CN104612101B - Beach method and special water-permeable pipe are supported in a kind of water-permeable pipe sandy beach - Google Patents
Beach method and special water-permeable pipe are supported in a kind of water-permeable pipe sandy beach Download PDFInfo
- Publication number
- CN104612101B CN104612101B CN201410803562.XA CN201410803562A CN104612101B CN 104612101 B CN104612101 B CN 104612101B CN 201410803562 A CN201410803562 A CN 201410803562A CN 104612101 B CN104612101 B CN 104612101B
- Authority
- CN
- China
- Prior art keywords
- permeable
- pipe
- beach
- permeable pipe
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
本发明提出一种透水管沙滩养滩方法及专用透水管。所述透水管包括管体,管体四周设有透水缝,管体上端设有管帽,管帽中间留有透气孔,透气孔用防沙多孔材料封堵。透水管管体和管帽材质均为PVC。透水管沙滩养滩方法是将透水管(平行或交错)间隔布置在波浪破碎带至波浪最高爬高线之间。本发明的主要施工工艺包括:测量定位、开挖坑槽、打入钢套管、连接抽沙水泵、抽沙、放置透水管、拔出钢套管和回填覆盖。本发明的主要优点:透水管养滩方法施工简单方便,初期投入小,且后期维护成本低。沙滩透水管埋入沙滩中,无其他辅助工程措施,不会破坏原有沙滩的自然美感和亲水环境,极大地提高了海滨地区的旅游资源价值。
The invention provides a permeable pipe beach maintenance method and a special permeable pipe. The permeable pipe includes a pipe body, the pipe body is surrounded by water-permeable joints, the upper end of the pipe body is provided with a pipe cap, and a vent hole is left in the middle of the pipe cap, and the vent hole is blocked with a sand-proof porous material. The permeable pipe body and cap are made of PVC. The permeable pipe beach maintenance method is to arrange permeable pipes (parallel or staggered) at intervals between the wave breaking zone and the highest wave climbing line. The main construction process of the present invention includes: measuring and positioning, excavating pits, driving steel casings, connecting sand pumps, pumping sand, placing permeable pipes, pulling out steel casings and backfilling. The main advantages of the present invention are that the construction of the permeable pipe beach raising method is simple and convenient, the initial investment is small, and the later maintenance cost is low. The beach permeable pipe is buried in the beach without other auxiliary engineering measures, which will not damage the natural beauty and hydrophilic environment of the original beach, and greatly improves the value of tourism resources in the seaside area.
Description
技术领域 technical field
本发明属于海岸保护工程技术领域,涉及一种沙滩保护和养滩技术,尤其是利用透水管进行沙滩养滩的方法。 The invention belongs to the technical field of coast protection engineering, and relates to a beach protection and beach maintenance technology, in particular to a method for beach maintenance by using permeable pipes.
背景技术 Background technique
随着全球气候的变化和人类活动的加剧,海岸侵蚀已成为了世界性的灾害。据政府间气候变化专业委员会估计,世界上70%的砂质海岸正在遭受侵蚀。由于我国大部分海岸线属于砂质海岸,因此海岸侵蚀十分严重,平均岸线蚀退率大于1.1m/a,局部达到5.5m/a或更大。现有的沙滩养滩技术主要是通过向海滩大量抛沙,并同时建造一字坝、丁坝等硬工程,促使受蚀海滩增宽和稳定。传统的养滩技术从一定程度上解决了沙滩侵蚀的问题,但也存在明显的不足。一方面大量的人工抛沙和硬工程措施需要极大的资金投入,而且后期根据侵蚀情况需要定期进行人工补沙,维护成本高;另一方面突出水面的一字坝、丁坝等硬工程措施破坏了沙滩的自然美感和亲水环境,降低了海滨地区的旅游资源价值。 With the change of global climate and the intensification of human activities, coastal erosion has become a worldwide disaster. The Intergovernmental Panel on Climate Change estimates that 70 percent of the world's sandy coasts are eroding. Since most coastlines in my country are sandy coasts, coastal erosion is very serious. The average coastline erosion rate is greater than 1.1m/a, and locally reaches 5.5m/a or more. The existing beach maintenance technology is mainly to widen and stabilize the eroded beach by throwing a large amount of sand to the beach and building hard works such as dike dams and spur dams at the same time. The traditional beach raising technology has solved the problem of beach erosion to a certain extent, but there are also obvious deficiencies. On the one hand, a large number of artificial sand throwing and hard engineering measures require a huge amount of capital investment, and in the later stage according to the erosion situation, artificial sand replenishment needs to be carried out regularly, and the maintenance cost is high; The natural beauty of the beach and the hydrophilic environment have been reduced, and the value of tourism resources in the seaside area has been reduced.
发明内容 Contents of the invention
本发明的目的是为了解决传统养滩技术的不足,提出了一种透水管沙滩养滩方法以及专用透水管。此方法特别适合于侵蚀型砂质海岸的保护。 The object of the present invention is to solve the deficiency of the traditional technology of raising beaches, and propose a method of raising beaches with permeable pipes and special permeable pipes. This method is especially suitable for the protection of erosion-type sandy coasts.
本发明提供的沙滩养滩专用透水管包括管体,管体四周设有透水缝,管体上端设有管帽,管帽中间留有透气孔,透气孔用防沙多孔材料封堵。所述透水管管体四周的透水缝为水平透水缝。所述水平透水缝成组设置,各组之间沿轴向和周向均留有间隔。所述的管体和管帽为PVC材质,管帽通过螺纹与透水管管体连接。 The water-permeable pipe specially used for beach maintenance provided by the invention includes a pipe body with water-permeable joints around the pipe body and a pipe cap on the upper end of the pipe body. There is a vent hole in the middle of the pipe cap, and the vent hole is blocked with a sand-proof porous material. The permeable joints around the body of the permeable pipe are horizontal permeable joints. The horizontal permeable joints are arranged in groups, and intervals are left between each group along the axial direction and the circumferential direction. The pipe body and the pipe cap are made of PVC, and the pipe cap is connected with the permeable pipe body through threads.
本发明提供的透水管沙滩养滩方法是,在波浪破碎带至波浪最高爬高线之间间隔布置所述的透水管。所述的透水管可以平行布置,也可以交错布置。 The permeable pipe beach maintenance method provided by the present invention is to arrange the permeable pipes at intervals between the wave breaking zone and the highest wave climbing line. The permeable pipes can be arranged in parallel or in a staggered manner.
本发明方法的主要施工工艺包括:测量定位、开挖坑槽、打入钢套管、连接抽沙水泵、抽沙、放置透水管、拔出钢套管和回填覆盖。 The main construction process of the method of the invention includes: measuring and positioning, excavating pits, driving steel casings, connecting sand pumps, pumping sand, placing permeable pipes, pulling out steel casings and backfilling.
本发明相对于传统的养滩措施具有以下优点和效果:The present invention has the following advantages and effects relative to traditional measures for raising beaches:
透水管沙滩养滩方法施工简单方便,初期投入小,且后期维护成本很低。 The permeable pipe beach maintenance method is simple and convenient in construction, with small initial investment and low maintenance cost in the later period.
沙滩透水管埋入沙滩中,无其他辅助工程措施,不会破坏原有沙滩的自然美感和亲水环境,极大地提高了海滨地区的旅游资源价值。 The beach permeable pipe is buried in the beach without other auxiliary engineering measures, which will not damage the natural beauty and hydrophilic environment of the original beach, and greatly improves the value of tourism resources in the seaside area.
附图说明 Description of drawings
图1是本发明中透水管的立面示意图。 Fig. 1 is a schematic elevation view of a permeable pipe in the present invention.
图2是本发明中透水管的展开示意图。 Fig. 2 is a schematic diagram of the expansion of the permeable pipe in the present invention.
图3是本发明中透水管管帽俯视图。 Fig. 3 is a top view of the permeable pipe cap in the present invention.
图4是本发明中透水管管帽侧视图 Fig. 4 is a side view of the permeable pipe cap in the present invention
图5是透水管在沙滩中的立面布置图。 Fig. 5 is an elevation layout diagram of the permeable pipes in the beach.
图6是透水管工作原理示意图。 Fig. 6 is a schematic diagram of the working principle of the permeable pipe.
图7是透水管在沙滩上平行布置的平面图。 Fig. 7 is a plan view of permeable pipes arranged in parallel on the beach.
图8是透水管在沙滩上交错布置的平面图。 Fig. 8 is a plane view of permeable pipes arranged in a staggered manner on the beach.
图中的附图标号为:透水管管帽1;透水管中的透水缝2;管帽透气孔3;埋设后的透水管4;波浪来向5;波浪爬高最大位置6;沙滩7;垂直下渗8;海水浸润面9。 The reference numerals in the figure are: the permeable pipe cap 1; the permeable seam 2 in the permeable pipe; the cap air hole 3; the buried permeable pipe 4; the wave direction 5; the maximum wave climbing position 6; the beach 7; Vertical infiltration 8; seawater infiltration surface 9.
具体实施方式 detailed description
下面参照附图对本发明进一步说明。 The present invention will be further described below with reference to the accompanying drawings.
实施例1、透水管 Embodiment 1, permeable pipe
如图1所示,透水管包括带透水缝2的PVC圆管管体和PVC管帽1,圆管直径150~300mm,长度为2~3m,管身设有水平透水缝,缝宽0.3mm。 As shown in Figure 1, the permeable pipe consists of a PVC round pipe body with a permeable joint 2 and a PVC pipe cap 1. The diameter of the round pipe is 150-300 mm and the length is 2-3 m. The pipe body is provided with a horizontal permeable joint with a width of 0.3 mm. .
如图2所示,所述水平透水缝成组设置,各组之间沿轴向和周向均留有间隔。 As shown in FIG. 2 , the horizontal permeable joints are arranged in groups, and intervals are left between each group along the axial direction and the circumferential direction.
如图3和图4所示,透水管管帽1上设有透气孔3,透气孔采用多孔材料封堵,保证透气不透沙。 As shown in Figures 3 and 4, the cap 1 of the water permeable pipe is provided with a vent hole 3, and the vent hole is blocked with a porous material to ensure ventilation and impermeable sand.
实施例2、透水管沙滩养滩方法 Embodiment 2, method for raising beach on permeable pipe beach
如图5至8所示,该方法是将透水管主要(垂直)布置在波浪破碎带至波浪最高爬高线之间。所述的透水管可以平行布置(如图7所示),也可以交错布置(如图8所示)。 As shown in Figures 5 to 8, the method is to arrange the permeable pipes mainly (vertically) between the wave breaking zone and the highest wave climbing line. The permeable pipes can be arranged in parallel (as shown in FIG. 7 ) or staggered (as shown in FIG. 8 ).
本发明方法的主要施工工艺包括:测量定位、开挖坑槽、打入钢套管、连接抽沙水泵、抽沙、放置透水管、拔出钢套管和回填覆盖。 The main construction process of the method of the invention includes: measuring and positioning, excavating pits, driving steel casings, connecting sand pumps, pumping sand, placing permeable pipes, pulling out steel casings and backfilling.
透水管沙滩养滩方法的主要原理是:涨潮时海水携带泥沙涌向沙滩,此时的沙滩湿润而不饱和,大量的海水通过透水管快速流入沙滩内部,海水携带的泥沙沉积在透水管周围,由于透水管的存在,涨潮时沉积在沙滩上的沙料要多于落潮时海水带走的沙料,从而使沙滩慢慢淤积,达到沙滩养滩修复的目的。 The main principle of the permeable pipe beach maintenance method is: when the tide is high, the seawater carries sediment to the beach. At this time, the beach is wet and not saturated. A large amount of seawater quickly flows into the beach through the permeable pipe, and the sediment carried by the seawater is deposited in the permeable pipe. Surroundings, due to the existence of permeable pipes, the amount of sand deposited on the beach during high tide is greater than that taken away by sea water during ebb tide, so that the beach is slowly silted up to achieve the purpose of beach maintenance and restoration.
应用实例1 Application example 1
在交通运输部天津水运工程科学研究院的某水槽中进行透水管沙滩养滩物理模型试验。对不安装透水管的沙滩进行连续的波浪作用,待沙滩坡面稳定后,记录下稳定断面形态,并将四根透水管用沙均匀固定在斜坡淤积段(如图5和图6所示)。在相同的波浪条件下继续进行试验直至沙滩坡面稳定。对比布置透水管前后的沙滩坡面可知,布置透水管后,沙滩的冲涮位置前移约45.0cm,最大淤积高度比布管前高出1.9cm,从而达到了沙滩养滩的目的。 A physical model test of permeable pipe beach cultivation was carried out in a tank of Tianjin Academy of Water Transport Engineering Science, Ministry of Transport. Continuous wave action is performed on the beach without permeable pipes. After the slope of the beach is stabilized, the stable section shape is recorded, and four permeable pipes are evenly fixed on the slope sedimentation section with sand (as shown in Figure 5 and Figure 6). Continue the test under the same wave conditions until the beach slope stabilizes. Comparing the slope of the beach before and after the arrangement of permeable pipes, it can be seen that after the arrangement of permeable pipes, the flushing position of the beach is moved forward by about 45.0cm, and the maximum sedimentation height is 1.9cm higher than before the arrangement of pipes, thus achieving the purpose of beach maintenance.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410803562.XA CN104612101B (en) | 2014-12-23 | 2014-12-23 | Beach method and special water-permeable pipe are supported in a kind of water-permeable pipe sandy beach |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410803562.XA CN104612101B (en) | 2014-12-23 | 2014-12-23 | Beach method and special water-permeable pipe are supported in a kind of water-permeable pipe sandy beach |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN104612101A CN104612101A (en) | 2015-05-13 |
| CN104612101B true CN104612101B (en) | 2016-02-10 |
Family
ID=53146730
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410803562.XA Active CN104612101B (en) | 2014-12-23 | 2014-12-23 | Beach method and special water-permeable pipe are supported in a kind of water-permeable pipe sandy beach |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104612101B (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106978794B (en) * | 2017-05-25 | 2019-08-06 | 河海大学 | A method for repairing degraded riparian zone using bionic plants |
| CN110725274A (en) * | 2019-10-25 | 2020-01-24 | 交通运输部天津水运工程科学研究所 | A buried special sand protection pipe for beach maintenance and sand protection and a method for beach maintenance and protection |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE20107201U1 (en) * | 2001-04-26 | 2001-09-13 | Behrendt, Rudi, 24226 Heikendorf | Sand trap / breakwater |
| CN102758417A (en) * | 2012-07-30 | 2012-10-31 | 黄海宽 | Method for water control and farmland building for environmental protection through water and soil separation and water and soil separation structure |
-
2014
- 2014-12-23 CN CN201410803562.XA patent/CN104612101B/en active Active
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE20107201U1 (en) * | 2001-04-26 | 2001-09-13 | Behrendt, Rudi, 24226 Heikendorf | Sand trap / breakwater |
| CN102758417A (en) * | 2012-07-30 | 2012-10-31 | 黄海宽 | Method for water control and farmland building for environmental protection through water and soil separation and water and soil separation structure |
Also Published As
| Publication number | Publication date |
|---|---|
| CN104612101A (en) | 2015-05-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103031836B (en) | A kind of method of building road on new hydraulically filled sludge ground fast | |
| CN102518114B (en) | Groundwater recharge and infiltration promoting method | |
| CN103122635B (en) | Foundation pit confined water resistant system and uprush stability judging method thereof | |
| CN102900097B (en) | Reverse filtering layer device for assisting in mounting suction barrel-shaped foundation applied to silt seabed and method for mounting barrel-shaped foundation | |
| CN104264624B (en) | A kind of checked-up lake is built canals the method for earial drainage | |
| CN112081125A (en) | Bottom sealing structure and construction technology of foundation pit in submerged sand and pebble stratum | |
| CN104612101B (en) | Beach method and special water-permeable pipe are supported in a kind of water-permeable pipe sandy beach | |
| CN103643690A (en) | Deep foundation pit exploration hole water burst treatment method | |
| CN101413277A (en) | Method for correcting incline of deep layer drill silt squeezing and soil discharging | |
| CN205077512U (en) | High slope protective structure of office area | |
| CN105421498B (en) | A kind of foundation ditch water-impervious and subsidence control method based on three-dimensional curtain gang of wells system | |
| CN102286961B (en) | Overflow dam for waste tires | |
| CN203768987U (en) | Shoreside water intake device for nuclear power plant | |
| CN204401638U (en) | A kind of foundation pit waterproof curtain wall | |
| CN207727520U (en) | Vacuum electroosmosis well point reduces the device of earth and rockfill dam saturation | |
| CN103898915A (en) | Anti-floating and waterstop construction method for small-area deep foundation pit of building | |
| CN204825787U (en) | Gabion barricade protective structure | |
| CN203429651U (en) | Ultra-large type deep foundation pit drainage system applied to littoral facies geological stratification area | |
| CN207176628U (en) | A kind of earth and rockfill dam impervious watertight structure | |
| CN204921033U (en) | A prevent drainage system for tunnel just props up construction stage | |
| WO2024174557A1 (en) | System for rapid desalination of sandy soil blown into dike at estuary before planting green plants | |
| CN205077478U (en) | Drainage structures for soft soil foundation | |
| CN103703886A (en) | A Moderate Shallow Well Method for Prevention and Control of Salinization | |
| CN204690683U (en) | A kind of ecology type of choking water protects beach structure | |
| CN205012318U (en) | Soft soil foundation treatment device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |