CN104631502B - The empty end, is without the using method of chute manhole - Google Patents
The empty end, is without the using method of chute manhole Download PDFInfo
- Publication number
- CN104631502B CN104631502B CN201510066259.0A CN201510066259A CN104631502B CN 104631502 B CN104631502 B CN 104631502B CN 201510066259 A CN201510066259 A CN 201510066259A CN 104631502 B CN104631502 B CN 104631502B
- Authority
- CN
- China
- Prior art keywords
- chute
- pipeline
- crescent moon
- manhole
- moon supporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/12—Manhole shafts; Other inspection or access chambers; Accessories therefor
- E02D29/124—Shaft entirely made of synthetic material
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/12—Manhole shafts; Other inspection or access chambers; Accessories therefor
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/02—Manhole shafts or other inspection chambers; Snow-filling openings; accessories
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Hydrology & Water Resources (AREA)
- Water Supply & Treatment (AREA)
- Public Health (AREA)
- Health & Medical Sciences (AREA)
- Laying Of Electric Cables Or Lines Outside (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Branch Pipes, Bends, And The Like (AREA)
Abstract
The present invention relates to a kind of empty end without the using method of chute manhole, two of well pedestal crescent moon supporting seats are connected to pipeline both sides, and the first half of pipeline just in time matches with semicircle chute; By the partial fixing that pipeline contacts with the semicircle chute of well pedestal; Face over the other end of bellmouth again, pipeline is cut away in the part that bellmouth inner ring is visual, obtain the manhole of chute.Of the present invention is a satisfied well holder structure without chute identical with outer diameter tube, as long as manhole is identical with pipeline material, caliber is identical, just can establish manhole according to desired location, after again well seat being welded in pipeline is connected, well interior conduit top is sliced off, bottom just can be used as chute and uses, smart structural design again, constructability is installed, and is particularly useful for no-dig technique pipeline field.
Description
Technical field
The present invention relates to manhole technical field, particularly relate to the using method of a kind of empty end without chute manhole.
Background technology
Along with the propelling of Urbanization Construction, the requirement of the reasonable laying of the pipe network of cities and towns plumbing and the conveying of other fluids is more and more higher.Plastic inspection well has become cities and towns water supply and sewerage pipeline and has built requisite unit.The laying difficulty of special cities and towns rain effluent discharge pipe network is comparatively large, slightly irrationally bring numerous worry will to daily life from now on.Further developing of current China pipe technology, no-dig technique pipeline field has become normality construction, and manhole is also must an obligato major product, but the plastic inspection well of routine cannot connect this pipeline, and namely enable connection but sealing also can not be guaranteed.
Summary of the invention
The technical problem to be solved in the present invention is: in order to provide a kind of manhole that can be applicable to no-dig technique pipeline field, the invention provides the using method of a kind of empty end without chute manhole.
The technical solution adopted for the present invention to solve the technical problems is: a kind of empty end is without the using method of chute manhole, comprise well pedestal, described well pedestal have bellmouth and two crescent moon supporting seats, described crescent moon supporting seat is positioned at one end of bellmouth and is symmetrical arranged, one end that setting crescent moon supporting seat connects with bellmouth is the rear end of crescent moon supporting seat, the other end is then front end, the rear end of two crescent moon supporting seats is fixedly connected with bellmouth, the rear end of two crescent moon supporting seats is connected and forms semicircle chute, the first half section cross section of two crescent moon supporting seats is roughly in crescent, the opposite face of the first half section of crescent moon supporting seat is plane, back is cambered surface, spacing d between two crescent moon supporting seats and the diameter of chute all match with outer diameter tube to be onstructed, described using method is characterized in that comprising the following steps: outer diameter tube to be installed is d,
1) two of well pedestal crescent moon supporting seats are connected to pipeline both sides, the first half of pipeline just in time matches with semicircle chute;
2) by partial fixing that pipeline contacts with the semicircle chute of well pedestal;
3) face over the other end of bellmouth again, pipeline is cut away in the part that bellmouth inner ring is visual, obtain the manhole of chute.
In order to strengthen intensity, the first half section of described crescent moon supporting seat is hollow-core construction, and its inside is also provided with brace rod.The second half section external rings of crescent moon supporting seat is provided with reinforcing rib.
Further, particularly, described step 2) in fixing mode for being welded and fixed.
The invention has the beneficial effects as follows, of the present invention is a satisfied well holder structure without chute identical with outer diameter tube, as long as manhole is identical with pipeline material, caliber is identical, just can establish manhole according to desired location, then after well seat is welded in pipeline is connected, then well interior conduit top is sliced off, bottom just can be used as chute and uses, smart structural design, constructability is installed, and is particularly useful for no-dig technique pipeline field.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the present invention is further described.
Fig. 1 is the structural representation without chute manhole at the bottom of sky.
Fig. 2 is the front view of Fig. 1.
Fig. 3 is the A-A sectional view of Fig. 2.
Schematic diagram when Fig. 4 is the construction without chute manhole at the bottom of sky.
Fig. 5 is the front view of Fig. 4.
Detailed description of the invention
In conjunction with the accompanying drawings, the present invention is further detailed explanation.These accompanying drawings are the schematic diagram of simplification, only basic structure of the present invention are described in a schematic way, and therefore it only shows the formation relevant with the present invention.
As Figure 1-5, embodiments of the invention, comprise well pedestal 1, well pedestal 1 have bellmouth 1-2 and two crescent moon supporting seat 1-3, two crescent moon supporting seat 1-3 are positioned at one end of bellmouth 1-2 and are symmetrical arranged up and down, the outline of two crescent moon supporting seat 1-3 cylindrically, and coaxially arrange with bellmouth 1-2, one end that setting crescent moon supporting seat 1-3 connects with bellmouth 1-2 is the rear end of crescent moon supporting seat 1-3, the other end is then front end, the rear end of two crescent moon supporting seat 1-3 is fixedly connected with bellmouth 1-2, the rear end of two crescent moon supporting seat 1-3 is connected and forms semicircle chute 1-4, the first half section 1-5 cross section of two crescent moon supporting seat 1-3 is roughly in crescent, the opposite face of the first half section 1-5 of crescent moon supporting seat 1-3 is plane, back is cambered surface, spacing d between two crescent moon supporting seat 1-3 and the diameter of chute 1-4 all match with pipeline 2 external diameter to be onstructed.Spacing between two crescent moon supporting seat 1-3 communicates with bellmouth 1-2.The first half section 1-5 of crescent moon supporting seat 1-3 is hollow-core construction, and its inside is also provided with brace rod 1-6.The second half section external rings of crescent moon supporting seat 1-3 is provided with reinforcing rib 1-7.
Described using method is characterized in that comprising the following steps: pipeline 2 external diameter to be installed is d,
1) two of well pedestal 1 crescent moon supporting seat 1-3 are connected to pipeline 2 both sides, the first half of pipeline just in time matches with semicircle chute 1-4;
2) by partial fixing that pipeline 2 contacts with the semicircle chute 1-4 of well pedestal 1;
3) face over the other end of bellmouth 1-2 again, pipeline 2 is cut away (a-quadrant namely in Fig. 5, the a-quadrant in figure is cut) in the part that bellmouth 1-2 inner ring is visual, obtains the manhole of chute.Step 2) in fixing mode for being welded and fixed.
The present invention is one and meets well holder structure without chute identical with outer diameter tube, as long as manhole is identical with pipeline material, caliber is identical, just can establish manhole according to desired location, again well seat burn-on connect after in well, conduit upper is sliced off, bottom just can be used as chute and uses, smart structural design, is particularly useful for no-dig technique pipeline field.
With above-mentioned according to desirable embodiment of the present invention for enlightenment, by above-mentioned description, relevant staff in the scope not departing from this invention technological thought, can carry out various change and amendment completely.The technical scope of this invention is not limited to the content on manual, must determine its technical scope according to right.
Claims (4)
1. the empty end, is without the using method of chute manhole, comprise well pedestal (1), described well pedestal (1) have bellmouth (1-2) and two crescent moon supporting seats (1-3), described crescent moon supporting seat (1-3) is positioned at one end of bellmouth (1-2) and is symmetrical arranged, one end that setting crescent moon supporting seat (1-3) connects with bellmouth (1-2) is the rear end of crescent moon supporting seat (1-3), the other end is then front end, the rear end of two crescent moon supporting seats (1-3) is fixedly connected with bellmouth (1-2), the rear end of two crescent moon supporting seats (1-3) is connected and forms semicircle chute (1-4), first half section (1-5) cross section of two crescent moon supporting seats (1-3) is roughly in crescent, the opposite face of the first half section (1-5) of crescent moon supporting seat (1-3) is plane, back is cambered surface, spacing d between two crescent moon supporting seats (1-3) and the diameter of chute (1-4) all match with outer diameter tube to be onstructed, described using method is characterized in that comprising the following steps: pipeline (2) external diameter to be installed is d,
1) two crescent moon supporting seats (1-3) of well pedestal (1) are connected to pipeline (2) both sides, the first half of pipeline just in time matches with semicircle chute (1-4);
2) by partial fixing that pipeline (2) contacts with the semicircle chute (1-4) of well pedestal (1);
3) face over the other end of bellmouth (1-2) again, pipeline (2) is cut away in the part that bellmouth (1-2) inner ring is visual, obtain the manhole of chute.
2. the empty end as claimed in claim 1, is without the using method of chute manhole, it is characterized in that: the first half section (1-5) of described crescent moon supporting seat (1-3) is hollow-core construction, and its inside is also provided with brace rod (1-6).
3. the empty end as claimed in claim 1, is without the using method of chute manhole, it is characterized in that: the second half section external rings of described crescent moon supporting seat (1-3) is provided with reinforcing rib (1-7).
4. the end as claimed in claim 1 empty, is without the using method of chute manhole, it is characterized in that: described step 2) in fixing mode for being welded and fixed.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510066259.0A CN104631502B (en) | 2015-02-09 | 2015-02-09 | The empty end, is without the using method of chute manhole |
PCT/CN2015/099438 WO2016127711A1 (en) | 2015-02-09 | 2015-12-29 | Application method of empty-bottom launder-free inspection well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510066259.0A CN104631502B (en) | 2015-02-09 | 2015-02-09 | The empty end, is without the using method of chute manhole |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104631502A CN104631502A (en) | 2015-05-20 |
CN104631502B true CN104631502B (en) | 2016-03-30 |
Family
ID=53210700
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510066259.0A Active CN104631502B (en) | 2015-02-09 | 2015-02-09 | The empty end, is without the using method of chute manhole |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN104631502B (en) |
WO (1) | WO2016127711A1 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104563268B (en) * | 2014-12-31 | 2016-06-22 | 江苏河马井股份有限公司 | The empty end, is without chute inspection shaft |
CN104631502B (en) * | 2015-02-09 | 2016-03-30 | 江苏河马井股份有限公司 | The empty end, is without the using method of chute manhole |
CN107376175A (en) * | 2017-08-17 | 2017-11-24 | 安徽安凯汽车股份有限公司 | A kind of fixed structure of power battery box Automatic Fire Extinguisher discharge tube |
CN110528548A (en) * | 2019-07-15 | 2019-12-03 | 中国一冶集团有限公司 | The prefabricated sedimentation well of one kind and the drawing prefabricated sedimentation well construction method of push pipe |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2126262B (en) * | 1982-08-26 | 1987-02-11 | Paragon Plastics Limited | Inspection chambers for drainage systems |
CN2494848Y (en) * | 2001-09-13 | 2002-06-12 | 吉林名门管道工程有限公司 | Non-bond prestressed concrete combined manhole |
CN201395857Y (en) * | 2009-05-06 | 2010-02-03 | 四川天鑫塑胶管业有限公司 | Inspection well with internal bell mouth and external bell mouth |
DE102009037042A1 (en) * | 2009-08-13 | 2011-02-17 | Hegler Plastik Gmbh | Shaft, in particular a control and flushing shaft for wastewater with a flow channel and plate for a flow channel |
CN102518199A (en) * | 2011-12-15 | 2012-06-27 | 昆明理工大学 | Hermetic connecting method for bell mouth of plastic inspection well |
CN204000941U (en) * | 2014-06-26 | 2014-12-10 | 浙江章达管业科技有限公司 | Reducing type injection moulding manhole seat |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201190290Y (en) * | 2008-05-03 | 2009-02-04 | 王兆林 | Buried water meter pool |
JP5912296B2 (en) * | 2011-05-27 | 2016-04-27 | 管清工業株式会社 | Excess pore water drainage structure construction method, excess pore water drainage structure and filter |
CN202164697U (en) * | 2011-06-15 | 2012-03-14 | 王杏存 | Reinforced concrete prefabricating inspection well |
JP5882143B2 (en) * | 2012-06-21 | 2016-03-09 | 日之出水道機器株式会社 | Anti-floating pile for underground structures and anti-floating method for underground structures |
CN204435530U (en) * | 2014-12-31 | 2015-07-01 | 江苏河马井股份有限公司 | The empty end, is without chute manhole |
CN104563268B (en) * | 2014-12-31 | 2016-06-22 | 江苏河马井股份有限公司 | The empty end, is without chute inspection shaft |
CN104631502B (en) * | 2015-02-09 | 2016-03-30 | 江苏河马井股份有限公司 | The empty end, is without the using method of chute manhole |
-
2015
- 2015-02-09 CN CN201510066259.0A patent/CN104631502B/en active Active
- 2015-12-29 WO PCT/CN2015/099438 patent/WO2016127711A1/en active Application Filing
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2126262B (en) * | 1982-08-26 | 1987-02-11 | Paragon Plastics Limited | Inspection chambers for drainage systems |
CN2494848Y (en) * | 2001-09-13 | 2002-06-12 | 吉林名门管道工程有限公司 | Non-bond prestressed concrete combined manhole |
CN201395857Y (en) * | 2009-05-06 | 2010-02-03 | 四川天鑫塑胶管业有限公司 | Inspection well with internal bell mouth and external bell mouth |
DE102009037042A1 (en) * | 2009-08-13 | 2011-02-17 | Hegler Plastik Gmbh | Shaft, in particular a control and flushing shaft for wastewater with a flow channel and plate for a flow channel |
CN102518199A (en) * | 2011-12-15 | 2012-06-27 | 昆明理工大学 | Hermetic connecting method for bell mouth of plastic inspection well |
CN204000941U (en) * | 2014-06-26 | 2014-12-10 | 浙江章达管业科技有限公司 | Reducing type injection moulding manhole seat |
Also Published As
Publication number | Publication date |
---|---|
CN104631502A (en) | 2015-05-20 |
WO2016127711A1 (en) | 2016-08-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104631502B (en) | The empty end, is without the using method of chute manhole | |
CN204435530U (en) | The empty end, is without chute manhole | |
CN104563268B (en) | The empty end, is without chute inspection shaft | |
CN203949117U (en) | A kind of segmentation dismountable portable is shown lamp stand | |
CN204263440U (en) | Resin expanded device | |
CN209229193U (en) | Rapid rush-repair connector | |
CN204435417U (en) | There is the manhole strengthening bearing capacity | |
CN208483463U (en) | A kind of LCD product dress foot tooling | |
CN204437485U (en) | A kind of cradle | |
CN216996664U (en) | Feeding device for production and processing of silicon dioxide powder | |
CN2799163Y (en) | Circle-trimming mouth-expanding device for plastic composite tube | |
CN204564517U (en) | The cylinder of screening machine | |
CN204493941U (en) | Metal tube bonding apparatus | |
CN202768555U (en) | Pipe body connection piece | |
CN201040413Y (en) | Die for using polyethylene double-resisting material to pressing flange | |
CN203462535U (en) | Replaceable anti-clogging transition joint hoop | |
CN203866865U (en) | Reducing connector of plastic inspection well | |
CN202117678U (en) | Tube storage device for shield machine | |
CN204282459U (en) | A kind of platform basin outlet device adapter sleeve of easy installation | |
CN205062846U (en) | Inspection shaft lid skeleton | |
CN205064302U (en) | Concatenation formula deep -well pump | |
CN206206725U (en) | Water mixing valve | |
CN205264661U (en) | A sleeve pipe for on extra -high voltage fuse | |
CN204249069U (en) | A kind of draw-in groove bellmouth body overhang roll mould | |
CN204373401U (en) | Bell enters return pipe maintenance structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder |
Address after: 213164 No. 28 Nanhu West Road, Technology Industry Development Zone, Wujin High-tech Zone, Changzhou City, Jiangsu Province Patentee after: JIANGSU HIPPO WELL SHARE CO., LTD. Address before: 213164 Jiangsu Changzhou Wujin District Hutang town gully industrial concentration area Patentee before: JIANGSU HIPPO WELL SHARE CO., LTD. |
|
CP02 | Change in the address of a patent holder |