CN104581831B - A kind of load equalization method between base station and system - Google Patents
A kind of load equalization method between base station and system Download PDFInfo
- Publication number
- CN104581831B CN104581831B CN201410851041.1A CN201410851041A CN104581831B CN 104581831 B CN104581831 B CN 104581831B CN 201410851041 A CN201410851041 A CN 201410851041A CN 104581831 B CN104581831 B CN 104581831B
- Authority
- CN
- China
- Prior art keywords
- cell
- base station
- information
- target
- load
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W28/00—Network traffic management; Network resource management
- H04W28/02—Traffic management, e.g. flow control or congestion control
- H04W28/08—Load balancing or load distribution
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The present invention provides the load equalization methods and system between a kind of base station, wherein the method includes:Source base station sends resource status request message to target BS;Resource status request message includes the cell high load capacity threshold value inquiry request message of target BS;Source base station receives the resource status response message from target BS;Resource status response message includes the cell high load capacity threshold information of target BS;Source base station judges whether the loading condiction for meeting neighboring community according to the cell load information of target BS and the cell high load capacity threshold information of target BS;If meeting the loading condiction of neighboring community, source base station judges whether the trigger condition for meeting load balancing;If meeting the trigger condition of load balancing, source base station triggers load balancing.The present invention improves the accuracy of load balancing judgement between base station, and user is avoided continuously to be switched between base station, reduces the risk of base station handover failure, lifting system handling capacity and user's perception.
Description
Technical field
The present invention relates to fields of communication technology, more particularly to the load equalization method and system between a kind of base station.
Background technology
Initial stage is disposed in LTE (Long Term Evolution, long term evolution) network, portion of base stations is from TD-SCDMA
(Time Division-Synchronous Code Division Multiple Access, TD SDMA) is made
What F-band (1880~1900MHz) evolution upgrading of formula was completed, since the manufacturer of TD-SCDMA is mostly that domestic manufacturers are leading.
Thus the situation without foreign vendor's equipment in bulk zone will be formed.In order to guide LTE industrial patterns to develop in a healthy way, operator
It wants to introduce external D frequency ranges (2570-2620MHz) LTE equipment vendors, and then forms the flower arrangement group of the different manufacturer of F/D frequency ranges
Web frame is easy to be formed the horizontal uneven phenomenon of traffic load between multiple cells.Therefore need by switching or other
Measure is distributed to change traffic load, and radio resource is made to keep higher utilization rate, while ensureing to have been established the QoS of business
(Quality of Service, service quality).Equally, in the layering network environment of same equipment vendor, it is also desirable to carry out business
Load balancing carry out the throughput performance of lifting system.
Load balancing includes load evaluation, information on load interaction and three parts of balance policy.For in the same base station
Floored community, carry out information on load interaction when, need not use X2 interface (realize base station between interconnection, be the equal of base
Stand and the interface of base station) interacting load information.But for the floored community in different base station, the information on load of minizone interacts
It needs to complete by X2 interface.When the super early warning threshold value of certain cell load of source base station eNB (base station) 1, RRM (Radio
Resource Management, wireless resource management) by notice AP, (Wireless Access Point are wirelessly visited subsystem
Ask access point) subsystem acquisition information on load, the neighboring community of request message is received according to the instruction periodicity in request message
Report the information on load of this cell.
At present under the load balancing scene between base station, the height that source base station may be configured in the neighboring community of target BS is negative
Load balancing process is triggered in the case of uplink or downlink load of the lotus threshold value less than the neighboring community.But it is adjacent at this time small
The high load capacity threshold value of area's configuration already below its uplink or downlink load, can cause user force to be switched to already exceed it is negative
Continue load balancing behind the neighboring community of lotus threshold value, and then switch between the continuous base station of formation, increases base station switching
The risk of failure, and influence user's regular traffic and user's perception.
Invention content
The present invention provides load equalization method and system between a kind of base station, to solve the load balancing between existing base station
Cause user continuously to be switched between base station, base station handover failure risk is big, influence user's regular traffic and user perception
Problem.
To solve the above-mentioned problems, the invention discloses the load equalization methods between a kind of base station, including:
Source base station sends resource status request message to target BS;The resource status request message includes the target
The cell high load capacity threshold value inquiry request message of base station;
The source base station receives the resource status response message from the target BS;The resource status response disappears
Breath includes the cell high load capacity threshold information of the target BS;
The source base station is according to the cell load information of the target BS and the cell high load capacity door of the target BS
Limit value information judges whether the loading condiction for meeting neighboring community;
If meeting the loading condiction of neighboring community, the source base station judges whether the trigger condition for meeting load balancing;
If meeting the trigger condition of load balancing, the source base station triggers load balancing.
Preferably, the source base station is high according to the cell load information of the target BS and the cell of the target BS
Load threshold information judges whether the loading condiction for meeting neighboring community, including:
The source base station is believed according to the cell uplink information on load of the target BS with cell uplink high load capacity threshold value
The downlink load information of breath or the target BS judges whether to meet adjacent small with cell downlink high load capacity threshold information
The loading condiction in area;
If the cell uplink information on load of the target BS is less than the cell uplink high load capacity threshold information, or
The downlink load information of the target BS is less than the cell downlink high load capacity threshold information, it is determined that meets neighboring community
Loading condiction;
If the cell uplink information on load of the target BS is more than or equal to the cell uplink high load capacity threshold information,
And the downlink load information of the target BS is more than or equal to the cell downlink high load capacity threshold information, it is determined that discontented
The loading condiction of sufficient neighboring community.
Preferably, the source base station judges whether the trigger condition for meeting load balancing, including:
The source base station judges whether the cell load information of the source base station is more than or equal to the cell height of the source base station
Load threshold information, and the difference of the cell load information of the source base station and the cell load information of the target BS,
Whether the cell high load capacity threshold information of the cell high load capacity threshold information and the target BS of the source base station is more than
Difference;
If the cell load information of the source base station is more than or equal to the cell high load capacity threshold information of the source base station, and
The difference of the cell load information of the source base station and the cell load information of the target BS is more than the small of the source base station
The difference of area's high load capacity threshold information and the cell high load capacity threshold information of the target BS, it is determined that it is equal to meet load
The trigger condition of weighing apparatus;
If the cell load information of the source base station is less than the cell high load capacity threshold information of the source base station, Huo Zhesuo
The difference of the cell load information of source base station and the cell load information of the target BS is stated, the source base station is less than or equal to
The difference of cell high load capacity threshold information and the cell high load capacity threshold information of the target BS, it is determined that be unsatisfactory for bearing
The trigger condition of lotus equilibrium.
Preferably, the source base station judges whether the cell load information of the source base station is more than or equal to the source base station
Cell high load capacity threshold information, including:
The source base station judges whether the cell uplink information on load of the source base station is more than or equal to the small of the source base station
Whether the cell downlink information on load of area's uplink high load capacity threshold information or the source base station is more than or equal to the source base station
Cell downlink high load capacity threshold information.
Preferably, the source base station judges the cell load of the cell load information and the target BS of the source base station
The difference of information, if be more than the cell high load capacity of the cell high load capacity threshold information and the target BS of the source base station
The difference of threshold information, including:
The source base station judges that the cell uplink information on load of the source base station and the cell uplink of the target BS are negative
The difference of lotus information, if be more than the cell of the cell uplink high load capacity threshold information and the target BS of the source base station
The difference of uplink high load capacity threshold information;Alternatively,
Judge the difference of the cell downlink information on load of the source base station and the cell downlink information on load of the target BS
Value, if be more than the cell downlink high load capacity of the cell downlink high load capacity threshold information and the target BS of the source base station
The difference of threshold information.
Correspondingly, the invention also discloses the load balancing systems between a kind of base station, including:Source base station and target BS,
Wherein, the source base station includes:
Request message sending module, for sending resource status request message to the target BS;The resource status
Request message includes the cell high load capacity threshold value inquiry request message of the target BS;
Response message receiving module, for receiving the resource status response message from the target BS;The money
Source status response message includes the cell high load capacity threshold information of the target BS;
Adjacent load judgment module, for according to the small of the cell load information of the target BS and the target BS
Area's high load capacity threshold information judges whether the loading condiction for meeting neighboring community;
Load balancing judgment module judges whether to meet load balancing if the loading condiction for meeting neighboring community
Trigger condition;
Load balancing trigger module, if the trigger condition for meeting load balancing, triggers load balancing.
Preferably, the adjacent load judgment module, including:
First judging submodule, for the cell uplink information on load and cell uplink high load capacity according to the target BS
The downlink load information of threshold information or the target BS judges whether full with cell downlink high load capacity threshold information
The loading condiction of sufficient neighboring community;
First determination sub-module, if the cell uplink information on load for the target BS is less than cell uplink height
Load threshold information or the downlink load information of the target BS are believed less than the cell downlink high load capacity threshold value
Breath, it is determined that meet the loading condiction of neighboring community;If the cell uplink information on load of the target BS is more than or equal to described
Cell uplink high load capacity threshold information, and the downlink load information of the target BS is more than or equal to cell downlink height
Load threshold information, it is determined that be unsatisfactory for the loading condiction of neighboring community.
Preferably, the load balancing judgment module, including:
Second judgment submodule, for judging whether the cell load information of the source base station is more than or equal to the source base station
Cell high load capacity threshold information, and the cell load information of the cell load information of the source base station and the target BS
Difference, if be more than the source base station cell high load capacity threshold information and the target BS cell high load capacity thresholding
The difference of value information;
Second determination sub-module, if being more than or equal to the cell of the source base station for the cell load information of the source base station
High load capacity threshold information, and the difference of the cell load information of the source base station and the cell load information of the target BS
Value is more than the cell high load capacity threshold information of cell high load capacity threshold information and the target BS of the source base station
Difference, it is determined that meet the trigger condition of load balancing;If the cell load information of the source base station is less than the source base station
The cell load information of the cell load information of cell high load capacity threshold information or the source base station and the target BS
Difference, be less than or equal to the source base station cell high load capacity threshold information and the target BS cell high load capacity thresholding
The difference of value information, it is determined that be unsatisfactory for the trigger condition of load balancing.
Preferably, it is described to judge whether the cell uplink information on load of the source base station is more than or equal to for second judgment submodule
Whether the cell uplink high load capacity threshold information of source base station or the cell downlink information on load of the source base station are more than or equal to
The cell downlink high load capacity threshold information of the source base station.
Preferably, second judgment submodule judges the cell uplink information on load of the source base station and the target BS
The difference of cell uplink information on load, if be more than the cell uplink high load capacity threshold information of the source base station and the target
The difference of the cell uplink high load capacity threshold information of base station;Alternatively,
Judge the difference of the cell downlink information on load of the source base station and the cell downlink information on load of the target BS
Value, if be more than the cell downlink high load capacity of the cell downlink high load capacity threshold information and the target BS of the source base station
The difference of threshold information.
Compared with the background art, the present invention includes following advantages:
Source base station sends the resource for the cell high load capacity threshold value inquiry request message for carrying target BS to target BS
Status request message carries the cell high load capacity door of target BS after target BS receives in resource status response message
Limit value information, feeds back to source base station.Source base station according to the cell load of target BS with load door limits value the case where etc., judge
The load balancing between base station whether is triggered, the accuracy of load balancing judgement between base station is improved, avoids user continuously in base
It is switched between standing, reduces the risk of base station handover failure, while ensure that the continuity of customer service, lifting system gulps down
The amount of spitting and user's perception.
Description of the drawings
Fig. 1 is the load equalization method flow chart between a kind of base station in the embodiment of the present invention one;
Fig. 2 is the load equalization method flow chart between a kind of base station in the embodiment of the present invention two;
Fig. 3 is the load equalization method flow chart between a kind of base station in the embodiment of the present invention three;
Fig. 4 is the load balancing system structure chart between a kind of base station in the embodiment of the present invention four;
Fig. 5 is the load balancing system structure chart between a kind of base station in the embodiment of the present invention five.
Specific implementation mode
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, below in conjunction with the accompanying drawings and specific real
Applying mode, the present invention is described in further detail.
The load balancing being discussed in detail between a kind of base station provided by the invention below by several specific embodiments are enumerated
Method and system.
Embodiment one
The load equalization method between a kind of base station provided in an embodiment of the present invention is discussed in detail.
Referring to Fig.1, the load equalization method flow chart between a kind of base station in the embodiment of the present invention is shown.
Step 100, source base station sends resource status request message to target BS.
Wherein, source base station and target BS are that in contrast, source base station refers to that the user of this base station is intended to be switched to other bases
The base station stood, target BS refer to that the user of other base stations is switched to the base station of this base station.For example, the user of the base stations A is intended to switch
To the base stations B, then the base stations A are source base station, and the base stations B are target BS.
The resource status request message may include that the cell high load capacity threshold value inquiry request of the target BS disappears
Breath.
The effect of the cell high load capacity threshold value inquiry request message of the target BS is to inquire the cell of target BS
High load capacity threshold information.
The high load capacity threshold information may include uplink load threshold value and downlink composite threshold value.
Step 102, the source base station receives the resource status response message from the target BS.
After the target BS receives the resource status request message from source base station, institute can be fed back to the source base station
State the resource status response message of target BS.
Wherein, the resource status response message may include the cell high load capacity threshold information of the target BS.
Step 104, the source base station is according to the cell of the cell load information and the target BS of the target BS
High load capacity threshold information judges whether the loading condiction for meeting neighboring community;If satisfied, thening follow the steps 106;If not satisfied,
Then flow terminates.
The cell load information of the target BS may include that the cell uplink information on load of target BS and downlink are born
Lotus information.
It specifically can be according to the cell uplink information on load of target BS and the cell uplink high load capacity thresholding of target BS
Value information, and, the cell downlink information on load of target BS and the cell downlink high load capacity threshold information of target BS are sentenced
The disconnected loading condiction for whether meeting neighboring community.
Step 106, the source base station judges whether the trigger condition for meeting load balancing;If satisfied, thening follow the steps
108;If not satisfied, then flow terminates.
For the load balancing situation between base station, source base station judges whether that the trigger condition for meeting load balancing may be used
Relative load thresholding strategy, i.e., meeting two following conditions is just believed that the trigger condition for meeting load balancing simultaneously.Condition one:
The cell uplink load of source base station is higher than this cell downlink higher than this cell uplink high load capacity thresholding or this cell downlink load
High load capacity thresholding.Condition two:The difference of the cell uplink load of source base station and the uplink load of the neighboring community of target BS, greatly
In the difference of the uplink load threshold value of the neighboring community of the cell and target BS of source base station or the cell downlink of source base station
The difference of the downlink load of the neighboring community of load and target BS is more than the neighboring community of the cell and target BS of source base station
Downlink load threshold value difference.
It should be noted that the execution sequence of above-mentioned steps 104 and step 106 is in no particular order, step can also be first carried out
106, then step 104 is executed, the present embodiment is not limited the execution sequence of step 104 and step 106.
Step 108, the source base station triggers load balancing.
User in this base station cell is switched in the cell of target BS by the source base station, realizes the load between base station
It is balanced.
In conclusion in the technical solution of the embodiment of the present invention, source base station sends to target BS and carries target BS
Cell high load capacity threshold value inquiry request message resource status request message, after target BS receives, in resource status
The cell high load capacity threshold information that target BS is carried in response message, feeds back to source base station.Source base station is according to target BS
Cell load and load door limits value the case where etc., judge whether to trigger the load balancing between base station, improve and bear between base station
The accuracy that lotus equilibrium judges, avoids user from continuously being switched between base station, reduces the risk of base station handover failure, together
When ensure that the continuity of customer service, lifting system handling capacity and user's perception.
Embodiment two
The load equalization method between a kind of base station provided in an embodiment of the present invention is discussed in detail.
With reference to Fig. 2, the load equalization method flow chart between a kind of base station in the embodiment of the present invention is shown.
Step 200, source base station sends resource status request message to target BS.
Wherein, source base station and target BS are that in contrast, source base station refers to that the user of this base station is intended to be switched to other bases
The base station stood, target BS refer to that the user of other base stations is switched to the base station of this base station.For example, the user of the base stations A is intended to switch
To the base stations B, then the base stations A are source base station, and the base stations B are target BS.
The resource status request message may include that the cell high load capacity threshold value inquiry request of the target BS disappears
Breath.
The effect of the cell high load capacity threshold value inquiry request message of the target BS is to inquire the cell of target BS
High load capacity threshold information.
The high load capacity threshold information may include uplink load threshold value and downlink composite threshold value.
Step 202, the source base station receives the resource status response message from the target BS.
After the target BS receives the resource status request message from source base station, institute can be fed back to the source base station
State the resource status response message of target BS.
Wherein, the resource status response message may include the cell high load capacity threshold information of the target BS.
Step 204, the source base station is according to the cell of the cell load information and the target BS of the target BS
High load capacity threshold information judges whether the loading condiction for meeting neighboring community;If satisfied, thening follow the steps 206;If not satisfied,
Then flow terminates.
The cell load information of the target BS may include that the cell uplink information on load of target BS and downlink are born
Lotus information.
It specifically can be according to the cell uplink information on load of target BS and the cell uplink high load capacity thresholding of target BS
Value information, and, the cell downlink information on load of target BS and the cell downlink high load capacity threshold information of target BS are sentenced
The disconnected loading condiction for whether meeting neighboring community.
Preferably, data can be divided into uplink and downlink according to transmission direction in base station, so, the step 204 can
Think:
The source base station is believed according to the cell uplink information on load of the target BS with cell uplink high load capacity threshold value
The downlink load information of breath or the target BS judges whether to meet adjacent small with cell downlink high load capacity threshold information
The loading condiction in area.
If the cell uplink information on load of the target BS is less than the cell uplink high load capacity threshold information, or
The downlink load information of the target BS is less than the cell downlink high load capacity threshold information, it is determined that meets neighboring community
Loading condiction.
For example, the cell uplink information on load of target BS is S1, the cell uplink high load capacity threshold value of target BS is believed
Breath is S, if S1 < S, judges the loading condiction for meeting neighboring community;Or the downlink load information X1 of target BS, target
The cell downlink high load capacity threshold information of base station is X, if X1 < X, judges the loading condiction for meeting neighboring community.
If the cell uplink information on load of the target BS is more than or equal to the cell uplink high load capacity threshold information,
And the downlink load information of the target BS is more than or equal to the cell downlink high load capacity threshold information, it is determined that discontented
The loading condiction of sufficient neighboring community.
For example, the cell uplink information on load of target BS is S2, the cell uplink high load capacity threshold value of target BS is believed
Breath is S, and the downlink load information of target BS is X2, and the cell downlink high load capacity threshold information of target BS is X, if S2 >=
S, and X2 >=X, it is determined that be unsatisfactory for the loading condiction of neighboring community.
Step 206, the source base station judges whether the trigger condition for meeting load balancing;If satisfied, thening follow the steps
208;If not satisfied, then flow terminates.
For the load balancing situation between base station, source base station judges whether that the trigger condition for meeting load balancing may be used
Relative load thresholding strategy, i.e., meeting two following conditions is just believed that the trigger condition for meeting load balancing simultaneously.Condition one:
The cell uplink load of source base station is higher than this cell downlink higher than this cell uplink high load capacity thresholding or this cell downlink load
High load capacity thresholding.Condition two:The difference of the cell uplink load of source base station and the uplink load of the neighboring community of target BS, greatly
In the difference of the uplink load threshold value of the neighboring community of the cell and target BS of source base station or the cell downlink of source base station
The difference of the downlink load of the neighboring community of load and target BS is more than the neighboring community of the cell and target BS of source base station
Downlink load threshold value difference.
Preferably, the step 206 may include:
Sub-step 2061, the source base station judge whether the cell load information of the source base station is more than or equal to the source base
The cell high load capacity threshold information stood.
Preferably, data can be divided into uplink and downlink according to transmission direction in base station, so, the sub-step 2061
Can be:
The source base station judges whether the cell uplink information on load of the source base station is more than or equal to the small of the source base station
Whether the cell downlink information on load of area's uplink high load capacity threshold information or the source base station is more than or equal to the source base station
Cell downlink high load capacity threshold information.
Sub-step 2062, the source base station judge the cell of the cell load information and the target BS of the source base station
The difference of information on load, if the cell of the cell high load capacity threshold information for being more than the source base station and the target BS is high
The difference of load threshold information.
Preferably, data can be divided into uplink and downlink according to transmission direction in base station, so, the sub-step 2062
Can be:
The source base station judges that the cell uplink information on load of the source base station and the cell uplink of the target BS are negative
The difference of lotus information, if be more than the cell of the cell uplink high load capacity threshold information and the target BS of the source base station
The difference of uplink high load capacity threshold information;Alternatively,
Judge the difference of the cell downlink information on load of the source base station and the cell downlink information on load of the target BS
Value, if be more than the cell downlink high load capacity of the cell downlink high load capacity threshold information and the target BS of the source base station
The difference of threshold information.
It should be noted that above-mentioned sub-step 2061 and sub-step 2062 have no sequencing relationship during realization,
It can also be performed simultaneously.
If the cell load information of the source base station is more than or equal to the cell high load capacity threshold information of the source base station, and
The difference of the cell load information of the source base station and the cell load information of the target BS is more than the small of the source base station
The difference of area's high load capacity threshold information and the cell high load capacity threshold information of the target BS, it is determined that it is equal to meet load
The trigger condition of weighing apparatus.
For example, the cell uplink information on load of source base station is S3, the cell uplink high load capacity threshold information S ' of source base station,
The cell uplink information on load S4 of target BS, the cell uplink high load capacity threshold information S of target BS, if S3 >=S ', and
S3-S4 >=S '-S, it is determined that meet the trigger condition of load balancing.
If the cell load information of the source base station is less than the cell high load capacity threshold information of the source base station, Huo Zhesuo
The difference of the cell load information of source base station and the cell load information of the target BS is stated, the source base station is less than or equal to
The difference of cell high load capacity threshold information and the cell high load capacity threshold information of the target BS, it is determined that be unsatisfactory for bearing
The trigger condition of lotus equilibrium.
For example, the cell downlink information on load of source base station is X3, the cell downlink high load capacity threshold information X ' of source base station,
The cell downlink information on load X4 of target BS, the cell downlink high load capacity threshold information X of target BS, if X3 < X ', or
X3-X4 < X '-X, it is determined that be unsatisfactory for the trigger condition of load balancing.
It should be noted that the execution sequence of above-mentioned steps 204 and step 206 is in no particular order, step can also be first carried out
206, then step 204 is executed, the present embodiment is not limited the execution sequence of step 204 and step 206.
Step 208, the source base station triggers load balancing.
User in this base station cell is switched in the cell of target BS by the source base station, realizes the load between base station
It is balanced.
In conclusion in the technical solution of the embodiment of the present invention, source base station sends to target BS and carries target BS
Cell high load capacity threshold value inquiry request message resource status request message, after target BS receives, in resource status
The cell high load capacity threshold information that target BS is carried in response message, feeds back to source base station.Source base station is according to target BS
Cell load and load door limits value the case where etc., judge whether to trigger the load balancing between base station, improve and bear between base station
The accuracy that lotus equilibrium judges, avoids user from continuously being switched between base station, reduces the risk of base station handover failure, together
When ensure that the continuity of customer service, lifting system handling capacity and user's perception.
Embodiment three
The load equalization method between a kind of base station provided in an embodiment of the present invention is discussed in detail.
With reference to Fig. 3, the load equalization method flow chart between a kind of base station in the embodiment of the present invention is shown.
Step 300, source base station carries out load evaluation operation.
Source base station carries out load evaluation operation, and the cell for evaluating source base station has reached upper load limit, needs cell
In user be switched in other base stations.
Step 302, the resource status request of the high load capacity threshold value inquiry request of source base station transmission carrying neighboring community disappears
It ceases to target BS.
Source base station is it needs to be determined that the cell high load capacity threshold value that the cell load situation of target BS is configured with target BS
Information.
Step 304, target BS will carry the resource status response message of the high load capacity threshold information of its this cell
Feed back to source base station.
Source base station can be according to the cell high load capacity threshold value of the cell load situation and target BS configuration of target BS
Information is judged, the judging result of condition one and condition two in above-described embodiment one and embodiment two is combined, really
The fixed load balancing operation that whether can be executed between base station.
In conclusion in the technical solution of the embodiment of the present invention, source base station sends to target BS and carries target BS
Cell high load capacity threshold value inquiry request message resource status request message, after target BS receives, in resource status
The cell high load capacity threshold information that target BS is carried in response message, feeds back to source base station.Source base station is according to target BS
Cell load and load door limits value the case where etc., judge whether to trigger the load balancing between base station, in one He of above-mentioned condition
On the basis of condition two, increase a new Rule of judgment, improves the accuracy of load balancing judgement between base station, avoid user
It is continuously switched between base station, reduces the risk of base station handover failure, while ensure that the continuity of customer service,
Lifting system handling capacity and user's perception.
Example IV
The load balancing system between a kind of base station provided in an embodiment of the present invention is discussed in detail.
With reference to Fig. 4, the load balancing system structure chart between a kind of base station in the embodiment of the present invention is shown.
The system may include source base station 40 and target BS 42, wherein the source base station 40 may include:
Request message sending module 401, response message receiving module 402, adjacent load judgment module 403, load balancing
Judgment module 404, load balancing trigger module 405.
The relationship between the function and each module of each module is discussed in detail separately below.
Request message sending module 401, for sending resource status request message to the target BS;The resource shape
State request message includes the cell high load capacity threshold value inquiry request message of the target BS.
Response message receiving module 402, for receiving the resource status response message from the target BS;It is described
Resource status response message includes the cell high load capacity threshold information of the target BS.
Adjacent load judgment module 403 is used for the cell load information according to the target BS and the target BS
Cell high load capacity threshold information judge whether the loading condiction for meeting neighboring community.
Load balancing judgment module 404 judges whether to meet load equal if the loading condiction for meeting neighboring community
The trigger condition of weighing apparatus.
Load balancing trigger module 405, if the trigger condition for meeting load balancing, triggers load balancing.
In conclusion in the technical solution of the embodiment of the present invention, source base station sends to target BS and carries target BS
Cell high load capacity threshold value inquiry request message resource status request message, after target BS receives, in resource status
The cell high load capacity threshold information that target BS is carried in response message, feeds back to source base station.Source base station is according to target BS
Cell load and load door limits value the case where etc., judge whether to trigger the load balancing between base station, improve and bear between base station
The accuracy that lotus equilibrium judges, avoids user from continuously being switched between base station, reduces the risk of base station handover failure, together
When ensure that the continuity of customer service, lifting system handling capacity and user's perception.
Embodiment five
The load balancing system between a kind of base station provided in an embodiment of the present invention is discussed in detail.
With reference to Fig. 5, the load balancing system structure chart between a kind of base station in the embodiment of the present invention is shown.
The system may include source base station 50 and target BS 52, wherein the source base station 50 may include:
Request message sending module 501, response message receiving module 502, adjacent load judgment module 503, load balancing
Judgment module 504, load balancing trigger module 505.
Wherein, the adjacent load judgment module 503 may include:First judging submodule 5031, first determines submodule
Block 5032.
The load balancing judgment module 504 may include:Second judgment submodule 5041, the second determination sub-module
5042。
The relationship between each module, the function of each submodule and each module, each submodule is discussed in detail separately below.
Request message sending module 501, for sending resource status request message to the target BS;The resource shape
State request message includes the cell high load capacity threshold value inquiry request message of the target BS.
Response message receiving module 502, for receiving the resource status response message from the target BS;It is described
Resource status response message includes the cell high load capacity threshold information of the target BS.
Adjacent load judgment module 503 is used for the cell load information according to the target BS and the target BS
Cell high load capacity threshold information judge whether the loading condiction for meeting neighboring community.
Preferably, the adjacent load judgment module 503 may include:
First judging submodule 5031, for high according to the cell uplink information on load and cell uplink of the target BS
Load threshold information or the downlink load information of the target BS are with the judgement of cell downlink high load capacity threshold information
The no loading condiction for meeting neighboring community.
First determination sub-module 5032, if the cell uplink information on load for the target BS is less than the cell
The downlink load information of row high load capacity threshold information or the target BS is less than the cell downlink high load capacity threshold value
Information, it is determined that meet the loading condiction of neighboring community;If the cell uplink information on load of the target BS is more than or equal to institute
Cell uplink high load capacity threshold information is stated, and the downlink load information of the target BS is more than or equal to the cell downlink
High load capacity threshold information, it is determined that be unsatisfactory for the loading condiction of neighboring community.
Load balancing judgment module 504 judges whether to meet load equal if the loading condiction for meeting neighboring community
The trigger condition of weighing apparatus.
Preferably, the load balancing judgment module 504 may include:
Second judgment submodule 5041, for judging whether the cell load information of the source base station is more than or equal to the source
The cell high load capacity threshold information of base station, and the cell load of the cell load information of the source base station and the target BS
The difference of information, if be more than the cell high load capacity of the cell high load capacity threshold information and the target BS of the source base station
The difference of threshold information.
Preferably, second judgment submodule 5041 judges whether the cell uplink information on load of the source base station is more than or equal to
Whether the cell uplink high load capacity threshold information of the source base station or the cell downlink information on load of the source base station are more than
Equal to the cell downlink high load capacity threshold information of the source base station.
Preferably, second judgment submodule 5041 judges the cell uplink information on load of the source base station and the target base
The difference for the cell uplink information on load stood, if be more than the source base station cell uplink high load capacity threshold information with it is described
The difference of the cell uplink high load capacity threshold information of target BS;Alternatively,
Judge the difference of the cell downlink information on load of the source base station and the cell downlink information on load of the target BS
Value, if be more than the cell downlink high load capacity of the cell downlink high load capacity threshold information and the target BS of the source base station
The difference of threshold information.
Second determination sub-module 5042, if the cell load information for the source base station is more than or equal to the source base station
Cell high load capacity threshold information, and the cell load information of the source base station and the cell load information of the target BS
Difference is more than the cell high load capacity threshold information of the cell high load capacity threshold information and the target BS of the source base station
Difference, it is determined that meet the trigger condition of load balancing;If the cell load information of the source base station is less than the source base station
Cell high load capacity threshold information or the cell load of cell load information and the target BS of the source base station believe
The difference of breath is less than or equal to the cell high load capacity door of the cell high load capacity threshold information and the target BS of the source base station
The difference of limit value information, it is determined that be unsatisfactory for the trigger condition of load balancing.
Load balancing trigger module 505, if the trigger condition for meeting load balancing, triggers load balancing.
In conclusion in the technical solution of the embodiment of the present invention, source base station sends to target BS and carries target BS
Cell high load capacity threshold value inquiry request message resource status request message, after target BS receives, in resource status
The cell high load capacity threshold information that target BS is carried in response message, feeds back to source base station.Source base station is according to target BS
Cell load and load door limits value the case where etc., judge whether to trigger the load balancing between base station, improve and bear between base station
The accuracy that lotus equilibrium judges, avoids user from continuously being switched between base station, reduces the risk of base station handover failure, together
When ensure that the continuity of customer service, lifting system handling capacity and user's perception.
For system embodiments, since it is basically similar to the method embodiment, so fairly simple, the correlation of description
Place illustrates referring to the part of embodiment of the method.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with
The difference of other embodiment, the same or similar parts between the embodiments can be referred to each other.
The load equalization method and system being provided for the embodiments of the invention above between a kind of base station, have carried out detailed Jie
It continues, principle and implementation of the present invention are described for specific case used herein, and the explanation of above example is only
It is the method and its core concept for being used to help understand the present invention;Meanwhile for those of ordinary skill in the art, according to this hair
Bright thought, there will be changes in the specific implementation manner and application range, in conclusion the content of the present specification should not manage
Solution is limitation of the present invention.
Claims (8)
1. the load equalization method between a kind of base station, which is characterized in that including:
Source base station sends resource status request message to target BS;The resource status request message includes the target BS
Cell high load capacity threshold value inquiry request message;
The source base station receives the resource status response message from the target BS;The resource status response message packet
Include the cell high load capacity threshold information of the target BS;
The source base station is according to the cell load information of the target BS and the cell high load capacity threshold value of the target BS
Information judges whether the loading condiction for meeting neighboring community;
If meeting the loading condiction of neighboring community, the source base station judges whether the trigger condition for meeting load balancing, including:
The source base station judges whether the cell load information of the source base station is more than or equal to the cell high load capacity thresholding of the source base station
Value information, and the difference of the cell load information of the source base station and the cell load information of the target BS, if be more than
The difference of the cell high load capacity threshold information of the source base station and the cell high load capacity threshold information of the target BS;
If the cell load information of the source base station is more than or equal to the cell high load capacity threshold information of the source base station, and described
The difference of the cell load information of source base station and the cell load information of the target BS, the cell for being more than the source base station are high
The difference of load threshold information and the cell high load capacity threshold information of the target BS, it is determined that meet load balancing
Trigger condition;
If the cell load information of the source base station is less than the cell high load capacity threshold information of the source base station or the source
The difference of the cell load information of base station and the cell load information of the target BS is less than or equal to the cell of the source base station
The difference of high load capacity threshold information and the cell high load capacity threshold information of the target BS, it is determined that it is equal to be unsatisfactory for load
The trigger condition of weighing apparatus;
If meeting the trigger condition of load balancing, the source base station triggers load balancing.
2. according to the method described in claim 1, it is characterized in that, the source base station is according to the cell load of the target BS
Information and the cell high load capacity threshold information of the target BS judge whether the loading condiction for meeting neighboring community, including:
The source base station according to the cell uplink information on load of the target BS and cell uplink high load capacity threshold information, or
The downlink load information of target BS described in person judges whether to meet neighboring community with cell downlink high load capacity threshold information
Loading condiction;
If the cell uplink information on load of the target BS is less than the cell uplink high load capacity threshold information or described
The downlink load information of target BS is less than the cell downlink high load capacity threshold information, it is determined that meets the negative of neighboring community
Lotus condition;
If the cell uplink information on load of the target BS is more than or equal to the cell uplink high load capacity threshold information, and
The downlink load information of the target BS is more than or equal to the cell downlink high load capacity threshold information, it is determined that is unsatisfactory for phase
The loading condiction of adjacent cell.
3. according to the method described in claim 1, it is characterized in that, the source base station judges the cell load letter of the source base station
Whether breath is more than or equal to the cell high load capacity threshold information of the source base station, including:
The source base station judges whether the cell uplink information on load of the source base station is more than or equal in the cell of the source base station
Whether the cell downlink information on load of row high load capacity threshold information or the source base station is more than or equal to the small of the source base station
Area's downlink high load capacity threshold information.
4. according to the method described in claim 1, it is characterized in that, the source base station judges the cell load letter of the source base station
The difference of breath and the cell load information of the target BS, if be more than the cell high load capacity threshold information of the source base station
With the difference of the cell high load capacity threshold information of the target BS, including:
The source base station judges that the cell uplink information on load of the source base station is believed with the cell uplink load of the target BS
The difference of breath, if be more than the cell uplink of the cell uplink high load capacity threshold information and the target BS of the source base station
The difference of high load capacity threshold information;Alternatively,
The difference for judging the cell downlink information on load of the source base station and the cell downlink information on load of the target BS is
The cell downlink high load capacity thresholding of the no cell downlink high load capacity threshold information more than the source base station and the target BS
The difference of value information.
5. the load balancing system between a kind of base station, which is characterized in that including:Source base station and target BS, wherein the source base
Station includes:
Request message sending module, for sending resource status request message to the target BS;The resource status request
Message includes the cell high load capacity threshold value inquiry request message of the target BS;
Response message receiving module, for receiving the resource status response message from the target BS;The resource shape
State response message includes the cell high load capacity threshold information of the target BS;
Adjacent load judgment module, for high according to the cell load information of the target BS and the cell of the target BS
Load threshold information judges whether the loading condiction for meeting neighboring community;
Load balancing judgment module judges whether to meet touching for load balancing if the loading condiction for meeting neighboring community
Clockwork spring part, including:Second judgment submodule, for judging whether the cell load information of the source base station is more than or equal to the source
The cell high load capacity threshold information of base station, and the cell load of the cell load information of the source base station and the target BS
The difference of information, if be more than the cell high load capacity of the cell high load capacity threshold information and the target BS of the source base station
The difference of threshold information;
Second determination sub-module, if the cell height that the cell load information for the source base station is more than or equal to the source base station is negative
Lotus threshold information, and the difference of the cell load information of the source base station and the cell load information of the target BS, greatly
In the difference of the cell high load capacity threshold information of the cell high load capacity threshold information and target BS of the source base station,
Then determine the trigger condition for meeting load balancing;If the cell that the cell load information of the source base station is less than the source base station is high
The difference of load threshold information or the cell load information of the source base station and the cell load information of the target BS
The cell high load capacity threshold value of value, the cell high load capacity threshold information and the target BS that are less than or equal to the source base station is believed
The difference of breath, it is determined that be unsatisfactory for the trigger condition of load balancing;
Load balancing trigger module, if the trigger condition for meeting load balancing, triggers load balancing.
6. system according to claim 5, which is characterized in that the adjacent load judgment module, including:
First judging submodule, for the cell uplink information on load and cell uplink high load capacity thresholding according to the target BS
The downlink load information of value information or the target BS judges whether to meet phase with cell downlink high load capacity threshold information
The loading condiction of adjacent cell;
First determination sub-module, if the cell uplink information on load for the target BS is less than the cell uplink high load capacity
The downlink load information of threshold information or the target BS is less than the cell downlink high load capacity threshold information, then
Determine the loading condiction for meeting neighboring community;If the cell uplink information on load of the target BS is more than or equal in the cell
Row high load capacity threshold information, and the downlink load information of the target BS is more than or equal to the cell downlink high load capacity door
Limit value information, it is determined that be unsatisfactory for the loading condiction of neighboring community.
7. system according to claim 5, which is characterized in that second judgment submodule judges in the cell of the source base station
Row information on load whether be more than or equal to the source base station cell uplink high load capacity threshold information or the source base station it is small
Whether area's downlink load information is more than or equal to the cell downlink high load capacity threshold information of the source base station.
8. system according to claim 5, which is characterized in that second judgment submodule judges in the cell of the source base station
The difference of row information on load and the cell uplink information on load of the target BS, if be more than the cell uplink of the source base station
The difference of high load capacity threshold information and the cell uplink high load capacity threshold information of the target BS;Alternatively,
The difference for judging the cell downlink information on load of the source base station and the cell downlink information on load of the target BS is
The cell downlink high load capacity thresholding of the no cell downlink high load capacity threshold information more than the source base station and the target BS
The difference of value information.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410851041.1A CN104581831B (en) | 2014-12-30 | 2014-12-30 | A kind of load equalization method between base station and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410851041.1A CN104581831B (en) | 2014-12-30 | 2014-12-30 | A kind of load equalization method between base station and system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104581831A CN104581831A (en) | 2015-04-29 |
CN104581831B true CN104581831B (en) | 2018-11-06 |
Family
ID=53096801
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410851041.1A Active CN104581831B (en) | 2014-12-30 | 2014-12-30 | A kind of load equalization method between base station and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104581831B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107801217A (en) * | 2016-08-29 | 2018-03-13 | 上海中兴软件有限责任公司 | A kind of balanced method and device of customer charge |
CN109495929B (en) * | 2017-09-12 | 2021-08-03 | 华为技术有限公司 | Service processing method, mobile edge computing device and network device |
CN112766639B (en) * | 2020-12-28 | 2023-03-28 | 上海电力大学 | Distribution network multi-fault first-aid repair task rapid distribution method |
CN115379578A (en) * | 2022-08-24 | 2022-11-22 | 中国联合网络通信集团有限公司 | Bandwidth allocation method and device and storage medium |
CN116390181B (en) * | 2023-06-07 | 2023-09-15 | 武汉世炬信息技术有限公司 | Switching method and system for switching communication cells by user terminal |
-
2014
- 2014-12-30 CN CN201410851041.1A patent/CN104581831B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104581831A (en) | 2015-04-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104581831B (en) | A kind of load equalization method between base station and system | |
TWI556661B (en) | Method and apparatus for coordination of self-optimization functions in a wireless network | |
US20200084683A1 (en) | Target Link Ranking in a Wireless Communication Network | |
US11399297B2 (en) | Resource controller for resource management in a telecommunication network | |
US9843963B2 (en) | Load balance method and relevant apparatuses | |
CN105103470B (en) | The method and apparatus of multiple cell equipment discovery for device-to-device communication | |
US20170041974A1 (en) | D2d link discovery method | |
EP3606189A1 (en) | Method and apparatus for adjusting transmit power of cell in multi-carrier system | |
EP2938121B1 (en) | Shunting processing method, and control unit and system | |
EP3345436B1 (en) | Method for an enhanced power consumption management of a user equipment using a mobile communication network, wherein different sets of radio resources are used in dependency of a power consumption information, mobile communication network, program comprising a computer readable program code, and computer program product | |
CN104955017B (en) | D2D resource allocation methods, device, base station and terminal based on multicarrier | |
US11076280B2 (en) | User equipment, serving base station, and methods of user equipment and serving base station | |
CN106664651A (en) | Communications system with idle mode terminal balancing | |
US20230007542A1 (en) | Conditional Configuration in a Wireless Communication Network | |
CN109121164A (en) | A kind of load equalization method and device | |
US20150105081A1 (en) | Method And Apparatus For Triggering Cell Reselection Based On A Resource Suspension | |
CN103874142A (en) | Method and device for switching user equipment | |
EP3232729B1 (en) | Method and system for providing device to device proximity services in wireless communication networks | |
CN103974331A (en) | Load balancing method, device and system for heterogeneous network | |
EP3099134A1 (en) | Access system, device and method | |
CN106899989B (en) | Method and apparatus for coordinating self-optimization functions in a wireless network | |
CN109586861B (en) | Load balancing method and device for carrier aggregation system | |
US11463904B2 (en) | Method and apparatus for selecting carrier in mobile communication system | |
CN103152774A (en) | LTE (long term evolution) interface expanding method and system supporting distributed autonomous load balancing | |
US9882676B2 (en) | Link-adaptation in partly centralized radio access networks |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |