CN104652725B - The leakage-proof structure of color steel roofing chimney and construction method - Google Patents

The leakage-proof structure of color steel roofing chimney and construction method Download PDF

Info

Publication number
CN104652725B
CN104652725B CN201510080142.8A CN201510080142A CN104652725B CN 104652725 B CN104652725 B CN 104652725B CN 201510080142 A CN201510080142 A CN 201510080142A CN 104652725 B CN104652725 B CN 104652725B
Authority
CN
China
Prior art keywords
watt
chimney
color steel
ground floor
steel roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510080142.8A
Other languages
Chinese (zh)
Other versions
CN104652725A (en
Inventor
何曲会
乔增龙
吕景瑞
赵鹏
孙维明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
CMTCC Shanghai Shisanye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd, CMTCC Shanghai Shisanye Construction Co Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201510080142.8A priority Critical patent/CN104652725B/en
Publication of CN104652725A publication Critical patent/CN104652725A/en
Application granted granted Critical
Publication of CN104652725B publication Critical patent/CN104652725B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to industrial premises color steel roofing installs the waterproofing and leakage-stopping construction applications after chimney, specially a kind of leakage-proof structure of color steel roofing chimney;It includes, as the steel structural upright column constituting Factory Building main body, being covered in firm structural upright top as the ground floor color steel roof watt of factory roof, and runs through the chimney of ground floor color steel roof watt, it is characterized in that:Also include being laid on watt layer that dams that ground floor color steel roof watt is upper and is equally run through by chimney, each piece dams and watt is all provided with the parallel fin of upper and lower twice along Factory Building horizontal direction, the fin that this be arranged in parallel up and down forms the horizontal structure of damming of multiple tracks, thus the current direction longitudinally flowing down Factory Building both sides are shunted.Dam watt from laterally disperseing current, thus avoiding the seeping phenomenon between chimney and roofing tile, it is to avoid long-term rainwater soaks the corrosiveness to roofing tile.

Description

The leakage-proof structure of color steel roofing chimney and construction method
Technical field
The present invention relates to industrial premises color steel roofing installs the waterproofing and leakage-stopping construction applications after chimney, specially a kind of color The leakage-proof structure of steel tile roofing chimney and construction method.
Background technology
In workshop building, always have air-conditioning, the discharge flue needs situation that directly perforate is stretched out from roofing tile, Rain-proof leak stopping at opening is all the priority and difficulty of construction of hydropower all the time:Taking the chimney of a diameter of 600mm as a example, color steel Tile roofing is speeded 760 type encaustic tiles for angle, and the spacing between encaustic tile crest is 360mm, and crest to trough distance is 71mm, chimney and coloured silk Between watt, upper edge part just can form a crescent plash, and rainwater is in all typically faintly acid, and long-term immersion is easy Corrosion encaustic tile, and easily allows application of anti-leakage layers come off, and so that water is penetrated into inside Factory Building, brings very burden to leakproof, common way Need every year these hydrops parts to be checked, costly.
Content of the invention
It is an object of the invention to, provide a kind of leakage-proof structure of color steel roofing chimney, it can be by chimney and roofing Between watt, plash eliminates, and one layer of leakproof, accomplishes dual fail-safe, thus improving installation quality, reducing leak risk, minimizing Maintenance number of times.
In order to achieve the above object, the present invention is realized in:
A kind of construction method of the leakage-proof structure of color steel roofing chimney, it is included as the steel construction constituting Factory Building main body Column, is covered in firm structural upright top as the ground floor color steel roof watt of factory roof, and runs through ground floor coloured silk steel room The chimney in face watt, also includes being laid on watt layer that dams that ground floor color steel roof watt is upper and is equally run through by chimney, each piece is cut Stream watt is all provided with the parallel fin of upper and lower twice along Factory Building horizontal direction, and it is horizontal that the fin that this be arranged in parallel up and down forms multiple tracks Dam structure, thus the current direction longitudinally flowing down Factory Building both sides are shunted;Wherein, described dam watt about twice parallel fins Interface triangular shape;Described construction method comprises the steps:
Step 1, the tapping point determining chimney according to drawing requirement and perforate size;And on ground floor color steel roof watt surface Make telltale mark;
Step 2, made using the color steel making ground floor color steel roof watt and dam watt;
Step 3, damming of making watt is arranged on ground floor color steel roof watt, installation should start to go here and there from top dormer Connection laying, reserves chimney position of opening in chimney tapping during laying;Dam and watt ground floor color steel roof is fixed on using rivet On watt, sealed using fluid sealant after fixing, prevent leak;
Step 4, according to labelling on ground floor color steel roof watt, carry out cutting using electric angle grinder, plain edge operation, Cut and after finishing, the heat-preservation cotton in ground floor color steel roof watt is taken out and keep properly, in case chimney is carried out after installing Filling;
Step 5, prefabricated chimney is connected from bottom to top, often all should be tightly connected between section chimney, prevent gas Let out in vitro;
After step 6, chimney are installed, the gap heat-preservation cotton between chimney and ground floor color steel roof watt is clogged;
Leakproof operation between step 7, ground floor color steel roof watt and chimney;
Step 7.1, plain edge and prune job will be carried out between chimney and ground floor color steel roof watt;
Step 7.2, carry out three painting one cloth operation;Specifically the first coating is by between chimney and ground floor color steel roof watt Gap and surrounding 200mm in the range of be all coated with bottom surface water-repellent paint, coating operation carries out patch operation, and patch operation is laggard Row the second coating operation;
Step 8, measure distance and the home position that chimney dams watt relatively on damming watt, and carry out labelling, with point Centered on draw at the circular hole of chimney radius plain edge operation is carried out to circular hole;After cutting, it is down covered above chimney, And so that this is dammed watt to dam with top and watt link together, rivet is fixed between the two;
After watt installation of damming around step 9, chimney, carry out second leak-proof construction by step 7 methods described;
Step 10, by chimney accessory install after, total preventing leaking engineer just terminates, and simulation mode detects leak stopping Effect, carry out leak stopping inspection.
Above-mentioned secondary leakage-proof construction method, employ dam watt avoid plash while, using secondary coating side Method, further increases the effect of leakproof, plays the effect of dual fail-safe.
Brief description
Fig. 1 is the structural representation damming watt in the present invention.
Fig. 2 is the leak-proof construction general flow chart of the present invention.
Fig. 3 is three painting one cloth blocking construction flow charts in coating operations of the present invention.
Specific embodiment
Further illustrate the present invention below by way of specific embodiment.
A kind of leakage-proof structure of color steel roofing chimney, it includes, as the steel structural upright column constituting Factory Building main body, covering In firm structural upright top as factory roof ground floor color steel roof watt, and the cigarette running through ground floor color steel roof watt Chimney, is characterized in that:Also include being laid on watt layer that dams that ground floor color steel roof watt is upper and is equally run through by chimney, each piece is cut Stream watt is all provided with the parallel fin of upper and lower twice along Factory Building horizontal direction, and it is horizontal that the fin that this be arranged in parallel up and down forms multiple tracks Dam structure, thus the current direction longitudinally flowing down Factory Building both sides are shunted.
A kind of leakage-proof structure of described color steel roofing chimney, described dam watt about the interface of twice parallel fins be in Triangle.
Above-mentioned dam watt from laterally disperseing current, thus avoiding the seeping phenomenon between chimney and roofing tile, Avoid long-term rainwater and soak the corrosiveness to roofing tile.
A kind of construction method of color steel roofing chimney leakage-proof structure, it comprises the steps:
Step 1, the tapping point determining chimney according to drawing requirement and perforate size;And on ground floor color steel roof watt surface Make telltale mark;
Step 2, made using the color steel making ground floor color steel roof watt and dam watt;
Step 3, damming of making watt is arranged on ground floor color steel roof watt, installation should start to go here and there from top dormer Connection laying, reserves chimney position of opening in chimney tapping during laying;Dam and watt ground floor color steel roof is fixed on using rivet On watt, sealed using fluid sealant after fixing, prevent leak;
Step 4, according to labelling on ground floor color steel roof watt, carry out cutting using electric angle grinder, plain edge operation, Cut and after finishing, the heat-preservation cotton in ground floor color steel roof watt is taken out and keep properly, in case chimney is carried out after installing Filling;
Step 5, prefabricated chimney is connected from bottom to top, often all should be tightly connected between section chimney, prevent gas Let out in vitro;
After step 6, chimney are installed, the gap heat-preservation cotton between chimney and ground floor color steel roof watt is clogged;
Leakproof operation between step 7, ground floor color steel roof watt and chimney;
Step 7.1, plain edge and prune job will be carried out between chimney and ground floor color steel roof watt;
Step 7.2, carry out three painting one cloth operation;Specifically the first coating is by between chimney and ground floor color steel roof watt Gap and surrounding 200mm in the range of be all coated with bottom surface water-repellent paint, coating operation carries out patch operation, and patch operation is laggard Row the second coating operation;
Step 8, measure distance and the home position that chimney dams watt relatively on damming watt, and carry out labelling, with point Centered on draw at the circular hole of chimney radius plain edge operation is carried out to circular hole;After cutting, it is down covered above chimney, And so that this intercepter plate is linked together with top intercepter plate, rivet is fixed between the two;
After intercepter plate around step 9, chimney is installed, carry out second leak-proof construction by step 7 methods described;
Step 10, by chimney accessory install after, total preventing leaking engineer just terminates, and simulation mode detects leak stopping Effect, carry out leak stopping inspection.
Above-mentioned secondary leakage-proof construction method, employ dam watt avoid plash while, using secondary coating side Method, further increases the effect of leakproof, plays the effect of dual fail-safe.

Claims (1)

1. a kind of construction method of the leakage-proof structure of color steel roofing chimney, the steel construction that it is included as constituting Factory Building main body stands Post, is covered in firm structural upright top as the ground floor color steel roof watt of factory roof, and runs through ground floor color steel roof Watt chimney, also include being laid on watt layer that dams that ground floor color steel roof watt is upper and is equally run through by chimney, each piece dams Watt all it is provided with the parallel fin of upper and lower twice along Factory Building horizontal direction, the fin that this be arranged in parallel up and down forms horizontal the cutting of multiple tracks Flow structure, thus the current direction longitudinally flowing down Factory Building both sides are shunted;Wherein, described dam watt about twice parallel fins boundary Face triangular shape;It is characterized in that:Described construction method comprises the steps:
Step 1, the tapping point determining chimney according to drawing requirement and perforate size;And make on ground floor color steel roof watt surface Telltale mark;
Step 2, made using the color steel making ground floor color steel roof watt and dam watt;
Step 3, damming of making watt is arranged on ground floor color steel roof watt, installation should start series connection paving from top dormer If reserving chimney position of opening in chimney tapping during laying;Dam and watt be fixed on ground floor color steel roof watt using rivet, Sealed using fluid sealant after fixation, prevent leak;
Step 4, according to labelling on ground floor color steel roof watt, carry out cutting using electric angle grinder, plain edge operation, cutting After finishing, the heat-preservation cotton in ground floor color steel roof watt is taken out and keep properly, in case chimney is filled out after installing Plug;
Step 5, prefabricated chimney is connected from bottom to top, often all should be tightly connected between section chimney, prevent outside gas Let out;
After step 6, chimney are installed, the gap heat-preservation cotton between chimney and ground floor color steel roof watt is clogged;
Leakproof operation between step 7, ground floor color steel roof watt and chimney;
Step 7.1, plain edge and prune job will be carried out between chimney and ground floor color steel roof watt;
Step 7.2, carry out three painting one cloth operation;Specifically the first coating is by the seam between chimney and ground floor color steel roof watt All it is coated with bottom surface water-repellent paint in the range of gap and surrounding 200mm, coating operation carries out patch operation, after patch operation, carry out Two coating operations;
Step 8, measure distance and the home position that chimney dams watt relatively on damming watt, and carry out labelling, with putting and being The circular hole of the heart place of drawing chimney radius simultaneously carries out plain edge operation to circular hole;After cutting, it is down covered above chimney, and makes This is dammed watt to be dammed with top and watt links together, and rivet is fixed between the two;
After watt installation of damming around step 9, chimney, carry out second leak-proof construction by step 7 methods described;
Step 10, by chimney accessory install after, total preventing leaking engineer just terminates, and simulation mode detects the effect of leak stopping Really, carry out leak stopping inspection.
CN201510080142.8A 2015-02-15 2015-02-15 The leakage-proof structure of color steel roofing chimney and construction method Active CN104652725B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510080142.8A CN104652725B (en) 2015-02-15 2015-02-15 The leakage-proof structure of color steel roofing chimney and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510080142.8A CN104652725B (en) 2015-02-15 2015-02-15 The leakage-proof structure of color steel roofing chimney and construction method

Publications (2)

Publication Number Publication Date
CN104652725A CN104652725A (en) 2015-05-27
CN104652725B true CN104652725B (en) 2017-03-08

Family

ID=53244312

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510080142.8A Active CN104652725B (en) 2015-02-15 2015-02-15 The leakage-proof structure of color steel roofing chimney and construction method

Country Status (1)

Country Link
CN (1) CN104652725B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760253B (en) * 2016-12-15 2019-03-29 共享钢构有限责任公司 A kind of installation method of waterproof construction and waterproof construction

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DK172943B1 (en) * 1997-09-05 1999-10-11 Velux Ind As Deformable roofing material and a method of making a roofing rail with a skirt of roofing roof
HU223750B1 (en) * 2000-11-25 2004-12-28 Vkr Holding A/S. Adjustable roof flashing and flashing kit
CA2460044C (en) * 2004-03-08 2009-03-03 Compagnie De Cheminees Industrielles Inc. Flashing for inclined roof and method for installing the same
CN200985600Y (en) * 2006-06-12 2007-12-05 李正国 Roofs water proof lead casing tube
CN202831430U (en) * 2011-12-14 2013-03-27 中国二十冶集团有限公司 Waterproof and leakproof mounting base for chimney joint of color steel roofing
GB2510326B (en) * 2012-11-22 2015-07-01 Forticrete Ltd Roof drainage system
CN103850404A (en) * 2014-03-06 2014-06-11 安徽博瑞特热能设备股份有限公司 Waterproof energy-dissipation roof penetrating device
CN204609147U (en) * 2015-02-15 2015-09-02 中冶天工上海十三冶建设有限公司 The seal structure of color steel roofing chimney

Also Published As

Publication number Publication date
CN104652725A (en) 2015-05-27

Similar Documents

Publication Publication Date Title
CN101949755B (en) Method for detecting quality of waterproof layer of rolled roofing material in inflatable manner
CN102995842A (en) Flexible waterproof roof system and construction method thereof
KR101966036B1 (en) Method for waterproofing rooftop and structure therefor
CN205100447U (en) Prevent rain water leakage's roofing blast pipe
CN104652725B (en) The leakage-proof structure of color steel roofing chimney and construction method
CN102912945B (en) Roof compound seepage-proofing steam exhausting hole detail treatment technology
CN104452949A (en) Embedded leak-proof joint
CN208777580U (en) A kind of hydrocone type drain gully waterproofing node structure
CN203669179U (en) Joint structure of steel roof at longitudinal and transverse striding position of steel structure factory building
CN105369994B (en) The discharge structure and its construction method of open valley side wall
CN204609147U (en) The seal structure of color steel roofing chimney
CN207959289U (en) Structure is repaired in a kind of leak for basement post-pouring zone position
CN106939671A (en) Metal sandwich roof plate construction method
CN109577565B (en) Slope roof construction method adopting large-span hyperbolic high-wave profiled steel sheet
KR20130117199A (en) Yroof method of roofing
CN201772978U (en) Device for detecting quality of roof coiled material waterproof layer by inflation method
CN105239732B (en) A kind of construction method of the stretching roofing pipe of rainwater leakage prevention
CN204419202U (en) A kind of tunnel slot repair structure
KR101595089B1 (en) Insulation and waterproof system for rooftop of building
KR200426312Y1 (en) Appliance For Preventing Water Of Urethane Using Air-line
CN110067345B (en) Bridge cut-off waterproof roof drain
CN207959290U (en) A kind of leakage maintaining structure for basement construction seam position
CN203834523U (en) System capable of inspecting waterproof structures of deformation joint
CN104533027A (en) Construction method of steel structure roof waterproof and heat insulation system
CN106760253A (en) A kind of installation method of waterproof construction and waterproof construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee after: MCC TIANGONG GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee after: MCC TIANGONG GROUP Corp.,Ltd.

Patentee after: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: CMTCC Shanghai 13th Construction Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190730

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee after: CHINA MCC20 GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.