China
Prior art keywords
central dividing
plate
dividing plate
flue
sealing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410819243.8A
Other languages
Chinese (zh)
Other versions
CN104633641A (en
Inventor
李玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Boiler Co Ltd
Original Assignee
Harbin Boiler Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Boiler Co Ltd filed Critical Harbin Boiler Co Ltd
Priority to CN201410819243.8A priority Critical patent/CN104633641B/en
Publication of CN104633641A publication Critical patent/CN104633641A/en
Application granted granted Critical
Publication of CN104633641B publication Critical patent/CN104633641B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Chimneys And Flues (AREA)
  • Treating Waste Gases (AREA)
  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Abstract

Provided is a re-heater flue intermediate separation plate sealing device and an installation method. In the prior art, a temperature adjustment baffle used for separating the interior of a hearth and an intermediate partition structure between headers are not provided. Among millions of tower-type boilers, the original structure is not applicable and cannot solve the seal and expansion problems of a re-heater flue intermediate separation plate. The re-heater flue intermediate separation plate sealing device comprises an intermediate hydrophobic plate (1), wherein the intermediate hydrophobic plate is respectively connected with a first intermediate separation plate(4), a second intermediate separation plate(5) and a third intermediate separation plate(6), and the first intermediate separation plate and the second intermediate separation plate are sealed by the third intermediate separation plate and the fourth intermediate separation plate(7) respectively. The re-heater flue intermediate separation plate sealing device and the installation method are applied to a boiler of which the smoke is in a circular air flue.

Description

For the central dividing plate sealing device and installation method of reheater flue
Technical field:
The present invention relates to a kind of central dividing plate sealing device and installation method for reheater flue, by temperature-adjusting baffle cloth Put in burner hearth, flue gas flow distribution adjusted by twin flue exiting flue gas temperature-adjusting baffle, so as to adjust high-low pressure reheater it Between heat distribution
Background technology:
Prior art is not used for the midfeather structure between the temperature-adjusting baffle and header inside separated furnace.Million In tower boiler, original structure is not applied to, it is impossible to solve sealing and the expansion issues of reheater flue central dividing plate.It is million super Critical tower boiler adopts first flue gas recirculation.It is spaced in needing to arrange at temperature-adjusting baffle and primary superheater entrance header Plate sealing device, by flue stokehold, stove latter two flue are separated into.Reheater flue central dividing plate sealing device must take into close Envelope, expansion issues.
The content of the invention:
It is an object of the invention to provide a kind of central dividing plate sealing device and installation method for reheater flue.
Above-mentioned purpose is realized by following technical scheme:
A kind of central dividing plate sealing device for reheater flue, its composition includes:The thin shape plate in centre, described centre Thin shape plate is connected respectively with central dividing plate one, central dividing plate two and central dividing plate three, described central dividing plate one with it is described in Space bar two is sealed respectively with described central dividing plate three, central dividing plate four.
The described central dividing plate sealing device for reheater flue, described central dividing plate one and described middle interval Plate two to be bolted carried out with sealing plate and seals, and described sealing plate is connected respectively with connecting plate, pad.
The described central dividing plate sealing device for reheater flue, described central dividing plate one and described middle interval Plate two is fastened with described central dividing plate three, central dividing plate four by described bolt, is sealed with described pad.
The described central dividing plate sealing device for reheater flue, described central dividing plate one and described middle interval U-shaped hole is machined with plate two, for absorbing the swell increment between boiler left and right side, below temperature-adjusting baffle, left and right side wall Water-cooling wall is welded with described centre and dredges shape plate and described sealing plate.
The installation method of the described central dividing plate sealing device for reheater flue:The method comprises the steps:
Temperature-adjusting baffle is arranged in boiler furnace, in needing to arrange at temperature-adjusting baffle and primary superheater entrance header Space bar sealing device, by flue stokehold, stove latter two flue are separated into.The concrete shape of reheater flue central dividing plate sealing device Formula:Shape plate is dredged in one piece of centre of temperature-adjusting baffle arranged beneath, one piece of connecting plate is arranged above primary superheater entrance header, Dredge and arrange between shape plate and connecting plate central dividing plate one, central dividing plate two, described central dividing plate one and described centre in centre Dividing plate two is fastened with described central dividing plate three, central dividing plate four by described bolt, is carried out with described pad close Envelope.
Beneficial effects of the present invention:
1. the present invention is to realize the arrangement form of million tower boiler temperature-adjusting baffles, is designed a kind of new for separating The midfeather structure between temperature-adjusting baffle and header inside burner hearth..This structure is simple to manufacture, easy for installation, solves again The sealing of hot device flue central dividing plate and expansion issues, the structure sealed using two-sided clamping plate, are simple to manufacture, it is ensured that safe, steady Fixed operation
2. the reheater flue central dividing plate of present invention arrangement, is effectively ensured million ultra supercritical tower boiler reheaters Homoiothermic.The heat distribution between high-low pressure reheater, simple structure, effectively solving sealing, the problem of expansion, fortune are solved very well Row is safe and reliable.
Reheater flue central dividing plate sealing device is set at temperature-adjusting baffle of the present invention and primary superheater entrance header, will Flue is separated into stokehold, stove latter two flue.The heat distribution between high-low pressure reheater is solved very well, using two-sided clamping plate The structure of sealing effectively reduces cost.Make Kazakhstan pot tower boiler that there is higher competitiveness.
Description of the drawings:
Accompanying drawing 1 is the intermediate deck structure schematic diagram of the present invention.
Accompanying drawing 2 is the middle A-A sectional views of accompanying drawing 1.
Accompanying drawing 3 is the middle B-B sectional views of accompanying drawing 1.
Accompanying drawing 4 is the middle C-C sectional views of accompanying drawing 2.
Accompanying drawing 5 is the D-D sectional views in accompanying drawing 2.
Accompanying drawing 6 is the E partial enlarged drawings in accompanying drawing 4.
Accompanying drawing 7 is the F partial enlarged drawings in accompanying drawing 4.
Accompanying drawing 8 is the G partial enlarged drawings in accompanying drawing 4.
Accompanying drawing 9 is the H partial enlarged drawings in accompanying drawing 5.
Accompanying drawing 10 is the J partial enlarged drawings in accompanying drawing 2.
Accompanying drawing 11 is the structural representation that water-cooling wall dredges shape plate.
Accompanying drawing 12 is the K-K sectional views of accompanying drawing 11.
Accompanying drawing 13 is the M partial enlarged drawings in accompanying drawing 11.
Specific embodiment:
Embodiment 1:
A kind of central dividing plate sealing device for reheater flue, its composition includes:The thin shape plate 1 in centre, it is described in Between dredge shape plate and be connected with central dividing plate 1, central dividing plate 25 and central dividing plate 36 respectively, described central dividing plate one with it is described Central dividing plate two sealed with described central dividing plate three, central dividing plate 47 respectively.
Embodiment 2:
The central dividing plate sealing device for reheater flue according to embodiment 1, described central dividing plate one with Described central dividing plate two is sealed by the connection of bolt 10 with sealing plate 3, described sealing plate respectively with connecting plate 2, pad Piece 8 connects.
Embodiment 3;
The central dividing plate sealing device for reheater flue according to embodiment 1 or 2, described central dividing plate one Fastened by described bolt with described central dividing plate three, central dividing plate four with described central dividing plate two, with described Pad sealed.
Embodiment 4;
The central dividing plate sealing device for reheater flue according to embodiment 1 or 2 or 3, described middle interval U-shaped hole is machined with plate one and described central dividing plate two, for absorbing the swell increment between boiler left and right side, in homoiothermic Baffle plate lower section, left and right side water wall welding water-cooling wall dredges shape plate 10, prevents flue gas direct current.
Embodiment 5:
A kind of installation method of the central dividing plate sealing device for reheater flue described in embodiment 1-4:The method Comprise the steps:
Temperature-adjusting baffle is arranged in boiler furnace, in needing to arrange at temperature-adjusting baffle and primary superheater entrance header Space bar sealing device, by flue stokehold, stove latter two flue are separated into.The concrete shape of reheater flue central dividing plate sealing device Formula:Shape plate is dredged in one piece of centre of temperature-adjusting baffle arranged beneath, one piece of connecting plate is arranged above primary superheater entrance header, Dredge and arrange between shape plate and connecting plate central dividing plate one, central dividing plate two, described central dividing plate one and described centre in centre Dividing plate two is fastened with described central dividing plate three, central dividing plate four by described bolt, is carried out with described pad close Envelope.

Claims (4)

1. a kind of central dividing plate sealing device for reheater flue, its composition includes:The thin shape plate in centre, is characterized in that:Institute The centre stated is dredged shape plate and is connected with central dividing plate one, central dividing plate two and central dividing plate three respectively, described central dividing plate one with The sealing structure of two-sided clamping plate is formed, and is adopted with described central dividing plate three, central dividing plate four between described central dividing plate two Fastened with bolt, sealed with pad, central dividing plate sealing is set at temperature-adjusting baffle and primary superheater entrance header Device;Shape plate is dredged in one piece of centre of temperature-adjusting baffle arranged beneath, one piece of connecting plate is arranged above primary superheater entrance header, Arrange between shape plate and connecting plate central dividing plate one, central dividing plate two in middle dredging.
2. the central dividing plate sealing device for reheater flue according to claim 1, is characterized in that:In described Two-sided clamping plate sealing structure is formed with sealing plate between space bar one and connecting plate, described sealing plate is by bolt, pad point It is not connected with central dividing plate one, connecting plate.
3. the central dividing plate sealing device for reheater flue according to claim 1 or 2, is characterized in that:It is described Central dividing plate one and described central dividing plate two on be machined with U shapes hole, for absorbing the expansion between boiler left and right side Amount, below temperature-adjusting baffle, left and right side water wall welding water-cooling wall dredges shape plate, prevents flue gas direct current.
4. the installation method of the central dividing plate sealing device for reheater flue described in a kind of one of claim 1-3, its It is characterized in that:The method comprises the steps:
Temperature-adjusting baffle is arranged in boiler furnace, is spaced in needing to arrange at temperature-adjusting baffle and primary superheater entrance header Plate sealing device, by flue stokehold, stove latter two flue, reheater flue central dividing plate sealing device concrete form are separated into: Shape plate is dredged in one piece of centre of temperature-adjusting baffle arranged beneath, one piece of connecting plate is arranged above primary superheater entrance header, in Between dredge and arrange between shape plate and connecting plate central dividing plate one, central dividing plate two, described central dividing plate one and described middle interval The sealing structure of two-sided clamping plate is formed with described central dividing plate three, central dividing plate four between plate two, and is carried out tightly using bolt Gu, sealed with pad.
CN201410819243.8A 2014-12-25 2014-12-25 Re-heater flue intermediate separation plate sealing device and installation method Active CN104633641B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410819243.8A CN104633641B (en) 2014-12-25 2014-12-25 Re-heater flue intermediate separation plate sealing device and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410819243.8A CN104633641B (en) 2014-12-25 2014-12-25 Re-heater flue intermediate separation plate sealing device and installation method

Publications (2)

Publication Number Publication Date
CN104633641A CN104633641A (en) 2015-05-20
CN104633641B true CN104633641B (en) 2017-05-03

Family

ID=53212691

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410819243.8A Active CN104633641B (en) 2014-12-25 2014-12-25 Re-heater flue intermediate separation plate sealing device and installation method

Country Status (1)

Country Link
CN (1) CN104633641B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6971867B2 (en) * 2018-01-25 2021-11-24 三菱パワー株式会社 Sealing device and sealing method for exhaust heat recovery boiler and exhaust heat recovery boiler equipped with this

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4665864A (en) * 1986-07-14 1987-05-19 Foster Wheeler Energy Corporation Steam generator and method of operating a steam generator utilizing separate fluid and combined gas flow circuits
FR2641848B1 (en) * 1989-01-19 1991-08-16 Stein Industrie OVERHEATING HARNESS FOR VAPOR SEPARATOR-SUPERHEATER WITH HORIZONTAL TUBES
CN202092104U (en) * 2011-05-02 2011-12-28 上海锅炉厂有限公司 Sealing mechanism between forge pieces at junction of smoke deflecting corner water-cooling wall and hearth back wall water-cooling wall
CN202092105U (en) * 2011-05-02 2011-12-28 上海锅炉厂有限公司 Sealing mechanism for sealing rear wall exhaust tube and suspension tube water-cooling wall penetrated by smoke deflecting corner water-cooling wall
CN103017153A (en) * 2012-12-26 2013-04-03 哈尔滨锅炉厂有限责任公司 300MW subcritical circulating fluidized bed boiler and working method

Also Published As

Publication number Publication date
CN104633641A (en) 2015-05-20

Similar Documents

Publication Publication Date Title
US9488370B2 (en) Arrangement structure suitable for inverted pulverized coal boiler with ultra-high steam temperature steam parameters
US8904790B2 (en) M-type pulverized coal boiler suitable for ultrahigh steam temperature
WO2014040491A1 (en) Tower-type boiler with primary reheater and secondary reheater
CN202032544U (en) Invert pulverized-coal fired boiler arrangement structure for ultrahigh steam temperature steam parameter
CN203258632U (en) Supercritical brown coal boiler
CN204005897U (en) High-temp solid heat recovery waste heat boiler
CN104633641B (en) Re-heater flue intermediate separation plate sealing device and installation method
CN101105287A (en) Screen type heated surface arrangement method for fluid bed boiler furnace
CN104534442A (en) Low mass flow speed ultra-supercritical boiler water circulation device and water circulation method
CN103759244B (en) Back-end surfaces sealing supporting structure and there is the industrial tail gas boiler of this structure
CN205188336U (en) Converter exhaust heat boiler fire door section flue
CN108870374A (en) A kind of small collection box structure of superheater for waste incinerator
CN201611090U (en) Waste-heat boiler superheater
CN104154513A (en) Waste heat boiler of can-type calcinator
CN208804666U (en) A kind of small collection box structure of superheater for waste incinerator
CN208846753U (en) It is a kind of to arrange water collecting device with efficient sealed burning boiler
CN207365046U (en) Waste heat boiler reheater tube panel arrangement
CN102287909B (en) Horizontal natural gas fired hot-water boiler
CN203517866U (en) Waste heat boiler with novel water wall roof tube through-wall structure
CN102679308B (en) Subcritical, the overcritical oil oven of Large Copacity more than high parameter 600MW
CN105737136A (en) U-shaped pipe superheater
CN206222280U (en) A kind of boiler and its convection bank structure
CN2869588Y (en) Vertical after-heat boiler
CN105402719B (en) It is a kind of fixed from the superheated steam generator for carrying compound recycle mode
CN205299491U (en) High flow stability's supercritical cycle fluidized bed boiler water wall under low -load

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant