CN104652407A - Folding type geotechnical-synthetic-material irregular-shaped granular pile with hoop reinforcements and construction method thereof - Google Patents

Folding type geotechnical-synthetic-material irregular-shaped granular pile with hoop reinforcements and construction method thereof Download PDF

Info

Publication number
CN104652407A
CN104652407A CN201510001429.7A CN201510001429A CN104652407A CN 104652407 A CN104652407 A CN 104652407A CN 201510001429 A CN201510001429 A CN 201510001429A CN 104652407 A CN104652407 A CN 104652407A
Authority
CN
China
Prior art keywords
parallelism
pile
style free
prose style
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510001429.7A
Other languages
Chinese (zh)
Other versions
CN104652407B (en
Inventor
王兴涛
陈建峰
叶观宝
曾岳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN201510001429.7A priority Critical patent/CN104652407B/en
Publication of CN104652407A publication Critical patent/CN104652407A/en
Application granted granted Critical
Publication of CN104652407B publication Critical patent/CN104652407B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/08Improving by compacting by inserting stones or lost bodies, e.g. compaction piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/18Placing by vibrating

Abstract

The invention relates to a folding type geotechnical-synthetic-material irregular-shaped granular pile with hoop reinforcements and a construction method thereof and belongs to the technical field of soft soil foundation treatment. The folding type geotechnical-synthetic-material irregular-shaped granular pile with the hoop reinforcements consists of a vertical reinforced type geotechnical-synthetic-material layer, circular hoop reinforcements and a granular material layer which is filled inside a granular pile hole, wherein the circular hoop reinforcements are equidistantly and horizontally fixed at the inner side of the vertical reinforced type geotechnical-synthetic-material layer along the vertical direction of the granular pile hole by using iron wires, the interior of the vertical reinforced type geotechnical-synthetic-material layer is filled with the granular material layer, compacting is carried out, and thus, the folding type geotechnical-synthetic-material irregular-shaped granular pile with the hoop reinforcements is formed. Compared with the prior art, the folding type geotechnical-synthetic-material irregular-shaped granular pile with the hoop reinforcements and the construction method thereof have the advantages that the frictional force between a pile body and a soil body can be fully utilized, a radial restraining force is provided, settling is effectively reduced, the load-carrying ability of a composite foundation is obviously increased, the carrying and construction are convenient, the pile has a prefabricating property, the engineering cost is relatively low, and the needs on industrial production are met.

Description

The collapsible geosynthetics abnormity granular pile of a kind of band stirrup and construction method thereof
Technical field
The invention belongs to field of civil engineering, especially relate to Soft Soil Subgrade Treatment Techniques field, be specifically related to the collapsible geosynthetics abnormity granular pile of a kind of band stirrup and construction method thereof.
Background technology
China's soft foundation is of a great variety, widely distributed, generally just has the features such as moisture content is high, compressibilty is large, intensity is low, bad hydraulic permeability.Often there is the engineering problems such as total settlement is excessive, relative settlement obvious, posterior settlement amount exceeds standard, Lack of support in the building be built on soft foundation, affects normal usage energy and the security performance of building.To this, for improving the supporting capacity of soft foundation, emerged in large numbers a large amount of soft foundation processing technologies both at home and abroad, wherein composite foundation reinforcing method is comparatively general.
A kind of more satisfactory Soft Ground mode of composite foundation stabilization method, originate from the sixties in 20th century, because this method significantly can improve the bearing capacity of ground, reduce foundation settlement, and effectively suppress foundation soil body lateral deformation, be worldwide all used widely.Broken stone pile is the one in treatment process of composite foundation, and it is with method pore-formings in soft foundation such as vibration, impact or water punchings, then by rubble press-in hole, is formed by the closely knit pile body of gravelly major diameter.Gravel pile reinforcing method is developed in 1936 by German engineer S.Steuerman, through the development of many decades, broken stone pile has been widely used in all kinds of highway on soft ground engineering, it both can improve bearing capacity of foundation soil, reduce decrement, other measures such as sand cushion can also be coordinated to accelerate the consolidation settlement speed of soft foundation, thus reach the object of consolidated subsoil.
Although broken stone pile is a kind of stake generally used in composite foundation stabilization, its defect is vulnerable to destroy.Broken stone pile needs the side limit of soil around pile to it to ensure intensity and the bearing capacity of pile body, when side limit is not enough, very easily there is bulging or general shear failure in pile body (particularly pile body near stake top), wherein bloating destruction is modal form under pile top load effect.The reason bloating destruction is under upper load effect, radial deformation can occur near stake top within the scope of certain depth, is out of shape senior general and causes pile capacity greatly to reduce thus cause losing efficacy.Broken stone pile works needs certain radial constraint, if foundation soil strength too low (it is generally acknowledged Undrained shear strength Cu<20kPa), broken stone pile just can not be provided to play the radial constraint needed for enough acting on, thus reduce integrated carrying ability.A kind of concrete core broken stone pile (ZL:200610037621.2) of Zhao Wei Ping invention, namely adopt Prefabricated Concrete stake as the stake core of broken stone pile, bear vertical load and be passed to lower sleeping hardpan, but this method not can solve rubble radial deformation problems of too; A kind of dual radial mesh cage broken stone pile (ZL:201020603436.7) of centre halfback Wang invention, in the stake side of broken stone pile, lateral restraint cylinder mould is set, to improve broken stone pile bearing capacity and to reduce sedimentation, but problem is the frictional force do not made full use of between pile body and the soil body, and construction technology is also comparatively numerous and diverse, workmanship is difficult to control.
In sum, the method for Treating soft foundation applying for macadam pile is utilized also to have some limitations in bearing capacity and quality control on construction guarantee etc. at present; For this reason, the technical scheme that the present invention proposes can make full use of the frictional force between pile body and the soil body, significantly improves the supporting capacity of broken stone pile, promotes the treatment effect of soft foundation, produces good economic benefit.
Summary of the invention
Object of the present invention is just the technological deficiency solving prior art medium stone stake existence, provides a kind of with stirrup collapsible geosynthetics abnormity granular pile and the construction method processing soft base thereof.
For realizing above-mentioned technical purpose, present invention employs following technical solution:
The band stirrup that the present invention proposes collapsible geosynthetics abnormity granular pile, described special-shaped granular pile is placed in soft foundation 7, the top of described special-shaped granular pile is positioned at earth's surface place, by prose style free from parallelism stake holes 2, vertical reinforced formula geosynthetic layer 3, circular stirrups 4, iron wire 5 and prose style free from parallelism filler 6 are formed, vertical reinforced formula geosynthetic layer 3 is positioned in prose style free from parallelism stake holes 2, circular stirrups 4 is fixed on the inner side of vertical reinforced formula geosynthetic layer 3 along the equidistant level of prose style free from parallelism stake holes 2 vertical direction by iron wire 5, by circular stirrups 4, vertical reinforced formula geosynthetic layer 3 is vertically separated into some pieces, discrete material layer 6 is filled in vertical reinforced formula geosynthetic layer 3, through closely knit final formation band stirrup collapsible geosynthetics abnormity granular pile.
In the present invention, described prose style free from parallelism stake holes 2 is cylindrical prose style free from parallelism stake holes; Described discrete material layer 6 is rubble or sand, and the prose style free from parallelism packing layer that particle diameter is not more than 6cm got by its medium stone, and the easy-to-use medium coarse sand of sand, also can use gravelly sand.
In the present invention, described vertical reinforced formula geosynthetic layer 3 adopts any one in geo-grid, geotextiles, geotechnical fabric bag or geotechnique's bag with tensile strength and water permeability; Diameter and the height size of the caliber of vertical reinforced formula geosynthetic layer 3 and height and prose style free from parallelism stake holes 2 are consistent, and sealing colligation is carried out by iron wire 5 in its underpart.
In the present invention, described circular stirrups 4 is the inner sides using iron wire to be equidistantly horizontally fixed on vertical reinforced formula geosynthetic layer 3 along prose style free from parallelism stake holes 2 vertical direction, and the spacing between fixed point is taken as the size of prose style free from parallelism stake holes 2 diameter; When the diameter of prose style free from parallelism stake holes 2 is less than or equal to 800mm, circular stirrups 4 diameter is selected to be less than 6mm; When being greater than 800mm when the diameter of prose style free from parallelism stake holes 2, circular stirrups 4 diameter is selected to be less than 8mm.
A kind of construction method with stirrup collapsible geosynthetics abnormity granular pile that the present invention proposes, the construction method used is immersed tube soil compaction method or the sleeve pipe compacting process of remaining silent, and Specific construction step is as follows:
One, immersed tube soil compaction of remaining silent method
1) vibration sinking tube pore-forming
Adopt vibrating type pile driver, after immersed tube machinery is in place, vibrating hammer vibration sinking tube is started after the earth's surface 1 of soft foundation 7 utilization hammer weighs and immersed tube is pressed into 1-2m by pile pipe deadweight slowly, often sinking 0.5-1m vibration staying 5-10s, until projected depth, in soft foundation 7, at this moment define a cylindrical shape underground prose style free from parallelism stake holes 2.
2) vertical reinforced formula geosynthetic layer 3 is installed
Vertical reinforced formula geosynthetic layer 3 is fixed circular stirrups 4 by iron wire 5, in vertical reinforced formula geosynthetic layer 3, put into appropriate discrete material layer 6 in advance, utilize the Gravitative Loads of discrete material layer 6, circular stirrups 4 and vertical reinforced formula geotechnique synthesis layer 3, automatically sink to the bottom of cylindrical shape underground prose style free from parallelism stake holes 2, complete the installation of vertical reinforced formula geosynthetic layer 3.
3) construction forms band stirrup collapsible geosynthetics abnormity granular pile
By the hopper on vibrating type pile driver, discrete material layer 6 is bet in cylindrical shape underground prose style free from parallelism stake holes 2, when the rubble height in prose style free from parallelism stake holes 2 is greater than 1/3 of prose style free from parallelism stake holes 2 height, can on pull out immersed tube, first should vibrate 5-10s before tube drawing, shake while pull out, often degree of lifting 0.5m-1.0m failure of oscillation, so repeatedly until full pipe is extracted, through closely knit final formation band stirrup collapsible geosynthetics abnormity granular pile, thus form compound foundation.
Two, sleeve pipe compacting process
1) ramming pipe pore-forming
Adopt steam pile driver or diesel hammer, after pile pipe is vertically in place, hammering inner and outer tubes on the earth's surface 1 of soft foundation 7, sink to the degree of depth of regulation, in soft foundation 7, at this moment define a cylindrical shape underground prose style free from parallelism stake holes 2.
2) vertical reinforced formula geosynthetic layer 3 is installed
Vertical reinforced formula geosynthetic layer 3 is fixed circular stirrups 4 by iron wire 5, pull up interior pipe, in vertical reinforced formula geosynthetic layer 3, put into appropriate discrete material layer 6 in advance, utilize the Gravitative Loads of discrete material layer 6, circular stirrups 4 and vertical reinforced formula geotechnique synthesis layer 3, automatically sink to the bottom of cylindrical shape underground prose style free from parallelism stake holes 2, complete the installation of vertical reinforced formula geosynthetic layer 3.
3) construction forms band stirrup collapsible geosynthetics abnormity granular pile
After the installation of vertical reinforced formula geosynthetic layer 3, discrete material layer 6 is filled in cylindrical shape underground rubble hole 2, put down interior pipe on 6, the discrete material layer in outer tube, pull up outer tube to concordant with interior pipe ground, hammering inner and outer tubes are real by discrete material lamination, pull up interior pipe and pour into discrete material layer 6 in outer tube, repeat said process, until pile pipe extracts ground, be with stirrup collapsible geosynthetics abnormity granular pile through hitting real final formation.
Working mechanism of the present invention:
After the collapsible geosynthetics granular pile of band stirrup squeezed into by soft foundation, form a kind of composite foundation, when composite foundation is subject to building or other factor applied pressures, vertical reinforced formula geosynthetic layer and stirrup provide radial constraint jointly, large due to the deformation ratio stirrup at vertical geosynthetic layer, the formation of the special-shaped granular pile of similar sugarcoated haws string data can be caused, which increase the contact area between pile body and the soil body, thus the frictional force increased between pile body and the soil body, improve pile body supporting capacity, the total bearing capacity of further lifting soft foundation.
Compared with prior art, the present invention has following Advantageous Effects:
1, the present invention is owing to utilizing the Gravitative Loads of appropriate discrete material layer, circular stirrups and vertical reinforced formula geotechnique synthesis layer, automatically sinks to the bottom of cylindrical shape underground prose style free from parallelism stake holes, installs more simple and convenient than general Reinforced Gravel Pile.
2, (fixing circular stirrups by iron wire) vertical reinforced formula geotechnique synthesis layer of the present invention can be folded into round pie, saves space, carries more convenient.
3, the special-shaped granular pile in the present invention increases the contact area between pile body and the soil body, thus increases the frictional force between pile body and the soil body, improves pile body supporting capacity, promotes the total bearing capacity of soft foundation further.
4, the present invention only increases the expense of stirrup material in construction investment, and cost performance is higher, and construction technology is simple, processes easy for installation, adapts to industrial production demand.
Accompanying drawing explanation
Fig. 1 is a kind of band stirrup collapsible geotextiles abnormity broken stone pile floor map;
Fig. 2 is a kind of band stirrup collapsible geotextiles abnormity broken stone pile elevational schematic view;
Number in the figure: 1-earth's surface, 2-prose style free from parallelism stake holes, 3-vertical reinforced formula geotechnique layer of cloth, 4-circular stirrups, 5-iron wire, 6-prose style free from parallelism packing layer, 7-soft foundation.
Detailed description of the invention
Referring to accompanying drawing, in conjunction with concrete enforcement case row, the present invention is described in detail.
embodiment 1
One, stirrup collapsible geosynthetics abnormity granular pile is with
As shown in Figure 1, 2, be placed in the underground prose style free from parallelism stake holes 2 of soft foundation 7, be made up of prose style free from parallelism stake holes 2, vertical reinforced formula geotechnique layer of cloth 3, circular stirrups 4, iron wire 5 and prose style free from parallelism packing layer 6, use iron wire 5 that circular stirrups 4 is equidistantly horizontally fixed on inside vertical reinforced formula geotechnique layer of cloth 3 along prose style free from parallelism stake holes 2 vertical direction, vertical reinforced formula geotechnique layer of cloth 3 is positioned in prose style free from parallelism stake holes 2, prose style free from parallelism packing layer 6 is filled, through closely knit final formation band stirrup collapsible geotextiles abnormity broken stone pile in vertical reinforced formula geotechnique layer of cloth 3.
In the present embodiment, prose style free from parallelism stake holes 2 is cylindrical prose style free from parallelism stake holes, and diameter is taken as 800mm; The prose style free from parallelism packing layer 6 adopted gets the prose style free from parallelism packing layer that particle diameter is not more than 6cm.
In the present embodiment the caliber of vertical reinforced formula geotechnique layer of cloth 3 and height consistent with the diameter of prose style free from parallelism stake holes 2 and height size, sealing colligation is carried out by iron wire 5 in its underpart.
Circular stirrups 4 in the present embodiment uses iron wire 5 to be equidistantly horizontally fixed on the inner side of vertical reinforced formula geotechnique layer of cloth 3 along prose style free from parallelism stake holes 2 vertical direction, and the spacing between fixed point is taken as the size of prose style free from parallelism stake holes 2 diameter; Select the circular stirrups of diameter 6mm;
Utilize the construction method of band stirrup collapsible geotextiles abnormity Treating soft foundation applying for macadam pile to adopt sleeve pipe compacting process, Specific construction step is as follows, as Fig. 1, shown in 2:
1) ramming pipe pore-forming
Adopt steam pile driver or diesel hammer, after pile pipe is vertically in place, hammering inner and outer tubes on the earth's surface 1 of soft foundation 7, sink to the degree of depth (10m) of regulation, in soft foundation 7, at this moment define a cylindrical shape underground prose style free from parallelism stake holes 2.
2) vertical reinforced formula geotechnique layer of cloth 3(is installed and fixes circular stirrups 4 by iron wire 5)
Pull up interior pipe, in vertical reinforced formula geotechnique layer of cloth 3, put into appropriate prose style free from parallelism packing layer 6 in advance, utilize the Gravitative Loads of prose style free from parallelism packing layer 6, circular stirrups 4 and vertical reinforced formula geotechnique layer of cloth 3, automatically sink to the bottom of cylindrical shape underground prose style free from parallelism stake holes 2, complete the installation of vertical reinforced formula geotechnique layer of cloth 3.
3) construction forms band stirrup collapsible geotextiles abnormity broken stone pile
After the installation of vertical reinforced formula geotechnique layer of cloth 3, prose style free from parallelism packing layer 6 is filled in cylindrical shape underground rubble hole 2, put down interior pipe on the prose style free from parallelism packing layer in outer tube 6, pull up outer tube to concordant with interior pipe ground, hammering inner and outer tubes, by prose style free from parallelism packing layer 6 compacting, pull up interior pipe and pour into prose style free from parallelism packing layer 6 in outer tubes, repeat said process, until pile pipe extracts ground, be with stirrup collapsible geotextiles abnormity broken stone pile through hitting real final formation, thus form compound foundation.
The relevant technologies content do not addressed in aforesaid way is taked or uses for reference prior art to realize.
It should be noted that, under the instruction of this manual, those skilled in the art can also make such or such easy variation pattern, such as equivalent way, or obvious mode of texturing.Above-mentioned variation pattern all should within protection scope of the present invention.

Claims (6)

1. a band stirrup collapsible geosynthetics abnormity granular pile, it is characterized in that, described special-shaped granular pile is placed in soft foundation (7), the top of described special-shaped granular pile is positioned at earth's surface (1) place, by prose style free from parallelism stake holes (2), vertical reinforced formula geosynthetic layer (3), circular stirrups (4), iron wire (5) and prose style free from parallelism filler (6) are formed, vertical reinforced formula geosynthetic layer (3) is positioned in prose style free from parallelism stake holes (2), circular stirrups (4) is fixed on the inner side of vertical reinforced formula geosynthetic layer (3) along the equidistant level of prose style free from parallelism stake holes (2) vertical direction by iron wire (5), by circular stirrups (4), vertical reinforced formula geosynthetic layer (3) is vertically separated into some pieces, discrete material layer (6) is filled in vertical reinforced formula geosynthetic layer (3), through closely knit final formation band stirrup collapsible geosynthetics abnormity granular pile.
2. one band stirrup according to claim 1 collapsible geosynthetics abnormity granular pile, is characterized in that: described prose style free from parallelism stake holes (2) is cylindrical prose style free from parallelism stake holes.
3. one band stirrup according to claim 1 collapsible geosynthetics abnormity granular pile, is characterized in that: described vertical reinforced formula geosynthetic layer (3) adopts any one in geo-grid, geotextiles, geotechnical fabric bag or geotechnique's bag with tensile strength and water permeability; Diameter and the height size of the caliber of vertical reinforced formula geosynthetic layer (3) and height and prose style free from parallelism stake holes (2) are consistent, and sealing colligation is carried out by iron wire (5) in its underpart.
4. one band stirrup according to claim 1 collapsible geosynthetics abnormity granular pile, it is characterized in that: described circular stirrups (4) is the inner side using iron wire to be equidistantly horizontally fixed on vertical reinforced formula geosynthetic layer (3) along prose style free from parallelism stake holes (2) vertical direction, and the spacing between fixed point is taken as the size of prose style free from parallelism stake holes (2) diameter; When the diameter of prose style free from parallelism stake holes (2) is less than or equal to 800mm, circular stirrups diameter is selected to be greater than 6mm; When the diameter of prose style free from parallelism stake holes (2) is greater than 800mm, circular stirrups diameter is selected to be greater than 8mm.
5. one band stirrup according to claim 1 collapsible geosynthetics abnormity granular pile, it is characterized in that: described discrete material layer (6) is rubble or sand, the prose style free from parallelism packing layer that particle diameter is less than 6cm got by its medium stone, sand medium coarse sand or gravelly sand described in discrete material layer.
6. an a kind of construction method with stirrup collapsible geosynthetics abnormity granular pile as claimed in claim 1, is characterized in that: the construction method used is immersed tube soil compaction method or the sleeve pipe compacting process of remaining silent, and construction sequence is as follows:
One, immersed tube soil compaction of remaining silent method
1) vibration sinking tube pore-forming
Adopt vibrating type pile driver, after immersed tube machinery is in place, vibrating hammer vibration sinking tube is started after earth's surface (1) the utilization hammer of soft foundation (7) weighs and immersed tube is pressed into 1-2m by pile pipe deadweight slowly, often sinking 0.5-1m vibration staying 5-10s, until projected depth, at this moment in soft foundation (7), define cylindrical shape underground prose style free from parallelism stake holes (2);
2) vertical reinforced formula geosynthetic layer (3) is installed
Vertical reinforced formula geosynthetic layer (3) is fixed circular stirrups (4) by iron wire (5), in vertical reinforced formula geosynthetic layer (3), put into appropriate discrete material layer (6) in advance, utilize the Gravitative Loads of discrete material layer (6), circular stirrups 4 and vertical reinforced formula geotechnique's synthesis layer (3), automatically sink to the bottom of cylindrical shape underground prose style free from parallelism stake holes (2), complete the installation of vertical reinforced formula geosynthetic layer (3);
3) construction forms band stirrup collapsible geosynthetics abnormity granular pile
By the hopper on vibrating type pile driver, stake discrete material layer (6) in cylindrical shape underground prose style free from parallelism stake holes (2), when the rubble height in prose style free from parallelism stake holes (2) is greater than 1/3 of prose style free from parallelism stake holes (2) height, can on pull out immersed tube, first should vibrate 5-10s before tube drawing, shake while pull out, often degree of lifting 0.5m-1.0m failure of oscillation, so repeatedly until full pipe is extracted, through closely knit final formation band stirrup collapsible geosynthetics abnormity granular pile, thus form compound foundation;
Two, sleeve pipe compacting process
1) ramming pipe pore-forming
Adopt steam pile driver or diesel hammer, after pile pipe is vertically in place, in the upper hammering inner and outer tubes in the earth's surface (1) of soft foundation (7), sink to the degree of depth of regulation, at this moment in soft foundation (7), define cylindrical shape underground prose style free from parallelism stake holes (2);
2) vertical reinforced formula geosynthetic layer (3) is installed
Vertical reinforced formula geosynthetic layer (3) is fixed circular stirrups (4) by iron wire (5), pull up interior pipe, in vertical reinforced formula geosynthetic layer (3), put into appropriate discrete material layer (6) in advance, utilize the Gravitative Loads of discrete material layer (6), circular stirrups (4) and vertical reinforced formula geotechnique's synthesis layer (3), automatically sink to the bottom of cylindrical shape underground prose style free from parallelism stake holes (2), complete the installation of vertical reinforced formula geosynthetic layer (3);
3) construction forms band stirrup collapsible geosynthetics abnormity granular pile
After the installation of vertical reinforced formula geosynthetic layer (3), discrete material layer (6) is filled in cylindrical shape underground prose style free from parallelism stake holes (2), put down interior pipe on discrete material layer (6) face in outer tube, pull up outer tube to concordant with interior pipe ground, hammering inner and outer tubes are by discrete material layer (6) compacting, pull up interior pipe in outer tube, pour into discrete material layer (6), repeat said process, until pile pipe extracts ground, stirrup collapsible geosynthetics abnormity granular pile is with through hitting real final formation, thus form compound foundation.
CN201510001429.7A 2015-01-05 2015-01-05 A kind of band stirrup collapsible geosynthetics abnormity granular pile and construction method thereof Expired - Fee Related CN104652407B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510001429.7A CN104652407B (en) 2015-01-05 2015-01-05 A kind of band stirrup collapsible geosynthetics abnormity granular pile and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510001429.7A CN104652407B (en) 2015-01-05 2015-01-05 A kind of band stirrup collapsible geosynthetics abnormity granular pile and construction method thereof

Publications (2)

Publication Number Publication Date
CN104652407A true CN104652407A (en) 2015-05-27
CN104652407B CN104652407B (en) 2016-08-24

Family

ID=53244001

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510001429.7A Expired - Fee Related CN104652407B (en) 2015-01-05 2015-01-05 A kind of band stirrup collapsible geosynthetics abnormity granular pile and construction method thereof

Country Status (1)

Country Link
CN (1) CN104652407B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544502A (en) * 2015-12-04 2016-05-04 中铁第四勘察设计院集团有限公司 Novel construction method of strengthening pile for deep soft soil foundation
CN109629551A (en) * 2019-02-01 2019-04-16 河海大学 A kind of high polymer rubble segmentation retaining wall water penetration pile and its construction technology

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1273713A2 (en) * 2001-07-07 2003-01-08 KELLER GRUNDBAU GmbH Method for constructing material columns to improve soil consolidation
CN1928250A (en) * 2006-07-25 2007-03-14 兰州理工大学 Method for reinforcing dispersive materials pile
CN200946265Y (en) * 2006-06-26 2007-09-12 河海大学 Vertical tube type grating reinforced stone column
CN101392527A (en) * 2008-10-21 2009-03-25 冯守中 Method for processing soft foundation by earthwork fabric granular pile
CN202099795U (en) * 2011-05-23 2012-01-04 中铁二院工程集团有限责任公司 Crushed stone pile for reinforcing extremely soft soil foundation
CN202124854U (en) * 2011-06-14 2012-01-25 华侨大学 Grid-type gravel pile
CN203639903U (en) * 2013-12-12 2014-06-11 江苏中瑞路桥建设有限公司 Side friction enhancement type precast tube pile structure
CN104005404A (en) * 2014-05-16 2014-08-27 杭州江润科技有限公司 Prestressed pipe pile coated with active material pile body and construction method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1273713A2 (en) * 2001-07-07 2003-01-08 KELLER GRUNDBAU GmbH Method for constructing material columns to improve soil consolidation
CN200946265Y (en) * 2006-06-26 2007-09-12 河海大学 Vertical tube type grating reinforced stone column
CN1928250A (en) * 2006-07-25 2007-03-14 兰州理工大学 Method for reinforcing dispersive materials pile
CN101392527A (en) * 2008-10-21 2009-03-25 冯守中 Method for processing soft foundation by earthwork fabric granular pile
CN202099795U (en) * 2011-05-23 2012-01-04 中铁二院工程集团有限责任公司 Crushed stone pile for reinforcing extremely soft soil foundation
CN202124854U (en) * 2011-06-14 2012-01-25 华侨大学 Grid-type gravel pile
CN203639903U (en) * 2013-12-12 2014-06-11 江苏中瑞路桥建设有限公司 Side friction enhancement type precast tube pile structure
CN104005404A (en) * 2014-05-16 2014-08-27 杭州江润科技有限公司 Prestressed pipe pile coated with active material pile body and construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
高晓波: ""土工格栅钢筋笼碎石桩软基处理技术分析"", 《公路与汽运》, no. 384, 30 June 2001 (2001-06-30) *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544502A (en) * 2015-12-04 2016-05-04 中铁第四勘察设计院集团有限公司 Novel construction method of strengthening pile for deep soft soil foundation
CN109629551A (en) * 2019-02-01 2019-04-16 河海大学 A kind of high polymer rubble segmentation retaining wall water penetration pile and its construction technology

Also Published As

Publication number Publication date
CN104652407B (en) 2016-08-24

Similar Documents

Publication Publication Date Title
CN101343874B (en) Method for processing foundation by wrapping piles in salty soil area
CN102465524B (en) Double radial mesh-cage sand-gravel pile and construction technology thereof
CN101220589B (en) Soil engineering bag and method for dynamically squeezing and synthetically reinforcing soft groundwork
CN101736738A (en) Pressure resistance and pull-out resistance grouted gravel pile
CN102888834A (en) Construction method of large-diameter crushed stone pile
CN103711114A (en) Foundation treatment method
CN103437336A (en) PVC hole-pipe gravel pile and soft foundation processing method thereof
CN109680671A (en) A kind of liquefaction foundation treatment method based on building waste
CN201406682Y (en) Gravel pile
CN204370400U (en) The two-way Reinforced Gravel Pile of a kind of geosynthetics
CN103966996A (en) Gravel pile and manufacturing method thereof
CN104652407A (en) Folding type geotechnical-synthetic-material irregular-shaped granular pile with hoop reinforcements and construction method thereof
CN102966109A (en) Method for constructing zonal deep foundation pit bottom sealing of soft soil foundation
CN101560760A (en) Construction method for fast concreting and dredging and filling ultra-fine earth foundation
CN113062300A (en) Construction method of gravel soil compaction pile composite foundation of collapsible stratum
CN105735253B (en) A kind of construction method of enlarged footing resistance to compression uplift pile
CN103981863B (en) The construction method of a kind of discrete material pile and the upper and lower consubstantiality compound pile of concrete pile
CN202644518U (en) Post-inserted reinforcement cage cement fly ash gravel pile
CN202865863U (en) Basic structure of heavy piece lifting frame
CN214783873U (en) Rigid-flexible composite pile structure for eliminating stratum negative frictional resistance
CN213390195U (en) Foundation structure
CN202023185U (en) Concrete tubular pile
CN203373764U (en) Concrete core sand-gravel pile composite foundation
WO2015045024A1 (en) Construction and landfill method for soft foundation and foundation with liquefaction potential, and structural body bag
CN203866822U (en) Up-and-down integrated composite pile of discrete material pile and concrete

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160824

Termination date: 20190105