CN104636598A - 一种计算流域最大蓄水量的方法 - Google Patents

一种计算流域最大蓄水量的方法 Download PDF

Info

Publication number
CN104636598A
CN104636598A CN201410845377.7A CN201410845377A CN104636598A CN 104636598 A CN104636598 A CN 104636598A CN 201410845377 A CN201410845377 A CN 201410845377A CN 104636598 A CN104636598 A CN 104636598A
Authority
CN
China
Prior art keywords
basin
calculated
formula
maximum water
calculate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410845377.7A
Other languages
English (en)
Inventor
李胜
郑强
张宗旗
张茜
张�荣
李涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUIZHOU EAST CENTURY TECHNOLOGY Co Ltd
Original Assignee
GUIZHOU EAST CENTURY TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUIZHOU EAST CENTURY TECHNOLOGY Co Ltd filed Critical GUIZHOU EAST CENTURY TECHNOLOGY Co Ltd
Priority to CN201410845377.7A priority Critical patent/CN104636598A/zh
Publication of CN104636598A publication Critical patent/CN104636598A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明公开了一种计算流域最大蓄水量的方法,它包括:1、计算流域的实际产流量,2、通过公式计算流域前期雨量Pa,3、计算消退系数,4、计算蒸发能力,5、假设一个土壤最大含水量值,根据步骤2、3和4计算出某一时刻的前期降雨量Pa;6、将步骤2-5的计算结果代入公式,滚动计算各时刻的产流量R,当步骤6计算出的产流量R与步骤1计算出的流域实际产流量相等时,则假设的土壤最大含水量值

Description

一种计算流域最大蓄水量的方法
技术领域:
本发明属于流域蓄水技术,尤其涉及一种计算流域最大蓄水量的方法。
背景技术:
流域土壤含水量的最大值称为流域最大蓄水量,它是流域综合平均指标,一般采用实测雨洪资料分析确定,计算时需要选取久旱无雨后一次降雨量较大且全流域产流的雨洪资料,计算流域平均降雨量及产流量,通过平均降雨量和产流量及雨期蒸发等值来确定,现有技术采用该方法需要选择特定的现场条件才能计算出,现场条件比较特殊,需要久旱无雨,实际情况中很难满足,使得计算出来的最大蓄水量偏差比较大。
发明内容:
本发明要解决的技术问题:提供一种计算流域最大蓄水量的方法,以解决现有技术计算流域最大蓄水量时需要选择特定的现场条件才能计算出结果,现场条件比较特殊,需要久旱无雨,实际情况中很难满足,使得计算出来的最大蓄水量存在偏差大及准确度低等问题。
本发明技术方案:
一种计算流域最大蓄水量的方法,它包括下述步骤:
步骤1、利用公式 
计算流域的实际产流量,式中为Δt时段内的流量,F为流域集水面积,为某时刻降雨;
步骤2、通过公式计算流域前期雨量Pa,式中:为某一时刻的前期雨量,为上一时刻的前期雨量,K为土壤含水量消退系数,某时刻降雨量;
步骤3、通过公式  计算消退系数,式中:K为流域的日消退系数,为流域蒸发能力,为土壤最大含水量;
步骤4、通过公式计算蒸发能力,式中: 为折减系数, 为实测蒸发值;
步骤5、假设一个土壤最大含水量值,根据步骤2、3和4计算出某一时刻的前期降雨量Pa;
步骤6、将步骤2-5的计算结果代入公式,计算出产流量R,计算出的产流量R与步骤1计算出的流域实际产流量相等,则假设的土壤最大含水量值即为流域最大蓄水量值;计算的产流量R与步骤1计算出的流域实际产流量不相等,则重复步骤2-6重新计算。
本发明的有益效果:
本发明计算方法简单,仅需要采集以往流域的实测流量资料直接计算得到流域径流值R,然后将流域径流值R代入相关公式进行滚动试算土壤最大含水量值,最终得到流域最大蓄水量值,不需要设定特定的环境条件,本方法优点是不需要满足其他要求如久旱无雨后的一次强降雨的雨洪资料等,本发明解决了现有技术计算流域最大蓄水量时需要选择特定的现场条件才能计算出结果,现场条件比较特殊,需要久旱无雨,实际情况中很难满足,使得计算出来的最大蓄水量存在偏差大及准确度低等问题。
具体实施方式:
一种计算流域最大蓄水量的方法,它包括下述步骤:
步骤1、利用公式计算流域的实际产流量,式中为Δt时段内的流量,F为流域集水面积,为某时刻降雨; 式中的,Δt,F等均可由实测流量资料得到。
步骤2、通过公式计算流域前期雨量Pa,式中:为某一时刻的前期雨量,为上一时刻的前期雨量,K为土壤含水量消退系数,某时刻降雨量;
步骤3、通过公式  计算消退系数,式中:K为流域的日消退系数,为流域蒸发能力,为土壤最大含水量;
步骤4、通过公式计算蒸发能力,式中: 为折减系数, 为实测蒸发值;
步骤5、假设一个土壤最大含水量值,根据步骤2、3和4计算出某一时刻的前期降雨量Pa;
步骤6、将步骤2-5的计算结果代入公式,计算出产流量R,计算出的产流量R与步骤1计算出的流域实际产流量相等,则假设的土壤最大含水量值即为流域最大蓄水量值;计算的产流量R与步骤1计算出的流域实际产流量不相等,则重复步骤2-6重新计算,直至计算结果相等,得到流域最大蓄水量值。
采用本发明方法计算流域最大蓄水量时,需要知道流域的历年降雨径流资料和蒸发资料。

Claims (1)

1.一种计算流域最大蓄水量的方法,它包括下述步骤:
步骤1、利用公式 计算流域的实际产流量,式中为Δt时段内的流量,F为流域集水面积,为某时刻降雨;
步骤2、通过公式计算流域前期雨量Pa,式中:为某一时刻的前期雨量,为上一时刻的前期雨量,K为土壤含水量消退系数,某时刻降雨量;
步骤3、通过公式  计算消退系数,式中:K为流域的日消退系数,为流域蒸发能力,为土壤最大含水量;
步骤4、通过公式计算蒸发能力,式中: 为折减系数, 为实测蒸发值;
步骤5、假设一个土壤最大含水量值,根据步骤2、3和4计算出某一时刻的前期降雨量Pa;
步骤6、将步骤2-5的计算结果代入公式,计算出产流量R,计算出的产流量R与步骤1计算出的流域实际产流量相等,则假设的土壤最大含水量值即为流域最大蓄水量值;计算的产流量R与步骤1计算出的流域实际产流量不相等,则重复步骤2-6重新计算。
CN201410845377.7A 2014-12-31 2014-12-31 一种计算流域最大蓄水量的方法 Pending CN104636598A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410845377.7A CN104636598A (zh) 2014-12-31 2014-12-31 一种计算流域最大蓄水量的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410845377.7A CN104636598A (zh) 2014-12-31 2014-12-31 一种计算流域最大蓄水量的方法

Publications (1)

Publication Number Publication Date
CN104636598A true CN104636598A (zh) 2015-05-20

Family

ID=53215339

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410845377.7A Pending CN104636598A (zh) 2014-12-31 2014-12-31 一种计算流域最大蓄水量的方法

Country Status (1)

Country Link
CN (1) CN104636598A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107092796A (zh) * 2017-04-26 2017-08-25 沈阳市水利建筑勘测设计院 一种土壤对流域地表径流调节能力的评价方法
CN109671248A (zh) * 2018-12-12 2019-04-23 河北省水利水电勘测设计研究院 基于防灾对象的山洪灾害预警方法
CN114548559A (zh) * 2022-02-23 2022-05-27 河南省科达水利勘测设计有限公司 一种基于前期雨量的山洪灾害动态预警方法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
全国勘察设计注册工程师水利水电工程专业管理会: "《水利水电工程专业基础知识》", 30 April 2007 *
孙立堂等: "改进的SCS模型产流参数在小清河流域的率定", 《人民黄河》 *
李龙辉等: "寒冷地区融雪径流和融冻期降雨径流计算模型初探", 《水文》 *
赵焕平等: "提供洪水预报精度的途径和方法", 《河南水利与南水北调》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107092796A (zh) * 2017-04-26 2017-08-25 沈阳市水利建筑勘测设计院 一种土壤对流域地表径流调节能力的评价方法
CN109671248A (zh) * 2018-12-12 2019-04-23 河北省水利水电勘测设计研究院 基于防灾对象的山洪灾害预警方法
CN114548559A (zh) * 2022-02-23 2022-05-27 河南省科达水利勘测设计有限公司 一种基于前期雨量的山洪灾害动态预警方法
CN114548559B (zh) * 2022-02-23 2024-04-30 河南省科达水利勘测设计有限公司 一种基于前期雨量的山洪灾害动态预警方法

Similar Documents

Publication Publication Date Title
Horst et al. Assessing impacts of surge-flow irrigation on water saving and productivity of cotton
Miao et al. Modeling water use, transpiration and soil evaporation of spring wheat–maize and spring wheat–sunflower relay intercropping using the dual crop coefficient approach
CN104636598A (zh) 一种计算流域最大蓄水量的方法
CN103461071A (zh) 冬小麦节水高产的根层补灌方法
Feng et al. Temporal-spatial distribution characteristics and causes analysis of reference crop evapotranspiration in hilly area of central Sichuan
Palsaniya et al. Now it is water all the way in Garhkundar-Dabar watershed of drought-prone semi-arid Bundelkhand, India
Yang et al. Climatic causes of ecological and environmental variations in the source regions of the Yangtze and Yellow Rivers of China
Luo et al. Modified Aver'yanov's phreatic evaporation equations under crop growing
Iacovides Water resources in Cyprus: Endowments and water management practices
CN107092796A (zh) 一种土壤对流域地表径流调节能力的评价方法
WU et al. Modeling crop evapotranspiration using remotely sensed vegetation data: A case study of winter wheat in the North China Plain
CN103636464A (zh) 一种辽西北地区寒富苹果的节水灌溉方法
GUO et al. Study of ecological water transfer mode and ecological compensation scheme of the Tarim River Basin in dry years
CN107727801A (zh) 一种屋顶绿化的海绵城市实施效果监测方法
Khedun et al. Mining water billing data to explore outdoor water use during different weather conditions
Beldring et al. Climate change impact on flow regimes of rivers in Bhutan and possible consequences for hydropower development
Joshi et al. Analysis of long term climate variability and changes in North-Western states of Indian Himalayan Region (IHR)
Al-Shamaa et al. Hydrological conditions of Badra-Jassan basin
David et al. Design shortcomings of the headwork and water distribution and control facilities of the canal irrigation systems of Ilocos Norte, Philippines
CN103609379A (zh) 红阳猕猴桃在平原地区的防旱抗涝技术
Xicai et al. Effects of deficit winter irrigation with overwintering freezing on oases soil salinization and alkalization
Gao et al. Impact of climate change and anthropogenic activities on stream flow and sediment discharge in the Wei River basin, China.
Kumar et al. Changing patterns of ground water level in Fatehabad district of Haryana, India
GAGES main stem gages: main stem gages
CN107135697A (zh) 一种与暗管相配套的加快旱田排盐速度的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150520