CN104678302B - 一种Boost变流器的风电机组低电压穿越测试系统及方法 - Google Patents

一种Boost变流器的风电机组低电压穿越测试系统及方法 Download PDF

Info

Publication number
CN104678302B
CN104678302B CN201510096464.1A CN201510096464A CN104678302B CN 104678302 B CN104678302 B CN 104678302B CN 201510096464 A CN201510096464 A CN 201510096464A CN 104678302 B CN104678302 B CN 104678302B
Authority
CN
China
Prior art keywords
unit
test
power network
wind
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510096464.1A
Other languages
English (en)
Other versions
CN104678302A (zh
Inventor
向大为
王腾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN201510096464.1A priority Critical patent/CN104678302B/zh
Publication of CN104678302A publication Critical patent/CN104678302A/zh
Application granted granted Critical
Publication of CN104678302B publication Critical patent/CN104678302B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明涉及一种Boost变流器的风电机组低电压穿越测试系统,用以进行风电机组的低电压穿越性能测试,包括分别与风场母线连接的模拟电网和被测机组,所述的模拟电网包括多个并联的电网模拟机组,所述的电网模拟机组和被测机组均包括依次连接的风力发电机、二极管整流桥、Boost变流器、全功率网侧变流器、滤波器、升压变压器和风力发电机组并网开关,所述的Boost变流器和全功率网侧变流器的直流母线上并联设有直流电容和crowbar电路,所述的crowbar电路包括并联在直流母线上的内置crowbar电路和外置crowbar电路。与现有技术相比,本发明具有可靠性高、实现简单、测试成本低、测试条件灵活可设、测试过程不影响电网安全运行等优点。

Description

一种Boost变流器的风电机组低电压穿越测试系统及方法
技术领域
本发明涉及电力测试领域,尤其是涉及一种Boost变流器的风电机组低电压穿越测试系统及方法。
背景技术
经过近年来的不断发展,风力发电已成为人类解决能源危机与环境问题的重要手段。随着越来越多的风电机组接入电网,为保证电力系统安全稳定运行,世界各国均制订出相应标准要求所有大型并网风电机组具备低电压穿越能力,即在电网故障时仍然保持不脱网并在故障切除后迅速恢复正常运行。
采用Boost变流器的风电机组是一种常用的风电技术,广泛应用于陆上和海上大型风电场,Boost变流器首先通过二极管不控整流将发电机发出的交流电整流成为直流电,然后通过Boost变换器将波动的直流电压升压到稳定的直流母线电压。机组正常运行时,通过控制Boost电感电流的大小可以调节发电机输出的有功功率,实现风机最大功率点跟踪运行。与PWM变流器相比,Boost变流器具有开关器件少、容量大、成本低、可靠性高的优点,但二极管不控整流会在发电机中产生谐波和转矩脉动,实际系统中往往采用多重化技术进行抑制。随着风电机组单机容量的不断增加,Boost变流器正作为一种可行的大功率(如10MW)风电变流器技术方案,引起大家新的重视。通过适当控制与保护措施,采用Boost变流器的风电机组能够实现低电压穿越运行。
风电机组的低电压穿越测试是验证风电机组关键性能的重要实验,目前所有大型风电机组必须经过相关机构对低电压穿越功能进行测试认证,风电机组低电压穿越测试的基本原理是将被测机组与模拟电源相连接(其中模拟电源模拟电网运行),通过模拟电源人为产生故障条件对风电机组的低电压穿越性能进行测试。为模拟电网故障,目前的测试方法主要包括:变压器模拟、阻抗模拟以及变流器模拟三种方法,其中阻抗模拟法是目前广泛采用的风电机组低电压穿越测试技术。以现场测试为例,现有的车载移动式测试系统将一系列阻抗构成的故障模拟装置装载在卡车上,现场测试时驱车前往风电场现场,然后将阻抗式故障模拟器串联在电网和风电场母线之间,通过配置各相阻抗的大小模拟各类不同严重程度的电网故障完成被测机组低电压穿越测试。受海上特殊环境和低可达性限制,采用现有技术对海上风电场实施低电压穿越测试将更加困难。实际工程中需要更为简便、经济及安全的风电机组低电压穿越测试技术。
现有技术存在测试设备成本高、运输与安装较复杂、测试过程可能威胁电网安全等不足,因此实际工程中需要更为简便、经济及安全的风电机组低电压穿越测试技术。
中国专利CN104215904A公开了一种全功率变流器风电机组低电压穿越测试系统及方法,该测试系统主要针对采用背靠背式全功率变流器的风电机组进行低电压穿越性能测试,由于发电机侧变流器结构不同,该技术无法直接应用于采用Boost变流器的风电机组,并且采用全功率变流器的成本较高、技术操作难度较大。
发明内容
本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种可靠性高、实现简单、测试成本低、测试条件灵活可设、测试过程不影响电网安全运行的Boost变流器的风电机组低电压穿越测试系统及方法。
本发明的目的可以通过以下技术方案来实现:
一种Boost变流器的风电机组低电压穿越测试系统,用以进行风电机组的低电压穿越性能测试,包括分别与风场母线连接的模拟电网和被测机组,所述的模拟电网包括多个并联的电网模拟机组,所述的电网模拟机组和被测机组均包括依次连接的风力发电机、二极管整流桥、Boost变流器、全功率网侧变流器、滤波器、升压变压器和风力发电机组并网开关,所述的Boost变流器和全功率网侧变流器的直流母线上并联设有直流电容和crowbar电路,所述的crowbar电路包括并联在直流母线上的内置crowbar电路和外置crowbar电路。
每个电网模拟机组中包括一台风力发电机,所述的被测机组中的风力发电机为一台待测风力发电机。
所述的内置crowbar电路和外置crowbar电路均包括相互连接的开关和crowbar电阻。
一种Boost变流器的风电机组低电压穿越测试系统的测试方法,包括以下步骤:
1)测试准备;
2)启动所有电网模拟机组与被测机组并控制其至预定测试转速条件运行;
3)电网模拟机组模拟电网条件运行;
4)对被测机组实施低电压穿越测试;
5)完成测试并安全停机。
所述的步骤1)具体包括以下步骤:
11)根据被测机组容量及风场条件,确定电网模拟机组并联组数;
12)配置电网模拟机组的crowbar电路;
13)确定被测机组测试运行的工作点,包括转速、有功功率和无功功率。
所述的步骤11)中电网模拟机组并联组数符合以下条件:
其中NWT_g为电网模拟机组并联组数,PTest_max为被测机组最大输出功率,Pgrid为电网模拟机组额定功率。
所述的步骤12)中电网模拟机组的crowbar电路容量配置方法包括:
配置内置crowbar电路:采用机组自带的内置crowbar电路,通过多个电网模拟机组并联满足泄能要求,并联电网模拟机组的数量满足:
ETest_max=PTest_max×Ttest
配置外置crowbar电路:通过外加外置crowbar电路满足泄能要求,外置crowbar电路容量满足:
Ecrowbar1≥ETest_max-Ecrowbar0×Ttest
其中,ETest_max为被测机组最大输出能量,PTest_max为被测机组最大输出功率,Ttest为电气测试时间,Ecrowbar0为一台电网模拟机组自带内置crowbar电路的额定容量,NWT_g为电网模拟机组并联组数,Ecrowbar1为外加的外置crowbar电路的额定容量。
所述的步骤3)包括以下步骤:
31)通过Boost变流器控制电网模拟机组直流母线电压,并通过crowbar电路消耗从电网侧馈入的多余电能;
32)电网模拟机组全功率网侧变流器按电网正常与故障运行条件模拟产生电网电压。
所述的步骤31)中crowbar电路的直流电压控制指令大于Boost变流器的直流电压控制指令一定值。
所述的步骤32)中电网故障运行包括三相对地故障运行、单相对地故障运行、两相对地故障运行和相间故障运行。
与现有技术相比,本发明具有以下优点:
一、实现简单、测试成本低,本发明利用测试现场现成的风电机组构成测试系统,无需或仅需少量硬件修改并通过适当控制完成测试,大大减少了测试设备及其运输成本。
二、测试条件灵活可设,本发明通过变流器控制模拟电网故障,因此能方便地按测试要求任意设定测试条件,包括故障前发电机转速及功率、风电场网络阻抗、电网故障类型及严重程度。
三、测试过程不影响电网安全运行,本发明利用风电机组自身发电构成孤立电网完成测试实验,因此测试系统无需与电网相连接,并且在直流母线侧配置crowbar电路进行泄能,从而保护系统硬件的安全,从而保障了电网安全。
四、可靠性高:本发明采用了Boost变流器,Boost变流器与常见的PWM变流器相比,具有开关器件少、容量大、成本低、可靠性高的优点,通过适当控制与保护措施,采用Boost变流器的风电机组能够实现低电压穿越运行,此外,随着风电机组单机容量的不断增加,应用Boost变流器可以作为一种可行的大功率(如10MW)风电变流器技术方案,
附图说明
图1是本发明的方法流程图。
图2是本发明的系统结构示意图。
图3是电网模拟机组Boost变流器直流母线电压控制外环框图。
图4是风电场两台电网模拟机组并联现场低电压穿越测试电气过程仿真结果图,其中,(4a)为电网模拟机组风场母线电压vpcc的波形图,(4b)为电网模拟机组发电机定子线电压vs_ab的波形图,(4c)为电网模拟机组网侧变流器电流igc的波形图,(4d)为电网模拟机组定子电流is的波形图,(4e)为电网模拟机组Boost变流器电感电流iL的波形图,(4f)为电网模拟机组crowbar电流icrowbar的波形图,(4g)为电网模拟机组直流母线电压Vdc的波形图,(4h)为电网模拟机组转速ωr的波形图,(4i)为电网模拟机组电磁转矩Te的波形图,(4j)为电网模拟机组网侧变流器输出有功和无功功率PQgc的波形图,(4k)为被测机组风场母线电压vpcc的波形图,(4l)为被测机组发电机定子线电压vs_ab的波形图,(4m)为被测机组网侧变流器电流igc的波形图,(4n)为被测机组定子电流is的波形图,(4o)为被测机组Boost变流器电感电流iL的波形图,(4p)为被测机组直流母线电压Vdc的波形图,(4q)为被测机组转速ωr的波形图,(4r)为被测机组电磁转矩Te的波形图,(4s)为被测机组网侧变流器输出有功和无功功率PQgc的波形图;
图5是模拟不同故障类型条件下低电压穿越测试仿真结果,其中,(5a)为模拟三相对地故障前风场母线电压vpcc的波形图,(5b)为模拟三相对地故障后风场母线电压vpcc的波形图,(5c)为电网模拟机组模拟三相对地故障前网侧变流器电流igc的波形图,(5d)为电网模拟机组模拟三相对地故障后网侧变流器电流igc的波形图,(5e)为模拟单相对地故障前风场母线电压vpcc的波形图,(5f)为模拟单相对地故障后风场母线电压vpcc的波形图,(5g)为电网模拟机组模拟单相对地故障前网侧变流器电流igc的波形图,(5h)为电网模拟机组模拟单相对地故障后网侧变流器电流igc的波形图,(5i)为模拟两相对地故障前风场母线电压vpcc的波形图,(5j)为模拟两相对地故障后风场母线电压vpcc的波形图,(5k)为电网模拟机组模拟两相对地故障前网侧变流器电流igc的波形图,(5l)为电网模拟机组模拟两相对地故障后网侧变流器电流igc的波形图,(5m)为模拟相间故障前风场母线电压vpcc的波形图,(5n)为模拟相间故障后风场母线电压vpcc的波形图,(5o)为电网模拟机组模拟相间故障前网侧变流器电流igc的波形图,(5p)为电网模拟机组模拟相间故障后网侧变流器电流igc的波形图。
其中,101、电网模拟风力发电机,102、待测风力发电机,2、二极管整流桥,3、Boost变流器,4、直流电容,5、内置crowbar电路,6、外置crowbar电路,7、全功率网侧变流器,8、滤波器,9、升压变压器,10、风力发电机组并网开关,11、风场母线,12、风场母线开关,13、被测机组,14、电网模拟机组,15、模拟电网。
具体实施方式
下面结合附图和具体实施例对本发明进行详细说明。
实施例:
如图2所示,一种Boost变流器的风电机组低电压穿越测试系统,用以进行风电机组的低电压穿越性能测试,包括分别与风场母线11连接的模拟电网15和被测机组13,所述的模拟电网15包括多个并联的电网模拟机组14,所述的电网模拟机组14和被测机组13均包括依次连接的风力发电机、二极管整流桥2、Boost变流器3、全功率网侧变流器7、滤波器8、升压变压器9和风力发电机组并网开关10,所述的Boost变流器3和全功率网侧变流器7的直流母线上并联设有直流电容4和crowbar电路,所述的crowbar电路包括并联在直流母线上的内置crowbar电路5和外置crowbar电路6,在风场母线11的电网侧还设有风场母线开关12。
每个电网模拟机组14中的风力发电机为一台电网模拟风力发电机101,所述的被测机组13中的风力发电机为一台待测风力发电机102,内置crowbar电路5和外置crowbar电路6均包括相互连接的开关和crowbar电阻。
如图1所示,一种Boost变流器的风电机组低电压穿越测试系统的测试方法,包括以下步骤:
1)测试准备,具体包括以下步骤:
11)根据被测机组容量及风场条件,确定电网模拟机组并联组数,电网模拟机组并联组数符合以下条件:
其中NWT_g为电网模拟机组并联组数,PTest_max为被测机组最大输出功率,Pgrid为电网模拟机组额定功率。;
12)配置电网模拟机组的crowbar电路,电网模拟机组的crowbar电路容量配置方法包括:
配置内置crowbar电路:采用机组自带的内置crowbar电路,通过多个电网模拟机组并联满足泄能要求,并联电网模拟机组的数量满足:
ETest_max=PTest_max×Ttest
配置外置crowbar电路:通过外加外置crowbar电路满足泄能要求,外置crowbar电路容量满足:
Ecrowbar1≥ETest_max-Ecrowbar0×Ttest
其中,ETest_max为被测机组最大输出能量,PTest_max为被测机组最大输出功率,Ttest为电气测试时间,Ecrowbar0为一台电网模拟机组自带内置crowbar电路的额定容量,NWT_g为电网模拟机组并联组数,Ecrowbar1为外加的外置crowbar电路的额定容量;
13)确定被测机组测试运行的工作点,包括转速、有功功率和无功功率;
2)启动所有电网模拟机组与被测机组并控制其至预定测试转速条件运行;
3)电网模拟机组模拟电网条件运行,具体包括以下步骤:
31)通过Boost变流器控制电网模拟机组直流母线电压,并通过crowbar电路消耗从电网侧馈入的多余电能,crowbar电路的直流电压控制指令大于Boost变流器的直流电压控制指令一定值;
32)电网模拟机组网侧变流器按电网正常与故障运行条件模拟产生电网电压,电网故障运行包括三相对地故障运行、单相对地故障运行、两相对地故障运行和相间故障运行;
4)对被测机组实施低电压穿越测试;
5)完成测试并安全停机。
现场测试系统由电网模拟机组14和被测机组13两部分组成,其中电网模拟机组为2台,用于模拟电网正常与故障运行条件。被测机组则为现场任选的需要测试低电压穿越性能的风电机组。每台电网模拟机组14包括依次连接的风力发电机、二极管整流桥2、Boost变流器3、母线电容4、内置crowbar电路5、外置crowbar电路6、全功率网侧变流器7、滤波器8、升压变压器9和风力发电机组并网开关10,其中直流母线额定电压为1150V,crowbar电路的直流电压控制指令为1200V,Boost变流器的直流电压控制指令为1150V,crowbar电路的直流电压控制指令比Boost变流器的直流电压控制指令大50V,全功率网侧变流器与Boost变流器的开关频率为2kHz,crowbar容量为1MJ。
如图4a-4s所示,图为2MW采用Boost变流器的风电机组低电压穿越测试电气过程仿真结果。测试条件为三相对地故障、阻抗角α=0、故障距离λ=0、风电场网络等效阻抗为Zeq=0.2pu(其中阻抗-电阻比X/R=4),测试时序如表1所示。其中,图4a-4j为电网模拟机组的仿真结果,图4k-4s为被测机组的仿真结果,图中记录的变量包括:图4a中vpcc为电网模拟机组风场母线电压,图4b中vs_ab为电网模拟机组发电机定子线电压,图4c中igc为电网模拟机组网侧变流器电流,图4d中is为电网模拟机组定子电流,图4e中iL为电网模拟机组Boost变流器电感电流,图4f中icrowbar为电网模拟机组crowbar电流,图4g中Vdc为电网模拟机组直流母线电压,图4h中ωr为电网模拟机组转速,图4i中Te为电网模拟机组电磁转矩,图4j中PQgc为电网模拟机组网侧变流器输出有功和无功功率,图4k中vpcc为被测机组风场母线电压,图4l中vs_ab为被测机组发电机定子线电压,图4m中igc为被测机组网侧变流器电流,图4n中is为被测机组定子电流,图4o中iL为被测机组Boost变流器电感电流,图4p中Vdc为被测机组直流母线电压,图4q中ωr为被测机组转速,图4r中Te为被测机组电磁转矩,图4s中PQgc为被测机组网侧变流器输出有功和无功功率。如图4所示,t=2.5s~3.5s是被测发电机电磁转矩调节过程,被测机组的功率状态可根据测试条件任意设定,电网故障从t=3.5s开始,持续600ms后于t=4.1s恢复。故障过程中被测机组的控制目标是在保证自身安全运行的前提下输出感性无功电流(此例为1pu)为电网故障电压提供支持,故障切除后被测机组快速恢复到故障前功率状态正常运行,测试过程于t=4.6s结束,此后各台机组立刻进入电气和机械停机流程。
表1低电压穿越测试电气过程时序表
电网模拟机组Boost变流器的外环控制框图如图3所示,其中外环为直流电压环,图3中Vdc *为直流母线电压给定值,Vdc为直流母线电压反馈值,PI为PI调节器,IL *为电感电流给定值。
如图5a-5p所示,图为模拟不同故障类型条件下低电压穿越测试仿真结果,其中,其中,图5a-5d为模拟电网三相对地故障条件下的仿真结果,图5e-5h为模拟电网单相对地故障条件下的仿真结果,图5i-5l为模拟电网两相对地故障条件下的仿真结果,图5m-5p为模拟电网相间故障条件下的仿真结果,其中,图5a中vpcc为三相对地故障前风场母线电压,图5b中vpcc为三相对地故障后风场母线电压,图5c中vpcc为电网模拟机组模拟三相对地故障前网侧变流器电流,图5d中vpcc为电网模拟机组模拟三相对地故障后网侧变流器电流,图5e中vpcc为模拟单相对地故障前风场母线电压,图5f中vpcc为模拟单相对地故障后风场母线电压,图5g中igc为电网模拟机组模拟单相对地故障前网侧变流器电流,图5h中igc为电网模拟机组模拟单相对地故障后网侧变流器电流,图5i中vpcc为模拟两相对地故障前风场母线电压,图5j中vpcc为模拟两相对地故障后风场母线电压,图5k中igc为电网模拟机组模拟两相对地故障前网侧变流器电流,图5l中igc为电网模拟机组模拟两相对地故障后网侧变流器电流,图5m中vpcc为模拟相间故障前风场母线电压,图5n中vpcc为模拟相间故障后风场母线电压,图5o中igc为电网模拟机组模拟相间故障前网侧变流器电流,图5p中igc为电网模拟机组模拟相间故障后网侧变流器电流。
图中记录的变量包括风场母线电压vpcc与电网模拟机组网侧变流器电流igc,故障发生在t=3.5s并于t=4.1s恢复,相关结果验证了本发明提出的方法能模拟所有类型的电网故障条件,现场实施低电压穿越测试。

Claims (10)

1.一种Boost变流器的风电机组低电压穿越测试系统,用以进行风电机组的低电压穿越性能测试,包括分别与风场母线(11)连接的模拟电网(15)和被测机组(13),其特征在于,所述的模拟电网(15)包括多个并联的电网模拟机组(14),所述的电网模拟机组(14)和被测机组(13)均包括依次连接的风力发电机、二极管整流桥(2)、Boost变流器(3)、全功率网侧变流器(7)、滤波器(8)、升压变压器(9)和风力发电机组并网开关(10),所述的Boost变流器(3)和全功率网侧变流器(7)的直流母线上并联设有直流电容(4)和crowbar电路,所述的crowbar电路包括并联在直流母线上的内置crowbar电路(5)和外置crowbar电路(6)。
2.根据权利要求1所述的一种Boost变流器的风电机组低电压穿越测试系统,其特征在于,每个电网模拟机组(14)中的风力发电机为一台电网模拟风力发电机(101),所述的被测机组(13)中的风力发电机为一台待测风力发电机(102)。
3.根据权利要求1所述的一种Boost变流器的风电机组低电压穿越测试系统,所述的内置crowbar电路(5)和外置crowbar电路(6)均包括相互连接的开关和crowbar电阻。
4.一种应用如权利要求1所述的Boost变流器的风电机组低电压穿越测试系统的测试方法,其特征在于,包括以下步骤:
1)测试准备;
2)启动所有电网模拟机组与被测机组并控制其至预定测试转速条件运行;
3)电网模拟机组模拟电网条件运行;
4)对被测机组实施低电压穿越测试;
5)完成测试并安全停机。
5.根据权利要求4所述的一种测试方法,其特征在于,所述的步骤1)具体包括以下步骤:
11)根据被测机组容量及风场条件,确定电网模拟机组并联组数;
12)配置电网模拟机组的crowbar电路;
13)确定被测机组测试运行的工作点,包括转速、有功功率和无功功率。
6.根据权利要求5所述的一种测试方法,其特征在于,所述的步骤11)中电网模拟机组并联组数符合以下条件:
N W T _ g ≥ P T e s t _ m a x P g r i d
其中NWT_g为电网模拟机组并联组数,PTest_max为被测机组最大输出功率,Pgrid为电网模拟机组额定功率。
7.根据权利要求5所述的一种测试方法,其特征在于,所述的步骤12)中电网模拟机组的crowbar电路容量配置方法包括:
配置内置crowbar电路:采用机组自带的内置crowbar电路,通过多个电网模拟机组并联满足泄能要求,并联电网模拟机组的数量满足:
N W T _ g ≥ E T e s t _ m a x E c r o w b a r 0
ETest_max=PTest_max×Ttest
配置外置crowbar电路:通过外加外置crowbar电路满足泄能要求,外置crowbar电路容量满足:
Ecrowbar1≥ETest_max-Ecrowbar0×Ttest
其中,ETest_max为被测机组最大输出能量,PTest_max为被测机组最大输出功率,Ttest为电气测试时间,Ecrowbar0为一台电网模拟机组自带内置crowbar电路的额定容量,NWT_g为电网模拟机组并联组数,Ecrowbar1为外加的外置crowbar电路的额定容量。
8.根据权利要求4所述的一种测试方法,其特征在于,所述的步骤3)包括以下步骤:
31)通过Boost变流器控制电网模拟机组直流母线电压,并通过crowbar电路消耗从电网侧馈入的多余电能;
32)电网模拟机组全功率网侧变流器按电网正常与故障运行条件模拟产生电网电压。
9.根据权利要求8所述的一种测试方法,其特征在于,所述的步骤31)中crowbar电路的直流电压控制指令大于Boost变流器的直流电压控制指令一定值。
10.根据权利要求8所述的一种测试方法,其特征在于,所述的步骤32)中电网故障运行包括三相对地故障运行、单相对地故障运行、两相对地故障运行和相间故障运行。
CN201510096464.1A 2015-03-04 2015-03-04 一种Boost变流器的风电机组低电压穿越测试系统及方法 Expired - Fee Related CN104678302B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510096464.1A CN104678302B (zh) 2015-03-04 2015-03-04 一种Boost变流器的风电机组低电压穿越测试系统及方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510096464.1A CN104678302B (zh) 2015-03-04 2015-03-04 一种Boost变流器的风电机组低电压穿越测试系统及方法

Publications (2)

Publication Number Publication Date
CN104678302A CN104678302A (zh) 2015-06-03
CN104678302B true CN104678302B (zh) 2017-07-28

Family

ID=53313636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510096464.1A Expired - Fee Related CN104678302B (zh) 2015-03-04 2015-03-04 一种Boost变流器的风电机组低电压穿越测试系统及方法

Country Status (1)

Country Link
CN (1) CN104678302B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107769264A (zh) * 2017-11-21 2018-03-06 北京合力电气传动控制技术有限责任公司 风力发电机组的控制方法、装置、系统、风电变流器
CN109725255A (zh) * 2018-12-21 2019-05-07 明阳智慧能源集团股份公司 一种风力发电机组海上低电压穿越检测方法
CN113497455B (zh) * 2020-03-19 2022-07-26 新疆金风科技股份有限公司 对风电场中的风电机组的变流器进行调控的方法及设备
CN113281582A (zh) * 2021-04-20 2021-08-20 中国电力科学研究院有限公司 一种测试变速抽蓄机组故障电压穿越特性的方法和系统

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101881814A (zh) * 2010-06-25 2010-11-10 西安久和能源科技有限公司 一种新型的兆瓦级风力发电机组试验系统及其试验方法
CN102121966A (zh) * 2010-01-07 2011-07-13 华北电力科学研究院有限责任公司 风力发电机低电压穿越能力的测量方法和分析系统
CN202583421U (zh) * 2012-03-31 2012-12-05 江苏新誉重工科技有限公司 一种兆瓦级风力模拟试验系统
CN103219740A (zh) * 2012-01-18 2013-07-24 同济大学 一种永磁同步风力发电机并网系统
CN104215904A (zh) * 2014-09-04 2014-12-17 同济大学 一种全功率变流器风电机组低电压穿越测试系统及方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9651629B2 (en) * 2012-07-16 2017-05-16 Clemson University Hardware-in-the-loop grid simulator system and method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102121966A (zh) * 2010-01-07 2011-07-13 华北电力科学研究院有限责任公司 风力发电机低电压穿越能力的测量方法和分析系统
CN101881814A (zh) * 2010-06-25 2010-11-10 西安久和能源科技有限公司 一种新型的兆瓦级风力发电机组试验系统及其试验方法
CN103219740A (zh) * 2012-01-18 2013-07-24 同济大学 一种永磁同步风力发电机并网系统
CN202583421U (zh) * 2012-03-31 2012-12-05 江苏新誉重工科技有限公司 一种兆瓦级风力模拟试验系统
CN104215904A (zh) * 2014-09-04 2014-12-17 同济大学 一种全功率变流器风电机组低电压穿越测试系统及方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
双馈风电机组低电压穿越特性的试验研究;胡书举 等;《高电压技术》;20100331;第36卷(第3期);789-795 *

Also Published As

Publication number Publication date
CN104678302A (zh) 2015-06-03

Similar Documents

Publication Publication Date Title
CN103454521B (zh) 一种风电场电网运行模拟装置
Muljadi et al. Short circuit current contribution for different wind turbine generator types
CN104215904B (zh) 一种全功率变流器风电机组低电压穿越测试系统及方法
CN102593865B (zh) 一种风电接入电网的动态模拟系统和模拟方法
Hussein et al. A type-4 wind power plant equivalent model for the analysis of electromagnetic transients in power systems
CN104678302B (zh) 一种Boost变流器的风电机组低电压穿越测试系统及方法
CN103094921A (zh) 直驱式风力发电机组机电暂态建模方法及机电暂态模型
CN104283212A (zh) 一种基于CompactRIO的双馈风力发电机组物理仿真平台
CN103454584B (zh) 风力发电机组高电压穿越测试设备
CN105633998A (zh) 风力发电机组高电压穿越控制方法和装置
Vajpayee et al. Crowbar protection of grid connected double fed induction generator with variable speed wind turbine
Altimania Modeling of doubly-fed induction generators connected to distribution system based on eMEGASim® real-time digital simulator
CN203479929U (zh) 一种风电场电网运行模拟装置
Meere et al. VSC-HVDC link to support voltage and frequency fluctuations for variable speed wind turbines for grid connection
Giaourakis et al. Dynamic behaviour of a wind energy conversion system including doubly-fed induction generator in fault conditions
Aykut et al. Modeling, control, and experimental verification of a 500 kW DFIG wind turbine
CN209356601U (zh) 双馈式风力发电并网实验平台
Firouzi et al. A modified transformer-type fault current limiter for enhancement fault ride-through capability of fixed speed-based wind power plants
Wembridge et al. Dynamic Voltage Support of Six-pulse Bridge Inverters: Equitable Performance Specification for Future Grids
Jun-qing et al. The research of the inter-turn short circuit of the stator windings in doubly fed induction generator
Hu et al. Ancillary frequency control of direct drive full-scale converter based wind power plants
CN204330927U (zh) 一种基于动模风光互补的继电保护适应性检测装置
Nayir et al. Analysis of short circuit faults in a system fed by wind turbine
Mehrshad et al. Transient simulation of fixed-speed wind turbine with grid fault variety in real wind farm
Jedut et al. Investigation of DFIG based wind turbine influence on the utility grid

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170728

Termination date: 20210304