CN104676635A - Intelligent boiler control system and control method thereof - Google Patents
Intelligent boiler control system and control method thereof Download PDFInfo
- Publication number
- CN104676635A CN104676635A CN201310612582.4A CN201310612582A CN104676635A CN 104676635 A CN104676635 A CN 104676635A CN 201310612582 A CN201310612582 A CN 201310612582A CN 104676635 A CN104676635 A CN 104676635A
- Authority
- CN
- China
- Prior art keywords
- control system
- feeding
- remote central
- boiler
- central control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Control Of Steam Boilers And Waste-Gas Boilers (AREA)
- Regulation And Control Of Combustion (AREA)
Abstract
The invention discloses an intelligent boiler control system, wherein the intelligent boiler control system comprises a remote central control system, a quantitative feeding control system, a hearth temperature detecting system arranged at the boiler burning end, and a feeding system arranged at the raw material terminal; the remote central control system is connected with the temperature detecting system, and the remote central control system is connected with the feeding system through the quantitative feeding control system. The intelligent boiler control system can detect the temperature of the boiler furnace, the fuel is judged about to run out while the temperature in the boiler furnace goes down, and the feeding system is immediately controlled for feeding the fuel. The intelligent level of the intelligent control system is high, full-time unattended operation is not required for the staff, so that the human cost is saved and the work efficiency is raised.
Description
Technical field
The invention belongs to automation field, specifically, relate to a kind of intelligent boiler control system and control method thereof.
Background technology
Boiler is industrial production and the indispensable combustion apparatus of life heat supply, is released energy by combustion fuel.
Life heating boiler is mainly used in heat supply in winter, and winter, day and night temperature was comparatively large, and general night temperatures is lower, and also higher to the requirement of boiler heat supplying temperature, day temperature is higher, does not need boiler to have higher heat supply temperature.The many combustion cases by artificial judgment boiler internal fuel of existing steam generator system, add controlled burning of fuel temperature as required, labor intensive cost, and intelligence degree are low.
Summary of the invention
The object of the invention is to for the deficiencies in the prior art, provide a kind of automaticity high can timing to the intelligent boiler control system of boiler feed and control method thereof.
Technical scheme of the present invention is: a kind of intelligent boiler control system, comprise remote central control system, quantitative feeding control system, be arranged on the fire box temperature detection system of boiler combustion end, with the feeding system being arranged on raw material terminal, remote central control system is connected with system for detecting temperature, and remote central control system is connected with feeding system through quantitative feeding control system.
Preferably: feeding system comprises switching system, detection system and digging system, switching system after testing system is connected with digging system.
A control method for intelligent boiler control system, comprises following characteristics:
(1) fire box temperature of detection is sent to remote central control system by fire box temperature detection system, and remote central control system is analyzed the temperature detected, if temperature changing regularity is by height on earth, then starts feed operation;
(2) remote central control system starts feeding system through quantitative feeding control system, switching system in feeding system controls digging system and starts working, detection system detects the excavation amount of digging system, if the excavation amount that detection system detects equals the feed value that quantitative feeding control system is transmitted, then switching system closes digging system, and feeder process terminates.
The invention has the beneficial effects as follows:
Intelligent boiler control system provided by the invention can detect the temperature in boiler furnace, if the temperature in boiler furnace from high to low, then be judged as that fuel is about to exhaust, timely control feeding system postcombustion, owing to devising quantitative feeding control system, each filler all fixing quantity, avoid filler too much to cause burning insufficient.This control system intelligence degree is high, full-time on duty without operating personnel, saves human cost, improves operating efficiency.
Accompanying drawing explanation
Accompanying drawing 1 is the structural representation of the embodiment of the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention will be further described in detail.
A kind of intelligent boiler control system, comprise remote central control system, quantitative feeding control system, be arranged on the fire box temperature detection system of boiler combustion end, with the feeding system being arranged on raw material terminal, remote central control system is connected with system for detecting temperature, and remote central control system is connected with feeding system through quantitative feeding control system.Feeding system comprises switching system, detection system and digging system, and switching system after testing system is connected with digging system.
The control principle of this system is as follows:
(1) fire box temperature of detection is sent to remote central control system by fire box temperature detection system, and remote central control system is analyzed the temperature detected, if temperature changing regularity is by height on earth, then starts feed operation;
(2) remote central control system starts feeding system through quantitative feeding control system, switching system in feeding system controls digging system and starts working, detection system detects the excavation amount of digging system, if the excavation amount that detection system detects equals the feed value that quantitative feeding control system is transmitted, then switching system closes digging system, and feeder process terminates.
Claims (3)
1. an intelligent boiler control system, it is characterized in that: comprise remote central control system, quantitative feeding control system, be arranged on the fire box temperature detection system of boiler combustion end, with the feeding system being arranged on raw material terminal, remote central control system is connected with system for detecting temperature, and remote central control system is connected with feeding system through quantitative feeding control system.
2. intelligent boiler control system as claimed in claim 1, it is characterized in that: described feeding system comprises switching system, detection system and digging system, switching system after testing system is connected with digging system.
3. a control method for intelligent boiler control system as claimed in claim 1, is characterized in that: comprise following characteristics:
(1) fire box temperature of detection is sent to remote central control system by fire box temperature detection system, and remote central control system is analyzed the temperature detected, if temperature changing regularity is by height on earth, then starts feed operation;
(2) remote central control system starts feeding system through quantitative feeding control system, switching system in feeding system controls digging system and starts working, detection system detects the excavation amount of digging system, if the excavation amount that detection system detects equals the feed value that quantitative feeding control system is transmitted, then switching system closes digging system, and feeder process terminates.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310612582.4A CN104676635A (en) | 2013-11-26 | 2013-11-26 | Intelligent boiler control system and control method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310612582.4A CN104676635A (en) | 2013-11-26 | 2013-11-26 | Intelligent boiler control system and control method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104676635A true CN104676635A (en) | 2015-06-03 |
Family
ID=53312032
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310612582.4A Pending CN104676635A (en) | 2013-11-26 | 2013-11-26 | Intelligent boiler control system and control method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104676635A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110687867A (en) * | 2019-10-31 | 2020-01-14 | 中船九江锅炉有限公司 | Use boiler control system of PLC controller |
-
2013
- 2013-11-26 CN CN201310612582.4A patent/CN104676635A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110687867A (en) * | 2019-10-31 | 2020-01-14 | 中船九江锅炉有限公司 | Use boiler control system of PLC controller |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203454747U (en) | Crucible aluminum melting furnace | |
CN201277795Y (en) | Agricultural and sideline products drying equipment with multiple heat sources | |
CN104676635A (en) | Intelligent boiler control system and control method thereof | |
CN204240800U (en) | A kind of ceramic member process units in conjunction with sintering oven and wax removal kiln | |
CN202955861U (en) | Energy-saving and environmental-friendly type curing barn heat supply burner | |
CN104676639A (en) | Intelligent boiler control system | |
CN104676626A (en) | Control system for boiler and control method thereof | |
CN104676640A (en) | Control system for boiler | |
CN202470042U (en) | Biomass fuel and diesel dual-purpose combustion engine | |
CN202392771U (en) | Boiler intelligent temperature control system | |
CN104676624A (en) | Boiler feed control system | |
CN202581376U (en) | Biomass incomplete-combustion hopper | |
CN104676625A (en) | System and method for controlling material supply of boiler | |
CN104676634A (en) | Timing control system for boiler and control method thereof | |
CN104676636A (en) | Timing control system for boiler | |
CN104501204B (en) | Temperature induction device for bio-particle boiler | |
CN204573594U (en) | A kind of oil transport pipeline intelligent gas heating equipment | |
CN204255078U (en) | A kind of industrial furnace | |
CN204409112U (en) | Nursery root attemperator | |
CN204923050U (en) | Reinforced material automatic control device that arranges of biomass power generation unit | |
CN104251485A (en) | Boiler control system | |
CN204006100U (en) | A kind of pneumatic negative-pressure firing device | |
CN102788346B (en) | Improved boiler system | |
CN102563618A (en) | Biomass fuel and diesel oil dual-purpose burner | |
CN203010632U (en) | Electric control system for garbage incinerator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150603 |