CN1046659C - Aerial prefabricating and constructing tech. for prestressed concrete arch-bar roof truss - Google Patents

Aerial prefabricating and constructing tech. for prestressed concrete arch-bar roof truss Download PDF

Info

Publication number
CN1046659C
CN1046659C CN 96117701 CN96117701A CN1046659C CN 1046659 C CN1046659 C CN 1046659C CN 96117701 CN96117701 CN 96117701 CN 96117701 A CN96117701 A CN 96117701A CN 1046659 C CN1046659 C CN 1046659C
Authority
CN
China
Prior art keywords
roof truss
top beam
prefabricating
prefabricated
arch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 96117701
Other languages
Chinese (zh)
Other versions
CN1154897A (en
Inventor
陈学伦
袁玉川
谭晓岗
庞怀烈
王学孔
吴显统
刘建夫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Province Sichuan Grain Engineering Construction Co
Sichuan Prov Grain Prospecting & Design Inst
Original Assignee
Sichuan Province Sichuan Grain Engineering Construction Co
Sichuan Prov Grain Prospecting & Design Inst
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Province Sichuan Grain Engineering Construction Co, Sichuan Prov Grain Prospecting & Design Inst filed Critical Sichuan Province Sichuan Grain Engineering Construction Co
Priority to CN 96117701 priority Critical patent/CN1046659C/en
Publication of CN1154897A publication Critical patent/CN1154897A/en
Application granted granted Critical
Publication of CN1046659C publication Critical patent/CN1046659C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention provides an air prefabricating construction technology of a prestressing force concrete arched plate roof truss, which comprises the steps that firstly, hoisting jack grooves are arranged outside top ring beams of two vertical walls in advance, tensioning anchor piles for tensioning anchor plates are embedded in gutters outside the top ring beams, and then, a horizontal support, a vertical support and a template are overlapped in the top ring beams of the two vertical walls so as to form a prefabricating operating platform; the arched plate roof truss is prefabricated on a platform according to a spacing and filling construction sequence; the prefabricated arched plate roof truss is moved to a mounting position horizontally. Full scaffolds do not need to be arranged, a prefabricating field is not needed, and a hoisting machine does not need to be used. The present invention has the advantages of simple and safe construction, reliable quality and low cost.

Description

The aerial prefabricating and constructing of prestressed concrete arch-bar roof truss
The present invention relates to a kind of the realm of building construction, particularly relate to the aerial prefabricating and constructing of a kind of prestressed concrete arch-bar roof truss.
The job practices of present large-span prestressed concrete arch-bar roof truss often adopts, and the prefabricated arch roof truss on ground lifts required installation site with large-scale hoisting machinery again and installs earlier; Or stay with repeatedly setting up full hall scaffold, aloft cast-in-situ construction method.The former floor space is big, and the transportation of member horizontal vertical needs with the large-scale hoisting machinery lifting, and difficulty of construction is big.The artificial consumption of the latter is many, the cost height.Chinese patent CN1097229 discloses a kind of overhead site-casting method for broad-span presrtressed arch plate, be through groove anchoring stretch-draw steel plate in the wall top beam outside, in the setting of collar tie beam inner ring by several horizontal supports that withstand two opposite collar tie beam inwalls in the span direction and horizontal support system that vertical support is formed, tension reinforcing steel bar on the stretch-draw steel plate then, existing field boundary waters into prestressed large-span arch bar roof in the high-altitude after setting up template, support, scaffold by commonsense method again.This method need not take the lifting of prefabricated field boundary ground and large-scale hoisting machinery, transportation, but still need set up full hall scaffold, is a kind of cast-in-place construction mode, and artificial consumption is many, the cost height.
The object of the present invention is to provide a kind of ground of neither using prefabricated, it is cast-in-place also need not set up full hall scaffold, and it is simple and safe to construct, and objectivized labour and activation labour expenditure are few, the aerial prefabricating and constructing of prestressed concrete arch-bar roof truss that cost is low.
The aerial prefabricating and constructing of prestressed concrete arch-bar roof truss of the present invention is, 1) at the default jack groove in the two vertical wall top beam outsides, and bury the stretch-draw anchoring pile parallel underground in the top beam outside with vertical wall, as the stretch-draw anchor slab lower fulcrum, the stretch-draw anchor slab is installed on the stretch-draw anchoring pile, and its quantity is looked the production quantity piece of every batch of arch roof truss and is decided.Set up cross binding and longitudinal bracing in two vertical wall top beam inboards then, and make cross binding hold out against top beam, top beam produces displacement when preventing reinforcing bar, cause wall crazing, for easy to operate, employing is provided with slack adjuster between cross binding, regulate this device and make it to hold out against top beam, and longitudinal and transverse support specification, spacing are determined by calculating.On cross binding, lay template again, constitute prefabricated operating platform; 2) stay with conventional jumping lattice and fill out a grade sequence of construction, open muscle, formwork erection, pour and maintenance, make arch roof truss by Pin; 3) jack is put in the jack groove in the top beam outside, pursue the arch roof truss that the Pin jacking is made, and be moved horizontally to the installation site, be conveniently moving, on two vertical top beams, be provided with special cart, the two ends of arch roof truss directly are placed on two dollies by the top, instruments such as available bottle gouard moved by hands, with the arch roof truss horizontally tracting to the installation site.Because the length of prefabricated operating platform is certain, the arch roof truss limited amount that is prefabricated into need be prefabricated in batches, so so far finish one-period.Repetitive operation is opened muscle, formwork erection, is poured and maintenance by Pin, is prefabricated into arch bar plank house frame, moves horizontally arch roof truss again to operations such as installation sites, finishes until whole arch roof truss production.
The advantage of the aerial prefabricating and constructing of concrete arch-bar roof truss of the present invention is prefabricated in batches aloft, it is cast-in-place aloft not need repeatedly to set up full hall scaffold, not prefabricated on ground yet, save field boundary ground, and do not need the large-scale hoisting machinery lifting, aerial prefabricated platform once is barricaded as, be repeatedly used, starting equipment is simple, construction safety, it is few to consume material and recruitment, and cost is low.If any two above house arch roof truss flowing water constructions, economic and technical norms are more remarkable.
Describe the embodiment of the invention in detail below in conjunction with accompanying drawing.
Fig. 1: the invention process state partial schematic diagram
Fig. 2; The invention process state plane schematic flow sheet
Embodiment 1:
Long 85 meters of certain silo, wide 18 meters, wall is high 7 meters, and roof system is made of the wide 1.2 meters prestressed concrete arch-bar roof trusses of 72 Pin.Be provided with settlement joint 9 at the silo middle part, two partly about its both sides were divided into silo by two adjacent cross walls 10.During construction, promptly at two cross walls, 10 places, reserve jack groove 8 in top beam 3 outsides, and bury stretch-draw anchoring pile 1 underground, opening installation stretch-draw anchor slab 2 on the anchoring pile 1, set up cross binding 5 and the longitudinal bracing 6 that has slack adjuster 7 then in top beam 3 inboards, regulating slack adjuster 7 makes cross binding 5 hold out against top beam 3, be lined with parallels 12 therebetween, on cross binding 5, lay template 4, the disposable aerial prefabricated platform of growing into 16 meters of taking again; On platform, adopt the jumping lattice to fill out a grade sequence of construction, open muscle, formwork erection, pour and maintenance, be prefabricated into first totally 12 Pin arch roof trusses 11 by design by Pin; Jack is put into the jack groove 8 in the top beam outside, on the dolly of the arch roof truss 11 that is prefabricated into by the Pin jacking to the top beam 3 (two ends that are about to arch roof truss 11 are placed on respectively on two dollies on the two vertical collar tie beams 3), draw with bottle gouard moved by hands, make dolly on top beam 3, move to the installation site, put in place until 12 Pin arch roof trusses 11.Repeat prefabricated and move horizontally the operation of arch roof truss 11, be divided into 6 batches and carry out, promptly 6 cycles are finished this silo arch roof truss construction.

Claims (2)

1, the aerial prefabricating and constructing of a kind of prestressed concrete arch-bar roof truss is characterized in that:
1) at first reserves the jack groove in the two vertical wall top beam outsides, and in the gutter of the top beam outside, bury the stretch-draw anchoring pile underground, the stretch-draw anchor slab is installed on the stretch-draw anchoring pile, set up cross binding and longitudinal bracing in two vertical wall top beam inboards then, and make cross binding hold out against top beam, on horizontal support, lay template then, constitute prefabricated operating platform;
2) adopt the pre-tensioning system production technology, by jump lattice fill out grade sequence of construction on prefabricated operating platform by Pin open muscle, formwork erection, pour, maintenance, make arch roof truss;
3) jack is put into the jack groove in the top beam outside, the arch roof truss that is prefabricated into by the Pin jacking, and be held in place on the dolly on the top beam, move horizontally arch roof truss again to the installation site.
2, the aerial prefabricating and constructing of prestressed concrete arch-bar roof truss as claimed in claim 1, when it is characterized in that setting up prefabricated operating platform, the mode that cross binding holds out against top beam is with slack adjuster is set in cross binding, and utilize the slack adjuster that is provided with between cross binding to regulate, make cross binding hold out against top beam.
CN 96117701 1996-09-09 1996-09-09 Aerial prefabricating and constructing tech. for prestressed concrete arch-bar roof truss Expired - Fee Related CN1046659C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 96117701 CN1046659C (en) 1996-09-09 1996-09-09 Aerial prefabricating and constructing tech. for prestressed concrete arch-bar roof truss

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 96117701 CN1046659C (en) 1996-09-09 1996-09-09 Aerial prefabricating and constructing tech. for prestressed concrete arch-bar roof truss

Publications (2)

Publication Number Publication Date
CN1154897A CN1154897A (en) 1997-07-23
CN1046659C true CN1046659C (en) 1999-11-24

Family

ID=5124529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 96117701 Expired - Fee Related CN1046659C (en) 1996-09-09 1996-09-09 Aerial prefabricating and constructing tech. for prestressed concrete arch-bar roof truss

Country Status (1)

Country Link
CN (1) CN1046659C (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101403212B (en) * 2008-11-13 2011-01-26 中铁二局股份有限公司 Construction method for pretensioned prestressing concrete simply supported T-beam
CN102465598A (en) * 2010-11-05 2012-05-23 江苏邗建集团有限公司 Construction method of high-altitude cast-in-site arch roof truss
CN102251667B (en) * 2011-05-11 2013-04-17 中冶建工集团有限公司 Construction method for reinforced concrete arched roof of grain store

Also Published As

Publication number Publication date
CN1154897A (en) 1997-07-23

Similar Documents

Publication Publication Date Title
CN103422672A (en) Construction method for reinforced concrete prefabricated house
CN111576619B (en) Production method of high-strength concrete post-cast assembled frame system
CN111926720A (en) Construction method suitable for continuous steel-structure cantilever beam closure in loess area
CN109267487A (en) A kind of long big section bent cap bracket system of overhanging
CN113638304B (en) Concrete beam type bridge hidden cover beam structure system and construction method thereof
CN102787560A (en) Integrated construction method of support of large cantilevered capping beam and vertical column
CN114922360B (en) Device for prefabricating and cast-in-situ combination of roof cornice structure and construction method thereof
CN111809851A (en) Steel pipe triangular truss support system and construction method
CN109457814B (en) Construction method for top cover of high-rise and large-diameter building based on Bailey truss structure
CN1046659C (en) Aerial prefabricating and constructing tech. for prestressed concrete arch-bar roof truss
CN112431407A (en) Construction method for formwork of building main body cantilever structure
CN115262637B (en) Subway station platform board assembled structure system
CN216616802U (en) Three-layer hydraulic self-lifting construction platform for vertical shaft
CN216108007U (en) Concrete beam type bridge and cast-in-situ hidden cover beam thereof
CN102767378A (en) Double-column type tunnel portal method for bent frame construction tunnel
CN114658214A (en) High-rise building disc buckle type high-altitude large-cantilever support frame support and anchor pressing integrated construction method
CN115478710A (en) High-rise building roof cantilever structure dismantling construction method
CN112554535B (en) Construction method for large silo top plate without supporting frame
CN114215333A (en) Rapid construction method for outer cornice of high-rise building
CN113802468A (en) Asymmetric cable-stayed bridge special-shaped concrete tower column construction process
CN1186509C (en) Post-stretching prestressed concrete arch bar roof and its construction method
CN1044829C (en) Overhead site-casting method for broad-span presrtressed arch plate
CN113338537A (en) Construction method of ultrahigh large-section concrete frame column
CN110805261A (en) Steel platform steel beam structure based on prestress reinforcement and construction method
JPH01256636A (en) Construction method of building

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
ERR Gazette correction

Free format text: CORRECT: INVENTOR; FROM: CHEN XUELUN TO: CHEN YONGLUN

C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee