CN104580597B - Connector waterproof construction and the waterproof mobile phone using the structure - Google Patents

Connector waterproof construction and the waterproof mobile phone using the structure Download PDF

Info

Publication number
CN104580597B
CN104580597B CN201510001198.XA CN201510001198A CN104580597B CN 104580597 B CN104580597 B CN 104580597B CN 201510001198 A CN201510001198 A CN 201510001198A CN 104580597 B CN104580597 B CN 104580597B
Authority
CN
China
Prior art keywords
housing
waterproof
connecting hole
connector
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510001198.XA
Other languages
Chinese (zh)
Other versions
CN104580597A (en
Inventor
马继东
陈凡国
熊斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Power Idea Technology Shenzhen Co Ltd
Original Assignee
Power Idea Technology Shenzhen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Power Idea Technology Shenzhen Co Ltd filed Critical Power Idea Technology Shenzhen Co Ltd
Priority to CN201510001198.XA priority Critical patent/CN104580597B/en
Publication of CN104580597A publication Critical patent/CN104580597A/en
Application granted granted Critical
Publication of CN104580597B publication Critical patent/CN104580597B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Telephone Set Structure (AREA)

Abstract

The present invention relates to a kind of connector waterproof construction, it includes one first housing, one second housing, one waterproof plug and a connection piece, one first connecting hole is provided with first housing, one second connecting hole is provided with second housing, the waterproof case is mutually locked with second connecting hole through first connecting hole and then first housing links together with second housing, a shell space is formed between first housing and second housing, the waterproof plug, which is located in first connecting hole, leans on the first housing outer surface side, an exhaust passage is further opened with first connecting hole, gas can be entered in the shell space by the exhaust passage in first connecting hole, a circle is at least equipped with the waterproof plug raised, interference is extruded between the wall of described raised and described first connecting hole side, thus achieve effective waterproof between the connector position and exterior space, and the inconvenient problem of the assembling of the waterproof plug is solved simultaneously.

Description

Connector waterproof construction and the waterproof mobile phone using the structure
Technical field
The present invention relates to a kind of connector waterproof construction, and a kind of waterproof mobile phone using the structure.
Background technology
In the structure design of each electronic product, it is all inevitable the need for consider the annexation of interelement, especially For waterproof electronic product, in addition it is also necessary to additionally consider the waterproof of each connecting hole and connector link position.With existing anti- Exemplified by sailor's machine, usual periwinkle collecting silk refer to Fig. 1, Fig. 2, Fig. 3 and Fig. 4 as connector between its front and rear casing, be that the screw connects Structurally waterproof schematic diagram is connect, it includes shell 200, a screw 300 and a waterproof plug 400, the waterproof plug after a fore shell 100, one 400 be a silica gel part, including a head 410 and a cylinder 420, and two circle projections 430, the spiral shell are provided with the cylinder 420 Silk 300 includes a screw terminal 310 and a screw rod 320, and the screw head 310 is identical with the section of silica gel part cylinder 420, institute State the correspondence waterproof plug head 410 on rear shell 200 and offer the also corresponding head on a groove 210, the bottom surface of groove 210 Portion 410 offers a hole 220, and is provided with the bottom surface of hole 220 on a screw via 230, the fore shell 100 described in correspondence Screw 300 is provided with a mate with threaded holes 110, and the screw terminal 310 is resisted against on the bottom surface of hole 220, while the screw rod 320 is sealed through the via 230 and the screwed hole 110, and then realizes the connection of the fore shell 100 and the rear shell 200, A shell space is formed between the fore shell 100 and the rear shell 200, while the waterproof plug 400 is assembled in the rear shell 200 On, the head 410 is resisted against on the bottom surface of groove 210, while the cylinder 420 is assembled in the hole 220, and it is described Interference is extruded between projection 430 and the side wall of the hole 220, the waterproof of the screw position, and the waterproof plug 400 are realized with this With the connection between the rear shell 200.In the waterproof construction of screw position, when the screw 300 assembles in place further assembling During the waterproof plug 400, due between the waterproof plug 400 and the hole 220 for interference assemble, while the screw terminal 310 with Abutted between the bottom surface of hole 220, therefore it is close to be almost close to one between the front end of the waterproof plug 400 and the screw terminal 310 Space is closed, and with the gradually loading of the waterproof plug 400, the confined space is tapered into, i.e., in described sealing space Gas volume is tapered into, while pressure gradually increases, causes the assembling of waterproof plug 400 difficulty gradually to increase, or even can not Assembling is in place;And the waterproof plug 400 is temporarily assembled to position under strength, it may also be because of by the sealing space Gas pressure be more than and ejected from extraneous atmospheric pressure, therefore, it is difficult to there is the waterproof plug assembling in the waterproof construction After the problem of spending big, and assembling because of the larger easy ejection of the gas pressure by the sealing space the problem of waterproof failure.
Presence based on problem above, it is considered to open up air discharge duct 450 in the side wall of waterproof plug 400, refer to Fig. 5, be Side wall has opened up the waterproof plug 400 ' of air discharge duct 450, and now the gas in the confined space can pass through the air discharge duct 450 are discharged into airspace so as to ensure that the pressure that the waterproof plug is received everywhere is consistent, preferably resolve the waterproof plug Packing problem, but due to the presence of the air discharge duct 450, it is impossible to while realizing the good waterproof of the link position.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of connector waterproof construction, the waterproof construction can both solve existing Easily ejected and waterproof after the problem of assembling difficulty when not opening up air discharge duct with the presence of waterproof plug described in technology is big, and assembling The problem of failure;Also can solve the waterproof plug open up exist during air discharge duct can not waterproof the problem of.
The invention solves the problems that another technical problem be to provide a kind of anti-sailor using above-mentioned connector waterproof construction Machine, the waterproof mobile phone can solve waterproof plug described in prior art and not open up that the assembling difficulty that exists during air discharge duct is big, assembling Afterwards easily ejection and the problem of waterproof failure;And the waterproof plug open up exist during air discharge duct can not waterproof the problem of.
A kind of connector waterproof construction, it includes one first housing, one second housing, a waterproof plug and a connection piece, institute State and one first connecting hole is provided with the first housing, be provided with one second connecting hole on second housing, the waterproof case is passed through First connecting hole is worn to be mutually locked with second connecting hole and then be connected first housing with second housing Together, a shell space is formed between first housing and second housing, the waterproof plug is located at the described first connection Leaned in hole and an exhaust passage is further opened with the first housing outer surface side, first connecting hole, first connection Gas can be entered in the shell space by the exhaust passage in hole, and circle projection is at least equipped with the waterproof plug, Interference is extruded between the wall of described raised and described first connecting hole side.
A kind of waterproof mobile phone, uses described connector waterproof construction.
The invention has the advantages that:Because the present invention offers exhaust on the first connecting hole side wall Groove, and the mutual stream in first connecting hole in gas and the shell space between gas can be realized by the air discharge duct It is logical, thus, between the waterproof plug and the screw terminal will not be an almost sealed space, but one gas can therebetween With the space of the shell space gas free exchange, when screw assembling further assembles the waterproof plug in place, institute Spatial volume between waterproof plug and the screw terminal is stated to be gradually reduced, but gas can be discharged into the shell space, therefore will not The situation for causing pressure to increase, so that the waterproof plug more smooth can be assembled in place, preferably solves institute in the prior art The packing problem of waterproof plug is stated, and after waterproof plug assembling in place, the pressure that its various pieces is received is balanced, can also be true Protect the problem of it will not produce ejection;It is described raised with described the in addition, it is raised to be also at least equipped with a circle on the waterproof plug Interference is extruded between one connecting hole side wall, so as to preferably ensure that the good waterproofing effect of the waterproof plug position.
Brief description of the drawings
In order to illustrate more clearly of technical scheme, further be situated between is made to the present invention below in conjunction with accompanying drawing Continue.
Fig. 1 is existing screw waterproof construction explosive view.
Fig. 2 is existing screw waterproof construction waterproof plug stereogram.
Fig. 3 is shell three-dimensional cutaway view after existing screw waterproof construction.
Fig. 4 is existing screw waterproof construction assembling view.
Fig. 5 is another waterproof plug stereogram that prior art opens up air discharge duct.
Fig. 6 is waterproof construction explosive view of the present invention.
Fig. 7 is waterproof construction explosive view " A-A " sectional view of the present invention.
Fig. 8 is waterproof construction assembling figure of the present invention.
Fig. 9 is waterproof construction assembling figure " B-B " sectional view of the present invention.
Figure 10 is waterproof construction assembling figure " B-B " sectional view " S " place of the present invention enlarged drawing.
Embodiment
It is right below in conjunction with the accompanying drawings and the specific embodiments to make the object, technical solutions and advantages of the present invention clearer Connector waterproof construction of the present invention and it is described further using the waterproof mobile phone of the waterproof construction.
It refer to Fig. 6 and Fig. 8, shell 1, a fore shell 2, a screw 3 and one after the waterproof mobile phone connecting-piece structure includes one It is provided with waterproof plug 4, the rear shell 1 on one first connecting hole 10, the fore shell 2 and is provided with one second connecting hole 20, it is described Screw 3 is mutually locked through first connecting hole 10 and second connecting hole 20 and then by the rear shell 1 and the fore shell 2 Link together, a shell space is formed between the rear shell 1 and the fore shell 2, the waterproof plug 4 is located at first connecting hole It is interior to lean on the rear outer surface side of shell 1.
Fig. 6 and Fig. 7 is refer to, the fore shell 2 includes a boss 21, and second connecting hole 20 is arranged at the boss 21 Center position on top surface, it is that a metal heats screwed hole, and is a blind hole;The screw 3 includes a head 31 and one and connected The screw thread being engaged with the screwed hole 20 is provided with socket part 32, the connecting portion 32;The waterproof plug 4 includes a flange 41 And a cylinder 42, the cylinder 42 is close with the diameter of screw head 31, two circles is also equipped with the cylinder 42 raised 43;The rear shell 1 also includes a projection 11, and the projection 11 is correspondingly arranged with the boss 21, and first connecting hole 10 is set It is placed in the center of projection 11 and through the rear shell 1, first connecting hole 10 includes a groove 12, the groove 12 It is opened on the outer surface of rear shell 1 and corresponding with the flange 41, first connecting hole 10 is also arranged at described including one Hole position 13 and one on the bottom surface of groove 12 is arranged at the screw via 14 on the hole position bottom surface, the hole position 13 and the screw The correspondence of head 31, and the screw via 14 is corresponding with the screw connection portion 32, the screw via 14 is through to described convex The top surface of post 11 is simultaneously just right with second connecting hole 20;An exhaust passage, the row are further opened with first connecting hole 10 Gas passage includes a guiding groove 15 and an air discharge duct 16, and the guiding groove 15 is located on the bottom surface of hole position 13, and the guiding Groove 15 is communicated respectively with the hole position space and the via 14;The air discharge duct 16 is opened on the top surface of projection 11, and The air discharge duct 16 is communicated respectively with the shell space and the via 14, so that, the gas in the space of hole position 13 leads to The setting of the guiding groove 15 and the air discharge duct 16 is crossed, keeps being interconnected with the shell space.
Fig. 8, Fig. 9 and Figure 10 are refer to, during the waterproof mobile phone assembling, the top surface of projection 11 and the top surface of boss 21 Mutually support, the screw head 31 is resisted against on the bottom surface of hole position 13, the connecting portion 32 runs through the via 14 and institute State the second connecting hole 20 to cooperate and lock, and then the fore shell 2 and the rear shell 1 are linked together, while before described The shell space of a closing is formed between shell 2 and the rear shell 1;The waterproof plug 4 is assembled on the rear shell 1, the flange 41 It is resisted against on the bottom surface of groove 12, the cylinder 42 is assembled in the hole position 13, and described raised 43 and the hole position 13 Interference is extruded between the wall of side.
In the assembling process of the waterproof mobile phone, because the assembling mode between described raised 43 and the hole position 13 is interference Coordinate, it is hereby ensured that effective waterproof between the position and exterior space;And the setting of the guiding groove 15 and air discharge duct 16, So that when the screw 3 assembles and further assembles the waterproof plug 4 in place, with the plug 4 gradually assembling in place, institute State the gas between waterproof plug 4 and the screw head 31 to be no longer restricted in this sealing space, and can be by described draw Guide groove 15 enters the via 14, then is discharged by the air discharge duct 16 to the shell space, and then is expelled to the housing Beyond space, therefore structure of the present invention will not produce the gas between plug 4 described in prior art and the screw head 31 Body, as space diminishes pressure increase, causes waterproof plug assembling difficulty big, and easily ejected after assembling because that can not discharge The problem of, it is achieved thereby that the smooth assembling of the waterproof plug 4;Connect simultaneously as the exhaust passage is arranged at described first Connect in hole 10, without opening up air discharge duct on the plug 4 again, it is ensured that the integrity of shape of the plug 4, so as to realize Effective interference between described raised 43 and the hole position 13, not only make it that the waterproof of the screw position is reliable, also causes institute State and connect reliable between waterproof plug 4 and the hole position 13.
It is preferred that, the guiding groove 15 is set along the diametric(al) of hole position 13, and its side is connected with the via 14, its Opposite side extends to the side wall of hole position 13, and the air discharge duct 16 is also set along the diametric(al) of via 14, its side and institute State via 14 to connect, its opposite side extends to the shell space;Thus, the length of guiding groove 15 is minimum, so that described anti- The stroke that gas discharge between water plug 4 and the screw head 31 is passed through is most short, most effective.
It will be evident that the present invention is in structure design, it is to connect by the cylinder 42 and the diameter design of screw head 31 Closely, this design is can be considered when being assembled based on the cylinder 42 and the screw head 31 using the hole position in same aperture, The hole position 13 in the present invention can both meet the assembling of the screw head 31, can realize again the cylinder 42 and its between Interference is assembled, and simplifies processing.
Another embodiment of the connector waterproof construction is that the air discharge duct 16 is opened on the top surface of boss 21, And the air discharge duct 16 is communicated respectively with the shell space and the via 14.
It is preferred that, the air discharge duct 16 is arranged on the top surface of boss 21, and is set along the via diameter direction, its Side is connected with the via, and its opposite side extends to the shell space.
Various electronic installations, such as mobile phone, tablet personal computer etc., any electronic installation member can be used for upper connector waterproof construction Assembly and connection part position between part needs waterproof, can use connector waterproof construction of the present invention, or use this The thinking of invention is changed and expanded.

Claims (8)

1. a kind of connector waterproof construction, it includes one first housing, one second housing, a waterproof plug and a connection piece, described It is provided with first housing on one first connecting hole, second housing and is provided with one second connecting hole, the connector runs through First connecting hole is mutually locked with second connecting hole and then is connected to first housing with second housing Together, a shell space is formed between first housing and second housing, the waterproof plug is located at first connecting hole It is interior to lean on the first housing outer surface side, it is characterised in that:The connector includes a head and a connecting portion, described first Connecting hole is included in a hole position corresponding with the head and a via corresponding with the connecting portion, first connecting hole An exhaust passage is further opened with, the exhaust passage includes a guiding groove and an air discharge duct, and the guiding groove is located at the hole position On bottom surface and connect the hole position and the via;First housing also includes a projection, and first connecting hole is opened in The projection top surface simultaneously runs through first housing, and the air discharge duct is then opened on the projection top surface and connects the housing Space and the via;The waterproof plug includes a flange and a cylinder, and the cylinder connects with the connector head diameter Near and be co-located in the hole position, it is raised to be also equipped with least one circle on the cylinder, described raised with hole position side wall Between extrude interference.
2. connector waterproof construction as claimed in claim 1, it is characterised in that:The guiding groove is along the hole position diametric(al) Set, its side is connected with the via, and its opposite side extends to hole position side wall.
3. connector waterproof construction as claimed in claim 2, it is characterised in that:Second housing also includes a boss, institute The second connecting hole is stated for a blind hole, and is opened on the boss top surface and is cooperated with the connecting portion, the projection top Mutually supported with the boss top surface in face.
4. connector waterproof construction as claimed in claim 3, it is characterised in that:The air discharge duct is along the via diameter direction Set, its side is connected with the via, and its opposite side extends to the shell space.
5. connector waterproof construction as claimed in claim 3, it is characterised in that:The air discharge duct can also be opened in the boss On top surface, and the air discharge duct is communicated respectively with the shell space and the via.
6. connector waterproof construction as claimed in claim 5, it is characterised in that:The air discharge duct is along the via diameter direction Set, its side is connected with the via, and its opposite side extends to the shell space.
7. a kind of waterproof mobile phone, it is characterised in that:Use the connector waterproof construction as described in any one of claim 1 to 6.
8. waterproof mobile phone as claimed in claim 7, it is characterised in that:First housing is rear shell, and second housing is Fore shell, the connector is screw, and the waterproof plug is a plug.
CN201510001198.XA 2015-01-05 2015-01-05 Connector waterproof construction and the waterproof mobile phone using the structure Active CN104580597B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510001198.XA CN104580597B (en) 2015-01-05 2015-01-05 Connector waterproof construction and the waterproof mobile phone using the structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510001198.XA CN104580597B (en) 2015-01-05 2015-01-05 Connector waterproof construction and the waterproof mobile phone using the structure

Publications (2)

Publication Number Publication Date
CN104580597A CN104580597A (en) 2015-04-29
CN104580597B true CN104580597B (en) 2017-10-17

Family

ID=53095747

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510001198.XA Active CN104580597B (en) 2015-01-05 2015-01-05 Connector waterproof construction and the waterproof mobile phone using the structure

Country Status (1)

Country Link
CN (1) CN104580597B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106686482B (en) * 2016-12-30 2023-05-12 深圳市冠旭电子股份有限公司 Earphone
CN107800825A (en) * 2017-10-26 2018-03-13 广东欧珀移动通信有限公司 The housing unit and electronic equipment of electronic equipment
CN107911502B (en) * 2017-10-26 2020-06-26 Oppo广东移动通信有限公司 Shell assembly of electronic equipment and electronic equipment
CN107908223B (en) * 2017-10-26 2020-10-16 Oppo广东移动通信有限公司 Shell assembly of electronic equipment and electronic equipment
CN108600485A (en) * 2018-05-31 2018-09-28 深圳市宝尔爱迪科技有限公司 A kind of waterproof communicating terminal with metal ornament strip

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201688376U (en) * 2010-04-09 2010-12-29 上海威侃电子材料有限公司 Waterproof breathable breather plug
CN103889186A (en) * 2014-03-31 2014-06-25 深圳市宝尔爱迪科技有限公司 Waterproof structure and waterproof electronic device comprising same
CN203968169U (en) * 2014-05-22 2014-11-26 昆山睿翔讯通通信技术有限公司 A kind of waterproof mobile phone housing

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201688376U (en) * 2010-04-09 2010-12-29 上海威侃电子材料有限公司 Waterproof breathable breather plug
CN103889186A (en) * 2014-03-31 2014-06-25 深圳市宝尔爱迪科技有限公司 Waterproof structure and waterproof electronic device comprising same
CN203968169U (en) * 2014-05-22 2014-11-26 昆山睿翔讯通通信技术有限公司 A kind of waterproof mobile phone housing

Also Published As

Publication number Publication date
CN104580597A (en) 2015-04-29

Similar Documents

Publication Publication Date Title
CN104580597B (en) Connector waterproof construction and the waterproof mobile phone using the structure
MX347874B (en) Sealed compressor housing.
CN103644328A (en) Puncture valve
CN206017376U (en) A kind of Fast Installation structure
CN204291100U (en) Connector waterproof construction and use the waterproof mobile phone of this structure
CN204728884U (en) A kind of pneumatic type window opener
CN207261742U (en) The fuel-displaced formula damping noise reduction check valve in side
CN108552607A (en) The electronic cigarette of gap air inlet
CN207990275U (en) Plug-in silica gel extrusion molding LED light bar
CN106686482B (en) Earphone
CN206148694U (en) Wireless telecom equipment's battery USB waterproof construction that charges
CN205847522U (en) A kind of eclipsed form sound column sound equipment
CN209100542U (en) A kind of damper
CN110398568B (en) Universal plane carbon monoxide electronic detector
CN211259750U (en) One-way interface gas circuit replacing device
CN105896337B (en) Explosion-proof electrical distribution box
CN208934566U (en) A kind of structural texture of primary and secondary fire resistant doorsets junction
CN107508049B (en) A kind of waterproof connector cap
CN206540472U (en) A kind of pyrotechnic composition detent mechanism of combined firework inner cylinder
CN209104227U (en) Battery case
CN209133086U (en) A kind of intelligent monitoring display device
CN110491625A (en) A kind of fire prevention transformer case
CN220054508U (en) Dampproofing mould proof paper tube
CN209505022U (en) The molding split type molding sleeve of bar is used on a kind of rod-pressing machine
CN217684321U (en) Improved grease gun pressure relief structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant