CN104616709B CN201510035159.1A CN201510035159A CN104616709B CN 104616709 B CN104616709 B CN 104616709B CN 201510035159 A CN201510035159 A CN 201510035159A CN 104616709 B CN104616709 B CN 104616709B
Authority
CN
China
Prior art keywords
power
nuclear power
power units
safety
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510035159.1A
Other languages
Chinese (zh)
Other versions
CN104616709A (en
Inventor
蔡小玲
刘仁和
黄旭峰
庄雄
林红
黄玮
孙辉
翟长春
熊京川
贾文阁
谭胜盛
崔岗
张兴振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China General Nuclear Power Corp
China Nuclear Power Engineering Co Ltd
PowerChina Fujian Electric Power Engineering Co Ltd
Original Assignee
China General Nuclear Power Corp
China Nuclear Power Engineering Co Ltd
Fujian Electric Power Survey and Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China General Nuclear Power Corp, China Nuclear Power Engineering Co Ltd, Fujian Electric Power Survey and Design Institute filed Critical China General Nuclear Power Corp
Priority to CN201510035159.1A priority Critical patent/CN104616709B/en
Publication of CN104616709A publication Critical patent/CN104616709A/en
Application granted granted Critical
Publication of CN104616709B publication Critical patent/CN104616709B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21DNUCLEAR POWER PLANT
    • G21D3/00Control of nuclear power plant
    • G21D3/04Safety arrangements
    • G21D3/06Safety arrangements responsive to faults within the plant
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21DNUCLEAR POWER PLANT
    • G21D3/00Control of nuclear power plant
    • G21D3/08Regulation of any parameters in the plant
    • G21D3/12Regulation of any parameters in the plant by adjustment of the reactor in response only to changes in engine demand
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Plasma & Fusion (AREA)
  • General Engineering & Computer Science (AREA)
  • High Energy & Nuclear Physics (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Control Of Eletrric Generators (AREA)

Abstract

The invention relates to control methods of nuclear power units, particularly to a safety and stability control method based on asynchronous oscillation of nuclear power units. The method is characterized by comprising computing the asynchronous oscillation control strategy of the nuclear power units in advance, and setting the set value of the control strategy into a safety automatic device; performing generator tripping through combined control of a stream turbine side and a nuclear island side in a manner of tripping the corresponding boosting variable high-voltage side breakers of the nuclear power unit. The safety and stability control method based on asynchronous oscillation of the nuclear power units is achieved through mutual cooperation of precise starting of the safety automatic device, effective control of a steam turbine regulating system to a steam turbine and a stream turbine bypass exhaust system, and precise execution provided by a reactor control system. Compared with the prior art, the safety and stability control method based on asynchronous oscillation of nuclear power units has the advantage that, when asynchronous oscillation of the nuclear power units occur, by effectively, precisely, timely and reasonably controlling the steam turbine side and the nuclear island side, the technical problem that the nuclear power units participate safety and stability control during asynchronous oscillation can be solved, so that the nuclear power units can participate in transient-state safety and stability control and meanwhile safe and stable operation of the nuclear power units can be ensured.

Description

Security and stability control method based on nuclear power generating sets asynchronous oscillation
Technical field
The present invention relates to a kind of control method of nuclear power generating sets, particularly a kind of safety based on nuclear power generating sets asynchronous oscillation Stable control method, the security and stability control being primarily adapted for use in during the outlet circuit generation asynchronous oscillation of pressurized-water reactor nuclear power plant.
Background technology
In power system, it is ensured that the safe and stable operation of power system is a matter of the last importance.Modern electric System is improved constantly due to unit capacity, and electrical network scale constantly expands, and electric pressure is improved constantly, supertension long distance power transmission with And interconnected network is formed, make electric network composition more complicated, cause the security and stability control of modern power systems more and more difficult.
If the generated output of Large Copacity power plant can not send into load center nearby, conveyed by long distance powedr transmission passage, electricity Caused by gas distance increase, electromotor synchronizing torque or damping torque are reduced, and are broken down in circuit or other electric network elements When may result in the problem that generating set is vibrated relative to Out of step.According to《Guiding rules of power system safety and stability》DL755 Regulation, when power system occur second level safety and stability standard major break down disturb when, when generating set relative to electrical network lose Step oscillation problem occurs, if asynchronous oscillation is still suffered from after protection, switch and reclosing correct operation, the machine of cutting must be taken to arrange Apply.
As requirement of the nuclear power generating sets to safety is high, control system is complicated, generally there is safety and stability in electrical network and ask All try one's best during topic and avoid cutting off nuclear power generating sets, nuclear power generating sets all do not participate in the security and stability control of electrical network for a long time.
The part nuclear power generating sets for accessing electrical network at present also occur in that asking for asynchronous oscillation when nuclear power plant sends line fault Topic, and the pattern of asynchronous oscillation be nuclear power generating sets relative to other unit asynchronous oscillations in electrical network, must now take excision The measure of nuclear power generating sets, exerting oneself for the nuclear power generating sets of step-out is reduced to into zero safe and stable operation that just can guarantee that electrical network rapidly, And the unit for cutting off other power plant cannot also make power system restoration stable.
The security and stability control function of above-mentioned nuclear power generating sets is by automatic safety device, steam turbine control system and reaction Heap controls bar system to realize, however, when nuclear power generating sets occur asynchronous oscillation, how to adjust to automatic safety device, steam turbine Section system and reactor control rod system be controlled become with the safe and stable operation for ensureing electrical network and nuclear power generating sets it is new Technical barrier, does not propose corresponding solution in prior art.
The content of the invention
It is an object of the invention to can effectively, in time, reliably according to one kind is provided in place of the deficiencies in the prior art Security and stability control method based on nuclear power generating sets asynchronous oscillation.
The purpose of the present invention is realized by following approach:
The security and stability control method of nuclear power generating sets asynchronous oscillation, which is characterized by, and comprises the steps:
1)According to the method for operation of electrical network, including normal operating mode and various maintenance runs, by simulation calculation Obtain the security and stability control strategy definite value during forecast failure collection of its correspondence generation nuclear power generating sets asynchronous oscillation;
2)By the security and stability control strategy fixed value adjusting for being obtained in automatic safety device;
3)Automatic safety device is being judged by the electric current of monitoring nuclear power plant outlet, voltage and circuit breaker position information After line failure and meet sending out to cut machine order and jump when cutting machine condition and losing for set security and stability control strategy definite value Step unit boosts accordingly and becomes high-pressure side chopper;
4)Machine is cut by the execution that jointly controls of steamer pusher side and nuclear island side, method is as follows:
When automatic safety device by tripping step-out unit boost accordingly change high-pressure side chopper cut machine when, whole nuclear power Unit completely disengages from electrical network, Turbo-generator Set band station-service load operation;Generator outlet chopper GCB is closed, turbine generator Unit continues to generate electricity, by house transformer conveying supply station-service load;Reactor control system is automatic by reactor nucleus power Adjust in 30%Pn, control rod is inserted to reduce core power;According to the situation of islet operation, follow-up control strategy is divided into two Kind:
(1)If islet operation success --- steam turbine band station-service load operation success, core power are reduced to 30% from 100%Pn Pn low power runs, turbine by-pass exhaust system are in temp-controled mode, and the time restriction of control rod insertion is 12 hours, If unit band station-service load operation more than 12 hours, needs control rod to be carried entirely to heap top, and carries out boronation maintenance low-power Level, takes long-term low power operational mode;During low power run, unit band station-service load waits electrical network to process event Barrier, after power system restoration is normal, reactor just can power per liter, grid-connected again.
(2)Islet operation is unsuccessful --- as tripping boosting becomes on high-tension side chopper, lose main factory External power, if steam turbine band station-service load operation is unsuccessful, Main Condensate Pump will be stopped transport, and the main feedwater of steam generator will be lost;
As in nuclear power plant, two machines constitute one group of operation, when steam turbine band station-service load operation it is unsuccessful, if adjacent The main transformer of unit normally runs, and unit public load is switched to adjacent unit and is powered to reduce the load that auxiliary becomes, and passed through Auxiliary becomes a main coolant pump of the startup separator of falling power transmission unit to recover coolant forced circulation, steam generator feed water by Auxiliary feedwater system is supplied, in the case where no other accidents occur, by set steady in hot shutdown 24 hours to wait Power system restoration;
If adjacent unit main transformer is stopped transport, two unit public loads can not switch to adjacent unit and power, can only switch Power to emergency power supply;If auxiliary becomes not surpass held, two unit public loads are switched to into auxiliary and becomes power supply, and by auxiliary Wherein one main coolant pump for becoming the startup separator of falling power transmission unit is helped to recover coolant forced circulation, steam generator feedwater Supplied by auxiliary feedwater system;In the case where no other accidents occur, by set steady hot shutdown 24 hours so as to etc. Treat power system restoration;
If adjacent unit main transformer is stopped transport, and auxiliary transformer also surpasses appearance, and the main coolant pump of failure unit can not start, Primary Ioops keep Natural Circulation, steam generator feedwater to be supplied by auxiliary feedwater system;As primary Ioops lose forced circulation, this When set steady hot shutdown condition time be 2 hours;In 2 hours, electrical network does not recover, and carries out Core cooling, and continue etc. Treat power system restoration;
Electrical network is waited to process failure, the normal reactor afterwards of power system restoration just can power per liter, grid-connected again.
Asynchronous oscillation control strategy of the present invention by calculated in advance nuclear power generating sets, and control strategy setting valve is arranged on In automatic safety device, when there is asynchronous oscillation in nuclear power generating sets by steamer pusher side and nuclear island side it is effective, accurate, and When, rationally control, taken into full account the control condition of automatic safety device, steam turbine control system and reactor control rod system And control program, the technical barrier of security and stability control is participated in when solving nuclear power generating sets asynchronous oscillation, is participated in nuclear power generating sets Electrical network transient safe and stable ensure that the safe and stable operation of nuclear power generating sets while control.
Description of the drawings
Fig. 1 show the schematic flow sheet of the security and stability control method of nuclear power generating sets asynchronous oscillation of the present invention;
Fig. 2 show described in the embodiment of the present invention jump step-out unit boost accordingly change high-pressure side chopper cut nuclear power generating sets (Islet operation success)Control flow chart;
Fig. 3 show described in the embodiment of the present invention by jump step-out unit boost accordingly change high-pressure side chopper cut nuclear power Unit(Islet operation is unsuccessful)Control flow.
The present invention is described further with reference to embodiment.
Specific embodiment
Most preferred embodiment:
The present invention provides a kind of security and stability control method of nuclear power generating sets asynchronous oscillation, the peace of nuclear power generating sets asynchronous oscillation Full stable control process schematic diagram is as shown in figure 1, comprise the following steps:
Step one:Calculate asynchronous oscillation security and stability control strategy definite value:Based on the various possible methods of operation of electrical network, wrap Normal operating mode and various maintenance runs are included, the forecast failure collection for nuclear power generating sets asynchronous oscillation may occur is calculated Corresponding security and stability control strategy definite value;
Step 2:By security and stability control strategy fixed value adjusting in automatic safety device;
Step 3:Automatic safety device passes through to monitor the information such as electric current, voltage and the circuit breaker position of nuclear power plant's outlet, After judging line failure and meet Policy Table when cutting machine condition send out cut machine order jump step-out unit boost accordingly Become high-pressure side chopper;
Step 4:Machine is cut by the execution that jointly controls of steamer pusher side and nuclear island side, its mode is by tripping step-out Unit boost accordingly become high-pressure side chopper mode carry out cutting machine.
Wherein it is by way of tripping unit boosts change high-pressure side chopper accordingly to carry out the control flow for cutting machine such as Fig. 2, shown in 3, its main control process is as follows:
When automatic safety device becomes high-pressure side chopper by tripping boosting cuts machine, whole nuclear power generating sets completely disengage from electricity Net, Turbo-generator Set band station-service load operation.GCB is closed, and Turbo-generator Set can continue to generate electricity, by house transformer Conveying supply station-service load.As steam turbine load declines to a great extent, unnecessary steam is arranged by turbine by-pass exhaust system action Toward condenser.Control rod is inserted to reduce core power by reactor nucleus power automatic adjusting in 30%Pn.According to islet operation Situation, follow-up control strategy are divided into two kinds:
(1) if islet operation success --- steam turbine band station-service load operation success, core power are reduced to 30% from 100%Pn Pn low power runs, turbine by-pass exhaust system are in temp-controled mode, and its control flow chart is as shown in Figure 2.Control rod The time restriction of insertion is 12 hours, if unit band station-service load operation more than 12 hours, needs control rod to be carried entirely to heap Top, and boronation maintenance lower power levels are carried out, take long-term low power operational mode.Either control rod insertion still adopts boron Change and maintain low power run, during low power run, unit band station-service load waits electrical network to process failure, and power system restoration is just After often, reactor just can power per liter, grid-connected again.If there is other accidents during low power run, into NS/ RRA patterns (NS is cooling normal shutdown pattern, and RRA is reactor RHR system), carry out Core cooling.
(2) islet operation is unsuccessful --- as tripping boosting becomes on high-tension side chopper, lose main factory External power, if steam turbine band station-service load operation is unsuccessful, Main Condensate Pump will be stopped transport, and the main feedwater of steam generator will be lost, its Control flow chart is as shown in Figure 3.
In nuclear power plant, two machines constitute one group of operation, and part station-service load is that two units are public.If steam turbine band factory It is unsuccessful with load operation, if the main transformer of adjacent unit normally runs, two unit public loads can be switched to adjacent machine Group power supply is to reduce the load that auxiliary becomes, and becomes a main coolant pump of the startup separator of falling power transmission unit to recover by auxiliary Coolant forced circulation, steam generator feedwater are supplied by auxiliary feedwater system.In the case where no other accidents occur, will Set steady is in hot shutdown 24 hours to wait power system restoration.If electrical network in 24 hours does not recover, unit will be into NS/ RRA patterns, carry out Core cooling, and continue waiting for power system restoration.
If adjacent unit main transformer is stopped transport, two unit public loads can not switch to adjacent unit and power, can only switch Power to emergency power supply.If auxiliary becomes not surpass held, two unit public loads are switched to into auxiliary and becomes power supply, and by auxiliary Wherein one main coolant pump for becoming the startup separator of falling power transmission unit is helped to recover coolant forced circulation, steam generator feedwater Supplied by auxiliary feedwater system.In the case where no other accidents occur, by set steady hot shutdown 24 hours so as to etc. Treat power system restoration.If electrical network in 24 hours does not recover, unit will carry out Core cooling into NS/RRA patterns, and continue etc. Treat power system restoration.
If adjacent unit main transformer is stopped transport, and auxiliary transformer also surpasses appearance, and the main coolant pump of failure unit can not start, Primary Ioops keep Natural Circulation, steam generator feedwater to be supplied by auxiliary feedwater system;As primary Ioops lose forced circulation, this When set steady hot shutdown condition time be 2 hours, in 2 hours electrical network do not recover then enter NS/RRA patterns, carry out heap Core is cooled down, and continues waiting for power system restoration.
Electrical network is waited to process failure, the normal reactor afterwards of power system restoration just can power per liter, grid-connected again.
The not described part of the present invention is same as the prior art.

Claims (1)

1. the security and stability control method based on nuclear power generating sets asynchronous oscillation, it is characterised in that comprise the steps:
1)According to the method for operation of electrical network, including normal operating mode and various maintenance runs, obtain its correspondence and core occurs Security and stability control strategy definite value during the forecast failure collection of group of motors asynchronous oscillation;
2)By the security and stability control strategy fixed value adjusting for being obtained in automatic safety device;
3)Automatic safety device is judging circuit by the electric current of monitoring nuclear power plant outlet, voltage and circuit breaker position information After breaking down and meet sending out when cutting machine condition for set security and stability control strategy definite value and cut machine order, jump step-out machine The corresponding boosting of group becomes high-pressure side chopper;
4)Machine is cut by the execution that jointly controls of steamer pusher side and nuclear island side, method is as follows:
When automatic safety device becomes high-pressure side chopper by tripping boosting cuts machine, whole nuclear power generating sets completely disengage from electrical network, Turbo-generator Set band station-service load operation;Generator outlet chopper GCB is closed, and Turbo-generator Set continues to generate electricity, and passes through House transformer conveying supply station-service load;Reactor nucleus power automatic adjusting in 30%Pn, will be controlled by reactor control system Rod inserts to reduce core power;According to the situation of islet operation, follow-up control strategy is divided into two kinds:
(1) if islet operation success --- steam turbine band station-service load operation success, it is low that core power is reduced to 30%Pn from 100%Pn Power operation, turbine by-pass exhaust system are in temp-controled mode, and the time restriction of control rod insertion is 12 hours, if Unit band station-service load operation more than 12 hours, then need control rod to be carried entirely to heap top, and carries out boronation maintenance lower power levels, Take long-term low power operational mode;During low power run, unit band station-service load waits electrical network to process failure, electrical network Recover it is normal after reactor just can power per liter, grid-connected again;
(2) islet operation is unsuccessful --- as tripping boosting becomes on high-tension side chopper, lose main factory's dispatch from foreign news agency Source, if steam turbine band station-service load operation is unsuccessful, Main Condensate Pump will be stopped transport, and the main feedwater of steam generator will be lost;
As in nuclear power plant, two machines constitute one group of operation, when steam turbine band station-service load operation it is unsuccessful, if adjacent unit Main transformer normally run, unit public load is switched to into adjacent unit and is powered to reduce the load of auxiliary transformer, and By a main coolant pump of the auxiliary transformer startup separator of falling power transmission unit recovering coolant forced circulation, steam generation Device feedwater is supplied by auxiliary feedwater system, in the case where no other accidents occur, by set steady in hot shutdown 24 hours To wait power system restoration;
If adjacent unit main transformer is stopped transport, two unit public loads can not switch to adjacent unit and power, can only switch Power to emergency power supply;If auxiliary transformer does not surpass and holds, two unit public loads are switched to into auxiliary transformer and are powered, And steamed with recovering coolant forced circulation by wherein one main coolant pump of the auxiliary transformer startup separator of falling power transmission unit Vapour generator feedwater is supplied by auxiliary feedwater system;In the case where no other accidents occur, by set steady in hot shutdown 24 hours to wait power system restoration;
If adjacent unit main transformer is stopped transport, and auxiliary transformer also surpasses appearance, and the main coolant pump of failure unit can not start, Primary Ioops keep Natural Circulation, steam generator feedwater to be supplied by auxiliary feedwater system;As primary Ioops lose forced circulation, this When set steady hot shutdown condition time be 2 hours;In 2 hours, electrical network does not recover, and carries out Core cooling, and continue etc. Treat power system restoration;
Electrical network is waited to process failure, the normal reactor afterwards of power system restoration just can power per liter, grid-connected again.
CN201510035159.1A 2015-01-23 2015-01-23 Safety and stability control method based on asynchronous oscillation of nuclear power units Active CN104616709B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510035159.1A CN104616709B (en) 2015-01-23 2015-01-23 Safety and stability control method based on asynchronous oscillation of nuclear power units

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510035159.1A CN104616709B (en) 2015-01-23 2015-01-23 Safety and stability control method based on asynchronous oscillation of nuclear power units

Publications (2)

Publication Number Publication Date
CN104616709A CN104616709A (en) 2015-05-13
CN104616709B true CN104616709B (en) 2017-04-26

Family

ID=53151126

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510035159.1A Active CN104616709B (en) 2015-01-23 2015-01-23 Safety and stability control method based on asynchronous oscillation of nuclear power units

Country Status (1)

Country Link
CN (1) CN104616709B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108155653A (en) * 2016-12-06 2018-06-12 苏州热工研究院有限公司 A kind of stability control equipment auxiliary control method and system for nuclear power plant
CN109147976A (en) * 2017-06-16 2019-01-04 苏州热工研究院有限公司 A kind of stability control equipment applied to nuclear power station cuts machine method
CN107845436B (en) * 2017-09-27 2023-11-14 中国核电工程有限公司 Remote shutdown station control method for main control room of pressurized water reactor nuclear power plant when not being resident
CN113936830A (en) * 2021-09-22 2022-01-14 广东核电合营有限公司 Nuclear power plant generator set state control method and electronic equipment

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001147294A (en) * 1999-11-24 2001-05-29 Hitachi Ltd Power generator facility
EP1438724A1 (en) * 2001-10-11 2004-07-21 Pebble Bed Modular Reactor (Proprietary) Limited A method of operating a nuclear power plant
US7961835B2 (en) * 2005-08-26 2011-06-14 Keller Michael F Hybrid integrated energy production process
CN103166249B (en) * 2011-12-14 2016-03-16 深圳市康必达中创科技有限公司 A kind of rapid combination system safety stable control method
CN203118515U (en) * 2012-09-25 2013-08-07 上海发电设备成套设计研究院 Pressurized water reactor nuclear power plant conventional island adapted for peak load regulation of power grid
CN103595127B (en) * 2013-09-18 2015-05-06 中国海洋石油总公司 Intelligent control method for offshore petroleum platform power grid

Also Published As

Publication number Publication date
CN104616709A (en) 2015-05-13

Similar Documents

Publication Publication Date Title
CN104633638B (en) The integrated control method of the shutdown not blowing out function of power plant FCB
CN104616709B (en) Safety and stability control method based on asynchronous oscillation of nuclear power units
CN103730906B (en) A kind of control method for coordinating suppressing Hybrid HVDC commutation failure
CN107465255B (en) A kind of Turbo-generator Set accident starting auxiliary Power switching method and system
CN102035217B (en) Control method for actively preventing simultaneous low-voltage tripping of sets in wind power field
CN105703401A (en) Emergency control method suitable for wind/photovoltaic power station
CN104795113B (en) A kind of chaser to nuclear power station unit station jumps the method and system that heap carries out risk assessment
CN112628711A (en) Auxiliary engine fault stable combustion control method based on 600MW supercritical unit low load
CN104637558B (en) Safe and stable control method for asynchronous oscillation of nuclear power unit
CN108134404B (en) Wind power generating set high voltage crossing control method and device
CN206195453U (en) Million units do not have high -pressure stand -by power supply's quick recovering start -up system
CN105863745B (en) The control method of shunt tripping steam turbine during a kind of grid-connected transformer unit gate out switch tripping operation
CN107171288A (en) A kind of fired power generating unit zero energy protects system and method
Venmathi et al. Impact of grid connected distributed generation on voltage sag
CN107492913A (en) Isolated network power station PMS power management systems
CN111934326A (en) Method and system for coordinately controlling high voltage ride through of wind generating set
CN114019372A (en) First loading capacity check test method for emergency security diesel generator of thermal power plant
CN113658733A (en) Control system device of nuclear turbine and control method thereof
Shi et al. Study on the faults of nuclear power plant and effects on transient stability of power system
JP2005201834A (en) Nuclear power plant and method for operating it
JP2016059168A (en) Bus voltage stabilizer
CN206922422U (en) A kind of single line of power plant sends out line fault protection system
CN111384707A (en) Supplementary trip device and method for ultrahigh-voltage combined switching station of nuclear power plant
CN109193806A (en) A method of for assessing generator loss-of-excitation protection and electric network coordination relationship
CN112350333B (en) Control method and device suitable for FCB triggering under isolated network operation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Cai Xiaoling

Inventor after: Jia Wenge

Inventor after: Tan Shengsheng

Inventor after: Cui Gang

Inventor after: Zhang Xingzhen

Inventor after: Liu Renhe

Inventor after: Huang Xufeng

Inventor after: Zhuang Xiong

Inventor after: Lin Hong

Inventor after: Huang Wei

Inventor after: Sun Hui

Inventor after: Di Changchun

Inventor after: Xiong Jingchuan

Inventor before: Cai Xiaoling

Inventor before: Liu Renhe

Inventor before: Huang Xufeng

Inventor before: Zhuang Xiong

Inventor before: Lin Hong

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20170126

Address after: 350003 Gulou District, Fujian, Fuzhou No. 54 Road, No. 268

Applicant after: Fujian Electric Power Survey and Design Institute

Applicant after: China General Nuclear Power Corporation

Applicant after: China Nuclear Power Engineering Co., Ltd.

Address before: 350003 Gulou District, Fujian, Fuzhou No. 54 Road, No. 268

Applicant before: Fujian Electric Power Survey and Design Institute

GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 350003 Gulou District, Fujian, Fuzhou No. 54 Road, No. 268

Co-patentee after: China General Nuclear Power Corporation

Patentee after: China Electric Power Construction Group Fujian electric survey and Design Institute Co., Ltd.

Co-patentee after: China Nuclear Power Engineering Co., Ltd.

Address before: 350003 Gulou District, Fujian, Fuzhou No. 54 Road, No. 268

Co-patentee before: China General Nuclear Power Corporation