Information field with time correlation include task issuing time, task execution duration and Equipment operation information;With the relevant information field of resource include task publication means, device resource type, default publications channel and Default frequency;Include task publication language and programme language with the relevant information field of language;
S2, according in the Resources list and task record maximum issue region is calculated with the relevant information field in region;
S3, according in the Resources list and task record time match result is calculated with the information field of time correlation;
S4, according in the Resources list and task record resource matched result is obtained with the relevant information field of resource;
S5, language matching result is broadcast according to obtaining original with the relevant information field of language in the Resources list and task record;
S6, it language matching result is broadcast to maximum issue region, time match result, resource matched result and original carries out arrangement group Conjunction obtains several emergency broadcase system scheduling controlling schemes.
2. emergency broadcase system scheduling controlling scheme generation method according to claim 1, which is characterized in that further packet Include step:
S7, actual conditions and relevant national standard according to different regions, several emergency broadcase systems obtained from step S6 Scheme that four kinds meet actual demand is filtered out in scheduling controlling scheme for policymaker's decision.
3. emergency broadcase system scheduling controlling scheme generation method according to claim 1, which is characterized in that the step S2 specifically includes following steps:
S21, input the Resources list and task record;
S22, judge resource overlay area in the Resources list whether within task publishing region, if task publishing region it The judgement of Regular Task publishing region is inside then carried out, step S21 is re-started if not within task publishing region;
S23, judge whether the task publishing region in task record is Regular Task publishing region according to region dictionary, if task Publishing region is Regular Task publishing region, then compartmentalization point is carried out to it according to province, city, county's standard;If task publishing region For irregular task publishing region, then GIS conversions are carried out to it, obtains optimal publishing region;
S24, the optimal publishing region obtained in step S23 is closed with the Regular Task publishing region after compartmentalization divides is carried out And obtain formal publishing region;
S25, the formal publishing region obtained in step S24 is matched with resource overlay area by region ID, is obtained most Big publishing region.
4. emergency broadcase system scheduling controlling scheme generation method according to claim 3, which is characterized in that the step GIS conversions in S23 are that task publication irregular area is scaled smallest size using relevant figure layer analysis tool in GIS The smallest size region merging technique for meeting merging condition is maximum poly- then further according to the relationship between superior and subordinate of administrative region by region Close region, as optimal publishing region.
5. emergency broadcase system scheduling controlling scheme generation method according to claim 1, which is characterized in that the step Resource matched result in S5 include default resource matching and it is all resource matched;The default resource matching is used in task Within the scope of issuing time and itself is also in the equipment release tasks of normal operation work;All resource matched are used in are appointed All devices release tasks within the scope of issuing time of being engaged in.
CN201510059634.9A 2015-02-05 2015-02-05 Emergency broadcase system scheduling controlling scheme generation method Active CN104680311B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510059634.9A CN104680311B (en) 2015-02-05 2015-02-05 Emergency broadcase system scheduling controlling scheme generation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510059634.9A CN104680311B (en) 2015-02-05 2015-02-05 Emergency broadcase system scheduling controlling scheme generation method

Publications (2)

Publication Number Publication Date
CN104680311A CN104680311A (en) 2015-06-03
CN104680311B true CN104680311B (en) 2018-07-27

Family

ID=53315319

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510059634.9A Active CN104680311B (en) 2015-02-05 2015-02-05 Emergency broadcase system scheduling controlling scheme generation method

Country Status (1)

Country Link
CN (1) CN104680311B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105391507A (en) * 2015-10-12 2016-03-09 成都九十度工业产品设计有限公司 Emergency broadcasting text information data analyzing method and system
CN105703860B (en) * 2016-03-15 2018-10-02 北京数码视讯科技股份有限公司 A kind of emergent broadcast method and device
CN106603179B (en) * 2017-01-03 2019-04-02 北京数码视讯科技股份有限公司 Emergent broadcast Screening germplasm method and system
CN108197165A (en) * 2017-12-15 2018-06-22 南京熊猫电子股份有限公司 A kind of emergent broadcast regional choice dispatch control method
CN110545150A (en) * 2018-05-28 2019-12-06 南京熊猫电子股份有限公司 Information release control method for emergency broadcast using scheduling plan

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101840439A (en) * 2010-05-25 2010-09-22 天津大学 Emergency situation recommending method based on emergency incident and emergency response plan
CN102831510A (en) * 2012-09-11 2012-12-19 中国长江三峡集团公司 Emergency response dispatching method and system based on three-level command mode of enterprise
CN103810560A (en) * 2013-11-01 2014-05-21 北京交通大学 Emergency resource scheduling method for emergencies of rail transit

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101840439A (en) * 2010-05-25 2010-09-22 天津大学 Emergency situation recommending method based on emergency incident and emergency response plan
CN102831510A (en) * 2012-09-11 2012-12-19 中国长江三峡集团公司 Emergency response dispatching method and system based on three-level command mode of enterprise
CN103810560A (en) * 2013-11-01 2014-05-21 北京交通大学 Emergency resource scheduling method for emergencies of rail transit

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
关于应急广播调度控制系统的设计;李翔 等;《2013国际传输与覆盖研讨会论文集》;20131023;第115-119页 *
应急广播指令设计思路;赵翮;《广播与电视技术》;20141115;第41卷(第11期);第91-94页 *

Also Published As

Publication number Publication date
CN104680311A (en) 2015-06-03

Similar Documents

Publication Publication Date Title
CN104680311B (en) Emergency broadcase system scheduling controlling scheme generation method
WO2006069199A3 (en) Personal credit management and monitoring system and method
Shaw Post disaster recovery: Issues and challenges
Zamuda et al. Federal adaptation and mitigation programs supporting Community investment in electricity resilience to extreme weather
Laugé et al. The role of critical infrastructures’ interdependencies on the impacts caused by natural disasters
Rudari RASOR Project: Rapid analysis and spatialisation of risk, from hazard to risk using EO data
CN110232355A (en) A kind of gas station's business revenue monitoring method and system
TW200701198A (en) Method for executing scheduled record task
Selva et al. From regional to site specific SPTHA through inundation simulations: a case study for three test sites in Central Mediterranean
Huang et al. Urban resilience assessment to flood risk using PSR model and system dynamics
Sorensen et al. Warnings and human response in the Oroville Dam crisis, February 2017
CN106341261A (en) Remote alarm method and device
Zaniboni et al. Risk Assessment Methodology for Cascading Earthquake and Tsunami Impact Applied to the Town of Augusta (Eastern Sicily, Italy)
Parisi et al. Cascading disasters in the huge coastal aquifer of Salento (Apulia region, Southern Italy) ensuing droughts
Necmioglu et al. Challenges and requirements for near-field tsunami warning in the Aegean Sea and Eastern Mediterranean
Dottori et al. Satellites, tweets, forecasts: the future of flood disaster management?
Mavrova-Guirguinova et al. Rossitsa River Basin: Flood Hazard and Risk Identification
Yang et al. Responding to extreme weather with innovative urban social governance mechanisms driven by complex adaptive systems theory: The 7.20 Zhengzhou flood
Mazzoleni et al. When the Levee Breaks: Cascading Effects
Baag et al. Determination of megathrust rupture processes using 3D Green functions for tsunami early warning
Vanacore et al. The Puerto Rico Component of the National Tsunami Hazard and Mitigation Program (PR-NTHMP)
Daniels et al. Earthquake Similarity through Graphical Modeling of Arrival Time Data
Tyagi et al. Multi Hazard Risk and Vulnerability Assessment of an Urban Agglomeration Under Climate Change
Cheng et al. Multi-segment Rupture Probabilities on the Xianshuihe Fault Zone, Southwestern China
Omira et al. Tsunamis along the Peru-Chile Trench: analysing the effect of co-seismic deformation on tsunami inundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant