CN104631707A - Combined square steel pipe concrete column and construction method - Google Patents

Combined square steel pipe concrete column and construction method Download PDF

Info

Publication number
CN104631707A
CN104631707A CN201510033302.3A CN201510033302A CN104631707A CN 104631707 A CN104631707 A CN 104631707A CN 201510033302 A CN201510033302 A CN 201510033302A CN 104631707 A CN104631707 A CN 104631707A
Authority
CN
China
Prior art keywords
steel pipe
pin
montant
shape semi
height
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510033302.3A
Other languages
Chinese (zh)
Other versions
CN104631707B (en
Inventor
丛术平
张征
王清
韩金生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201510033302.3A priority Critical patent/CN104631707B/en
Publication of CN104631707A publication Critical patent/CN104631707A/en
Application granted granted Critical
Publication of CN104631707B publication Critical patent/CN104631707B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention provides a combined square steel pipe concrete column and a construction method. The combined square steel pipe concrete column comprises L-shaped half steel pipes, pins, vertical rods, a transverse rod and concrete; two rows of pins are arranged on the inner wall of each of the L-shaped half steel pipes; the vertical rods are connected through the traverse rod and clamped into the two rows of pins; two L-shaped half steel pipes are welded into a square steel pipe in which the concrete is poured; when constructing the column, a steel plate is processed into the L-shaped half steel pipes, the pins are welded on the inner walls of the L-shaped half steel pipes, the transverse rod is welded between the two vertical rods, the two L-shaped half steel pipes are integrally buckled, and the vertical rods are inserted into the pins, so as to weld the two L-shaped half steel pipes into a whole, and moreover, the concrete is poured into the square steel pipe. The combined square steel pipe concrete column can overcome the shortage of a square steel pipe concrete column and has the advantages of being high in bearing capacity and high in fire resistance; the construction method can solve the problem of difficult construction of the inside of the square steel pipe.

Description

Composite square steel tube concrete column and construction method
Technical field
The present invention relates to steel core concrete column field in civil engineering.
Background technology
The advantages such as steel core concrete column has that bearing capacity is high, plasticity and good toughness, easy construction, fire resistance are better, the application in heavy duty, large-span structure is more and more extensive.Concrete-filled steel square tubular column has the advantages such as joint structure is simple, anti-bending strength is good, but also there are some shortcomings, one is that square steel pipe is less to the concrete effect of contraction in inside, and concrete bearing power increase is few, and comparatively concrete-filled circular steel tube column is low for the bearing capacity of concrete-filled steel square tubular column; Two be square steel pipe in concrete outside, easily lose bearing capacity in fire, fire resistance is poorer than reinforced concrete post; Three is that bonding between steel pipe and concrete is more weak, and the poisson's ratio of load-bearing initial stage steel pipe is greater than concrete poisson's ratio, easily departs between steel pipe and concrete.In order to overcome the above-mentioned shortcoming of concrete-filled steel square tubular column, need a kind of novel concrete-filled steel square tubular column and construction method.
Summary of the invention
The problem that concrete-filled steel square tubular column is less to the concrete effect of contraction in inside in order to overcome, steel pipe and concrete easily depart from, improve the fire resistance of concrete-filled steel square tubular column, the present invention discloses a kind of composite square steel tube concrete column and construction method.
The technical scheme of composite square steel tube concrete column of the present invention is: composite square steel tube concrete column is made up of L shape semi-steel pipe, pin, montant, cross bar and concrete.The length of L shape semi-steel pipe two limb is equal, the inwall of every limb vertically arranges two row's pins, the head of a nail interior side contacts of montant and pin, be stuck in two row's pins, relative two montants in position are coupled together by cross bar, two L shape semi-steel pipe welding form square steel pipe, the inner concreting of square steel pipe.Two row's pins are symmetrical along the center line of L shape semi-steel pipe limb, and clear distance equals the cross-sectional length of montant, and pin is vertically uniformly distributed, and spacing is 0.5 times of L shape semi-steel pipe limb length, and on two limbs, the height of pin is different, every one deck height of pin difference 100mm.The height of montant is identical with the height of L shape semi-steel pipe.Cross bar is vertically uniformly distributed, and spacing is 0.5 times of L shape semi-steel pipe limb length, and every one deck cross bar is identical with the centre-height of pin.
At the load-bearing initial stage, the poisson's ratio of steel is greater than concrete poisson's ratio, and the outside distortion of steel pipe is greater than concrete, can strengthen the interaction between steel pipe and concrete, avoid the phenomenon occurring that steel pipe and concrete depart from by pin; The load-bearing later stage, the poisson's ratio of steel is less than concrete poisson's ratio, concrete outwards expands, by montant, cross bar and pin, retrain the distortion of two opposite side steel pipe walls, can confined concrete better, for concrete provides larger confined pressure power, improve concrete compressive strength, and then improve the bearing capacity of post.Montant has concrete protective, heats up comparatively slow in fire, and depression of bearing force is also comparatively slow, can improve the fire endurance of post.
The construction method of composite square steel tube concrete column of the present invention is: the L shape semi-steel pipe limb such as steel plate being processed into, the inwall of L shape semi-steel pipe positions the position of pin, two row's pins are symmetrical along the center line of limb, clear distance equals the cross-sectional length of montant, pin is vertically uniformly distributed, spacing is 0.5 times of L shape semi-steel pipe limb length, on two limbs, the height of pin is different, and every one deck height of pin difference 100mm, the inwall of the every limb of L shape semi-steel pipe welds pin, with steel plate processing montant and cross bar, the height of montant is identical with the height of L shape semi-steel pipe, montant positions the position of cross bar, cross bar is vertically uniformly distributed, spacing is 0.5 times of L shape semi-steel pipe limb length, the centre-height of two montant cross tubes is identical with the centre-height of pin on L shape semi-steel pipe one limb, the centre-height of another two montant cross tubes is identical with the centre-height of pin on another limb of L shape semi-steel pipe, cross bar is welded between two montants, 3rd montant welds cross bar, by the cross bar on the 3rd montant through being linked to be two overall montants, and the 4th montant is welded on cross bar, two L shape semi-steel pipes are buckled together, montant is penetrated in pin from end, two L shape semi-steel pipes are welded into entirety, at the inner concreting of square steel pipe.
Composite square steel tube concrete column of the present invention improves square steel pipe to the concrete effect of contraction in inside, the fire resistance that enhances connection between concrete and square steel pipe, improve post, and described construction method solves the not easy working problem in square steel pipe inside.The present invention can overcome the shortcoming of concrete-filled steel square tubular column, has the advantages such as bearing capacity is high, fire resistance is good.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the present invention is further described.
Fig. 1 is the schematic cross-section of composite square steel tube concrete column of the present invention.
Fig. 2 is the axonometric drawing of L shape semi-steel pipe of the present invention and pin.
Fig. 3 is the axonometric drawing of montant of the present invention and cross bar.
Fig. 4 is work progress figure of the present invention.
In figure: 1-L shape semi-steel pipe, 2-pin, 3-montant, 4-cross bar, 5-concrete, 6-weld seam.
Detailed description of the invention
As Figure 1-3, a kind of composite square steel tube concrete column, is made up of L shape semi-steel pipe (1), pin (2), montant (3), cross bar (4) and concrete (5).Two limb length of L shape semi-steel pipe (1) are equal, the inwall of every limb is vertically arranged two row's pins (2), two rows' pin (2) are symmetrical along the center line of limb, clear distance equals the cross-sectional length of montant (3), pin (2) is vertically uniformly distributed, spacing is 0.5 times of L shape semi-steel pipe (1) limb length, and on two limbs, the height of pin (2) is different, and every one deck pin (2) highly differs 100mm.The head of a nail interior side contacts of montant (3) and pin (2), be stuck in two row's pins (2), the height of montant (3) is identical with the height of L shape semi-steel pipe (1).Relative two montants (3) in position are coupled together by cross bar (4), and cross bar (4) is vertically uniformly distributed, and spacing is long 0.5 times of L shape semi-steel pipe (1) limb, and every one deck cross bar (4) is identical with the centre-height of pin (2).Two L shape semi-steel pipes (1) are buckled together, and connect into entirety by weld seam (6), the inner concreting (5) of square steel pipe.
Fig. 4 is the work progress figure of composite square steel tube concrete column of the present invention, and whole work progress is divided into a, b, c, d, e five steps, and concrete work progress is: step a, the L shape semi-steel pipe (1) of limb such as steel plate to be processed into, step b, the inwall of L shape semi-steel pipe (1) positions the position of pin (2), two rows' pin (2) are symmetrical along the center line of limb, clear distance equals the cross-sectional length of montant (3), pin (2) is vertically uniformly distributed, and spacing is 0.5 times of L shape semi-steel pipe (1) limb length, and on two limbs, the height of pin (2) is different, every one deck pin (2) highly differs 100mm, and the inwall of the every limb of L shape semi-steel pipe (1) welds pin (2), step c, montant (3) and cross bar (4) is processed with steel plate, the height of montant (3) is identical with the height of L shape semi-steel pipe (1), montant (3) positions the position of cross bar (4), cross bar (4) is vertically uniformly distributed, spacing is 0.5 times of L shape semi-steel pipe (1) limb length, the centre-height of two montants (3) cross tube (4) is identical with the centre-height of pin (2) on L shape semi-steel pipe (1) limb, the centre-height of another two montants (3) cross tube (4) is identical with the centre-height of pin (2) on L shape semi-steel pipe (1) another limb, cross bar (4) is welded between two montants (3), 3rd montant (3) welds cross bar (4), by the cross bar (4) on the 3rd montant (3) through being linked to be two overall montants (3), and upper welding the 4th montant (3) of cross bar (4), two L shape semi-steel pipes (1) are buckled together by steps d, and montant (3) is penetrated in pin (2) from end, and two L shape semi-steel pipes (1) are connected into entirety by weld seam (6), step e, the inner concreting (5) of square steel pipe.

Claims (4)

1. a composite square steel tube concrete column, is made up of L shape semi-steel pipe, pin, montant, cross bar and concrete, it is characterized in that: the inwall of the every limb of L shape semi-steel pipe is vertically arranged two row's pins; The head of a nail interior side contacts of montant and pin, is stuck in two row's pins; Relative two montants in position are coupled together by cross bar.
2. composite square steel tube concrete column according to claim 1, is characterized in that: two row's pins are symmetrical along the center line of L shape semi-steel pipe limb, and clear distance equals the cross-sectional length of montant; Pin is vertically uniformly distributed; On L shape semi-steel pipe two limb, the height of pin is different, every one deck height of pin difference 100mm.
3. composite square steel tube concrete column according to claim 1, is characterized in that: cross bar is vertically uniformly distributed, and every one deck cross bar is identical with the centre-height of pin.
4. realize a construction method for composite square steel tube concrete column according to claim 1, it is characterized in that: the L shape semi-steel pipe limb such as steel plate being processed into, the inwall of L shape semi-steel pipe positions the position of pin, two row's pins are symmetrical along the center line of limb, clear distance equals the cross-sectional length of montant, pin is vertically uniformly distributed, spacing is 0.5 times of L shape semi-steel pipe limb length, on two limbs, the height of pin is different, and every one deck height of pin difference 100mm, the inwall of the every limb of L shape semi-steel pipe welds pin, with steel plate processing montant and cross bar, the height of montant is identical with the height of L shape semi-steel pipe, montant positions the position of cross bar, cross bar is vertically uniformly distributed, spacing is 0.5 times of L shape semi-steel pipe limb length, the centre-height of two montant cross tubes is identical with the centre-height of pin on L shape semi-steel pipe one limb, the centre-height of another two montant cross tubes is identical with the centre-height of pin on another limb of L shape semi-steel pipe, cross bar is welded between two montants, 3rd montant welds cross bar, by the cross bar on the 3rd montant through being linked to be two overall montants, and the 4th montant is welded on cross bar, two L shape semi-steel pipes are buckled together, montant is penetrated in pin from end, two L shape semi-steel pipes are welded into entirety, at the inner concreting of square steel pipe.
CN201510033302.3A 2015-01-23 2015-01-23 Combined square steel pipe concrete column and construction method Expired - Fee Related CN104631707B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510033302.3A CN104631707B (en) 2015-01-23 2015-01-23 Combined square steel pipe concrete column and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510033302.3A CN104631707B (en) 2015-01-23 2015-01-23 Combined square steel pipe concrete column and construction method

Publications (2)

Publication Number Publication Date
CN104631707A true CN104631707A (en) 2015-05-20
CN104631707B CN104631707B (en) 2017-01-18

Family

ID=53210902

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510033302.3A Expired - Fee Related CN104631707B (en) 2015-01-23 2015-01-23 Combined square steel pipe concrete column and construction method

Country Status (1)

Country Link
CN (1) CN104631707B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101818575A (en) * 2010-02-10 2010-09-01 中国建筑第七工程局有限公司 Construction technology of cross-shaped profile steel column
CN203174885U (en) * 2013-01-23 2013-09-04 中国一冶集团有限公司 Steel pipe concrete column for increasing grip force of steel pipe and concrete
KR20130114535A (en) * 2012-04-09 2013-10-18 유한회사 케이테크코리아 Concrete filled tubular for building pillar construction
CN204531177U (en) * 2015-01-23 2015-08-05 山东科技大学 Composite square steel tube concrete column

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101818575A (en) * 2010-02-10 2010-09-01 中国建筑第七工程局有限公司 Construction technology of cross-shaped profile steel column
KR20130114535A (en) * 2012-04-09 2013-10-18 유한회사 케이테크코리아 Concrete filled tubular for building pillar construction
CN203174885U (en) * 2013-01-23 2013-09-04 中国一冶集团有限公司 Steel pipe concrete column for increasing grip force of steel pipe and concrete
CN204531177U (en) * 2015-01-23 2015-08-05 山东科技大学 Composite square steel tube concrete column

Also Published As

Publication number Publication date
CN104631707B (en) 2017-01-18

Similar Documents

Publication Publication Date Title
CN201080609Y (en) Prestressed concrete pipe pile connecting component
CN108487453B (en) Connecting structure and connecting method for steel tube concrete column and reinforced concrete beam
CN203487640U (en) Beam column connection T type node applied in top-down method
CN205088797U (en) Empty intermediate layer steel core concrete column of half punching wherein and girder steel connected node imbed
CN104674986A (en) Multi-cavity concrete-filled steel tubular wall with internal pre-machined semi-continuous reinforcement cage and construction method
CN202730755U (en) H-shaped support pile
CN203603526U (en) Reinforcing structure of reinforced concrete frame column
CN203569557U (en) Reinforcing steel bar combined mechanism based on construction concrete
CN203284773U (en) Pipe pile connecting structure and pipe pile foundation
CN204531177U (en) Composite square steel tube concrete column
CN110158808B (en) Vertical node connection form of assembled steel tube bundle concrete
CN103628569A (en) Clamping groove assembling type steel pipe concrete column-steel beam connecting joint
CN104631707A (en) Combined square steel pipe concrete column and construction method
CN103806530B (en) A kind of special-shaped overhanging steel structure and construction method thereof
CN203626237U (en) Steel-wood square column for supporting and forming reinforced concrete member in building construction
CN202023189U (en) Hollow concrete square pile for foundation
CN201437613U (en) Steel beam integral feed-through type concrete-filled tubular column and steel beam connecting node
CN105297895A (en) Compound steel pipe concrete column-steel beam semi-through haunch type node
CN204475670U (en) The steel core concrete column of the semicontinuous reinforcing cage of a kind of built-in preprocessing
CN210685114U (en) Prefabricated hollow pipe device for hollow floor slab
CN210194957U (en) Assembled steel tube bundle concrete vertical joint connection form
CN212129467U (en) Inner tube strenghthened type square sleeve side cavity intermediate layer steel core concrete column and girder steel node
CN202730754U (en) H-shaped support pile
CN202000346U (en) Prestressed concrete square pile
CN103046648A (en) Composite structure reinforcing steel bar connecting node

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170118

Termination date: 20210123

CF01 Termination of patent right due to non-payment of annual fee