CN104678915B - Multi-crane coordinated scheduling method oriented to semiconductor production line carrying system - Google Patents

Multi-crane coordinated scheduling method oriented to semiconductor production line carrying system Download PDF

Info

Publication number
CN104678915B
CN104678915B CN201310634924.2A CN201310634924A CN104678915B CN 104678915 B CN104678915 B CN 104678915B CN 201310634924 A CN201310634924 A CN 201310634924A CN 104678915 B CN104678915 B CN 104678915B
Authority
CN
China
Prior art keywords
overhead traveling
traveling crane
cranes
crane
idle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310634924.2A
Other languages
Chinese (zh)
Other versions
CN104678915A (en
Inventor
王晨曦
刘明哲
徐皑冬
金妮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Institute of Automation of CAS
Original Assignee
Shenyang Institute of Automation of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Institute of Automation of CAS filed Critical Shenyang Institute of Automation of CAS
Priority to CN201310634924.2A priority Critical patent/CN104678915B/en
Publication of CN104678915A publication Critical patent/CN104678915A/en
Application granted granted Critical
Publication of CN104678915B publication Critical patent/CN104678915B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • G05B19/4189Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by the transport system
    • G05B19/41895Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by the transport system using automatic guided vehicles [AGV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Abstract

The invention relates to a multi-crane coordinated scheduling method oriented to a semiconductor production line carrying system. The method comprises the following steps: detecting whether other cranes are disposed in a path after planning the crane moving path by the carrying system; directly sending a moving command to move a current crane to a destination if the other cranes are not disposed in the path, calculating a safe position far from the current crane if the other cranes are in an idle state if the other cranes are disposed in the path, and moving the idle cranes to the safe position; moving and scheduling after moving the current crane to the safe position of the other cranes with moving tasks if the disposed other cranes have the moving tasks; repeating the process in an iterated mode to control movement of relevant cranes. According to the method, multiple cranes are moved at the same time under the condition that the multiple cranes are not in collision to one another; the carrying tasks are distributed to the multiple cranes at the same time; the multi-crane scheduling method is used for coordinating the actions of moving and waiting of the multiple cranes so as to jointly carry out the carrying tasks of the multiple cranes.

Description

One kind is towards many overhead traveling crane coordinated scheduling methods of semiconductor production line handling system
Technical field
The present invention relates to a kind of handling system multiple stage overhead traveling crane coordinated scheduling method, carries in particular for semiconductor production line The coordinated scheduling method of the multiple stage overhead traveling crane of system.
Background technology
In modern semiconductor production factory, generally removing for the materials such as wafer is carried out using the handling system of automatization Fortune activity.And the carrying overhead traveling crane of handling system can use tens overhead traveling cranes by the scale of factory.Common handling system one As occur that the overhead traveling crane transfer line of selection passes by length, have the overhead traveling crane not high situation of overhead traveling crane utilization rate such as run empty always.How to assist The utilization rate that multiple stage overhead traveling crane improves overhead traveling crane is mixed up, the production efficiency of handling system and the production effect of semiconductor factory is directly affected Rate.
The content of the invention
Low in order to overcome the shortcomings of handling system multiple stage overhead traveling crane coordinated scheduling efficiency, the present invention provides one kind towards quasiconductor Production line handling system multiple stage overhead traveling crane is coordinated to adjust dispatching method, while overhead traveling crane is carried safely, improves multiple stage day The utilization rate of car.
The technical solution adopted for the present invention to solve the technical problems is:It is a kind of many towards semiconductor production line handling system Overhead traveling crane coordinated scheduling method, comprises the following steps:
Handling system is cooked up after current overhead traveling crane movement route, is checked in this route with the presence or absence of other overhead traveling cranes;If not depositing Then directly current overhead traveling crane is being sent and is being moved to the order of destination;If existing, the overhead traveling crane nearest with current overhead traveling crane is searched, sentenced Whether fixed nearest overhead traveling crane is idle overhead traveling crane;
If idle overhead traveling crane, the destination locations of current overhead traveling crane are made in a forward direction plus the position after safe distance For the destination of idle overhead traveling crane, the mobile route of idle overhead traveling crane is cooked up;
If not idle overhead traveling crane, then it is assumed that be to carry overhead traveling crane, be moved to the home in the reverse direction for carrying overhead traveling crane After reschedule;
Movement directive is sent to above-mentioned overhead traveling crane simultaneously;Then nearest overhead traveling crane is made as current overhead traveling crane, repeat the above steps All overhead traveling cranes reach respective destination in this circuit.
If the idle overhead traveling crane, by the destination locations of current overhead traveling crane in a forward direction plus the position after safe distance The destination as idle overhead traveling crane is put, the mobile route of idle overhead traveling crane is cooked up, and current overhead traveling crane is associated with the idle overhead traveling crane, And record current day car mark on idle overhead traveling crane.
It is described if not idle overhead traveling crane, then it is assumed that be carry overhead traveling crane, be moved to carry overhead traveling crane home after adjust again Degree;After calculating to the home for carrying overhead traveling crane, find from the incidence relation of current overhead traveling crane record and closed with current overhead traveling crane The overhead traveling crane numbering of connection, and obtained associating the stop position of overhead traveling crane according to overhead traveling crane numbering, sending order makes the overhead traveling crane be moved to stopping Position.
The speed that all overhead traveling cranes are moved on track section is identical.
Beneficial effects of the present invention and advantage:
1. the inventive method makes multiple stage overhead traveling crane in the case where not colliding mutually, while mobile multiple stage overhead traveling crane.And it is right Multiple stage overhead traveling crane distributes carrying task simultaneously, coordinates many overhead traveling cranes by many overhead traveling crane dispatching methods and moves and the action such as wait jointly complete Into the carrying task of multiple stage overhead traveling crane.
2., because track only allows an overhead traveling crane to pass through, using many overhead traveling crane dispatching methods more overhead traveling cranes can be allowed to move Come, improve the overall handling efficiency of the utilization rate and handling system of track.
3. the present invention increases overhead traveling crane related information in overhead traveling crane, records the identification information of adjacent overhead traveling crane.By the pass of overhead traveling crane When connection information just can calculate many overhead traveling crane collaborative works, the overhead traveling crane moves to the home before destination, so can improve and Improve the efficiency of transmission of overhead traveling crane.
Description of the drawings
Fig. 1 is the handling system schematic diagram of the present invention;
Fig. 2 is many overhead traveling crane scheduling flow figures.
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawings and examples.
The present invention discloses one kind towards many overhead traveling crane coordinated scheduling methods of semiconductor production line handling system, carries track by straight The fork rail composition of trajectory, shaped form bend and switching connection both direction track.Carry track-bound covering wafer storage to set Standby and process equipment.Overhead traveling crane hangs in orbit, and track section can only once allow an overhead traveling crane to pass through.The operation of overhead traveling crane Direction is fixed, it is impossible to backward running.Same time track section only allows an overhead traveling crane to pass through.
After handling system cooks up overhead traveling crane movement route by the dispatching platform of server, by server controls platform Find out in the overhead traveling crane related information of record in inspection route with the presence or absence of other overhead traveling cranes.If it does not, directly transmitting mobile life Order allows overhead traveling crane to move to destination.It is remote by one to calculating current overhead traveling crane if overhead traveling crane is idle condition if there is other overhead traveling cranes The home of point, allows idle overhead traveling crane to be moved to home.If exist other overhead traveling cranes oneself have mobile task, current overhead traveling crane It is moved to other oneself and has after mobile task overhead traveling crane home and is moving scheduling.Repeat said process using iterative manner Control is moved to related overhead traveling crane.By many overhead traveling crane coordination approachs, track utilization rate can be improved, while improve carrying effect Rate.
The present invention specifically includes following steps:
After systems organization goes out overhead traveling crane movement route, check with the presence or absence of other overhead traveling cranes in this route, if without other days Car, then directly send to overhead traveling crane and be moved to the order of destination.
If there are other overhead traveling cranes, the overhead traveling crane nearest with current overhead traveling crane is searched, judge whether nearest overhead traveling crane is idle overhead traveling crane.If It is idle overhead traveling crane, by the destination of current vehicle farther position is calculated(Plus the position of safe distance)As idle overhead traveling crane Destination, cooks up the mobile route of idle overhead traveling crane.Current overhead traveling crane is associated with nearest idle overhead traveling crane, and in idle overhead traveling crane note Record current day car mark.Being designated as idle overhead traveling crane is moved by current overhead traveling crane.
If the nearest overhead traveling crane for existing is carrying state, current overhead traveling crane is first arranged to transfer point to carry before overhead traveling crane destination Side is apart from a nearest safe distance position of destination.Current overhead traveling crane is moved to after home, checks current location and mesh The route of cursor position whether there is other overhead traveling cranes.
Repeat said process in an iterative manner, control is moved to related overhead traveling crane, until all related overhead traveling cranes are moved Move to target location.
Wherein, the order for being moved to mesh ground for sending to overhead traveling crane, is made up of multiple points of route.These are put Related mark, by these points the track element sequence that route is passed through can be identified.
Safe distance is to maintain that two overhead traveling cranes do not collide and crash sensor does not produce the orbital distance of warning.By In track an overhead traveling crane can only be allowed to pass through, when overhead traveling crane stops, in front and back car will keep minimum of one safe distance;When overhead traveling crane is moved When dynamic, in front and back car will also keep minimum of one safe distance.Generally system safe distance is according to the actual track circuit of overhead traveling crane It is fixed.
Minimum of one safe distance is kept when overhead traveling crane is moved.Overhead traveling crane speed when specified track is moved is fixed.Two It is identical that overhead traveling crane equally moves through the time of same track section.So the too fast feelings for hitting front truck of rear car movement will not occur Condition.
In addition, current overhead traveling crane is associated with nearest idle overhead traveling crane, and current day car mark is recorded in idle overhead traveling crane.It is designated as Idle overhead traveling crane is moved by current overhead traveling crane.
After idle overhead traveling crane distributes movement directive, other overhead traveling cranes are searched whether in route in the same way, if depositing In other idle overhead traveling cranes, mobile other idle overhead traveling cranes are to farther home.
If presence has distributed other overhead traveling cranes of mobile task, the security bit of other overhead traveling cranes for distributing mobile task is moved to Postpone and reschedule.Calculating to the home of other overhead traveling cranes for distributing mobile task, from the pass of this overhead traveling crane record The overhead traveling crane numbering associated with this overhead traveling crane is found in connection relation, according to the overhead traveling crane numbering for finding out the stop position of the overhead traveling crane is calculated Put.According to the stop position for calculating, in distribution, that overhead traveling crane is moved to home instruction.
Handling system is made up of track, overhead traveling crane, wafer storage device and wafer process equipment and server.As shown in Figure 1: A, B, C are overhead traveling cranes.The tip of triangular form represents the forward direction side of movement, and overhead traveling crane does not allow opposite direction to move.D is that wafer process sets Standby, G is wafer storage device.
Fig. 2 is many overhead traveling crane scheduling flow figures
After overhead traveling crane distribution mobile route, search and whether there is in route nearest overhead traveling crane.If not existing, shifting is directly transmitted Dynamic order is simultaneously special to be moved to destination.
If there are other overhead traveling cranes, the task status of other overhead traveling cranes is determined.
If idle overhead traveling crane, distribute remote away from destination(Safe distance)Home route.With idle overhead traveling crane Based on carry out same scheduling flow, until all related overhead traveling cranes all distribute route.Movement is sent to all related overhead traveling cranes Order and wait all related overhead traveling cranes to be moved to destination.
If the nearest overhead traveling crane for existing has mobile task, distribute closer away from mobile overhead crane destination(Safe distance)Safety Position route.Same scheduling flow is being carried out based on the mobile overhead crane for existing.Until all related days all distribute road Line.Movement directive is sent to all related overhead traveling cranes and waits all related overhead traveling cranes to be moved to destination.
By taking the handling system shown in Fig. 1 as an example:
After overhead traveling crane A distribution is moved to the route of D positions, can find out from A to D and there is overhead traveling crane B and C.It is nearest with A Overhead traveling crane is B.
It is first more remote with A mesh ground to B distribution if B and C are idle overhead traveling cranes(Safe distance)Home E.To day Car B distribution is moved to after the route of home E, is searched and whether there is between B and E overhead traveling crane.Find out overhead traveling crane C.By the mesh with B The remote home meters of some of ground E put out the destination F of C.
When it is determined that all related overhead traveling cranes mobile route and destination after, to A, tri- overhead traveling cranes of B, C send mobile life simultaneously Order.Work as A, tri- overhead traveling cranes of B, C all reach this finishing scheduling after specified destination.
If wherein C is not idle overhead traveling crane, and the destination of C is D.When it is determined that B mobile route after, discovery there is overhead traveling crane C. The safe distance H closer with overhead traveling crane C halt D is calculated, distributes the destination H of overhead traveling crane B.And calculated by the destination of B Overhead traveling crane A should in-position H safe distances position I.After determining the destination of all related overhead traveling cranes, movement directive is sent.When All overhead traveling cranes are moved to after destination, complete this scheduling.
After C reaches D points and completes the loading or unloading operation of wafer, C is changed into idle overhead traveling crane.Now existed by the route of A to D Idle overhead traveling crane B and idle overhead traveling crane C.The destination for determining C as stated above is F, and the destination of B is E, and the destination of A is D.Together When to A, B, C sends movement directive.After all overhead traveling cranes move to destination, this scheduling is completed.

Claims (3)

1. one kind is towards many overhead traveling crane coordinated scheduling methods of semiconductor production line handling system, it is characterised in that comprise the following steps:
Handling system is cooked up after current overhead traveling crane movement route, is checked in this route with the presence or absence of other overhead traveling cranes;If not existing, Directly the order for being moved to destination is sent to current overhead traveling crane;If existing, the overhead traveling crane nearest with current overhead traveling crane is searched, judge nearest Whether overhead traveling crane is idle overhead traveling crane;
If idle overhead traveling crane, using the destination locations of current overhead traveling crane in a forward direction plus the position after safe distance as sky The destination of not busy overhead traveling crane, cooks up the mobile route of idle overhead traveling crane;
If not idle overhead traveling crane, then it is assumed that be to carry overhead traveling crane, weight after the home in the reverse direction for carrying overhead traveling crane is moved to New scheduling;
Movement directive is sent to above-mentioned overhead traveling crane simultaneously;Then using nearest overhead traveling crane as current overhead traveling crane, repeat the above steps, this line is made All overhead traveling cranes reach respective destination in road;
It is described if not idle overhead traveling crane, then it is assumed that be carry overhead traveling crane, be moved to carry overhead traveling crane home after reschedule; Obtain to the home for carrying overhead traveling crane, the overhead traveling crane associated with current overhead traveling crane is found from the incidence relation of current overhead traveling crane record Numbering, and obtained associating the stop position of overhead traveling crane according to overhead traveling crane numbering, sending order makes association overhead traveling crane be moved to stop position.
2. one kind according to claim 1 is towards many overhead traveling crane coordinated scheduling methods of semiconductor production line handling system, and it is special Levy and be:If the idle overhead traveling crane, by the destination locations of current overhead traveling crane in a forward direction plus the position after safe distance The destination as idle overhead traveling crane is put, the mobile route of idle overhead traveling crane is cooked up, and current overhead traveling crane is associated with the idle overhead traveling crane, And record current day car mark on idle overhead traveling crane.
3. one kind according to claim 1 is towards many overhead traveling crane coordinated scheduling methods of semiconductor production line handling system, and it is special Levy and be:The speed that all overhead traveling cranes are moved on track section is identical.
CN201310634924.2A 2013-11-28 2013-11-28 Multi-crane coordinated scheduling method oriented to semiconductor production line carrying system Active CN104678915B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310634924.2A CN104678915B (en) 2013-11-28 2013-11-28 Multi-crane coordinated scheduling method oriented to semiconductor production line carrying system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310634924.2A CN104678915B (en) 2013-11-28 2013-11-28 Multi-crane coordinated scheduling method oriented to semiconductor production line carrying system

Publications (2)

Publication Number Publication Date
CN104678915A CN104678915A (en) 2015-06-03
CN104678915B true CN104678915B (en) 2017-04-26

Family

ID=53314150

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310634924.2A Active CN104678915B (en) 2013-11-28 2013-11-28 Multi-crane coordinated scheduling method oriented to semiconductor production line carrying system

Country Status (1)

Country Link
CN (1) CN104678915B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108067770B (en) * 2016-11-17 2019-07-02 中国科学院沈阳自动化研究所 One kind is towards automobile top cover welding and assembling production lines multitask robot coordinated scheduling method
CN107272698B (en) * 2017-07-25 2018-07-31 哈尔滨工大特种机器人有限公司 A kind of dispatch control method and system applied to more AGV cooperating operations
CN107179773B (en) * 2017-07-25 2018-07-31 哈尔滨工大特种机器人有限公司 A kind of the evacuation dispatch control method and system of AGV
CN110175912B (en) * 2019-04-08 2023-05-05 西安链融科技有限公司 Committee-based blockchain cross-chain asset transfer method and blockchain information terminal
CN111176239B (en) * 2020-01-07 2021-04-20 南方科技大学 Scheduling method of roller grinding workshop
CN112446642A (en) * 2020-12-11 2021-03-05 大连英达士智能科技有限公司 Multi-crown-block scheduling optimization method and system
CN113247508B (en) * 2021-05-14 2023-04-18 深圳市海柔创新科技有限公司 Robot avoiding method, control terminal and automatic cargo sorting system
CN116542417B (en) * 2023-07-05 2023-09-12 泓浒(苏州)半导体科技有限公司 Control system and method for semiconductor production line conveying system
CN117376984B (en) * 2023-12-08 2024-03-08 华芯(武汉)智能装备有限公司 Crown block scheduling data transmission method and readable storage medium
CN117744909A (en) * 2024-02-19 2024-03-22 华芯(嘉兴)智能装备有限公司 Roaming control method and device for crown block

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1587010A (en) * 2004-08-12 2005-03-02 友达光电股份有限公司 Automatic material transport system

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DK199800837A (en) * 1998-06-29 1999-12-30 Ecco Sko A S Installations for the treatment of subjects
TWI256372B (en) * 2001-12-27 2006-06-11 Tokyo Electron Ltd Carrier system of polishing processing body and conveying method of polishing processing body
KR20110091020A (en) * 2008-12-26 2011-08-10 무라다기카이가부시끼가이샤 Traveling vehicle system
CN102103379A (en) * 2009-12-17 2011-06-22 广州风神汽车有限公司 Dispatching system of automated guided vehicle (AGV)
CN103268119A (en) * 2013-06-05 2013-08-28 合肥凌翔信息科技有限公司 Automatic guided vehicle navigation control system and navigation control method thereof

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1587010A (en) * 2004-08-12 2005-03-02 友达光电股份有限公司 Automatic material transport system

Also Published As

Publication number Publication date
CN104678915A (en) 2015-06-03

Similar Documents

Publication Publication Date Title
CN104678915B (en) Multi-crane coordinated scheduling method oriented to semiconductor production line carrying system
CN107168316B (en) Multi-AGV dispatching system based on single-direction and two-direction mixed paths
CN103723532B (en) Multi-story frame type automated container dock stockyard loading and unloading system and handling method thereof
CN109190840A (en) A kind of freezer shuttle dispatching management information system and dispatching method
US9811090B2 (en) Guided vehicle system and guided vehicle travel schedule generation method
CN108490929A (en) A kind of Dispatching monitor and control system and method for AGV trolleies
CN108197787B (en) Flexible automation line and automatic logistics conveying line's cooperative scheduling system
US9836050B2 (en) Guided vehicle system and guided vehicle control method
Zhen et al. A review on yard management in container terminals
CN110194343A (en) A kind of communication system and cargo method for carrying of more AGV intelligent storage compact shelvings
CN104609086A (en) Four-directional shuttle vehicle control system based on road right tokens
CN104007764A (en) Agv dispatching system
CN107032234B (en) Automate the double vehicle avoidance systems of track crane
TW201600445A (en) Transport vehicle system and transport method
CN104555743B (en) Track and overhead traveling crane control method for coordinating towards semiconductor production line handling system
CN104346658A (en) Automatic trolley storage system scheduling method based on improved dynamic banker's algorithm
Stahlbock et al. Efficiency considerations for sequencing and scheduling of double-rail-mounted gantry cranes at maritime container terminals
CN109828591A (en) A kind of automatic guided vehicle and its Autonomous Seam Locating Method and device with storage function
CN108454640A (en) Control method for vehicle and system
CN106743040A (en) A kind of scheduling system based on handling and conveying equipment
CN206278844U (en) The double car avoiding devices of automation track crane
CN106527447A (en) Rail guide vehicle control method based on laser sensor
Hu et al. Performance analysis on transfer platforms in frame bridge based automated container terminals
CN114757627B (en) Relay type lifting path planning and scheduling method
CN107193265B (en) A kind of mobile robot multiple spot scheduling communication method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant