CN104596000B - Air conditioner and control method of air conditioner - Google Patents

Air conditioner and control method of air conditioner Download PDF

Info

Publication number
CN104596000B
CN104596000B CN201410810639.6A CN201410810639A CN104596000B CN 104596000 B CN104596000 B CN 104596000B CN 201410810639 A CN201410810639 A CN 201410810639A CN 104596000 B CN104596000 B CN 104596000B
Authority
CN
China
Prior art keywords
temperature
heat exchanger
control valve
air
conditioner
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410810639.6A
Other languages
Chinese (zh)
Other versions
CN104596000A (en
Inventor
岑晓维
李丰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GD Midea Air Conditioning Equipment Co Ltd
Original Assignee
Guangdong Midea Refrigeration Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Midea Refrigeration Equipment Co Ltd filed Critical Guangdong Midea Refrigeration Equipment Co Ltd
Priority to CN201410810639.6A priority Critical patent/CN104596000B/en
Publication of CN104596000A publication Critical patent/CN104596000A/en
Application granted granted Critical
Publication of CN104596000B publication Critical patent/CN104596000B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F5/00Air-conditioning systems or apparatus not covered by F24F1/00 or F24F3/00, e.g. using solar heat or combined with household units such as an oven or water heater
    • F24F5/0007Air-conditioning systems or apparatus not covered by F24F1/00 or F24F3/00, e.g. using solar heat or combined with household units such as an oven or water heater cooling apparatus specially adapted for use in air-conditioning
    • F24F5/001Compression cycle type
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/89Arrangement or mounting of control or safety devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/30Arrangement or mounting of heat-exchangers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2110/00Control inputs relating to air properties
    • F24F2110/10Temperature
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/80Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air
    • F24F11/83Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers
    • F24F11/84Control systems characterised by their outputs; Constructional details thereof for controlling the temperature of the supplied air by controlling the supply of heat-exchange fluids to heat-exchangers using valves

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Atmospheric Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Signal Processing (AREA)
  • Sustainable Development (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The invention provides an air conditioner. The air conditioner comprises an outdoor heat exchanger assembly and a temperature control device, wherein the outdoor heat exchanger assembly comprises a first heat exchanger, a second heat exchanger, a first heater and a second heater, the first heat exchanger and the first heater are connected in series to form a first branch, the second heat exchanger and the second heater are connected in series to form a second branch, and the first branch and the second branch are connected in parallel; the temperature control device is connected with the outdoor heat exchanger assembly and used for detecting the temperature of the first heat exchanger and the temperature of the second heat exchanger, controlling action of the first heater according to the temperature of the first heat exchanger and controlling action of the second heater according to the temperature of the second heat exchanger. Correspondingly, the invention further provides a control method of the air conditioner. According to the air conditioner and the control method of the air conditioner, the air conditioner can not only supply heat continuously but also defrost an outdoor unit in a heating mode.

Description

The control method of air-conditioner and air-conditioner
Technical field
The present invention relates to household appliance technical field, more specifically, it is related to a kind of air-conditioner and a kind of controlling party of air-conditioner Method.
Background technology
When worst cold case is heated, the easy frosting of outdoor unit heat exchanger increases thermal resistance and windage to heat pump type air conditioner, heat exchange Efficiency drastically declines and has a strong impact on heat transfer effect, in order to avoid heat transfer effect continuous decrease, it is necessary to carry out defrost to system.
Existing air-conditioned main defrost pattern is switching four-way valve, carries out kind of refrigeration cycle.Although such defrost pattern energy It is enough that frost on outdoor heat exchanger is removed clean, but during defrost, it is out of service during indoor set, it is impossible to continuous to room Heat supply, can reduce room temperature, influence the thermal comfort experience of user.
It is therefore proposed that a kind of just seem very necessary in defrost without suspending the control method of the air-conditioner of heat supply.
The content of the invention
It is contemplated that at least solving one of technical problem present in prior art.
Therefore, it is an advantage of the invention to provide a kind of air-conditioner.
It is a further object of the invention to provide a kind of control method of air-conditioner.
To achieve the above object, embodiment provides a kind of air-conditioner, outdoor heat exchanger group according to a first aspect of the present invention Part, the outdoor heat exchange device assembly includes First Heat Exchanger, the second heat exchanger, primary heater and secondary heater, described the One heat exchanger is connected in series to form tie point, second heat exchanger and the secondary heater string with the primary heater Connection connection forms the second branch road, wherein, the tie point is connected with second branch circuit parallel connection;Attemperating unit, is connected to institute Outdoor heat exchange device assembly is stated, for detecting the temperature of the First Heat Exchanger and the temperature of second heat exchanger, and according to institute Primary heater action described in the temperature control of First Heat Exchanger is stated, and according to the temperature control institute of second heat exchanger State secondary heater action.
Air-conditioner according to an embodiment of the invention, outdoor heat exchange device assembly includes the tie point being connected in parallel and Two branch roads, are provided with the heat exchanger and heater being connected in series on each branch road, heater is in parallel with heat exchanger, and pass through Attemperating unit carries out thermometric to the heat exchanger in tie point and the second branch road, and dynamic according to the temperature control heater for measuring Make, by the technical scheme, air-conditioning in a heating mode, persistently to indoor heating, can not exist while smooth defrost The situation of defrost is carried out to outdoor heat exchanger from indoor environment heat absorption during traditional air-conditioning defrost, and will not also reduce room Temperature, fluctuations in indoor temperature is small, it is to avoid damage of the compressor repeatedly starting and stopping to compressor, extends the use longevity of compressible machine Life, so the whole machine for extending life-span, it is to avoid the abrasion that four-way valve commutates to four-way valve repeatedly, extend the use of four-way valve In the life-span, improve the performance of air-conditioner.
In addition, the air-conditioner provided according to the above embodiment of the present invention also has following additional technical feature:
According to one embodiment of present invention, the outdoor heat exchange device assembly also includes the first control valve and the second control Valve, the first control valve is located in the tie point, and the first control valve, the primary heater and described first are changed Hot device is sequentially connected in series, and the second control valve is located on second branch road, the second control valve, described second Heater and second heat exchanger are sequentially connected in series.
Air-conditioner according to an embodiment of the invention, be respectively arranged with tie point and the second branch road the first control valve and Second control valve, the first control valve, primary heater, First Heat Exchanger are sequentially connected in series on the first leg, the second control Valve, secondary heater, the second heat exchanger are sequentially connected on the second branch road, and tie point and the connection of the second branch circuit parallel connection, By the technical scheme, two branch roads are designed, each branch road is provided with heater, heat exchanger and control valve, can carry out When defrost is processed, it is ensured that a branch road carries out defrost, and another branch road proceeds to heat.
According to one embodiment of present invention, also include:Four-way valve, the four-way valve include first port, second port, 3rd port and the 4th port, compressor, the compressor include gas returning port and exhaust outlet, the gas returning port and the first end Mouth connection, the exhaust outlet is connected with the second port;Indoor heat exchanger, one end of the indoor heat exchanger and the described 3rd Port connects, and the other end of the indoor heat exchanger is connected with the first end of throttling arrangement;The throttling arrangement, the throttling dress The second end put is connected with one end of the outdoor heat exchange device assembly, the other end and the four-way of the outdoor heat exchange device assembly The 4th port connection of valve.
Air-conditioner, compressor, four-way valve, indoor heat exchanger, throttling are connected by pipeline according to an embodiment of the invention The refrigerant circulation circuit that device, outdoor heat exchange device assembly are formed, allows air-conditioner to be heated, freezed or other operations.
According to one embodiment of present invention, described first the institute of valve and the second control valve and the four-way valve is controlled The connection of the 4th port is stated, the First Heat Exchanger and second heat exchanger are connected with second end of the throttling arrangement.
Air-conditioner according to an embodiment of the invention, the first control valve and the second control valve connect with the 4th port of four-way valve Connect, First Heat Exchanger and the second heat exchanger are connected with the second end of throttling arrangement, in cooling mode, refrigerant stream in systems To:Exhaust outlet of compressor → four-way valve → the first control valve and the second control valve → primary heater and secondary heater → the first Heat exchanger and the second heat exchanger → throttling arrangement → indoor heat exchanger → compressor return air mouthful, in a heating mode, refrigerant is being Flow direction in system:Exhaust outlet of compressor → four-way valve → indoor heat exchanger → throttling arrangement → First Heat Exchanger and the second heat exchanger → primary heater and secondary heater → the first control valve and the second control valve → compressor return air mouthful.
According to one embodiment of present invention, the first control valve and the second control valve and the throttling arrangement The second end connection, the First Heat Exchanger and second heat exchanger are connected with the 4th port of the four-way valve.
The second port of air-conditioner according to an embodiment of the invention, the first control valve and the second control valve and throttling arrangement Connection, First Heat Exchanger and the second heat exchanger be connected with the 4th port of four-way valve, and in cooling mode, refrigerant is in systems Flow direction:Exhaust outlet of compressor → four-way valve → First Heat Exchanger and the second heat exchanger → primary heater and secondary heater → the One control valve and second control valve → throttling arrangement → indoor heat exchanger → compressor return air mouthful, in a heating mode, refrigerant exists Flow direction in system:Exhaust outlet of compressor → four-way valve → indoor heat exchanger → throttling arrangement → the first control valve and the second control Valve → primary heater and secondary heater → First Heat Exchanger and the second heat exchanger → compressor return air mouthful.
According to one embodiment of present invention, the attemperating unit includes:First temperature measuring equipment and the second temperature measuring equipment, institute State the first temperature measuring equipment to be arranged on the coil pipe of the First Heat Exchanger, the temperature for detecting the First Heat Exchanger, and institute State the second temperature measuring equipment to be arranged on the coil pipe of second heat exchanger, the temperature for detecting the First Heat Exchanger.
According to the air-conditioner that the present invention is provided, the first temperature measuring equipment and the second temperature measuring equipment can in time monitor the first heat exchange The temperature of the temperature of device and the second heat exchanger, detects whether the temperature on First Heat Exchanger and the second heat exchanger reaches and wants exactly Whether the temperature of frosting, carried out with the defrost action that this determines air-conditioner, improves the sensitivity of air-conditioner, and the moment ensures empty Device is adjusted to be in heat exchange efficiency higher.
According to one embodiment of present invention, the attemperating unit also includes:Controller, the controller is connected to described First temperature measuring equipment and second temperature measuring equipment, for receiving the temperature of first temperature measuring equipment detection and receiving described the The temperature of two temperature measuring equipments detection, and detected according to the temperature and second temperature measuring equipment of first temperature measuring equipment detection Primary heater, the first control valve events, the secondary heater and the second control valve events described in temperature control.
According to one embodiment of present invention, the controller is in except other moulds of heating mode in the air-conditioner During formula, for controlling the primary heater and the secondary heater to close, and the first control valve and second control Valve processed is opened completely.
Air-conditioner according to an embodiment of the invention, when air-conditioner is in refrigeration mode, the first control valve and the second control Valve processed is opened completely, and primary heater and secondary heater are closed, refrigerant flow direction in systems:Exhaust outlet of compressor → four-way Valve → the first control valve and second control valve → primary heater and secondary heater → First Heat Exchanger and the second heat exchanger → Throttling arrangement → indoor heat exchanger → compressor return air mouthful.Controller selects sex work according to air-conditioner working condition, saves The power consumption of air-conditioner, also effectively reduces the fault rate of controller, and then improves the reliability and sexual valence of air-conditioner Than.
According to one embodiment of present invention, the controller is when the air-conditioner is in heating mode, and in institute The temperature that detect with second temperature measuring equipment of temperature for stating the detection of the first temperature measuring equipment is all higher than during equal to the preset temperature, For controlling the primary heater and the secondary heater to close, and the first control valve is complete with the described second control valve It is complete to open.
Air-conditioner according to an embodiment of the invention, when air-conditioner is heated, and in first temperature measuring equipment The temperature that the temperature of detection is detected with second temperature measuring equipment is all higher than being equal to the preset temperature, that is to say, that in air-conditioning The First Heat Exchanger and the second heat exchanger of the outdoor heat exchange device assembly of device in the absence of in the case of frosting, the first control valve and the Two control valves are opened completely, and primary heater and secondary heater are closed, refrigerant flow direction in systems:Exhaust outlet of compressor → Four-way valve → indoor heat exchanger → throttling arrangement → First Heat Exchanger and the second heat exchanger → primary heater and secondary heater → the first control valve and the second control valve → compressor return air mouthful.
According to one embodiment of present invention, the controller is when the air-conditioner is in heating mode, and in institute When the temperature for stating the detection of the first temperature measuring equipment is less than the preset temperature, for controlling the primary heater to open, described the One control valve is not exclusively opened, the secondary heater is closed and the second control valve is opened completely.
Air-conditioner according to an embodiment of the invention, when air-conditioner is heated, and in first temperature measuring equipment When the temperature of detection is less than the preset temperature, that is to say, that when the temperature on the First Heat Exchanger of tie point is less than air-conditioning During the preset temperature of device, tie point frosting, by controlling, primary heater opening is heated to refrigerant, first controls Valve not exclusively opens control cold medium flux, carries out defrost treatment, and the secondary heater on the second branch road is closed and the second control Valve is opened completely, proceeds to heat, and can so reduce the fluctuation of indoor temperature, under conditions of heating operation is not influenceed again Defrost treatment can be carried out, it is ensured that the thermal comfort experience of user, and refrigerant flow direction in systems:Exhaust outlet of compressor → Four-way valve → indoor heat exchanger → throttling arrangement → First Heat Exchanger and the second heat exchanger → primary heater and secondary heater → the first control valve and the second control valve → compressor return air mouthful.
According to one embodiment of present invention, the controller is when the air-conditioner is in heating mode, and in institute When the temperature for stating the detection of the second temperature measuring equipment is less than the preset temperature, for controlling the secondary heater to open, described the Two control valves are not exclusively opened, the primary heater is closed and the first control valve is opened completely.
Air-conditioner according to an embodiment of the invention, when air-conditioner is heated, and in second temperature measuring equipment When the temperature of detection is less than the preset temperature, that is to say, that when the temperature on the second heat exchanger of the second branch road is less than air-conditioning During the preset temperature of device, the second branch road frosting, by controlling, secondary heater opening is heated to refrigerant, second controls Valve not exclusively opens control cold medium flux, carries out defrost treatment, and the primary heater in tie point is closed and the first control Valve is opened completely, proceeds to heat, and can so reduce the fluctuation of indoor temperature, under conditions of heating operation is not influenceed again Defrost treatment can be carried out, it is ensured that the experience of the thermal comfort of user, and refrigerant flows to refrigerant flow direction in systems:Compression Machine exhaust outlet → four-way valve → indoor heat exchanger → throttling arrangement → First Heat Exchanger and the second heat exchanger → primary heater and Secondary heater → the first controls valve and the second control valve → compressor return air mouthful.
According to one embodiment of present invention, the controller is when the air-conditioner is in heating mode, and in institute When the temperature for stating the detection of the first temperature measuring equipment is respectively less than the preset temperature with the temperature of second temperature measuring equipment, for controlling The primary heater is opened, the first control valve is not exclusively opened, the secondary heater is closed and second control Valve is opened completely, or the control secondary heater is opened, the second control valve is not exclusively opened, the primary heater is closed Close and the first control valve is opened completely.
Air-conditioner according to an embodiment of the invention, when air-conditioner is heated, the temperature of the first temperature measuring equipment detection When temperature with the second temperature measuring equipment is respectively less than preset temperature, that is to say, that as the First Heat Exchanger of tie point and second When temperature on second heat exchanger on road is respectively less than the preset temperature of air-conditioner, tie point and the second branch road carry out frosting, first First, first judgement is that the heat exchanger on which branch road first reaches frosting condition, when the First Heat Exchanger in tie point first reaches knot Ice-lolly part, by controlling primary heater opening to heat refrigerant, first controls valve not exclusively to open control refrigerant Flow, carries out defrost treatment, and the secondary heater on the second branch road is closed and the second control valve is opened completely, proceeds system Heat, when the temperature of First Heat Exchanger is more than preset temperature, tie point stopping defrost being heated closes primary heater And first control valve open completely, and the second branch road starts defrost, secondary heater is opened refrigerant is heated, the Two control valves not exclusively open control cold medium flux, and two branch roads replace heater, refrigerant is heated, and reach a branch road Heated, a branch road carries out defrost, the fluctuation of indoor temperature can be so reduced, under conditions of heating operation is not influenceed Defrost treatment can be carried out again, it is ensured that the thermal comfort experience of user, and improve the service life of air-conditioner, and refrigerant Flow direction in systems:Exhaust outlet of compressor → four-way valve → indoor heat exchanger → throttling arrangement → First Heat Exchanger and second is changed Hot device → primary heater and secondary heater → the first control valve and the second control valve → compressor return air mouthful.
A kind of control method of the air-conditioner of embodiment according to the second aspect of the invention, start the air-conditioner it Afterwards, judge whether in heating mode;When the judged result is no, make the primary heater and the secondary heater Close, and the first control valve is opened completely with the described second control valve;When judged result is to be, the outdoor is judged Whether the temperature of the second heat exchanger of the temperature of the First Heat Exchanger of heat exchanger assembly and the outdoor heat exchange device assembly is all higher than Or equal to preset temperature;When the temperature of the First Heat Exchanger and the temperature of second heat exchanger are all higher than or pre- equal to described If during temperature, closing the secondary heater of the primary heater of the outdoor heat exchange device assembly and the outdoor heat exchange device assembly Close, and make the first of the outdoor heat exchange device assembly to control valve to be beaten completely with the second control valve of the outdoor heat exchange device assembly Open, otherwise, open the primary heater, the first control valve is not exclusively opened, the secondary heater is closed and institute The second control valve is stated to open completely, or open the secondary heater, the second control valve is not exclusively opened, described first Heater is closed and the first control valve is opened completely, until the temperature of the First Heat Exchanger and second heat exchanger Temperature is all higher than or equal to the preset temperature.
The control method of air-conditioner according to an embodiment of the invention, after the controller for starting air-conditioning, controller is first Judge air-conditioning whether in heating mode;If air-conditioner is in heating mode, controller starts detection First Heat Exchanger and the The temperature of two heat exchangers, then contrasts detection temperature and predetermined temperature, according to the contrast of detection temperature and preset temperature, really Fixed first control valve, the second control valve, primary heater, the working condition of secondary heater.If air-conditioner is not at heating Pattern, controller closes primary heater and secondary heater, and the first control valve is opened completely with the second control valve, this When air-conditioning two normal heating operations of branch road.Wherein, when air-conditioner is in heating mode, when controller detection first changes When the temperature of hot device and the second heat exchanger is all higher than preset temperature, controller closes primary heater and secondary heater, and The first control valve is set to be opened completely with the second control valve, now the normal heating operation of the two of air-conditioning branch road.When tie point When temperature on First Heat Exchanger is less than the preset temperature of air-conditioner, tie point frosting is opened by controlling primary heater Refrigerant is heated, the first control valve not exclusively opens control cold medium flux, carries out defrost treatment, and on the second branch road Secondary heater close and second control valve open completely, proceed to heat.When the temperature of the second temperature measuring equipment detection is small When preset temperature, that is to say, that when preset temperature of the temperature on the second heat exchanger of the second branch road less than air-conditioner, the Two branch road frostings, by controlling secondary heater opening to heat refrigerant, second controls valve not exclusively to open control Cold medium flux, carries out defrost treatment, and the primary heater in tie point is closed and the first control valve is opened completely, continue into Row is heated.When controller starts to detect the temperature, both less than preset temperature of First Heat Exchanger and the second heat exchanger, tie point And have a normal work in the second branch road, another carries out heating defrost, and after a branch road defrost is finished, detection temperature is big When preset temperature, this branch road normal work is carried out heating defrost by controller to another branch road, until two branch roads Detection temperature is both greater than equal to preset temperature.Now at least one branch road normally runs air-conditioning all the time, does not influence air-conditioner Normally heat, enter the comfort level without influence user and the application to air-conditioner is experienced.
Additional aspect of the invention and advantage will be given in following description section, partly by from following description In become obvious, or by it is of the invention practice recognize.
Brief description of the drawings
Of the invention above-mentioned and/or additional aspect and advantage will become from description of the accompanying drawings below to embodiment is combined Substantially and be readily appreciated that, wherein:
Fig. 1 is connection diagram of the air-conditioner described according to one embodiment of present invention in refrigeration;
Fig. 2 is the First Heat Exchanger and the second heat exchanger of air-conditioner described according to one embodiment of present invention in system Connection diagram when hot;
Fig. 3 is the defrost route schematic diagram of the First Heat Exchanger of air-conditioner described according to one embodiment of present invention;
Fig. 4 is the defrost route schematic diagram of the second heat exchanger of air-conditioner described according to one embodiment of present invention;
Fig. 5 is the schematic diagram of the connected mode of air-conditioner described according to another embodiment of the invention;
Fig. 6 is the schematic flow sheet of the control method of air-conditioner described according to one embodiment of present invention;
Fig. 7 is the schematic flow sheet of the control method of air-conditioner described according to another embodiment of the invention.
Specific embodiment
It is below in conjunction with the accompanying drawings and specific real in order to be more clearly understood that the above objects, features and advantages of the present invention Mode is applied to be further described in detail the present invention.It should be noted that in the case where not conflicting, the implementation of the application Feature in example and embodiment can be mutually combined.
Many details are elaborated in the following description in order to fully understand the present invention, but, the present invention may be used also Implemented with being different from mode described here using other, therefore, protection scope of the present invention does not receive following public tool The limitation of body embodiment.
As shown in Figures 1 to 5, embodiment provides a kind of air-conditioner, outdoor heat exchanger group according to a first aspect of the present invention Part, the outdoor heat exchange device assembly includes that First Heat Exchanger 401, the second heat exchanger 402, primary heater 501 and second are heated Device 502, the First Heat Exchanger 401 is connected in series to form tie point, second heat exchanger with the primary heater 501 402 and the secondary heater 502 be connected in series to form the second branch road, wherein, the tie point is with second branch road simultaneously Connection connection;Attemperating unit, is connected to the outdoor heat exchange device assembly, temperature and institute for detecting the First Heat Exchanger 401 The temperature of the second heat exchanger 402 is stated, and primary heater 501 is acted according to the temperature control of the First Heat Exchanger 401, And the secondary heater 502 according to the temperature control of second heat exchanger 402 is acted.
Air-conditioner according to an embodiment of the invention, outdoor heat exchange device assembly includes the tie point being connected in parallel and Two branch roads, are provided with the heat exchanger and heater being connected in series on each branch road, heater is in parallel with heat exchanger, and pass through Attemperating unit carries out thermometric to the heat exchanger in tie point and the second branch road, and dynamic according to the temperature control heater for measuring Make, by the technical scheme, air-conditioning in a heating mode, persistently to indoor heating, can not exist while smooth defrost The situation of defrost is carried out to outdoor heat exchanger from indoor environment heat absorption during traditional air-conditioning defrost, and will not also reduce room Temperature, fluctuations in indoor temperature is small, it is to avoid damage of the compressor repeatedly starting and stopping to compressor, extends the use longevity of compressible machine Life, so the whole machine for extending life-span, it is to avoid the abrasion that four-way valve commutates to four-way valve repeatedly, extend the use of four-way valve In the life-span, improve the performance of air-conditioner.
In addition, the air-conditioner provided according to the above embodiment of the present invention also has following additional technical feature:
As shown in Figures 1 to 5, according to one embodiment of present invention, the outdoor heat exchange device assembly also includes the first control Valve processed 601 and second controls valve 602, the first control valve 601 to be located in the tie point, the first control valve 601, The primary heater 501 and the First Heat Exchanger 401 are sequentially connected in series, and the second control valve 602 is located at institute State on the second branch road, the second control valve 602, the secondary heater 502 and the company of being sequentially connected in series of the second heat exchanger 402 Connect.
Air-conditioner, is respectively arranged with the first control valve according to an embodiment of the invention in tie point and the second branch road 601 and the second control valve 602, the first control valve 601, primary heater 501, First Heat Exchanger 401 are on the first leg successively It is connected in series, the second control valve 602, secondary heater 502, the second heat exchanger 402 are sequentially connected on the second branch road, and the One branch road and the second branch circuit parallel connection are connected, and by the technical scheme, design two branch roads, and each branch road is provided with heater, Heat exchanger and control valve, can be when defrost treatment be carried out, it is ensured that a branch road carries out defrost, and another branch road proceeds system Heat.
According to one embodiment of present invention, as shown in Figures 1 to 5, also include:Four-way valve 1, the four-way valve 1 includes First port, second port, the 3rd port and the 4th port, compressor 7, the compressor 7 include gas returning port and exhaust outlet, institute State gas returning port to be connected with the first port, the exhaust outlet is connected with the second port;Indoor heat exchanger 2, the interior One end of heat exchanger 2 is connected with the 3rd port, and the other end of the indoor heat exchanger 2 connects with the first end of throttling arrangement 3 Connect;The throttling arrangement 3, the second end of the throttling arrangement 3 is connected with one end of the outdoor heat exchange device assembly, the outdoor The other end of heat exchanger assembly is connected with the 4th port of the four-way valve 1.
Air-conditioner, compressor 7, four-way valve 1, indoor heat exchanger 2, section are connected by pipeline according to an embodiment of the invention The refrigerant circulation circuit that stream device 3, outdoor heat exchange device assembly are formed, allows air-conditioner to be heated, freezed or other operations.
According to one embodiment of present invention, as shown in Figures 1 to 5, the first control valve 601 and second control Valve 602 is connected with the 4th port of the four-way valve 1, the First Heat Exchanger 401 and second heat exchanger 402 and institute State second end connection of throttling arrangement 3.
Air-conditioner according to an embodiment of the invention, as shown in Figures 1 to 5, thick-line arrow is represented and heated, thin-line arrow Represent defrost.First control valve 601 and second control valve 602 be connected with the 4th port of four-way valve 1, First Heat Exchanger 401 and Second heat exchanger 402 is connected with the second end of throttling arrangement 3, in cooling mode, refrigerant flow direction in systems:Compressor 7 The control control of valve 601 and second of exhaust outlet → four-way valve 1 → the first valve 602 → primary heater 501 and secondary heater 502 → The gas returning port of 401 and second 2 → compressor of heat exchanger 402 → throttling arrangement, 3 → indoor heat exchanger of First Heat Exchanger 7, is heating mould Under formula, refrigerant flow direction in systems:7 exhaust outlets of compressor → 1 → indoor heat exchanger of four-way valve, 2 → throttling arrangement 3 → the first 402 → the primary heater of heat exchanger 501 of heat exchanger 401 and second and the control valve 601 and second of secondary heater 502 → the first are controlled The gas returning port of 602 → compressor of valve 7 processed.
According to one embodiment of present invention, as shown in figure 5, the first control valve 601 and the second control valve 602 It is connected with second end of the throttling arrangement 3, the First Heat Exchanger 401 and second heat exchanger 402 and described four 4th port connection of port valve 1.
Air-conditioner according to an embodiment of the invention, the first control valve 601 and second control valve 602 and throttling arrangement 3 Second port is connected, and the heat exchanger 402 of First Heat Exchanger 401 and second is connected with the 4th port of four-way valve 1, in refrigeration mode Under, refrigerant flow direction in systems:The heat exchanger 402 of 7 exhaust outlets of compressor → 1 → First Heat Exchanger of four-way valve 401 and second → Primary heater 501 and 3 → interior of the control control 602 → throttling arrangement of valve of valve 601 and second of secondary heater 502 → the first are changed The hot gas returning port of 2 → compressor of device 7, in a heating mode, refrigerant flow direction in systems:7 exhaust outlets of compressor → four-way valve 1 → The control control valve of the valve 601 and second 602 → primary heater 501 of 2 → throttling arrangement of indoor heat exchanger 3 → the first and the second heating The gas returning port of 502 → First Heat Exchanger of device, 401 and second 402 → compressor of heat exchanger 7.
According to one embodiment of present invention, the attemperating unit includes:First temperature measuring equipment and the second temperature measuring equipment, institute State the first temperature measuring equipment to be arranged on the coil pipe of the First Heat Exchanger 401, the temperature for detecting the First Heat Exchanger 401 Degree, and second temperature measuring equipment is arranged on the coil pipe of second heat exchanger 402, for detecting the First Heat Exchanger 401 temperature.
According to the air-conditioner that the present invention is provided, the first temperature measuring equipment and the second temperature measuring equipment can in time monitor the first heat exchange The temperature of the temperature of device 401 and the second heat exchanger 402, detects the temperature on the heat exchanger 402 of First Heat Exchanger 401 and second exactly Whether whether degree reaches the temperature for wanting frosting, carried out with the defrost action that this determines air-conditioner, improves the sensitivity of air-conditioner, Moment ensures that air-conditioner is in heat exchange efficiency higher.
According to one embodiment of present invention, the attemperating unit also includes:Controller, the controller is connected to described First temperature measuring equipment and second temperature measuring equipment, for receiving the temperature of the first temperature measuring equipment detection and receiving described The temperature of the second temperature measuring equipment detection, and the temperature according to first temperature measuring equipment detection and second temperature measuring equipment detection Temperature control described in primary heater 501, it is described first control valve 601 act, the secondary heater 502 and described second Control valve 602 is acted.
According to one embodiment of present invention, as shown in figure 1, the controller is in except heating mould in the air-conditioner During other patterns of formula, for controlling the primary heater 501 and the secondary heater 502 to close, and first control Valve processed 601 and the second control valve 602 are opened.
Air-conditioner according to an embodiment of the invention, when air-conditioner is in refrigeration mode, the first control valve 601 and second Control valve 602 is opened completely, and primary heater 501 and secondary heater 502 are closed, refrigerant flow direction in systems:Compressor 7 The control control of valve 601 and second of exhaust outlet → four-way valve 1 → the first valve 602 → primary heater 501 and secondary heater 502 → The gas returning port of 401 and second 2 → compressor of heat exchanger 402 → throttling arrangement, 3 → indoor heat exchanger of First Heat Exchanger 7.Controller root Sex work is selected according to air-conditioner working condition, the power consumption of air-conditioner is saved, the failure of controller is also effectively reduced Rate, and then improve the reliability and cost performance of air-conditioner.
According to one embodiment of present invention, as shown in Fig. 2 the controller is in heating mode in the air-conditioner When, and be all higher than equal to described in the temperature that the temperature that first temperature measuring equipment is detected is detected with second temperature measuring equipment During preset temperature, for controlling the primary heater 501 and the secondary heater 502 to close, and the first control valve 601 open completely with the described second control valve 602.
Air-conditioner according to an embodiment of the invention, when air-conditioner is heated, and in first temperature measuring equipment The temperature that the temperature of detection is detected with second temperature measuring equipment is all higher than being equal to the preset temperature, that is to say, that in air-conditioning In the absence of in the case of frosting, first controls the heat exchanger 402 of First Heat Exchanger 401 and second of the outdoor heat exchange device assembly of device The control valve 602 of valve 601 and second is opened completely, and primary heater 501 and secondary heater 502 close, and refrigerant is in systems Flow direction:7 exhaust outlets of compressor → 3 → First Heat Exchanger of four-way valve 1 → indoor heat exchanger, 2 → throttling arrangement 401 and second exchanges heat 402 → primary heater of device 501 and the control valve 601 and second of secondary heater 502 → the first control 602 → compressor of valve 7 times Gas port.
According to one embodiment of present invention, as shown in figure 3, the controller is in heating mode in the air-conditioner When, and when the temperature of first temperature measuring equipment detection is less than the preset temperature, for controlling the primary heater 501 are opened, the first control valve 601 is not exclusively opened, the secondary heater 502 is closed and the second control valve 602 Open completely.
Air-conditioner according to an embodiment of the invention, when air-conditioner is heated, and in first temperature measuring equipment When the temperature of detection is less than the preset temperature, that is to say, that when the temperature on the First Heat Exchanger 401 of tie point is less than sky When adjusting the preset temperature of device, tie point frosting is heated, the by controlling primary heater 501 to open to refrigerant One control valve 601 not exclusively opens control cold medium flux, carries out defrost treatment, and the secondary heater 502 on the second branch road is closed Close and the second control valve 602 is opened completely, proceed to heat, can so reduce the fluctuation of indoor temperature, do not influenceing system Defrost treatment can be carried out under conditions of heat operation again, it is ensured that the thermal comfort experience of user, and refrigerant stream in systems To:7 exhaust outlets of compressor → four-way valve 1 → indoor heat exchanger, 2 → throttling arrangement 3 → First Heat Exchanger 401 and the second heat exchanger 402 → primary heater 501 and the return-air of 602 → compressor of the control control valve of valve 601 and second of secondary heater 502 → the first 7 Mouthful.
According to one embodiment of present invention, as shown in figure 4, the controller is in heating mode in the air-conditioner When, and when the temperature of second temperature measuring equipment detection is less than the preset temperature, for controlling the secondary heater 502 are opened, the second control valve 602 is not exclusively opened, the primary heater 501 is closed and the first control valve 601 Open completely.
Air-conditioner according to an embodiment of the invention, when air-conditioner is heated, and in second temperature measuring equipment When the temperature of detection is less than the preset temperature, that is to say, that when the temperature on the second heat exchanger 402 of the second branch road is less than sky When adjusting the preset temperature of device, the second branch road frosting is heated, the by controlling secondary heater 502 to open to refrigerant Two control valves 602 not exclusively open control cold medium flux, carry out defrost treatment, and the primary heater 501 in tie point is closed Close and the first control valve 601 is opened completely, proceed to heat, can so reduce the fluctuation of indoor temperature, do not influenceing system Defrost treatment can be carried out under conditions of heat operation again, it is ensured that the thermal comfort experience of user, and the refrigerant that flows to of refrigerant exists Flow direction in system:7 exhaust outlets of the compressor → He of 3 → First Heat Exchanger of four-way valve 1 → indoor heat exchanger, 2 → throttling arrangement 401 Second 402 → primary heater of heat exchanger 501 and the control control valve 602 → pressure of valve 601 and second of secondary heater 502 → the first The gas returning port of contracting machine 7.
According to one embodiment of present invention, as shown in Figure 4 and Figure 5, the controller is in the air-conditioner and heats During pattern, and the temperature detected in first temperature measuring equipment is respectively less than described presetting with the temperature of second temperature measuring equipment During temperature, for controlling the primary heater 501 to open, the first control valve 601 is not exclusively opened, described second heats Device 502 is closed and the second control valve 602 is opened completely, or the control secondary heater 502 is opened, described second controls Valve 602 is not exclusively opened, the primary heater 501 is closed and the first control valve 601 is opened completely.
Air-conditioner according to an embodiment of the invention, when air-conditioner is heated, the temperature of the first temperature measuring equipment detection When temperature with the second temperature measuring equipment is respectively less than preset temperature, that is to say, that when the First Heat Exchanger 401 and second of tie point When temperature on second heat exchanger 402 of branch road is respectively less than the preset temperature of air-conditioner, tie point and the second branch road are tied Frost, first, first judgement is that the heat exchanger on which branch road first reaches frosting condition, when the First Heat Exchanger 401 in tie point First reach frosting condition, refrigerant is heated by controlling primary heater 501 to open, first control valve 601 it is not complete It is complete to open control cold medium flux, defrost treatment is carried out, and the secondary heater 502 on the second branch road is closed and the second control valve 602 open completely, proceed to heat, and when the temperature of First Heat Exchanger 401 is more than preset temperature, tie point stops defrost Heated and closed primary heater 501 and the first control valve 601 is opened completely, and the second branch road is started defrost, by second Heater 502 open refrigerant is heated, second control valve 602 not exclusively open control cold medium flux, two branch roads Alternately heater, heats to refrigerant, reaches a branch road and is heated, and a branch road carries out defrost, can so reduce The fluctuation of indoor temperature, can carry out defrost treatment, it is ensured that the thermal comfort of user again under conditions of heating operation is not influenceed Experience, and improve the service life of air-conditioner, and refrigerant flow direction in systems:7 exhaust outlets of compressor → four-way valve 1 2 → throttling arrangement of → indoor heat exchanger, 3 → First Heat Exchanger 401 and second 402 → primary heater of heat exchanger 501 and second add The gas returning port of 602 → compressor of the control control valve of valve 601 and second of hot device 502 → the first 7.
As shown in fig. 7, a kind of control method of air-conditioner of embodiment according to the second aspect of the invention, for above-mentioned Air-conditioner described in any one, the control method of the air-conditioner includes:Step 702, after the air-conditioner is started, judges Whether heating mode is in;Step 704, when the judged result is no, adds the primary heater 501 and described second Hot device 502 is closed, and the first control valve 601 is opened completely with the described second control valve 602;When judged result is yes When, step 706 judges the temperature and the outdoor heat exchange device assembly of the First Heat Exchanger 401 of the outdoor heat exchange device assembly Whether the temperature of the second heat exchanger 402 is all higher than or equal to preset temperature;When the temperature of the First Heat Exchanger 401 and described The temperature of two heat exchangers 402 is all higher than or during equal to the preset temperature, and step 704 makes the of the outdoor heat exchange device assembly The secondary heater 502 of one heater 501 and the outdoor heat exchange device assembly is closed, and makes the of the outdoor heat exchange device assembly Second control valve 602 of one control valve 601 and the outdoor heat exchange device assembly is opened completely, and otherwise, step 708 makes described the One heater 501 is opened, the first control valve 601 is not exclusively opened, the secondary heater 502 is closed and second control Valve processed 602 is opened completely, or open the secondary heater 502, the second control valve 602 is not exclusively opened, described the One heater 501 is closed and the first control valve 601 is opened completely, until the temperature of the First Heat Exchanger 401 and described The temperature of the second heat exchanger 402 is all higher than or equal to the preset temperature.
The control method of air-conditioner, as shown in Figures 1 to 7, is starting the control of air-conditioning according to an embodiment of the invention After device, whether controller first determines whether air-conditioning in heating mode;If air-conditioner is in heating mode, controller starts detection The temperature of the heat exchanger 402 of First Heat Exchanger 401 and second, then contrasts detection temperature and predetermined temperature, according to detection temperature With the contrast of preset temperature, determine that the first control valve 601, second controls valve 602, primary heater 501, secondary heater 502 Working condition.If air-conditioner is not at heating mode, controller closes primary heater 501 and secondary heater 502, And the first control valve 601 is opened completely with the second control valve 602, the now normal heating operation of the two of air-conditioning branch road.Wherein, When air-conditioner is in heating mode, when the temperature of the heat exchanger 402 of First Heat Exchanger 401 and second of controller detection is all higher than During preset temperature, controller closes primary heater 501 and secondary heater 502, and makes the first control valve 601 and the second control Valve processed 602 is opened completely, now the normal heating operation of the two of air-conditioning branch road.When on the First Heat Exchanger 401 of tie point When temperature is less than the preset temperature of air-conditioner, tie point frosting is added by controlling primary heater 501 to open to refrigerant It is heat-treated, the first control valve 601 not exclusively opens control cold medium flux, carries out defrost treatment, and on the second branch road second adds Hot device 502 is closed and the second control valve 602 is opened completely, proceeds to heat.When the temperature of the second temperature measuring equipment detection is less than During preset temperature, that is to say, that when preset temperature of the temperature on the second heat exchanger 402 of the second branch road less than air-conditioner, Second branch road frosting, refrigerant is heated by controlling secondary heater 502 to open, second control valve 602 it is incomplete Control cold medium flux is opened, defrost treatment is carried out, and the primary heater 501 in tie point is closed and the first control valve 601 Open completely, proceed to heat.It is all small when controller starts to detect the temperature of the heat exchanger 402 of First Heat Exchanger 401 and second When preset temperature, there is a normal work in tie point and the second branch road, another carries out heating defrost, when a branch road After defrost is finished, when detection temperature is more than preset temperature, controller is added this branch road normal work to another branch road Thermalization frost, until the detection temperature of two branch roads is both greater than equal to preset temperature.Now at least one branch road is being just all the time for air-conditioning Often operation, does not influence the normal of air-conditioner to heat, and enters without the comfort level of influence user and to air-conditioner using experience.
As shown in fig. 6, after system boot, judging whether it is heating operation, if it is not, two control valves are opened completely, two add Hot device is closed.Otherwise, judge whether outdoor heat exchanger coil temperature T >=t sets up, if so, two control valves are opened completely, and two Individual refrigerant heater is closed, and otherwise primary heater one is closed, and the first control valve is opened completely;Secondary heater is opened, and second Control valve opens certain aperture, and until coil temperature T >=t, secondary heater stops heating, and control valve is opened completely, while inspection Look into whether another outdoor heat exchanger branch road coil temperature T >=t sets up, similarly come determine this branch road primary heater open and first Whether control valve fully opens, so circulation, and two branch roads replace heater, reach a branch road and heat, another branch road defrost Purpose system boot after, judge whether it is heating operation, if it is not, two control valves are opened completely, two refrigerant heaters are closed. Otherwise, judge whether outdoor heat exchanger coil temperature T >=t sets up, if so, two control valves are opened completely, and primary heater is closed Close, otherwise primary heater is closed, the first control valve is opened completely;Secondary heater is opened, and the second control valve is opened and necessarily opened Degree, until coil temperature T >=t, secondary heater stops heating, and the second control valve is opened completely, while checking that another outdoor is changed Whether whether hot device branch road coil temperature T >=t sets up, similarly complete to determine the unlatching of this branch road primary heater and the first control valve Full open, so circulation, two branch roads alternately open refrigerant heater, reach a branch road and heat, the purpose of another branch road defrost.
In the description of this specification, term " connection " etc. all should be interpreted broadly, for example, " connection " can be the company of fixation Connect, or be detachably connected, or be integrally connected;Can be joined directly together, it is also possible to be indirectly connected to by intermediary. For the ordinary skill in the art, above-mentioned term specifically containing in the present invention can as the case may be understood Justice.
In the description of this specification, the description of term " one embodiment " etc. means that combining the embodiment or example describes Specific features, structure, material or feature be contained at least one embodiment of the invention or example.In this manual, Schematic representation to above-mentioned term is not necessarily referring to identical embodiment or example.And, the specific features of description, knot Structure, material or feature can in an appropriate manner be combined in one or more any embodiments or example.
The preferred embodiments of the present invention are the foregoing is only, is not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.It is all within the spirit and principles in the present invention, made any repair Change, equivalent, improvement etc., should be included within the scope of the present invention.

Claims (9)

1. a kind of air-conditioner, it is characterised in that including:
Outdoor heat exchange device assembly, the outdoor heat exchange device assembly includes First Heat Exchanger, the second heat exchanger, primary heater, the Two heaters, the first control valve and the second control valve, the First Heat Exchanger and the primary heater are connected in series to form the One branch road, second heat exchanger and the secondary heater are connected in series to form the second branch road, wherein, the tie point with The second branch circuit parallel connection connection, the first control valve is located in the tie point, the first control valve, described first Heater and the First Heat Exchanger are sequentially connected in series, and the second control valve is located on second branch road, and described second Control valve, the secondary heater and second heat exchanger are sequentially connected in series;
Attemperating unit, is connected to the outdoor heat exchange device assembly, the temperature and described second for detecting the First Heat Exchanger The temperature of heat exchanger, and the primary heater action according to the temperature control of the First Heat Exchanger, and according to described the Secondary heater action described in the temperature control of two heat exchangers;
Four-way valve, the four-way valve includes first port, second port, the 3rd port and the 4th port;
Compressor, the compressor includes gas returning port and exhaust outlet, and the gas returning port is connected with the first port, the exhaust Mouth is connected with the second port;
Indoor heat exchanger, one end of the indoor heat exchanger is connected with the 3rd port, the other end of the indoor heat exchanger It is connected with the first end of throttling arrangement;
The throttling arrangement, the second end of the throttling arrangement is connected with one end of the outdoor heat exchange device assembly, the outdoor The other end of heat exchanger assembly is connected with the 4th port of the four-way valve;
Wherein, the first control valve and the second control valve are connected with second end of the throttling arrangement, and described the One heat exchanger and second heat exchanger are connected with the 4th port of the four-way valve.
2. the air-conditioner according to claim 1, it is characterised in that the attemperating unit includes:First temperature measuring equipment and Second temperature measuring equipment, first temperature measuring equipment is arranged on the coil pipe of the First Heat Exchanger, for detecting that described first changes The temperature of hot device, and second temperature measuring equipment is arranged on the coil pipe of second heat exchanger, for detecting that described second changes The temperature of hot device.
3. the air-conditioner according to claim 2, it is characterised in that the attemperating unit also includes:Controller, the control Device processed is connected to first temperature measuring equipment and second temperature measuring equipment, the temperature for receiving the first temperature measuring equipment detection Spend and receive the temperature of the second temperature measuring equipment detection, and the temperature and described second detected according to first temperature measuring equipment Primary heater, the first control valve, the secondary heater and described second described in the temperature control of temperature measuring equipment detection Control valve events.
4. the air-conditioner according to claim 3, it is characterised in that the controller is in except system in the air-conditioner During other patterns of heat pattern, for controlling the primary heater and the secondary heater to close, and first control Valve and the second control valve are opened completely.
5. the air-conditioner according to claim 3, it is characterised in that the controller is in the air-conditioner and heats mould During formula, and it is all higher than being equal in advance in the temperature that the temperature that first temperature measuring equipment is detected is detected with second temperature measuring equipment If during temperature, for controlling the primary heater and the secondary heater to close, and the first control valve and described the Two control valves are opened completely.
6. the air-conditioner according to claim 3, it is characterised in that the controller is in the air-conditioner and heats mould During formula, and when the temperature of first temperature measuring equipment detection is less than preset temperature, for controlling the primary heater to beat Open, the first control valve is not exclusively opened, the secondary heater is closed and the second control valve is opened completely.
7. the air-conditioner according to claim 3, it is characterised in that the controller is in the air-conditioner and heats mould During formula, and when the temperature of second temperature measuring equipment detection is less than preset temperature, for controlling the secondary heater to beat Open, the second control valve is not exclusively opened, the primary heater is closed and the first control valve is opened completely.
8. the air-conditioner according to claim 3, it is characterised in that the controller is in the air-conditioner and heats mould During formula, and preset temperature is respectively less than with the temperature of second temperature measuring equipment in the temperature that first temperature measuring equipment is detected When, control the primary heater to open, the first control valve is not exclusively opened, the secondary heater is closed and described the Two control valves are opened completely, or the control secondary heater is opened, the second control valve is not exclusively opened, described first adds Hot device is closed and the first control valve is opened completely.
9. a kind of control method of air-conditioner, it is characterised in that for the air-conditioner as any one of claim 1 to 8, The control method of the air-conditioner includes:
After the air-conditioner is started, judge whether in heating mode;
When judged result is no, close the primary heater of outdoor heat exchange device assembly and secondary heater, and make the room First control valve of external heat exchanger component is opened completely with the second control valve of the outdoor heat exchange device assembly;
When the judged result is to be, the temperature and the outdoor for judging the First Heat Exchanger of the outdoor heat exchange device assembly are changed Whether the temperature of the second heat exchanger of hot device assembly is all higher than or equal to preset temperature;
It is all higher than when the temperature of the First Heat Exchanger and the temperature of second heat exchanger or during equal to the preset temperature, is made The secondary heater of the primary heater of the outdoor heat exchange device assembly and the outdoor heat exchange device assembly is closed, and makes the room First control valve of external heat exchanger component is opened completely with the second control valve of the outdoor heat exchange device assembly, otherwise, is made described Primary heater is opened, the first control valve is not exclusively opened, the secondary heater is closed and the second control valve is complete It is complete to open, or open the secondary heater, the second control valve is not exclusively opened, the primary heater is closed and institute State the first control valve to open completely, until the temperature of the temperature of the First Heat Exchanger and second heat exchanger is all higher than or waits In the preset temperature.
CN201410810639.6A 2014-12-19 2014-12-19 Air conditioner and control method of air conditioner Active CN104596000B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410810639.6A CN104596000B (en) 2014-12-19 2014-12-19 Air conditioner and control method of air conditioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410810639.6A CN104596000B (en) 2014-12-19 2014-12-19 Air conditioner and control method of air conditioner

Publications (2)

Publication Number Publication Date
CN104596000A CN104596000A (en) 2015-05-06
CN104596000B true CN104596000B (en) 2017-05-24

Family

ID=53121953

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410810639.6A Active CN104596000B (en) 2014-12-19 2014-12-19 Air conditioner and control method of air conditioner

Country Status (1)

Country Link
CN (1) CN104596000B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104976737B (en) * 2015-06-30 2018-02-23 广东美的制冷设备有限公司 Air conditioner and refrigerating method
CN105953360B (en) * 2016-05-04 2018-10-16 广东美的暖通设备有限公司 The control method of air conditioner and air conditioner
CN108397829B (en) * 2018-04-20 2021-05-25 青岛海尔空调器有限总公司 Fresh air conditioner indoor unit
CN108826583B (en) * 2018-05-30 2020-01-17 珠海格力电器股份有限公司 Defrosting control method and device of air conditioning system
CN113340011B (en) * 2021-06-08 2022-05-03 四川大学 Heat exchanger rapid switching mechanism and method for refrigeration and heat pump circulating system
CN113776263A (en) * 2021-08-25 2021-12-10 珠海格力电器股份有限公司 Evaporator defrosting control method and device and refrigerator

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11173624A (en) * 1997-12-09 1999-07-02 Sanyo Electric Co Ltd Air conditioner
CN200989704Y (en) * 2006-12-13 2007-12-12 浙江盾安人工环境设备股份有限公司 Low-temperature constant-temperature constant-humidity air conditioner unit
CN102022807A (en) * 2009-09-11 2011-04-20 Lg电子株式会社 Air conditioner and method for controlling the same
CN202254546U (en) * 2011-07-29 2012-05-30 苏州韩博厨房电器科技有限公司 Fuzzy electrical heating defrosting device of air-source heat pump water heater
CN202902507U (en) * 2012-07-09 2013-04-24 青岛海尔空调电子有限公司 Heat pump air conditioner defrosting system
CN203550265U (en) * 2013-07-15 2014-04-16 潘延龄 Double-evaporator refrigerating device allowing continuous refrigerating
CN204421439U (en) * 2014-12-19 2015-06-24 广东美的制冷设备有限公司 Air-conditioner

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11173624A (en) * 1997-12-09 1999-07-02 Sanyo Electric Co Ltd Air conditioner
CN200989704Y (en) * 2006-12-13 2007-12-12 浙江盾安人工环境设备股份有限公司 Low-temperature constant-temperature constant-humidity air conditioner unit
CN102022807A (en) * 2009-09-11 2011-04-20 Lg电子株式会社 Air conditioner and method for controlling the same
CN202254546U (en) * 2011-07-29 2012-05-30 苏州韩博厨房电器科技有限公司 Fuzzy electrical heating defrosting device of air-source heat pump water heater
CN202902507U (en) * 2012-07-09 2013-04-24 青岛海尔空调电子有限公司 Heat pump air conditioner defrosting system
CN203550265U (en) * 2013-07-15 2014-04-16 潘延龄 Double-evaporator refrigerating device allowing continuous refrigerating
CN204421439U (en) * 2014-12-19 2015-06-24 广东美的制冷设备有限公司 Air-conditioner

Also Published As

Publication number Publication date
CN104596000A (en) 2015-05-06

Similar Documents

Publication Publication Date Title
CN104596000B (en) Air conditioner and control method of air conditioner
CN104879843B (en) Air conditioner controlling device, multi-split air conditioner and air-conditioner control method
CN103411340B (en) Outdoor heat exchange device and Defrost method thereof
KR101479458B1 (en) Refrigeration device
CN105318618B (en) Air-cooled heat pump cold-hot water machine and its defrosting control method
CN104729029A (en) Air conditioning system and control method thereof
KR20100081621A (en) Air conditioner and defrosting driving method of the same
CN106382777A (en) Air conditioning system and reflux control method of reflux refrigerant of subcooler
CN105650810B (en) Control method, single cold type air conditioner and the heating and air conditioner of air conditioner
CN105588336B (en) Water heater and its control method
CN103591732B (en) Air conditioning system
CN105115211B (en) Air-cooled heat pump cold-hot water machine and its defrosting control method
CN104748464A (en) Multi-online defrosting method and device for air conditioning system and air conditioner
CN105318491B (en) The control method and device of air conditioner
CN106524399A (en) Air conditioner defrosting device, air conditioner defrosting control method and system and air conditioner
CN104729163A (en) Air conditioning system and defrosting control method thereof
CN110173822A (en) Progress control method, control device, air conditioner and computer readable storage medium
CN107917505A (en) Multi-split air conditioning system and outdoor unit defrosting control method thereof
CN107421072A (en) Air conditioner and high-temperature-resistant control method thereof
CN105299988B (en) Air-cooled heat pump cold-hot water machine and its prevent high voltage protective method
CN104101143A (en) Air conditioner and control method thereof
CN106885391A (en) A kind of air-conditioner and its control method
CN204421439U (en) Air-conditioner
CN108826732A (en) Air-conditioning system and its control method
CN104949295B (en) Water-cooled air conditioning system for ships and control method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant