CN104618169B - A kind of display methods and device of monitoring data - Google Patents

A kind of display methods and device of monitoring data Download PDF

Info

Publication number
CN104618169B
CN104618169B CN201310535189.XA CN201310535189A CN104618169B CN 104618169 B CN104618169 B CN 104618169B CN 201310535189 A CN201310535189 A CN 201310535189A CN 104618169 B CN104618169 B CN 104618169B
Authority
CN
China
Prior art keywords
monitoring data
display cycle
time point
display
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310535189.XA
Other languages
Chinese (zh)
Other versions
CN104618169A (en
Inventor
林俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tencent Technology Shenzhen Co Ltd
Tencent Cloud Computing Beijing Co Ltd
Original Assignee
Tencent Technology Shenzhen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tencent Technology Shenzhen Co Ltd filed Critical Tencent Technology Shenzhen Co Ltd
Priority to CN201310535189.XA priority Critical patent/CN104618169B/en
Publication of CN104618169A publication Critical patent/CN104618169A/en
Application granted granted Critical
Publication of CN104618169B publication Critical patent/CN104618169B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention is suitable for field of computer technology, provides the display methods and device of a kind of monitoring data, comprising: initializes N number of display cycle, the cycle length of N number of display cycle is all the same and the time point of covering is overlapped, and the N is the integer greater than 1;The monitoring data in each display cycle is obtained respectively;Monitoring data of the N number of display cycle on the identical time point is carried out while being shown.In the present invention, current monitor data and history same period monitoring data are shown simultaneously by the way of year-on-year, to intuitively reflect the numerical value difference of current monitor data Yu history same period monitoring data, the time point that service exception occurs for IT system is quickly navigated to convenient for monitoring system, further to eliminate service exception, the time cost for solving service exception is greatly reduced, the O&M efficiency of IT system is improved.

Description

A kind of display methods and device of monitoring data
Technical field
The invention belongs to field of computer technology more particularly to the display methods and device of a kind of monitoring data.
Background technique
In order to guarantee that information technology (Information Technology, IT) system can be run steadily in the long term, in IT The usually all mating corresponding monitoring system in the backstage of system, all kinds of operation datas for generating in running to IT system are supervised Control, it is abnormal convenient for when business occurs abnormal, being searched, being positioned by monitoring data, to solve the problems, such as.
Existing monitoring system is only for operation data caused by some day or a certain all IT systems, according to data The time sequencing of generation is shown, however, since the data volume of operation data is quite huge and data type is various, once go out It when existing service exception, needs to browse mass data one by one, check, further orient operation data and exceed or low In the time point of expected threshold value, the time cost for solving service exception is considerably increased, the O&M efficiency of IT system is reduced.
Summary of the invention
The display methods for being designed to provide a kind of monitoring data of the embodiment of the present invention, it is intended to which it is right in the prior art to solve The problem of O&M low efficiency of IT system.
The embodiments of the present invention are implemented as follows, a kind of display methods of monitoring data, comprising:
Initialize N number of display cycle, the cycle length of N number of display cycle is all the same and the time point counterpoise of covering It closes, the N is the integer greater than 1;
The monitoring data in each display cycle is obtained respectively;
Monitoring data of the N number of display cycle on the identical time point is carried out while being shown.
The another object of the embodiment of the present invention is to provide a kind of display device of monitoring data, comprising:
Initialization unit, for initializing N number of display cycle, the cycle length of N number of display cycle is all the same and covers The time point of lid is overlapped, and the N is the integer greater than 1;
Acquiring unit, for obtaining the monitoring data in each display cycle respectively;
Display unit, for monitoring data of the N number of display cycle on the identical time point to be carried out while being shown Show.
In embodiments of the present invention, current monitor data and history same period monitoring data are carried out by the way of year-on-year It shows simultaneously, to reflect the numerical value difference of current monitor data Yu history same period monitoring data, intuitively convenient for monitoring system The time point that system quickly navigates to IT system generation service exception greatly reduces solution industry further to eliminate service exception The time cost for exception of being engaged in, improves the O&M efficiency of IT system.
Detailed description of the invention
Fig. 1 is the implementation flow chart of the display methods of monitoring data provided in an embodiment of the present invention;
Fig. 2 is the schematic diagram of the display cycle of initialization provided in an embodiment of the present invention;
Fig. 3 is the specific implementation flow chart of the display methods S103 of monitoring data provided in an embodiment of the present invention;
Fig. 4 is the schematic diagram of the display methods of monitoring data provided in an embodiment of the present invention;
Fig. 5 is the specific implementation flow chart of the display methods S103 of monitoring data provided in an embodiment of the present invention;
Fig. 6 is the structural block diagram of the display device of monitoring data provided in an embodiment of the present invention.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
In embodiments of the present invention, current monitor data and history same period monitoring data are carried out by the way of year-on-year It shows simultaneously, to reflect the numerical value difference of current monitor data Yu history same period monitoring data, intuitively convenient for monitoring system The time point that system quickly navigates to IT system generation service exception greatly reduces solution industry further to eliminate service exception The time cost for exception of being engaged in, improves the O&M efficiency of IT system.
In embodiments of the present invention, monitoring data is IT system generated data during operation, including but unlimited In IT system during operation generated request amount, response quautity, unsuccessfully amount, time-out amount, etc..For example, with instant messaging For platform, at each moment of operation, the traffic volume of instant message can be generated, recipient after instant message is sent It is instant that response quautity, instant message, which send Various types of data, the above-mentioned data such as the quantity that unsuccessfully amount, instant message time-out are not sent, Communication platform monitoring data generated during operation.As monitoring system, it is used to acquire and show IT system and is transporting All kinds of monitoring datas caused by during battalion are convenient for relevant operation maintenance personnel root to reflect the traffic-operating period of IT system The service exception of IT system is positioned according to the monitoring data shown.
Based on above-mentioned monitoring system, in general, corresponding to a monitoring threshold at each moment for every a kind of monitoring data It is worth range, according to the numerical values recited for the monitoring data generated in the moment IT system that monitoring system is reflected, once it finds The monitoring data is more than the upper limit of the monitoring threshold value or the lower limit lower than the monitoring threshold value, then the monitoring data is abnormal number According to largely showing that service exception has occurred in the moment IT system, operation maintenance personnel can be according further to as a result, The operation problem of IT system is positioned at the time of the monitoring data and the monitoring data generate, to further solve the problems, such as.
Since IT system is in most cases in normal operation state, every one kind monitoring data fixes one a certain The numerical value at moment should be monitored in threshold range accordingly positioned at the moment, therefore, in embodiments of the present invention, for every A kind of monitoring data, by by the monitoring data at a certain moment with the history same period similar monitoring data carry out numerical value compared with, if There is exception in the monitoring data at the moment, then between the monitoring data at the moment and the similar monitoring data of the history same period obviously Biggish difference can be generated, the monitoring data that can intuitively reflect the moment according to the difference as a result, is abnormal.
Based on the above principles, Fig. 1 shows the implementation process of the display methods of monitoring data provided in an embodiment of the present invention, Details are as follows:
In S101, initialize N number of display cycle, the cycle length of N number of display cycle is all the same and covering when Between put and be overlapped, the N is the integer greater than 1.
In the present embodiment, initialization needs to participate in N number of display cycle that monitoring data is shown, this N number of display cycle Cycle length it is all the same and covering time point be overlapped.By taking Fig. 2 as an example, 3 display cycles are initialized, are respectively executed Before seven days that the same day of display cycle initialization, the previous day for executing display cycle initialization and execution display cycle initialize (before i.e. one week), wherein the cycle length of each display cycle is one day (i.e. 24 hours), and each display cycle is covered The time point of lid is also one-to-one: for example, each display cycle covers each integral point in its 24 hours same day, or Person, each display cycle cover half integral point of each of its 0 point to 6 points of same day.
Before initializing N number of display cycle, can quantity to the display cycle of initialization and each display cycle it Between period distances be configured, it is aobvious when needing to initialize by taking the period distances between each display cycle shown in Fig. 2 as an example When showing the period, then the current system date is read first, determine first display cycle, i.e., what the execution display cycle initialized works as It, secondly respectively by the current system date toward being pushed forward one day and toward being pushed forward seven days, so that it is determined that second display cycle, that is, execute The previous day of display cycle initialization, and determine the third display cycle, that is, execute first 7th day of display cycle initialization. Pass through the week between the quantity of the pre-set display cycle initialized and each display cycle initialized Period is every as long as determine current system time, it can the disposable initialization for completing the display cycle.
Due to needing to get the monitoring number in each display cycle respectively after the initialization for completing the display cycle According to, and the monitoring data in each display cycle may relate to up to thousands of kinds of different types of monitoring datas, and every type The monitoring data of type all includes its data on all time points of display cycle covering, therefore, entire monitoring data Obtain and subsequent data handling procedure treating capacity be it is very big, be easy certain pressure is caused to monitoring data source.Out Consider in above-mentioned reason, as an embodiment of the present invention, the display cycle is initialized by the way of periodically triggering, carries out The display of monitoring data, specifically, S101 is as follows:
When system time reaches preset time, N number of display cycle is initialized.
That is, according to O&M needs, such as operation maintenance personnel is needed per the operating condition for paying close attention to IT system every other hour, then According to system time, per the display process of automatic trigger monitoring data every other hour, on the basis of present system time, initialization N number of display cycle is shown with carrying out subsequent monitoring data.
As another embodiment of the present invention, the display cycle is initialized by the way of manually triggering, is monitored number According to display, specifically, S101 is as follows:
After detecting monitoring data idsplay order, N number of display cycle is initialized.
That is, monitoring system is after detecting the input of the instruction, triggering prison by monitoring data idsplay order is manually entered Control data display process initialize N number of display cycle by present system time or on the basis of the appointing system time, with into The subsequent monitoring data of row is shown.As an implementation example of the invention, monitoring data idsplay order can be in operation maintenance personnel By being inputted when web browser access monitoring data.The present embodiment is suitable for the situation when IT system burst service exception, O&M Personnel after receiving the feedback of service exception, can in time by way of manually triggering come checking monitoring data, and When find the problem where, further solve service exception.
During actual supervisory control system running, by the way of can triggering and deposit using regular triggering and manually, that is, protect Regularity, the stability of O&M operation are demonstrate,proved, and guarantees the real-time of O&M operation.
In S102, the monitoring data in each display cycle is obtained respectively.
After completing display cycle initialization, according to the time point that each display cycle is covered, obtain respectively every Monitoring data in a display cycle.In the present embodiment, the acquisition in order to facilitate S102 to monitoring data is generated in IT system After Various types of data, monitoring system carries out structured storage to these data, according to the date-time of data generation, generates data The parameters such as IT system title and data type logically save these data, as a result, in S102, can be very convenient Required data are extracted from the data of these structured storages in ground.
In S103, monitoring data of the N number of display cycle on the identical time point is carried out while being shown.
In the present embodiment, monitoring data of N number of display cycle on same time point is carried out in year-on-year mode same When show.
As an embodiment of the present invention, S103 is specifically as shown in Figure 3:
In S301, settling time coordinate system contains what N number of display cycle was covered in the time coordinate system All time points.
In S302, according to the time point for including in the time coordinate system, in the time coordinate system simultaneously Draw monitoring data of the monitoring data in N number of specified period on each time point.
That is, all time points covered according to the display cycle, sequentially establish reference axis, and the reference axis each On numerical value position corresponding to time point, draw this N number of display cycle at the time point on monitoring data.It is right by taking Fig. 4 as an example In 3 display cycles according to generation shown in Fig. 2, abscissa, and root are established sequentially with the time point that this 3 display cycles cover According to the monitoring data in each display cycle in this 3 display cycles at every point of time on numerical value, by these numeric renderings It in the same chart and exports, can intuitively find out very much, on most of time point, the monitoring number of this 3 display cycles According to being substantially overlapped or extremely close, mutual difference to a very small extent, and between 8 points to 10 points, And between 14 points to 24 points, compared to other two display cycles, it is clear that there is a display cycle to go out in this 3 display cycles Showed abnormal data, according to it is reflected in chart the case where, the system time for abnormal data occurred can be quickly located Point checks that abnormal numerical value occurs in the monitoring data of specifically which display cycle, to facilitate operation maintenance personnel to supervise for this part Control data are further analyzed, and judge whether this part monitoring data is located in normal monitoring threshold range, to send out Existing problem, early solves the service exception of IT system.
As another embodiment of the invention, the monitoring data in each display cycle got according to S102 can To precompute the numerical difference between the monitoring data in each time point in the every two display cycle from the background, count if it exists Value difference is more than the time point of preset threshold, then it is assumed that may have the monitoring data of some display cycle to occur on the time point different Constant value, so that this part exception numerical value be shown.In the present embodiment, it is equivalent to the monitoring data got to S102 It is filtered, operation maintenance personnel is facilitated more efficiently to solve service exception.S103 is specifically as shown in Figure 5:
In S501, calculate separately the monitoring data in N number of display cycle on each time point mutually it Between difference.
By taking the display cycle shown in Fig. 2 as an example, monitoring data on a time point needs to calculate separately out first Difference, second display cycle between display cycle and second display cycle and the difference between the third display cycle, Difference between third display cycle and first display cycle.In the present embodiment, it analyzes for convenience, the difference is equal It can indicate that actual difference is absolute value.
In S502, for each time point, judge the monitoring data of N number of display cycle at the time point on Whether mutual difference is respectively less than the preset difference value at the time point.
Based on aforementioned relative theory, when IT system is in normal operation state, every one kind monitoring data is a certain solid The numerical value at a fixed time point should be monitored in threshold range accordingly positioned at the moment, and the different display cycles are in same time Monitoring data on point can't numerically generate too big deviation, therefore, judge N number of display by upper at every point of time Whether the mutual difference of the monitoring data in period is respectively less than the preset difference value at the time point, can also judge in the time With the presence or absence of abnormal numerical value on point.
In S503, when upper mutual difference is not equal at the time point for the monitoring data of N number of display cycle Less than the preset difference value at the time point, then to N number of display cycle at the time point on monitoring data carry out and meanwhile show.
According to the judging result of S502, if finding, the monitoring data of N number of display cycle is mutual on a time point Difference be not be respectively less than the time point preset difference value when, then to the monitoring data on the time point of this N number of display cycle into It row while showing, as a result, according to the display of S503 as a result, it is possible to the case where directly viewing abnormal numerical value, to facilitate O&M Personnel further analyze for this part monitoring data, judge whether this part monitoring data is located at normal monitoring threshold It is worth in range, to find the problem, early solves the service exception of IT system.
Display methods based on the above-mentioned monitoring data that the embodiment of the present invention illustrates, in the process for carrying out O&M to IT system In, the quantity for needing the monitoring data paid close attention to can be greatly reduced.By taking immediate communication platform as an example, the monitoring data of generation Up to more than 1000 kinds of type, the numerical value if desired generated in a certain period of time to this more than 1000 kinds of monitoring datas carries out one by one It checks, will undoubtedly expend huge time cost, and the display methods of the monitoring data provided through the embodiment of the present invention, it can be with Directly focus is navigated in the monitoring data for producing abnormal numerical value, in this way, the class for the monitoring data for needing to pay close attention to Usually not more than 50, type, to accelerate the solution process of service exception.Meanwhile abnormal numerical value is more intensively shown Out, operation maintenance personnel is also facilitated quickly to position the common problem in IT system during solving service exception, thus as early as possible It determines the logic solved the problems, such as, also accelerates the solution process of service exception.
In addition, in embodiments of the present invention, coming to monitor current monitor data and the history same period by the way of year-on-year Data are carried out while being shown, are more in line with the moving law of IT system.For example, for immediate communication platform, it is clear that in work Make time and night leisure time, user is higher using the frequency that platform sends instant message, at this point, the industry of immediate communication platform Business amount is extremely active, and in morning, user is obviously lower using the frequency that platform sends instant message, at this time immediate communication platform Portfolio also more mitigate, therefore, in embodiments of the present invention, can be by IT system by setting reasonable display cycle Peak hours/period distinguished with idle period, the period identical as the history same period is monitored comparing respectively, more standby The practical significance of O&M.
Fig. 6 shows the structural block diagram of the display device of monitoring data provided in an embodiment of the present invention, which can use In the display methods for running monitoring data described in Fig. 1 to Fig. 5 embodiment of the present invention.For ease of description, it illustrates only and this The relevant part of embodiment.
Referring to Fig. 6, which includes:
Initialization unit 61, for initializing N number of display cycle, the cycle length of N number of display cycle it is all the same and The time point of covering is overlapped, and the N is the integer greater than 1.
Acquiring unit 62, for obtaining the monitoring data in each display cycle respectively.
Display unit 63, for being carried out simultaneously to monitoring data of the N number of display cycle on the identical time point Display.
Optionally, the display unit 63 includes:
Computation subunit, for calculating separately the monitoring data in N number of display cycle at each time point Mutual difference.
Judgment sub-unit, for judging the monitoring data of N number of display cycle at this for each time point Between put the preset difference value whether upper mutual difference is respectively less than the time point.
It shows subelement, goes up mutual difference at the time point for the monitoring data when N number of display cycle Not be respectively less than the preset difference value at the time point, then to N number of display cycle at the time point on monitoring data carry out it is same When show.
Optionally, the display unit 63 includes:
Subelement is established, settling time coordinate system is used for, contains N number of display cycle institute in the time coordinate system All time points of covering.
Subelement is drawn, for according to the time point for including in the time coordinate system, in the time coordinate system In draw monitoring data of the monitoring data in N number of specified period on each time point simultaneously.
Optionally, the initialization unit 61 is specifically used for:
When system time reaches preset time, N number of display cycle is initialized.
Optionally, the initialization unit 61 is specifically used for:
After detecting monitoring data idsplay order, N number of display cycle is initialized.
Optionally, described device further include:
Setting unit, for the quantity of the display cycle initialized to be arranged and each display into initialization is arranged Period distances between period.
In embodiments of the present invention, current monitor data and history same period monitoring data are carried out by the way of year-on-year It shows simultaneously, to reflect the numerical value difference of current monitor data Yu history same period monitoring data, intuitively convenient for monitoring system The time point that system quickly navigates to IT system generation service exception greatly reduces solution industry further to eliminate service exception The time cost for exception of being engaged in, improves the O&M efficiency of IT system.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (10)

1. a kind of display methods of monitoring data characterized by comprising
Initialize N number of display cycle, the cycle length of N number of display cycle is all the same and the time point of covering is overlapped, institute Stating N is the integer greater than 1;
The monitoring data in each display cycle is obtained respectively;
Monitoring data of the N number of display cycle on the identical time point is carried out while being shown;
Wherein, the monitoring data to N number of display cycle on the identical time point carries out while display includes: point Monitoring data in N number of display cycle difference mutual on each time point is not calculated;When described N number of aobvious Showing that the monitoring data in period goes up mutual difference at the time point is not when being respectively less than the preset difference value at the time point, to institute State N number of display cycle at the time point on monitoring data carry out and meanwhile show.
2. the method as described in claim 1, which is characterized in that it is described to N number of display cycle at the identical time point On monitoring data carry out simultaneously show include:
Settling time coordinate system contains all times that N number of display cycle covered in the time coordinate system Point;
According to the time point for including in the time coordinate system, N number of finger is drawn simultaneously in the time coordinate system Monitoring data of the monitoring data of fixed cycle on each time point.
3. the method as described in claim 1, which is characterized in that the initialization N number of display cycle includes:
When system time reaches preset time, N number of display cycle is initialized.
4. the method as described in claim 1, which is characterized in that the initialization N number of display cycle includes:
After detecting monitoring data idsplay order, N number of display cycle is initialized.
5. method according to any of claims 1-4, which is characterized in that before initialization N number of display cycle, The method also includes:
The quantity of the display cycle initialized is set and is arranged into during the week between each display cycle of initialization Every.
6. a kind of display device of monitoring data characterized by comprising
Initialization unit, for initializing N number of display cycle, the cycle length of N number of display cycle is all the same and covering Time point is overlapped, and the N is the integer greater than 1;
Acquiring unit, for obtaining the monitoring data in each display cycle respectively;
Display unit, for monitoring data of the N number of display cycle on the identical time point to be carried out while being shown;
Wherein, the display unit includes: computation subunit, for calculating separately the monitoring data in N number of display cycle The mutual difference on each time point;It shows subelement, exists for the monitoring data when N number of display cycle The time point upper mutual difference is not when being respectively less than the preset difference value at the time point, to N number of display cycle at this Monitoring data on time point is carried out while being shown.
7. device as claimed in claim 6, which is characterized in that the display unit further include:
Subelement is established, settling time coordinate system is used for, containing N number of display cycle in the time coordinate system is covered All time points;
Subelement is drawn, it is same in the time coordinate system for according to the time point for including in the time coordinate system When draw monitoring data of the monitoring data in N number of specified period on each time point.
8. device as claimed in claim 6, which is characterized in that the initialization unit is specifically used for:
When system time reaches preset time, N number of display cycle is initialized.
9. device as claimed in claim 6, which is characterized in that the initialization unit is specifically used for:
After detecting monitoring data idsplay order, N number of display cycle is initialized.
10. device as claim in any one of claims 6-9, which is characterized in that described device further include:
Setting unit, for the quantity of the display cycle initialized to be arranged and each display cycle into initialization is arranged Between period distances.
CN201310535189.XA 2013-11-01 2013-11-01 A kind of display methods and device of monitoring data Active CN104618169B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310535189.XA CN104618169B (en) 2013-11-01 2013-11-01 A kind of display methods and device of monitoring data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310535189.XA CN104618169B (en) 2013-11-01 2013-11-01 A kind of display methods and device of monitoring data

Publications (2)

Publication Number Publication Date
CN104618169A CN104618169A (en) 2015-05-13
CN104618169B true CN104618169B (en) 2019-01-08

Family

ID=53152460

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310535189.XA Active CN104618169B (en) 2013-11-01 2013-11-01 A kind of display methods and device of monitoring data

Country Status (1)

Country Link
CN (1) CN104618169B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105893223A (en) * 2016-04-29 2016-08-24 乐视控股(北京)有限公司 Abnormity display method and abnormity display device
CN108681745B (en) * 2018-04-25 2020-12-25 腾讯科技(深圳)有限公司 Abnormal information identification method and device, storage medium and electronic device
CN109390040A (en) * 2018-09-17 2019-02-26 王子洋 A kind of intelligent electronic medical records system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1655525A (en) * 2004-02-10 2005-08-17 华为技术有限公司 Network supervisory system and method
CN1972210A (en) * 2006-11-21 2007-05-30 华为技术有限公司 Network monitoring method and its system
CN101197010A (en) * 2006-12-06 2008-06-11 鸿富锦精密工业(深圳)有限公司 Working flow distribution system and method
CN101582812A (en) * 2008-05-13 2009-11-18 新奥特(北京)视频技术有限公司 Monitoring and operation managing system
CN101651583A (en) * 2009-09-17 2010-02-17 杭州华三通信技术有限公司 Monitoring information management method and device
CN102226898A (en) * 2011-06-13 2011-10-26 中国有色金属长沙勘察设计研究院有限公司 Method and device for controlling monitoring data to be put in storage in online monitoring system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103326958B (en) * 2012-03-22 2017-07-04 罗普特(厦门)科技集团有限公司 Monitoring data caching method and system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1655525A (en) * 2004-02-10 2005-08-17 华为技术有限公司 Network supervisory system and method
CN1972210A (en) * 2006-11-21 2007-05-30 华为技术有限公司 Network monitoring method and its system
CN101197010A (en) * 2006-12-06 2008-06-11 鸿富锦精密工业(深圳)有限公司 Working flow distribution system and method
CN101582812A (en) * 2008-05-13 2009-11-18 新奥特(北京)视频技术有限公司 Monitoring and operation managing system
CN101651583A (en) * 2009-09-17 2010-02-17 杭州华三通信技术有限公司 Monitoring information management method and device
CN102226898A (en) * 2011-06-13 2011-10-26 中国有色金属长沙勘察设计研究院有限公司 Method and device for controlling monitoring data to be put in storage in online monitoring system

Also Published As

Publication number Publication date
CN104618169A (en) 2015-05-13

Similar Documents

Publication Publication Date Title
US10558545B2 (en) Multiple modeling paradigm for predictive analytics
CN109345377B (en) Data real-time processing system and data real-time processing method
CN105227626B (en) Content pushing method and device and terminal
EP2911060B1 (en) Method and device for determining resource leakage and for predicting resource usage state
US7684881B2 (en) Transient-sensitive indicators for HMI devices
CN104618169B (en) A kind of display methods and device of monitoring data
EP3591485B1 (en) Method and device for monitoring for equipment failure
US8341637B2 (en) Utilization management
US11512816B2 (en) Systems and methods for reporting pipeline pressures
CN104899127A (en) Monitoring method and device of server
CN102226890A (en) Monitoring method and device for host batch job data
CN107241205A (en) abnormality monitoring method and device
CN107102929A (en) The detection method and device of failure
CN105354127A (en) Cloud management platform based monitoring method
CN105373118A (en) Intelligent equipment data acquisition method
CN112445583A (en) Task management method, task management system, electronic device, and storage medium
CN103401722A (en) System and method for monitoring software resources
CN111710403A (en) Medical equipment supervision method, equipment and readable storage medium
CN116149824A (en) Task re-running processing method, device, equipment and storage medium
CN112581715B (en) Battery high-temperature alarm method, device and system
CN113419921A (en) Task monitoring method, device, equipment and storage medium
CN115099778A (en) Management and control method, system, equipment and medium for industrial manufacturing equipment
US11481298B2 (en) Computing CPU time usage of activities serviced by CPU
CN113961431A (en) Service monitoring method and device
US11516099B2 (en) Resource monitoring system, resource monitoring method, and information storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190808

Address after: 518000 Nanshan District science and technology zone, Guangdong, Zhejiang Province, science and technology in the Tencent Building on the 1st floor of the 35 layer

Co-patentee after: Tencent cloud computing (Beijing) limited liability company

Patentee after: Tencent Technology (Shenzhen) Co., Ltd.

Address before: Shenzhen Futian District City, Guangdong province 518044 Zhenxing Road, SEG Science Park 2 East Room 403

Patentee before: Tencent Technology (Shenzhen) Co., Ltd.

TR01 Transfer of patent right