CN104597298A - Intelligent substation vector test combination box - Google Patents

Intelligent substation vector test combination box Download PDF

Info

Publication number
CN104597298A
CN104597298A CN201510067388.1A CN201510067388A CN104597298A CN 104597298 A CN104597298 A CN 104597298A CN 201510067388 A CN201510067388 A CN 201510067388A CN 104597298 A CN104597298 A CN 104597298A
Authority
CN
China
Prior art keywords
box
cable
intelligent substation
vector test
crank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510067388.1A
Other languages
Chinese (zh)
Inventor
陈乐�
沈淼
汪雷
吴兴龙
宋毅
张磊
邹东升
项忠华
董国威
邵涤球
付阳
周宗学
徐照民
宋根华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Xuancheng Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Xuancheng Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Xuancheng Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510067388.1A priority Critical patent/CN104597298A/en
Publication of CN104597298A publication Critical patent/CN104597298A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to the technical field of tool boxes, in particular to an intelligent substation vector test combination box including a cable box and an instrument box which are assembled in matched and buckled manners. The instrument box comprises a box body and a box cover, the box body is attracted to the vertical metal wall through a bottom magnet, and the box body is provided with a volt ampere meter accommodating box, a tool accommodating box and a clamp-shaped current transformer accommodating box inside; the cable box is provided with a cable coil which is provided with a crank and which is used for winding a voltage test cable, the crank extends out of the cable box, the cable coil in the cable box can be rotated by moving the crank, handle positions are arranged on left and right sides of the cable box, one side of the cable box is provided with a penetrating hole in the axial direction of the cable coil, the voltage text cable penetrates the penetrating hole, and one side of the cable box provided with the crank is further provided with a wiring post. The intelligent substation vector test combination box has the advantages that the vector test procedure is simplified effectively, the power conducting time is shortened, and the personnel safety is guaranteed.

Description

Intelligent substation vector test combination box
Technical field
The invention relates to tool box technical field, particularly relates to intelligent substation vector test combination box.
Background technology
Vector test is the final tache that equipment power transmission is newly thrown by transformer station, for detecting the correctness (comprising the effective value of current/voltage, phase place, phase sequence) of current/voltage circuit connection, prevents the malfunction of protective relaying device.The electric current of conventional substation needed for vector test, voltage data amount are all integrated on the protection screen of secondary chamber; vector test is comparatively simple, and testing crew only need carry phase meter usually, current testing line, two shorter voltage test lines can complete test.And the current/voltage analog quantity of intelligent substation is positioned in outdoor different intelligent terminal control cabinet, and different interval switch board is distant, by long-distance cable, bus reference voltage need be delivered to measurement interval when carrying out vector test, complex operation, waste time and energy, and when passing through charged interval, there is larger danger.
Summary of the invention
The object of the invention is avoid above-mentioned weak point of the prior art and provide a kind of intelligent substation vector test combination box, to simplify vector test flow process, shortens the time of power transmission, ensures the safety of personnel.
The object of the invention is achieved through the following technical solutions:
Provide intelligent substation vector test combination box, described combination box integral insulation, a body weight for humans can be born, stool can be worked as use, it comprises bottom and arranges the instrument box that the cable box of universal wheel and top arrange handle, instrument box can mate the top that fastens and be arranged on cable box to be combined into described combination box, preferably, the cross sectional shape size of described cable box and the cross sectional shape of described instrument box measure-alike.
Instrument box comprises casing and the case lid detachably hinged with casing, the inner side of described case lid is preferably provided with tool bag, casing, by being arranged at magnet adsorption bottom it in vertical metallic walls, is provided with volt ampere meter receiver, Tool storage kit and split core type current transformer receiver in casing.
Preferably, described volt ampere meter receiver is dismountable to be arranged in described casing, described volt ampere meter receiver is by being arranged at magnet adsorption bottom it in vertical metallic walls, realize the hand-held of three-phase phase volt ampere meter and the use of fixed dual-purpose formula, three-phase phase volt ampere meter is applicable to the vector test work of traditional transformer station simultaneously, and type of service is flexible, applicability is strong.Tool storage kit and split core type current transformer receiver are fixedly installed in described casing.Three-phase phase volt ampere meter apparent size 230 × 125 × 43mm placed in volt ampere meter receiver, Tool storage kit is for placing some findings such as current testing line, and described split core type current transformer receiver is set side by side with three split core type current transformer standing grooves.
Preferably, in described case lid, volt ampere meter receiver, Tool storage kit and split core type current transformer receiver, all pad is provided with foam to protect instrument.
Universal wheel bottom cable box is the universal wheel of strap brake, is divided into corner bottom cable box.Be provided with in cable box band crank, for being wound around the cable disk of voltage test line, described crank extends to outside cable box, cable box inner cable drum is rotatably positioned at by shake crank, the left and right sides of cable box is provided with handle position, the wherein side of cable box offers punched out along the axial direction of cable disk, voltage test line is drawn from this punched out, and side cable box being provided with described crank is also provided with binding post.
Preferably, the length being wrapped in the voltage test line on cable disk is 100m, and the length, width and height of described combination box are 500mm × 400mm × 600mm.
The beneficial effect of the invention:
The intelligent substation vector test combination box of the invention is mainly used in the work of intelligent substation vector test, solves the difficult problem that traditional three-phase phase volt ampere meter cannot be applicable to the work of intelligent substation vector test.The instrument box on combination box upper strata can place three-phase phase volt ampere meter, current testing line, split core type current transformer and required jointer, meet safe distance reasonably arrange panel will effectively improve the space availability ratio of combination box.The casing of instrument box is by being arranged at magnet adsorption bottom it in vertical metallic walls, and flexible applicability is strong.The cable disk being wound with voltage test line is built in the cable box of combination box lower floor, facilitates protection personnel to shift to next test interval, has evaded the dangerous points such as site test line is in disorder, instrument is scattered simultaneously, improves the security of working site, order.This combination box integrates the testing tools such as three-phase phase volt ampere meter, current testing line, voltage test line, jointer, it is have the practical tool box measuring the electrical quantity such as single-phase to three-phase AC voltage, electric current, phase place, meritorious factor, frequency, phase sequence, effectively realize high efficiency and the instrument portability of the work of intelligent substation vector test, alleviate intelligent substation put into operation before checking and accepting amount, combination box is lightly portable, simplify the work such as in-situ FTIR spectroelectrochemitry, instrument arrangement, decrease vector test workload largely, improve efficiency.
Accompanying drawing explanation
Accompanying drawing is utilized to be described further innovation and creation, but the embodiment in accompanying drawing does not form any restriction to the invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to the following drawings.
Fig. 1 is the structural representation of the intelligent substation vector test combination box of the invention.
Reference numeral:
1-instrument box, 11-case lid, 111-tool bag, 112-foam, 12-casing, 121-volt ampere meter receiver, 122-Tool storage kit, 123-split core type current transformer receiver, 13-instrument box snap close,
2-cable box, 21-cable disk, 22-crank, 23-punched out, 24-binding post, 25-universal wheel, 26-cable box snap close,
3-voltage test line.
Embodiment
With the following Examples the invention is further described.
The intelligent substation vector test combination box of the invention, as shown in Figure 1, described combination box comprises cable box 2 and instrument box 1.
Instrument box 1 comprises casing 12 and the case lid 11 detachably hinged with casing, is fastened and connected between case lid 11 and casing 12 by instrument box snap close 13.The inner side of case lid 11 is preferably provided with tool bag 111, for placing some findings, small tool.Case lid 11 pad is provided with foam 112 for the protection of instrument.Casing 12 is by being arranged at magnet adsorption bottom it in vertical metallic walls; volt ampere meter receiver 121, Tool storage kit 122 and split core type current transformer receiver 123 is provided with in casing 12; wherein; volt ampere meter receiver 121 is positioned at the side of casing 12; Tool storage kit 122 and split core type current transformer receiver 123 are co-located at the opposite side of casing 12, and in volt ampere meter receiver 121, Tool storage kit 122 and split core type current transformer receiver 123, all pad is provided with foam to protect instrument.Volt ampere meter receiver 121 is dismountable to be arranged in casing 12, volt ampere meter receiver 121 is by being arranged at magnet adsorption bottom it in vertical metallic walls, realize the hand-held of three-phase phase volt ampere meter and the use of fixed dual-purpose formula, three-phase phase volt ampere meter is applicable to the vector test work of traditional transformer station simultaneously, and type of service is flexible, applicability is strong.Tool storage kit 122 and split core type current transformer receiver 123 are fixedly installed in casing 12, and split core type current transformer receiver 123 is set side by side with three split core type current transformer standing grooves.
The bottom of cable box 2 is provided with the universal wheel 25 of strap brake, is divided into the corner, bottom of cable box 2.The cable disk 21 of band crank 22 is provided with in cable box 2, cable disk 21 is for being wound around voltage test line 3, crank 22 is arranged on the outside of cable box 2, cable box 2 inner cable drum 21 is rotatably positioned at by shake crank 22, the left and right sides of cable box 2 is provided with handle position and is convenient to move cable box 2, the wherein side of cable box 2 offers punched out 23 along the axial direction of cable disk 21, namely voltage test line 3 draws from this punched out 23, and side cable box 2 being provided with crank 22 is also provided with binding post 24 for external connection.
Instrument box 1 mates fastening by cable box snap close 26 and is arranged on the top of cable box 2 to be combined into described combination box, preferably, the cross sectional shape size of cable box and the cross sectional shape of instrument box measure-alike, the overall length, width and height of described combination box are preferably 500mm × 400mm × 600mm.
Finally should be noted that; above embodiment is only in order to illustrate the technical scheme of the invention; but not the restriction to the invention protection domain; although done to explain to the invention with reference to preferred embodiment; those of ordinary skill in the art is to be understood that; can modify to the technical scheme of the invention or equivalent replacement, and not depart from essence and the scope of the invention technical scheme.

Claims (7)

1. intelligent substation vector test combination box, is characterized in that: the insulation of described combination box, and it comprises bottom and arranges the instrument box that the cable box of universal wheel and top arrange handle, and instrument box can mate the top that fastens and be arranged on cable box to be combined into described combination box; Instrument box comprises casing and the case lid detachably hinged with casing, and casing, by being arranged at magnet adsorption bottom it in vertical metallic walls, is provided with volt ampere meter receiver, Tool storage kit and split core type current transformer receiver in casing; Be provided with in cable box band crank, for being wound around the cable disk of voltage test line, described crank extends to outside cable box, cable box inner cable drum is rotatably positioned at by shake crank, the left and right sides of cable box is provided with handle position, the wherein side of cable box offers punched out along the axial direction of cable disk, voltage test line is drawn from this punched out, and side cable box being provided with described crank is also provided with binding post.
2. intelligent substation vector test combination box according to claim 1, is characterized in that: in described case lid, volt ampere meter receiver, Tool storage kit and split core type current transformer receiver, all pad is provided with foam to protect instrument.
3. intelligent substation vector test combination box according to claim 1, it is characterized in that: described volt ampere meter receiver is dismountable to be arranged in described casing, described volt ampere meter receiver is by being arranged at magnet adsorption bottom it in vertical metallic walls, and Tool storage kit and split core type current transformer receiver are fixedly installed in described casing.
4. intelligent substation vector test combination box according to claim 1, is characterized in that: described split core type current transformer receiver is set side by side with three split core type current transformer standing grooves.
5. intelligent substation vector test combination box according to claim 1, is characterized in that: the inner side of described case lid is provided with tool bag.
6. intelligent substation vector test combination box according to claim 1, is characterized in that: described universal wheel is the universal wheel of strap brake, is divided into corner bottom cable box.
7. intelligent substation vector test combination box according to claim 1, it is characterized in that: the cross sectional shape size of described cable box and the cross sectional shape of described instrument box measure-alike, the length being wrapped in the voltage test line on cable disk is 100m, and the length, width and height of described combination box are 500mm × 400mm × 600mm.
CN201510067388.1A 2015-02-09 2015-02-09 Intelligent substation vector test combination box Pending CN104597298A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510067388.1A CN104597298A (en) 2015-02-09 2015-02-09 Intelligent substation vector test combination box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510067388.1A CN104597298A (en) 2015-02-09 2015-02-09 Intelligent substation vector test combination box

Publications (1)

Publication Number Publication Date
CN104597298A true CN104597298A (en) 2015-05-06

Family

ID=53123211

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510067388.1A Pending CN104597298A (en) 2015-02-09 2015-02-09 Intelligent substation vector test combination box

Country Status (1)

Country Link
CN (1) CN104597298A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108015730A (en) * 2017-11-27 2018-05-11 国家电网公司 A kind of electric power overhaul tool box
CN109738700A (en) * 2019-03-11 2019-05-10 宁波市电力设计院有限公司 A kind of transformer harmonic measurement device
CN111050516A (en) * 2019-11-01 2020-04-21 西安科成新果信息科技有限公司 Household appliance function detection device based on Internet of things and operating system thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202102017U (en) * 2011-06-15 2012-01-04 沧州供电公司 Mobile high-pressure test operation platform
CN102608368A (en) * 2012-03-30 2012-07-25 辽宁省电力有限公司朝阳供电公司 Portable test power box
CN103094856A (en) * 2013-01-18 2013-05-08 湖州电力局 Overhauling and calibration console of transformer substation
CN203224579U (en) * 2013-04-02 2013-10-02 国家电网公司 System for testing protection vectors before commissioning of substation
CN203745486U (en) * 2013-11-13 2014-07-30 国家电网公司 Magnetic-suction-type meter sleeve used for universal meter
CN204439668U (en) * 2015-02-09 2015-07-01 国家电网公司 intelligent substation vector test combination box

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202102017U (en) * 2011-06-15 2012-01-04 沧州供电公司 Mobile high-pressure test operation platform
CN102608368A (en) * 2012-03-30 2012-07-25 辽宁省电力有限公司朝阳供电公司 Portable test power box
CN103094856A (en) * 2013-01-18 2013-05-08 湖州电力局 Overhauling and calibration console of transformer substation
CN203224579U (en) * 2013-04-02 2013-10-02 国家电网公司 System for testing protection vectors before commissioning of substation
CN203745486U (en) * 2013-11-13 2014-07-30 国家电网公司 Magnetic-suction-type meter sleeve used for universal meter
CN204439668U (en) * 2015-02-09 2015-07-01 国家电网公司 intelligent substation vector test combination box

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108015730A (en) * 2017-11-27 2018-05-11 国家电网公司 A kind of electric power overhaul tool box
CN109738700A (en) * 2019-03-11 2019-05-10 宁波市电力设计院有限公司 A kind of transformer harmonic measurement device
CN109738700B (en) * 2019-03-11 2024-01-09 宁波市电力设计院有限公司 Transformer harmonic detection device
CN111050516A (en) * 2019-11-01 2020-04-21 西安科成新果信息科技有限公司 Household appliance function detection device based on Internet of things and operating system thereof

Similar Documents

Publication Publication Date Title
CN104597298A (en) Intelligent substation vector test combination box
CN205302779U (en) Electric energy measurement analogue test device
JP2015175689A (en) Partial discharge monitoring device and partial discharge monitoring system
CN204439668U (en) intelligent substation vector test combination box
CN203660358U (en) Portable electric power security measure arrangement tool box
CN102944800A (en) High-voltage electrical appliance electromagnetic radiation emission type testing system
CN203398643U (en) Drainage wire rack
CN202189667U (en) Wall bushing of mutual inductor
CN206848410U (en) A kind of Partial discharge detector
CN203326376U (en) Compactly-installed small power distribution box
CN205129811U (en) Relay protection toolbox is used in debugging
CN204819443U (en) Novel integrative case of portable line machine
CN205301509U (en) Convenient to use's testing transformer
CN205791144U (en) Portable T-shaped unplugg grounding device
CN202256414U (en) Portable-type multifunctional test power supply device
CN207603064U (en) A kind of device for the maintenance of 35KV switch carts
CN203465335U (en) GIS-type electronic mutual inductor housing
CN203326369U (en) Portable maintenance power box
CN204666725U (en) Power generator rotor magnetic pole AC impedance and power attenuation measure special car
CN106443336A (en) Power transmission tower grounding grid detection box
CN202817558U (en) Auxiliary test tool for oil and gas bushing transformer
CN202957472U (en) High-voltage switch cabinet for networked electric power system
CN204947415U (en) A kind of being easy to shakes the service handcart surveying 10kV interconnection cable insulation
CN202333504U (en) Electric energy metering cabinet
CN205104354U (en) Mini voltage transformer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150506

RJ01 Rejection of invention patent application after publication