CN104593697A - Method for manufacturing high-strength heat-resistant steel sheet for power station - Google Patents

Method for manufacturing high-strength heat-resistant steel sheet for power station Download PDF

Info

Publication number
CN104593697A
CN104593697A CN201510027659.0A CN201510027659A CN104593697A CN 104593697 A CN104593697 A CN 104593697A CN 201510027659 A CN201510027659 A CN 201510027659A CN 104593697 A CN104593697 A CN 104593697A
Authority
CN
China
Prior art keywords
temperature
steel plate
rolling
steel
power station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510027659.0A
Other languages
Chinese (zh)
Other versions
CN104593697B (en
Inventor
赵振铎
潘小娟
陈金虎
王育田
范光伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Taigang Stainless Steel Co Ltd
Original Assignee
Shanxi Taigang Stainless Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Taigang Stainless Steel Co Ltd filed Critical Shanxi Taigang Stainless Steel Co Ltd
Priority to CN201510027659.0A priority Critical patent/CN104593697B/en
Publication of CN104593697A publication Critical patent/CN104593697A/en
Application granted granted Critical
Publication of CN104593697B publication Critical patent/CN104593697B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat Treatment Of Steel (AREA)

Abstract

The invention relates to a method for manufacturing a high-strength heat-resistant steel sheet for a power station. According to the method, the prepared continuous casting billet comprises the following components in percentage by weight: 0.07-0.13% of C, 0.15-0.50% of Si, 0.35-0.55% of Mn, less than or equal to 0.02% of P, less than or equal to 0.01% of S, 8.50-9.50% of Cr, 0.30-0.6% of Mo, 0.15-0.25% of V, 1.50-2.00% of W, 0.04-0.07% of Nb, 0.035-0.065% of N, 0.002-0.005% of B, 0.10-0.30% of Ni and greater than 0 and less than or equal to 0.015% of Al; the annealing temperature is 740 +/-10 DEG C; defects are ground by virtue of hot grinding; the heating temperature of a steel billet is 1220 +/-10 DEG C; during rolling, the rolling-starting temperature is 1170-1200 DEG C, the pass reduction in roughing is 25-30%, the pass reduction in finishing is 30-35% and the final rolling temperature is 860-880 DEG C; the slow cooling pit temperature is not less than 200 DEG C and the steel sheet putting time is 120-180 minutes; the heat straightening is performed and the tempering temperature is 790 +/-10 DEG C. The method for manufacturing high-strength heat-resistant steel sheet for the power station is short in flow, high in efficiency and low in cost.

Description

The manufacture method of a kind of power station high-strength temperature-resistant steel plate
Technical field
The present invention relates to the manufacture method of a kind of power station high-strength temperature-resistant steel plate.
Background technology
Power station high temperature steel is owing to having excellent high-strength temperature-resistant performance, and the structure that (intensive parameter reaches more than 600Mpa, and heat resisting temperature reaches 600 DEG C) can be used as Power Station Boiler Heating Surface structural part and four large pipeline suspension and supports manufactures.
In order to prepare the power station high-strength temperature-resistant steel plate meeting performance requriements, this steel plate need after normalizing+tempering heat treatment yield strength R p0.2≤ 440Mpa, tensile strength Rm≤620Mpa, unit elongation A≤20%, normal temperature ballistic work A kV2≤ 90 J.In actual production trial-manufacturing process, steel plate, after rolling, needs off-line to carry out normalizing and tempering heat treatment, causes that technical process is long, efficiency is low, cost is high.
Summary of the invention
In order to solve existing power station high-strength temperature-resistant steel plate manufacturing processed in there is thermal treatment process long flow path, efficiency is low and cost is high deficiency, the invention provides the manufacture method of the power station steel plate that a kind of flow process is short, efficiency is high, cost is low, performance is excellent.
Mechanism of the present invention is by adopting controlled rolling+tempering process to realize to power station high-strength heat-resistant steel, shortening technical process, improve production efficiency, reduces manufacturing cost, and manufacture ejecting plate shape is good, the power station high-strength temperature-resistant steel plate of excellent performance.
The technical process of the manufacture method of this power station high-strength heat-resistant steel is: Slug preparing → annealing → hot repair mill → heating steel billet → rolling → slow cooling → hot straightening → tempering heat treatment → inspection.
The percent mass proportioning of this power station high-strength temperature-resistant composition of steel is:
C 0.07~0.13, Si 0.15~0.50, Mn 0.35~0.55, P ≤0.02, S≤0.01, Cr 8.50~9.50, Mo 0.30~0.6, V 0.15~0.25, W 1.50~2.00,
Nb 0.04 ~ 0.07, N 0.035 ~ 0.065, B 0.002 ~ 0.005, Ni 0.10 ~ 0.30,0 < Al≤0.015, all the other are Fe and inevitable impurity;
The present invention is directed to the Slug preparing in the operation of rolling, annealing, hot repair mill, heating steel billet, rolling, slow cooling, hot straightening, tempering etc. to be described.
The preparation method of this power station high-strength heat-resistant steel comprises following step successively:
I Slug preparing
Through hot metal pretreatment, converter top and bottom complex blowing, AOD and LF refining, the mass percent of molten steel composition reaches following requirement tapping:
C 0.07~0.13, Si 0.15~0.50, Mn 0.35~0.55, P ≤0.02, S≤0.01, Cr 8.50~9.50, Mo 0.30~0.6, V 0.15~0.25, W 1.50~2.00,
Nb 0.04 ~ 0.07, N 0.035 ~ 0.065, B 0.002 ~ 0.005, Ni 0.10 ~ 0.30,0 < Al≤0.015, all the other are Fe and inevitable impurity;
The continuously cast bloom that continuous casting becomes 200 ~ 220mm thick;
iIannealing
The red annealing furnace that send of strand is annealed, annealing temperature 740 scholar 10 DEG C, and soaking time 3 ~ 4 hours, directly comes out of the stove, and redly send hot repair grinder sequence;
iIIhot repair is ground
Reconditioning is carried out in the red annealing continuously cast bloom upper and lower plates face sent, grinds clean defect; (the defect such as continuously cast bloom crizzle, subsurface porosity.Peeling amount is 1-2%, and one side grinding thichness is 1-2.2mm) become steel billet;
iVheating steel billet
Heated in process furnace by steel billet after reconditioning, Heating temperature is 1220 scholar 10 DEG C, and soaking time is 3 ~ 4 hours, guarantees that steel billet burning is even, grills thoroughly;
vrolling
Through high-pressure water descaling, by the rolling on roughing mill of the steel billet after high-pressure water descaling, start rolling temperature 1170 ~ 1200 DEG C, roughing reduction in pass is 25 ~ 30%, is rolled into intermediate blank, and workpiece thickness controls at 60 ~ 80mm, intermediate blank is rolling on finishing mill, last pass draught is 30 ~ 35%, and finishing temperature control is at 860 ~ 880 DEG C, and finish rolling becomes steel plate;
vIslow cooling
Before steel plate enters hole, in burial pit, temperature must reach more than 200 DEG C, after steel plate rolling completes, and directly put into burial pit and carry out cooling in heap, the time of putting into is 120 ~ 180min.
VII hot straightening
In order to ensure template, steel plate is carried out hot straightening; Straightening temperature is 500-600 DEG C, and aligning passage is 1-2 road, ensures steel plate width direction roughness≤5mm/m.
vIIItempering
Red for steel plate delivering in heat treatment furnace is carried out temper, and tempering temperature is 790 scholar 10 DEG C, and soaking time is 60 ~ 120min, and steel plate is come out of the stove air cooling.
For ensuring the quality of products, this power station manufacture method of high-strength temperature-resistant steel plate exists vIIItempering light plate is come out of the stove after air cooling, also carries out steel plate inspection, i.e. flaw detection, mechanical property and the inspection of plate shape; Ultrasonic inspection, rank≤II level; Mechanical properties test, yield strength R p0.2be 480 ~ 530MPa, tensile strength R mbe 665 ~ 694MPa, unit elongation A is 24 ~ 29%, normal temperature ballistic work A kV2be 165 ~ 210J; Plate shape is checked, and steel plate width direction roughness is not more than 5mm/m.
Advantage of the present invention
Power station high-strength temperature-resistant steel adopts controlled rolling+tempering heat treatment process method, and the complete rear burial pit of directly putting into of rolling carries out cooling in heap, concrete case study on implementation eliminate reheat, normalizing process, production cost reduces by 500 yuan/ton.Shorten technical process, improve production efficiency, by mating rational rolling technological parameter, ensure that the structure property of steel plate, rolling unrelieved stress is eliminated by rolling rear slow cooling, rectify technique Strip Shape Control for steel plate hot and provide guarantee, the power station of preparation is good with high-strength temperature-resistant steel plate plate shape, and mechanical property all reaches ASTM A1017/ A1017M standard-required.
Embodiment
Describe the specific embodiment of the present invention in detail below in conjunction with embodiment, but specific embodiment of the invention is not limited to following embodiment.
embodiment 1
Power station heat-resisting steel sheet and plate dimensions is thickness 25mm, width 2000mm, and the mass percent of its chemical composition is: C 0.088%, Si 0.224%, Mn 0.43%, P 0.012 %, S 0.002%, Cr 8.86%, Mo 0.41%, V 0.21%, W 1.61%, Nb 0.059%, N 0.057%, B 0.0022%, Ni 0.21%, Al 0.003%, all the other are Fe and inevitable impurity.
Ultrasonic inspection: rank≤II level;
Mechanical property requirements: yield strength R p0.2>=440MPa, tensile strength R m>=620MPa, unit elongation A>=20%, normal temperature ballistic work A kV2>=90J;
Template requires: steel plate width direction roughness≤5mm/m.
The present embodiment comprises following step successively:
I Slug preparing
Through hot metal pretreatment, converter top and bottom complex blowing, AOD and LF refining, the composition of molten steel reaches following requirement tapping:
C 0.088%, Si 0.224%, Mn 0.43%, P 0.012 %, S 0.002%,
Cr 8.86%, Mo 0.41%, V 0.21%, W 1.61%, Nb 0.059%, N 0.057%, B 0.0022%, Ni 0.21%, Al 0.003%, all the other are Fe and inevitable impurity.
The continuously cast bloom that continuous casting becomes 220mm thick;
II annealing
The red annealing furnace that send of strand is annealed, annealing temperature 740 DEG C, and soaking time 4 hours, directly comes out of the stove, and redly send hot repair grinder sequence;
III hot repair mill
Reconditioning is carried out in the red annealing continuously cast bloom upper and lower plates face sent, and grind clean defect, peeling amount is 1.4%, and one side grinding thichness is 1.54mm, becomes steel billet.
IV heating steel billet
Heated in process furnace by steel billet after reconditioning, Heating temperature is 1230 DEG C, and soaking time is 4 hours, guarantees that steel billet burning is even, grills thoroughly;
V rolling
Through high-pressure water descaling, by the rolling on roughing mill of the steel billet after high-pressure water descaling, start rolling temperature 1180 DEG C, roughing reduction in pass is 27%, and be rolled into middle part base, workpiece thickness controls at 65mm, roll into the rolling on finishing mill of middle steel plate intermediate blank, last pass draught is 31%, and finishing temperature control is at 870 DEG C, and finish rolling becomes steel plate;
VI slow cooling
Before steel plate enters hole, in burial pit, temperature must reach more than 200 DEG C, after steel plate rolling completes, and directly put into burial pit and carry out cooling in heap, the time of putting into is 150min.
VII hot straightening
In order to ensure template, steel plate is carried out hot straightening; Straightening temperature is 530 DEG C, and aligning passage is 1 road, ensures steel plate width direction roughness≤5mm/m.
VIII tempering
Red for steel plate delivering in heat treatment furnace is carried out temper, and tempering temperature is 790 DEG C, and soaking time is 70min, and steel plate is come out of the stove air cooling;
Ⅸ inspection
Finished steel plate is detected a flaw, mechanical property and plate shape inspection.Ultrasonic inspection rank is I level, carries out mechanical properties test, yield strength R to finished steel plate p0.2for 490MPa, tensile strength R mfor 675MPa, unit elongation A is 25.5%, normal temperature ballistic work A kV2for 170J, meet mechanical property requirements, steel plate width direction roughness is 4mm/m.
embodiment 2
Power station heat-resisting steel sheet and plate dimensions is thickness 36mm, width 2000mm, and the mass percent of its chemical composition is:
C 0.087%, Si 0.23%, Mn 0.44%, P 0.013 %, S 0.001%, Cr 8.91%, Mo 0.43%, V 0.23%, W 1.63%, Nb 0.061%, N 0.059%, B 0.0021%, Ni 0.22%, Al 0.004%, all the other are Fe and inevitable impurity.
Ultrasonic inspection: rank≤II level;
Mechanical property requirements: yield strength R p0.2>=440MPa, tensile strength R m>=620MPa, unit elongation A>=20%, normal temperature ballistic work A kV2>=90J;
Template requires: steel plate width direction roughness≤5mm/m.
The present embodiment comprises following step successively:
I Slug preparing
Through hot metal pretreatment, converter top and bottom complex blowing, AOD and LF refining, the composition of molten steel reaches following requirement tapping:
C 0.087%, Si 0.23%,Mn 0.44%, P 0.013 %, S 0.001%,
Cr 8.91%, Mo 0.43%, V 0.23%, W 1.63%, Nb 0.061%, N 0.059%, B 0.0021%, Ni 0.22%, Al 0.004%, all the other are Fe and inevitable impurity.
The continuously cast bloom that continuous casting becomes 220mm thick;
II annealing
The red annealing furnace that send of strand is annealed, annealing temperature 740 DEG C, and soaking time 4 hours, directly comes out of the stove, and redly send hot repair grinder sequence;
III hot repair mill
Reconditioning is carried out in the red annealing continuously cast bloom upper and lower plates face sent, and grind clean defect, peeling amount is 1.6%, and one side grinding thichness is 1.76mm, becomes steel billet.
IV heating steel billet
Heated in process furnace by steel billet after reconditioning, Heating temperature is 1210 DEG C, and soaking time is 4 hours, guarantees that steel billet burning is even, grills thoroughly;
V rolling
Through high-pressure water descaling, by the rolling on roughing mill of the steel billet after high-pressure water descaling, start rolling temperature 1170 DEG C, roughing reduction in pass is 29%, and workpiece thickness controls, at 75mm, to roll into intermediate blank, intermediate blank is rolling on finishing mill, last pass draught is 32%, and finishing temperature control is at 875 DEG C, and finish rolling becomes steel plate;
VI slow cooling
Before steel plate enters hole, in burial pit, temperature must reach more than 200 DEG C, after steel plate rolling completes, and directly put into burial pit and carry out cooling in heap, the time of putting into is 170min.
VII hot straightening
In order to ensure template, steel plate is carried out hot straightening; Straightening temperature is 580 DEG C, and aligning passage is 2 roads, ensures steel plate width direction roughness≤5mm/m.
VIII tempering
Red for steel plate delivering in heat treatment furnace is carried out temper, and tempering temperature is 790 DEG C, and soaking time is 110min, and steel plate is come out of the stove air cooling;
Ⅸ inspection
Finished steel plate is detected a flaw, mechanical property and plate shape inspection.UT (Ultrasonic Testing) rank is I level, carries out mechanical properties test, yield strength R to finished steel plate p0.2for 495MPa, tensile strength R mfor 680MPa, unit elongation A is 25%, normal temperature ballistic work A kV2for 192J, meet mechanical property requirements, steel plate width direction roughness is 4mm/m.

Claims (2)

1. a power station manufacture method for high-strength temperature-resistant steel plate, it comprises following step successively:
islug preparing
Through hot metal pretreatment, converter top and bottom complex blowing, AOD and LF refining, the mass percent of molten steel composition reaches following requirement tapping:
C 0.07 ~ 0.13, Si 0.15 ~ 0.50, Mn 0.35 ~ 0.55, P≤0.02, S≤0.01, Cr 8.50 ~ 9.50, Mo 0.30 ~ 0.6, V 0.15 ~ 0.25, W 1.50 ~ 2.00, Nb 0.04 ~ 0.07, N 0.035 ~ 0.065, B 0.002 ~ 0.005%, Ni 0.10 ~ 0.30,0 < Al≤0.015, all the other are Fe and inevitable impurity;
The continuously cast bloom that continuous casting becomes 200 ~ 220mm thick;
iIannealing
The red annealing furnace that send of strand is annealed, annealing temperature 740 scholar 10 DEG C, and soaking time 3 ~ 4 hours, directly comes out of the stove, and redly send hot repair grinder sequence;
iIIhot repair is ground
Reconditioning is carried out in the red annealing continuously cast bloom upper and lower plates face sent, grinds clean defect; Peeling amount is 1-2%, and one side grinding thichness is 1-2.2mm, becomes steel billet;
iVheating steel billet
Heated in process furnace by steel billet after reconditioning, Heating temperature is 1220 scholar 10 DEG C, and soaking time is 3 ~ 4 hours, guarantees that steel billet burning is even, grills thoroughly;
vrolling
Through high-pressure water descaling, by the rolling on roughing mill of the steel billet after high-pressure water descaling, start rolling temperature 1170 ~ 1200 DEG C, roughing reduction in pass is 25 ~ 30%, is rolled into intermediate blank, and workpiece thickness controls at 60 ~ 80mm, intermediate blank is rolling on finishing mill, last pass draught is 30 ~ 35%, and finishing temperature control is at 860 ~ 880 DEG C, and finish rolling becomes steel plate;
vIslow cooling
Before steel plate enters hole, in burial pit, temperature reaches more than 200 DEG C, after steel plate rolling completes, and directly put into burial pit and carry out cooling in heap, the time of putting into is 120 ~ 180min;
vIIhot straightening
Steel plate is carried out hot straightening; Steel plate width direction roughness≤5mm/m;
vIIItempering
Red for steel plate delivering in heat treatment furnace is carried out temper, and tempering temperature is 790 scholar 10 DEG C, and soaking time is 60 ~ 120min, and steel plate is come out of the stove air cooling.
2. the manufacture method of power station according to claim 1 high-strength temperature-resistant steel plate, is characterized in that: vIIItempering light plate is come out of the stove after air cooling, also steel plate is detected a flaw, mechanical property and plate shape inspection; Ultrasonic inspection, rank≤II level; Mechanical properties test, yield strength R p0.2be 480 ~ 530MPa, tensile strength R mbe 665 ~ 694MPa, unit elongation A is 24 ~ 29%, normal temperature ballistic work A kV2be 165 ~ 210J; Plate shape is checked, and steel plate width direction roughness is not more than 5mm/m.
CN201510027659.0A 2015-01-21 2015-01-21 A kind of manufacture method of power station high-strength temperature-resistant steel plate Active CN104593697B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510027659.0A CN104593697B (en) 2015-01-21 2015-01-21 A kind of manufacture method of power station high-strength temperature-resistant steel plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510027659.0A CN104593697B (en) 2015-01-21 2015-01-21 A kind of manufacture method of power station high-strength temperature-resistant steel plate

Publications (2)

Publication Number Publication Date
CN104593697A true CN104593697A (en) 2015-05-06
CN104593697B CN104593697B (en) 2016-08-24

Family

ID=53119745

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510027659.0A Active CN104593697B (en) 2015-01-21 2015-01-21 A kind of manufacture method of power station high-strength temperature-resistant steel plate

Country Status (1)

Country Link
CN (1) CN104593697B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109207845A (en) * 2017-06-30 2019-01-15 宝钢特钢有限公司 A kind of ultra supercritical heat-resisting steel sheet and plate and its manufacturing method
CN113699337A (en) * 2021-08-06 2021-11-26 山西太钢不锈钢股份有限公司 Heat treatment process for continuous casting large round billet of 9Cr heat-resistant steel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001262286A (en) * 2000-03-22 2001-09-26 Japan Steel Works Ltd:The HIGH-PURITY HIGH-Cr FERRITIC HEAT RESISTING STEEL AND ITS MANUFACTURING METHOD
CN1807955A (en) * 2006-01-20 2006-07-26 天津商学院 High alloy steel seamless steel pipe and production method thereof
CN101660098A (en) * 2009-09-16 2010-03-03 天津钢管集团股份有限公司 Hot-rolling seamless steel pipe applicable to high temperature of 580-620 DEG C and high pressure of 24-30MPa and production method thereof
CN102864379A (en) * 2012-10-08 2013-01-09 北京科技大学 Fe-Cr-Co-W-Mo martensitic heat resistant steel and method for manufacturing same
CN103045962A (en) * 2012-12-26 2013-04-17 钢铁研究总院 Steel for steam-temperature ultra-supercritical thermal power unit and preparation method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001262286A (en) * 2000-03-22 2001-09-26 Japan Steel Works Ltd:The HIGH-PURITY HIGH-Cr FERRITIC HEAT RESISTING STEEL AND ITS MANUFACTURING METHOD
CN1807955A (en) * 2006-01-20 2006-07-26 天津商学院 High alloy steel seamless steel pipe and production method thereof
CN101660098A (en) * 2009-09-16 2010-03-03 天津钢管集团股份有限公司 Hot-rolling seamless steel pipe applicable to high temperature of 580-620 DEG C and high pressure of 24-30MPa and production method thereof
CN102864379A (en) * 2012-10-08 2013-01-09 北京科技大学 Fe-Cr-Co-W-Mo martensitic heat resistant steel and method for manufacturing same
CN103045962A (en) * 2012-12-26 2013-04-17 钢铁研究总院 Steel for steam-temperature ultra-supercritical thermal power unit and preparation method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109207845A (en) * 2017-06-30 2019-01-15 宝钢特钢有限公司 A kind of ultra supercritical heat-resisting steel sheet and plate and its manufacturing method
CN113699337A (en) * 2021-08-06 2021-11-26 山西太钢不锈钢股份有限公司 Heat treatment process for continuous casting large round billet of 9Cr heat-resistant steel

Also Published As

Publication number Publication date
CN104593697B (en) 2016-08-24

Similar Documents

Publication Publication Date Title
CN110438416B (en) Method for eliminating surface cracks of ultra-wide high-nitrogen austenitic stainless steel medium plate
CN102899460B (en) Heat treatment method for martensitic stainless steel forging module
CN103769424B (en) The control method of steekle mill surface of steel plate red scale
CN101704026B (en) Method for controlling pitting on surface of medium steel plate
CN104988435B (en) Low-carbon high-tenacity super-thick steel plate and manufacturing method thereof
CN109234633B (en) Rare earth treated high-strength steel plate with low preheating temperature of 690MPa level and preparation method thereof
CN108193137B (en) DQ-Q &amp; T method of 1000 MPa-grade hydroelectric steel plate with thickness not greater than 80mm
CN106216392B (en) One kind eliminates cut deal piebald defects controlling method
CN104480394A (en) High-carbon low-alloy saw blade steel for cutting stone and metal and manufacturing method of hot-rolled steel plate made of high-carbon low-alloy saw blade steel
CN104593696B (en) A kind of station boiler heat-resisting steel sheet and plate and manufacture method thereof
CN101700533A (en) Method for increasing scale removal effect of medium and heavy plate
CN101586210B (en) High strength enamel steel and producing technology and enamel firing technology thereof
CN104862616A (en) Large-thickness high-toughness container steel plate and manufacturing method thereof
CN113817963A (en) 1000 MPa-level low-welding-crack-sensitivity steel plate and production method thereof
CN105256224A (en) Cold-rolled micro carbon steel strip for oil heater and preparation method of steel strip
CN105274429A (en) Production method for alloy filament
CN105401091A (en) 42CrMo shaft part and heat treatment process thereof
CN102199734B (en) High-strength 301L stainless steel used for bus, and manufacture method thereof
CN105925889A (en) Ultrathick specification 1.2311 mold steel plate and preparation method thereof
CN105274428A (en) Production method for alloy filament with zero defect on surface
CN104593697B (en) A kind of manufacture method of power station high-strength temperature-resistant steel plate
CN113084132A (en) Production method for reducing surface defects of ferritic stainless steel plate
CN107119237A (en) The production method of Q690D medium plates and reduction Q690D medium plate energy consumptions
CN107119238A (en) The 690MPa grades wide thin steel for engineering machinery plate of yield strength and its production method
CN110055391A (en) A method of eliminating fine steel hot rolling edge crack defect

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant