CN104594648A - Halfen curtain wall embedded part installation device and Halfen curtain wall embedded part installation method - Google Patents

Halfen curtain wall embedded part installation device and Halfen curtain wall embedded part installation method Download PDF

Info

Publication number
CN104594648A
CN104594648A CN201410849494.0A CN201410849494A CN104594648A CN 104594648 A CN104594648 A CN 104594648A CN 201410849494 A CN201410849494 A CN 201410849494A CN 104594648 A CN104594648 A CN 104594648A
Authority
CN
China
Prior art keywords
curtain wall
embedded part
fragrant
wall embedded
kazakhstan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410849494.0A
Other languages
Chinese (zh)
Other versions
CN104594648B (en
Inventor
朱毅敏
黄玉林
蒲洋
朱庆烨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 1 Group Co Ltd
Original Assignee
Shanghai Construction No 1 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 1 Group Co Ltd filed Critical Shanghai Construction No 1 Group Co Ltd
Priority to CN201410849494.0A priority Critical patent/CN104594648B/en
Publication of CN104594648A publication Critical patent/CN104594648A/en
Application granted granted Critical
Publication of CN104594648B publication Critical patent/CN104594648B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Curtains And Furnishings For Windows Or Doors (AREA)

Abstract

The invention discloses a Halfen curtain wall embedded part installation device and a Haffen curtain wall embedded part installation method and belongs to the technical field of positioning and installation of curtain wall embedded parts. The Halfen curtain wall embedded part installation device comprises a fixing component and a regulating component, wherein one end of the fixing component is vertically and fixedly connected with a vertical plate of an L-shaped profiled steel sheet, and the other end of the fixing component is fixedly connected with the bottom of a Halfen groove; the top end of the regulating component is fixedly connected with the bottom of the Halfen groove, and the bottom end of the regulating component is fixedly connected with a transverse plate of the L-shaped profiled steel sheet. The method comprises the following steps: firstly paying off and positioning two ends of the Halfen groove of a Halfen groove curtain wall embedded part by use of a total station, and regulating the Halfen groove curtain wall embedded part to a proper position by use of the fixing component and the regulating component; then welding and fixing the positioned Halfen groove curtain wall embedded part to the transverse plate of the L-shaped profiled steel sheet. According to the device, the positioning and installation accuracy and installation fastness of the Halfen groove curtain wall embedded part are improved, and the embedded part correction workload in follow-up curtain wall fixation and installation is greatly reduced.

Description

A kind of erecting device and method of breathing out fragrant curtain wall embedded part
Technical field
The invention belongs to location and the mounting technique field of curtain wall embedded part, particularly relate to a kind of erecting device and method of breathing out fragrant curtain wall embedded part.
Background technology
In concrete curtain wall installation, breathing out fragrant groove built-in fitting is be convenient to install and adjustable desirable fixture.The general tape measure that adopts of traditional curtain wall embedded part location construction carries out measurement and positioning, and adopts the mode fixing with floor bar spot welding to install.Aforementioned curtain wall embedded part location and installation precision is lower, and particularly when agent structure is abnormity, labyrinth, installation stationarity is poor, thus before causing curtain wall construction, rectification work amount increases.Therefore, complicated for agent structure moulding, building sideline is irregular and have employed the curtain wall embedded part installation of breathing out fragrant slot type embedded part, provides that a kind of positioning accuracy request is high, the erecting device of installing the good Kazakhstan sweet smell embedded part of fastness and method be the technical barrier that those skilled in the art need solution badly.
Summary of the invention
The object of the present invention is to provide a kind of installation accuracy high, install fastness good, contribute to reducing erecting device and the method for the fragrant embedded part in Kazakhstan of workload before curtain wall construction, to solve in conventional curtain wall embedded part technique because of adopt tape measure location to cause curtain wall embedded part positioning precision is low, install fastness difference problem.
To achieve these goals, technical scheme of the present invention is:
A kind of erecting device breathing out fragrant curtain wall embedded part, be applicable to the location and installation of the fragrant curtain wall embedded part in described Kazakhstan, described Kazakhstan fragrant curtain wall embedded part comprises breathes out the holdfast that fragrant groove and at least two are fixedly installed on the fragrant trench bottom in described Kazakhstan, described Kazakhstan fragrant curtain wall embedded part is fixedly connected with by the transverse slat of described holdfast with L-type profiled sheet, the erecting device of the fragrant curtain wall embedded part in described Kazakhstan comprises fixation kit and adjusting part, one end of described fixation kit is fixedly connected with the riser of described L-type profiled sheet is vertical, and the other end of described fixation kit is fixedly connected with the bottom of the fragrant groove in described Kazakhstan; The top of described adjusting part is fixedly connected with the bottom of the fragrant groove in described Kazakhstan, and the bottom of described adjusting part is fixedly connected with the transverse slat of described L-type profiled sheet.
Further, described adjusting part comprises the screw rod and the female connector of associated band that are threaded, the top of described screw rod is fixedly connected with the fragrant trench bottom in described Kazakhstan, and the bottom of described connector is fixedly connected with the transverse slat of described L-type profiled sheet.
Further, described adjusting part comprises the reinforcing bar and connector that are threaded, and the top of described reinforcing bar is fixedly connected with the fragrant trench bottom in described Kazakhstan, and the bottom of described connector is fixedly connected with the transverse slat of described L-type profiled sheet.
Further, described fixation kit comprises two and is symmetricly set in fragrant groove center line both sides, described Kazakhstan and be arranged in parallel two pieces of band steels, one end single-sided welding of described band steel be fixed on the bottom of the fragrant groove in described Kazakhstan, the other end single-sided welding of described band steel is fixed on the riser of described L-type profiled sheet.
Breathe out a mounting method for fragrant curtain wall embedded part, comprise the steps:
Step one: erecting device and total powerstation that the fragrant curtain wall embedded part in the Kazakhstan as described in any one of Claims 1-4 is provided, and the fragrant curtain wall embedded part of described erecting device and described Kazakhstan forms a fixed connection;
Step 2: utilize the two ends of described total powerstation to the fragrant groove in the Kazakhstan of the fragrant curtain wall embedded part in described Kazakhstan to carry out unwrapping wire location, and utilize described fixation kit and described adjusting part to adjust the fragrant curtain wall embedded part in described Kazakhstan to correct position;
Step 3: after the fragrant curtain wall embedded part in described Kazakhstan has been located, is fixed on fragrant for the Kazakhstan being connected with described erecting device curtain wall slugging on the transverse slat of described L-type profiled sheet, namely completes the location and installation work of the fragrant curtain wall embedded part in described Kazakhstan.
The present invention compared with prior art, tool has the following advantages and beneficial effect: the erecting device of the fragrant curtain wall embedded part in Kazakhstan of the present invention, be applicable to the location and installation of curtain wall embedded part, breathe out fragrant curtain wall embedded part and comprise and breathe out fragrant groove and at least two and be fixedly installed on the holdfast breathing out fragrant trench bottom.The erecting device breathing out fragrant curtain wall embedded part comprises fixation kit and adjusting part, and one end of fixation kit is fixedly connected with the riser of L-type profiled sheet is vertical, and the other end of fixation kit is fixedly connected with the bottom of breathing out fragrant groove; The top of adjusting part is fixedly connected with the bottom of breathing out fragrant groove, and the bottom of adjusting part is fixedly connected with the transverse slat of L-type profiled sheet.Before carrying out constructure body structure exterior wall and carrying out curtain wall installation, first the pre-position on the L-type profiled sheet of constructure body structure floor finds the installation site and absolute altitude of breathing out fragrant curtain wall embedded part accurately in conjunction with total powerstation, then the other end of the fixation kit be fixedly connected with the fragrant curtain wall embedded part in Kazakhstan is fixedly connected with the riser of L-type profiled sheet and prevents from breathing out the displacement that fragrant curtain wall embedded part produces horizontal direction, and by with breathe out the other end of adjusting part that fragrant curtain wall embedded part is fixedly connected with and to be fixedly connected with the setting height(from bottom) that the location of carrying out vertical direction and adjustment determine to breathe out fragrant curtain wall embedded part with the transverse slat of L-type profiled sheet, in conjunction with total powerstation, the fragrant curtain wall embedded part in Kazakhstan is accurately located, and the holdfast breathing out fragrant curtain wall embedded part is welded on the transverse slat of L-type profiled sheet, thus realize the location and installation of breathing out fragrant curtain wall embedded part.Adopt the mounting method of the fragrant curtain wall embedded part in Kazakhstan of the present invention, significantly improve the location and installation precision of breathing out fragrant curtain wall embedded part, greatly reduce the rectification work amount to embedded part when follow-up curtain wall fixedly mounts, and improve the fixed property of breathing out fragrant curtain wall embedded part, thus solve in conventional curtain wall embedded part technique because employing tape measure location causes the problem that curtain wall embedded part positioning precision is low, install fastness difference.
Accompanying drawing explanation
Erecting device and the method for Kazakhstan of the present invention fragrant curtain wall embedded part are provided by following embodiment and accompanying drawing.
Fig. 1 is the structural representation of the erecting device breathing out fragrant curtain wall embedded part.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the erecting device of the fragrant curtain wall embedded part in Kazakhstan that the present invention proposes and method are described in further detail.According to the following describes and claims, advantages and features of the invention will be clearer.Need to illustrate in addition, accompanying drawing all adopts the form that simplifies very much and all uses non-ratio accurately, only in order to object that is convenient, the aid illustration embodiment of the present invention lucidly.For sake of convenience, hereinafter described " on ", D score is consistent with the upper and lower direction of accompanying drawing, but this can not become the restriction of technical solution of the present invention.
Curtain wall is the exterior wall pad of building, is the modern large-scale Light Wall with decorative effect commonly used with highrise building.Curtain wall not load-bearing, hangs on constructure body structure as curtain, therefore is also called suspension wall, it by structural framing with inlay sheet material and form, do not bear the architectural exterior-protecting construction of agent structure load and effect.Usually, before curtain wall installation, first in the template intending the fabric structure floor installing curtain wall place, lay embedded part, then the connecting parts being used for connecting curtain wall is set on embedded part.When adopted embedded part be slot type breathe out fragrant curtain wall embedded part (breathe out fragrant curtain wall embedded part and comprise the holdfast that a fragrant groove in Kazakhstan and at least two are fixedly installed on the fragrant trench bottom in described Kazakhstan) time, first will breathe out fragrant curtain wall embedded part unwrapping wire and locate; Then, on profiled sheet holdfast being fixedly welded on building floor or fabric structure girder steel, the fragrant groove notch in Kazakhstan making to breathe out fragrant curtain wall embedded part upwards, and uses foam insert or bar shaped filler to prevent concrete from entering to breathe out in fragrant groove in the fragrant groove in Kazakhstan; Build the concrete of fabric structure floor again; Finally pull out the filler breathed out in fragrant groove, and in the fragrant groove in Kazakhstan, connecting parts is set with secured curtain wall.
Have employed in the present embodiment and breathe out the location and installation that fragrant slot type curtain wall embedded part carries out curtain wall, the external wall moulding of intending installing curtain wall is complicated, and positioning accuracy request is high.Carry out measurement and positioning according to traditional employing tape measure and breathe out fragrant curtain wall embedded part, namely directly the holdfast of fragrant embedded part will be breathed out and floor bar spot welding is connected and fixed mode, the positioning precision of breathing out fragrant curtain wall embedded part is lower, installation stationarity is poor, the rectification work amount of being undertaken causing the later stage when curtain wall is installed is excessive, thus affects the duration of a project.For foregoing problems, the erecting device adopting pump to breathe out fragrant curtain wall embedded part in this enforcement assists the installation of breathing out fragrant curtain wall embedded part, thus while improving the fragrant curtain wall embedded part installation accuracy in Kazakhstan, improve and fixing fixing is installed, reduce rectification work amount when curtain wall is installed in subsequent handling thus save the duration.
Embodiment one
The erecting device of the fragrant curtain wall embedded part in Kazakhstan of the present invention is described in detail below in conjunction with Fig. 1.
A kind of erecting device breathing out fragrant curtain wall embedded part 10, be applicable to the location and installation of curtain wall embedded part, breathe out fragrant curtain wall embedded part 10 and comprise the fragrant groove 11 in a Kazakhstan and at least two holdfasts 12 be fixedly installed on bottom the fragrant groove 11 in Kazakhstan, breathe out fragrant curtain wall embedded part 10 to be fixedly connected with the transverse slat 21 of L-type profiled sheet by holdfast 12, the erecting device breathing out fragrant curtain wall embedded part 10 comprises fixation kit 31 and adjusting part 32, one end of fixation kit 31 is fixedly connected with the riser 22 of L-type profiled sheet is vertical, and the other end of fixation kit 31 is fixedly connected with the bottom of breathing out fragrant groove 11; The top of adjusting part 32 is fixedly connected with the bottom of breathing out fragrant groove 11, and the bottom of adjusting part 32 is fixedly connected with the transverse slat 21 of L-type profiled sheet.
Specifically, in order to reduce when follow-up curtain wall is installed, the fragrant groove 11 in Kazakhstan be rectified a deviation, need, when installing the fragrant curtain wall embedded part 10 in Kazakhstan, to improve the positioning precision of breathing out fragrant curtain wall embedded part 10.In the present embodiment, breathe out bottom fragrant groove 11 and be fixedly connected with fixation kit 31 and adjusting part 32, make the erecting device breathing out fragrant curtain wall embedded part form integrative-structure with the fragrant curtain wall embedded part 1 in Kazakhstan.During installation, first, high-precision total powerstation is utilized to carry out unwrapping wire location to the two ends that each breathes out the fragrant groove 11 in Kazakhstan of fragrant curtain wall embedded part 10, then, the other end of fixation kit 31 is encorbelmented on the riser 22 of L-type profiled sheet, produces displacement in the horizontal direction to prevent breathing out fragrant curtain wall embedded part 10; The bottom of adjusting part 32 is connected with the transverse slat 21 of L-type profiled sheet is vertical, produces displacement in the vertical direction to regulate fragrant curtain wall embedded part 10 height in Kazakhstan to correct position and to prevent breathing out fragrant curtain wall embedded part 10; Meanwhile the fragrant curtain wall embedded part 10 in Kazakhstan is fixedly installed on the transverse slat 21 of L-type profiled sheet.Like this, the horizontal departure of fragrant for each Kazakhstan curtain wall embedded part 10 can be controlled to be less than ± 10mm at left and right directions, front and back deviation 0 ~ 10mm; Vertical missing controls within 3mm; Angle off normal controls within 2 °.The erecting device breathing out fragrant curtain wall embedded part is utilized to carry out the installation of breathing out fragrant curtain wall embedded part 10, not only increase the location and installation precision of breathing out fragrant curtain wall embedded part 10, also improve the fixed property of breathing out fragrant curtain wall embedded part 10, and do not affect the construction of laying fabric structure main body floor bar in subsequent handling on the transverse slat 21 of L-type profiled sheet.
Continue with reference to figure 1, adjusting part 32 comprises the screw rod 33 and the female connector 34 of associated band that are threaded, and the top of screw rod 33 is fixedly connected with bottom the fragrant groove 11 in Kazakhstan.Breathe out fragrant curtain wall embedded part 10 when installing, the bottom of connector 34 is fixedly connected with the transverse slat 21 of L-type profiled sheet, and is finely tuned the setting height(from bottom) of breathing out fragrant curtain wall embedded part 10 by rotating connector 34.
Certainly, in order to save cost, carry out secondary utilization to construction waste material, adjusting part 32 can select the reinforcing bar 33 that is threaded and connector 34, the top of reinforcing bar 33 is fixedly connected with bottom the fragrant groove 11 in Kazakhstan, and the bottom of connector 34 is fixedly connected with the transverse slat 21 of L-type profiled sheet.That is, after the location of breathing out fragrant curtain wall embedded part 10 vertical direction meets construction requirement, diameter with connector 34 under welding two below the two ends of breathing out Sino-Kazakhstan fragrant groove 11 center line of fragrant curtain wall embedded part 10 is the bar dowel 33 of 16mm, regulates the height of this bar dowel 33 by rotating connector 34.The upper limit of bar dowel 33 height is determined by the height of the holdfast 12 breathing out fragrant curtain wall embedded part 10.Bar dowel 33 1 is welded in the bottom of breathing out fragrant curtain wall embedded part 10, and other end is threaded with connector 34, is welded on the transverse slat 21 of the L-type profiled sheet of constructure body structure floor bottom connector 34.By fixing at the bottom welding breathing out fragrant groove 11 bar dowel 33 being vertically provided with connector 34, only need to rotate connector 34 can realize highly finely tuning the fragrant groove 11 in Kazakhstan, until the setting height(from bottom) of breathing out fragrant curtain wall embedded part 10 is adjusted to the setting height(from bottom) place of the fragrant curtain wall embedded part 10 in the Kazakhstan determined through total station survey.
Continue with reference to figure 1, fixation kit 31 comprises two and is symmetricly set in fragrant groove 11 center line both sides, Kazakhstan and be arranged in parallel two pieces of band steels, and one end single-sided welding of this band steel is fixed on the bottom of breathing out fragrant groove 11.When installing the fragrant curtain wall embedded part 10 in Kazakhstan, the other end single-sided welding of band steel is fixed on the riser 22 of L-type profiled sheet, the fragrant slot type embedded part 10 in Kazakhstan can be fixed the installed position that ships under construction is determined, prevent from breathing out the displacement that fragrant slot type embedded part 10 produces horizontal direction, thus to the workload that the fragrant curtain wall embedded part 10 in Kazakhstan is rectified a deviation when reducing later stage curtain wall installation, to improve the efficiency of construction that curtain wall is installed.
Embodiment two
Continuing composition graphs 1 below specifically utilizes the erecting device breathing out fragrant curtain wall embedded part to carry out breathing out the method for fragrant curtain wall installation.Breathe out the mounting method of fragrant curtain wall embedded part, comprise the steps:
Step one, provide the erecting device and total powerstation (not shown) of breathing out fragrant curtain wall embedded part 10.
Specifically, first determine the predetermined installation site of breathing out fragrant curtain wall embedded part 10, erecting device connects as one with the fragrant curtain wall embedded part 10 in Kazakhstan, and completes the Installation and Debugging of total powerstation.
Step 2: utilize the two ends of total powerstation to the fragrant groove 11 in the Kazakhstan of breathing out fragrant curtain wall embedded part 10 to carry out unwrapping wire location, determine the predetermined setting height(from bottom) of breathing out fragrant groove 11.
Continue with reference to figure 1, according to total powerstation unwrapping wire location, the free end of fixation kit 31 is fixedly connected with the riser 22 of L-type profiled sheet is vertical, prevents breathing out fragrant curtain wall embedded part 10 and produce horizontal movement; Vertically be fixedly welded on by adjusting part 32 and breathe out bottom fragrant groove 11 with on the transverse slat 21 of L-type profiled sheet, the setting height(from bottom) utilizing adjusting part 32 to adjust to breathe out fragrant curtain wall embedded part 10 is to correct position place.
Step 3, after breathing out fragrant curtain wall embedded part 10 and having located, fragrant for the Kazakhstan being connected with erecting device curtain wall embedded part 10 is fixedly welded on the transverse slat 21 of L-type profiled sheet, namely completes the location and installation work of breathing out fragrant curtain wall embedded part 10.
In sum, the erecting device of the fragrant curtain wall embedded part in Kazakhstan of the present invention, is applicable to the location and installation of curtain wall embedded part, breathes out fragrant curtain wall embedded part and comprises and breathe out fragrant groove and at least two and be fixedly installed on the holdfast breathing out fragrant trench bottom.The erecting device breathing out fragrant curtain wall embedded part comprises fixation kit and adjusting part, and one end of fixation kit is fixedly connected with the riser of L-type profiled sheet is vertical, and the other end of fixation kit is fixedly connected with the bottom of breathing out fragrant groove; The top of adjusting part is fixedly connected with the bottom of breathing out fragrant groove, and the bottom of adjusting part is fixedly connected with the transverse slat of L-type profiled sheet.Before carrying out constructure body structure exterior wall and carrying out curtain wall installation, first the pre-position on the L-type profiled sheet of constructure body structure floor finds the installation site and absolute altitude of breathing out fragrant curtain wall embedded part accurately in conjunction with total powerstation, then the other end of the fixation kit be fixedly connected with the fragrant curtain wall embedded part in Kazakhstan is fixedly connected with the riser of L-type profiled sheet and prevents from breathing out the displacement that fragrant curtain wall embedded part produces horizontal direction, and by with breathe out the other end of adjusting part that fragrant curtain wall embedded part is fixedly connected with and to be fixedly connected with the setting height(from bottom) that the location of carrying out vertical direction and adjustment determine to breathe out fragrant curtain wall embedded part with the transverse slat of L-type profiled sheet, in conjunction with total powerstation, the fragrant curtain wall embedded part in Kazakhstan is accurately located, and the holdfast breathing out fragrant curtain wall embedded part is welded on the transverse slat of L-type profiled sheet, thus realize the location and installation of breathing out fragrant curtain wall embedded part.Adopt the mounting method of the fragrant curtain wall embedded part in Kazakhstan of the present invention, significantly improve the location and installation precision of breathing out fragrant curtain wall embedded part, greatly reduce the rectification work amount to embedded part when follow-up curtain wall fixedly mounts, and improve the fixed property of breathing out fragrant curtain wall embedded part, thus solve in conventional curtain wall embedded part technique because employing tape measure location causes the problem that curtain wall embedded part positioning precision is low, install fastness difference.In addition, breathe out in the erecting device of fragrant curtain wall embedded part draw materials in adjusting part employing building site reinforcing bar and with it matching used connector easily, the secondary that can realize construction waste material utilizes, and provides cost savings.
Foregoing description is only the description to present pre-ferred embodiments, any restriction not to the scope of the invention.Any change that those skilled in the art does according to above-mentioned disclosure, modification, all belong to the protection domain of claim.

Claims (5)

1. breathe out the erecting device of fragrant curtain wall embedded part for one kind, be applicable to the location and installation of the fragrant curtain wall embedded part in described Kazakhstan, described Kazakhstan fragrant curtain wall embedded part comprises breathes out the holdfast that fragrant groove and at least two are fixedly installed on the fragrant trench bottom in described Kazakhstan, described Kazakhstan fragrant curtain wall embedded part is fixedly connected with by the transverse slat of described holdfast with L-type profiled sheet, it is characterized in that, the erecting device of the fragrant curtain wall embedded part in described Kazakhstan comprises fixation kit and adjusting part, one end of described fixation kit is fixedly connected with the riser of described L-type profiled sheet is vertical, the other end of described fixation kit is fixedly connected with the bottom of the fragrant groove in described Kazakhstan, the top of described adjusting part is fixedly connected with the bottom of the fragrant groove in described Kazakhstan, and the bottom of described adjusting part is fixedly connected with the transverse slat of described L-type profiled sheet.
2. the erecting device breathing out fragrant curtain wall embedded part as claimed in claim 1, it is characterized in that, described adjusting part comprises the screw rod and the female connector of associated band that are threaded, the top of described screw rod is fixedly connected with the fragrant trench bottom in described Kazakhstan, and the bottom of described connector is fixedly connected with the transverse slat of described L-type profiled sheet.
3. the erecting device breathing out fragrant curtain wall embedded part as claimed in claim 2, it is characterized in that, described adjusting part comprises the reinforcing bar and connector that are threaded, the top of described reinforcing bar is fixedly connected with the fragrant trench bottom in described Kazakhstan, and the bottom of described connector is fixedly connected with the transverse slat of described L-type profiled sheet.
4. the erecting device breathing out fragrant curtain wall embedded part as claimed in claim 1, it is characterized in that, described fixation kit comprises two and is symmetricly set in fragrant groove center line both sides, described Kazakhstan and be arranged in parallel two pieces of band steels, one end single-sided welding of described band steel be fixed on the bottom of the fragrant groove in described Kazakhstan, the other end single-sided welding of described band steel is fixed on the riser of described L-type profiled sheet.
5. breathe out a mounting method for fragrant curtain wall embedded part, it is characterized in that, comprise the steps:
Step one: erecting device and total powerstation that the fragrant curtain wall embedded part in the Kazakhstan as described in any one of Claims 1-4 is provided, and the fragrant curtain wall embedded part of described erecting device and described Kazakhstan forms a fixed connection;
Step 2: utilize the two ends of described total powerstation to the fragrant groove in the Kazakhstan of the fragrant curtain wall embedded part in described Kazakhstan to carry out unwrapping wire location, and utilize described fixation kit and described adjusting part to adjust the fragrant curtain wall embedded part in described Kazakhstan to correct position;
Step 3: after the fragrant curtain wall embedded part in described Kazakhstan has been located, is fixed on fragrant for the Kazakhstan being connected with described erecting device curtain wall slugging on the transverse slat of described L-type profiled sheet, namely completes the location and installation work of the fragrant curtain wall embedded part in described Kazakhstan.
CN201410849494.0A 2014-12-31 2014-12-31 A kind of erecting device breathing out fragrant curtain wall embedded part and method Active CN104594648B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410849494.0A CN104594648B (en) 2014-12-31 2014-12-31 A kind of erecting device breathing out fragrant curtain wall embedded part and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410849494.0A CN104594648B (en) 2014-12-31 2014-12-31 A kind of erecting device breathing out fragrant curtain wall embedded part and method

Publications (2)

Publication Number Publication Date
CN104594648A true CN104594648A (en) 2015-05-06
CN104594648B CN104594648B (en) 2017-01-04

Family

ID=53120665

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410849494.0A Active CN104594648B (en) 2014-12-31 2014-12-31 A kind of erecting device breathing out fragrant curtain wall embedded part and method

Country Status (1)

Country Link
CN (1) CN104594648B (en)

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4840004A (en) * 1988-07-21 1989-06-20 Ting Raymond M L Externally drained wall joint design
EP0470814A1 (en) * 1990-08-07 1992-02-12 Kajima Corporation Tile-supporting tool, tiled wall structure and tiled curtain wall
CA1298519C (en) * 1987-10-29 1992-04-07 John J. Michlovic Color cap system for locking strip gaskets
IT1282025B1 (en) * 1995-11-17 1998-03-06 Ugo Balzari STRUCTURAL CURTAIN WALL SYSTEM WITH GUARANTEES OF IMPERMEABILITY OF THE BUILDING TO WATER, AIR AND FIRE
CN201443136U (en) * 2009-07-22 2010-04-28 徐公科 Pre-cast fixing device
CN201512882U (en) * 2009-09-11 2010-06-23 中建(长沙)不二幕墙装饰有限公司 Embedded part for building curtain wall
CN201620498U (en) * 2010-01-29 2010-11-03 中山盛兴股份有限公司 Unit type curtain wall support
EP2322730A1 (en) * 2008-08-15 2011-05-18 Sergei Mihailovich Anpilov Frame building
CN201972412U (en) * 2011-01-28 2011-09-14 中国三冶集团有限公司第二建筑工程公司 Concrete wall large-scale embedded part mounting and positioning device
CN201991081U (en) * 2011-03-28 2011-09-28 缪泉 C-shaped slide channel type embedded part
CN102220792A (en) * 2011-03-16 2011-10-19 上海玻机幕墙工程有限公司 Metal curtain wall assembling device
CN202284329U (en) * 2011-09-16 2012-06-27 沈阳远大铝业工程有限公司 Concrete embedded part
CN202359700U (en) * 2011-10-31 2012-08-01 沈阳远大铝业工程有限公司 Horizontal embedded part for curtain wall
CN202925724U (en) * 2012-11-20 2013-05-08 北京金易格新能源科技发展有限公司 Bracket gravity members for curtain bracket and curtain bracket
CN203613690U (en) * 2013-10-25 2014-05-28 天颂建设集团有限公司 Curtain wall connecting structure
CN203977641U (en) * 2014-01-23 2014-12-03 广东兴发幕墙门窗有限公司 A kind of unit glass curtain wall stud location adjusting device

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA1298519C (en) * 1987-10-29 1992-04-07 John J. Michlovic Color cap system for locking strip gaskets
US4840004A (en) * 1988-07-21 1989-06-20 Ting Raymond M L Externally drained wall joint design
EP0470814A1 (en) * 1990-08-07 1992-02-12 Kajima Corporation Tile-supporting tool, tiled wall structure and tiled curtain wall
IT1282025B1 (en) * 1995-11-17 1998-03-06 Ugo Balzari STRUCTURAL CURTAIN WALL SYSTEM WITH GUARANTEES OF IMPERMEABILITY OF THE BUILDING TO WATER, AIR AND FIRE
EP2322730A1 (en) * 2008-08-15 2011-05-18 Sergei Mihailovich Anpilov Frame building
CN201443136U (en) * 2009-07-22 2010-04-28 徐公科 Pre-cast fixing device
CN201512882U (en) * 2009-09-11 2010-06-23 中建(长沙)不二幕墙装饰有限公司 Embedded part for building curtain wall
CN201620498U (en) * 2010-01-29 2010-11-03 中山盛兴股份有限公司 Unit type curtain wall support
CN201972412U (en) * 2011-01-28 2011-09-14 中国三冶集团有限公司第二建筑工程公司 Concrete wall large-scale embedded part mounting and positioning device
CN102220792A (en) * 2011-03-16 2011-10-19 上海玻机幕墙工程有限公司 Metal curtain wall assembling device
CN201991081U (en) * 2011-03-28 2011-09-28 缪泉 C-shaped slide channel type embedded part
CN202284329U (en) * 2011-09-16 2012-06-27 沈阳远大铝业工程有限公司 Concrete embedded part
CN202359700U (en) * 2011-10-31 2012-08-01 沈阳远大铝业工程有限公司 Horizontal embedded part for curtain wall
CN202925724U (en) * 2012-11-20 2013-05-08 北京金易格新能源科技发展有限公司 Bracket gravity members for curtain bracket and curtain bracket
CN203613690U (en) * 2013-10-25 2014-05-28 天颂建设集团有限公司 Curtain wall connecting structure
CN203977641U (en) * 2014-01-23 2014-12-03 广东兴发幕墙门窗有限公司 A kind of unit glass curtain wall stud location adjusting device

Also Published As

Publication number Publication date
CN104594648B (en) 2017-01-04

Similar Documents

Publication Publication Date Title
US20190071863A1 (en) Advanced Curtain Wall Mullion Anchoring System
CN104975666B (en) A kind of hyperboloid metal plate curtain wall three-dimensional regulation mounting structure and its installation method
CN204940875U (en) A kind of adjustable bar reinforcement positioning device
TW201730414A (en) Curtain wall mullion anchoring system
CN104110140B (en) Net rack node location adjusting device and location adjusting method
CN203821867U (en) Shear wall body assembling and aligning device
CN107338887A (en) Only have the connection method of flat out of plane constraint and upper connecting node at the top of out-hung panel
CN204060322U (en) The secondary frame of a kind of mounting door-window
CN106401029B (en) A kind of wall board connector, panel structure and construction method
CN104975667B (en) A kind of hyperboloid metal plate curtain wall installing structure and its installation method
CN207283099U (en) A kind of wall pre-embedded hydroelectric line case positioning device
CN203475851U (en) Device for hoisting steel beam in position
CN104594648A (en) Halfen curtain wall embedded part installation device and Halfen curtain wall embedded part installation method
CN205743048U (en) Correction positioner installed by a kind of curtain wall large-size column
CN204609070U (en) Adjustable steel adaptor
CN114934673B (en) Construction method of glass curtain wall of wood structure system
CN207538264U (en) Adjustable breast board curtain wall adapting system
CN108560860A (en) A kind of bi-directional adjustable mounts wallboard
CN108999365A (en) It constructs adjustable precast concrete out-hung panel connecting node
CN213682995U (en) Adjusting fixing support of UHPC hanging plate
CN109487823A (en) The accurate installation method of groove type embedded part in city integrated piping lane punching block system
CN103572877B (en) The installation node of air diffuser on ceiling board and cassette installation method
CN205421765U (en) Depend on wall handrail mounting structure between house stair
CN106223604A (en) The shuttering supporting adjusting means of 45 ° of pitched roof concrete
TWM440327U (en) Post-installation adjustment/positioning structure of door panel and wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant