CN104568593B - 固体充填法采煤二维物理模拟实验装置及实验方法 - Google Patents
固体充填法采煤二维物理模拟实验装置及实验方法 Download PDFInfo
- Publication number
- CN104568593B CN104568593B CN201510050081.0A CN201510050081A CN104568593B CN 104568593 B CN104568593 B CN 104568593B CN 201510050081 A CN201510050081 A CN 201510050081A CN 104568593 B CN104568593 B CN 104568593B
- Authority
- CN
- China
- Prior art keywords
- solid filling
- analog material
- solid
- filling
- mining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510050081.0A CN104568593B (zh) | 2015-01-30 | 2015-01-30 | 固体充填法采煤二维物理模拟实验装置及实验方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510050081.0A CN104568593B (zh) | 2015-01-30 | 2015-01-30 | 固体充填法采煤二维物理模拟实验装置及实验方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104568593A CN104568593A (zh) | 2015-04-29 |
CN104568593B true CN104568593B (zh) | 2017-01-18 |
Family
ID=53085172
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510050081.0A Active CN104568593B (zh) | 2015-01-30 | 2015-01-30 | 固体充填法采煤二维物理模拟实验装置及实验方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104568593B (zh) |
Families Citing this family (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104963707A (zh) * | 2015-07-16 | 2015-10-07 | 山东科技大学 | 一种相似材料模拟试验支架 |
CN105092816B (zh) * | 2015-07-28 | 2017-01-18 | 重庆大学 | 一种三维多煤层开采相似材料模型实验系统 |
CN105181463A (zh) * | 2015-10-23 | 2015-12-23 | 山东科技大学 | 一种含水矸石压缩试验装置及其试验方法 |
CN105510554A (zh) * | 2016-01-07 | 2016-04-20 | 中国矿业大学(北京) | 一种急倾斜煤层水平分段综放开采模拟实验台及实验方法 |
CN105758992B (zh) * | 2016-02-23 | 2018-08-14 | 中国矿业大学(北京) | 顶煤冒放性预测试验台及预测方法 |
CN105954498B (zh) * | 2016-06-29 | 2018-04-10 | 河南理工大学 | 一种矿山立体物理模拟煤岩层装填及开采方法 |
CN107014680A (zh) | 2017-03-16 | 2017-08-04 | 中国矿业大学 | 一种固体充填体物理相似模拟材料的确定方法 |
CN107037197A (zh) * | 2017-06-12 | 2017-08-11 | 贵州大学 | 一种矿用相似材料二维模拟试验系统 |
CN107917836A (zh) * | 2017-12-08 | 2018-04-17 | 河南理工大学 | 充填材料力学实验标准试件的制备装置及利用该装置制作标准试件的方法 |
CN108279297A (zh) * | 2018-03-26 | 2018-07-13 | 山东科技大学 | 固体材料条带充填稳定性模拟系统、实验主体以及方法 |
CN108508184B (zh) * | 2018-04-09 | 2023-08-18 | 山东科技大学 | 一种复杂条件煤层开采地表沉陷相似模拟试验装置及方法 |
CN108828184B (zh) * | 2018-04-20 | 2020-12-08 | 安徽匠桥科技服务有限公司 | 一种煤矿区开采沉陷相似实验模型装置 |
CN108593890A (zh) * | 2018-05-30 | 2018-09-28 | 西安科技大学 | 一种煤层开采的可视化组合块体物理相似模拟实验装置 |
CN109827842A (zh) * | 2019-01-02 | 2019-05-31 | 河北工程大学 | 一种矸石充填推压捣实试验箱及矸石充填推压捣实方法 |
CN109540572B (zh) * | 2019-01-14 | 2024-06-14 | 河北工程大学 | 煤矿充填智能模拟试验装置 |
CN109883838B (zh) * | 2019-03-28 | 2020-03-27 | 中国矿业大学 | 一种变角度散体充填材料试验装置 |
CN110018291B (zh) * | 2019-04-18 | 2020-05-05 | 中国矿业大学 | 一种充填开采流固耦合物理相似模拟实验测试系统 |
CN110080770B (zh) * | 2019-05-08 | 2021-01-05 | 华北科技学院 | 一种倾斜长壁综采放顶煤采场矿压模拟监控装置 |
CN110514804A (zh) * | 2019-08-30 | 2019-11-29 | 西安科技大学 | 一种煤层采动物理相似模拟实验装填装置及装填方法 |
CN110702062B (zh) * | 2019-09-06 | 2020-11-17 | 山东科技大学 | 平面移动变形测量系统及其在二维相似模拟实验中的应用 |
CN111044707A (zh) * | 2019-12-25 | 2020-04-21 | 神华神东煤炭集团有限责任公司 | 煤矿采空区遗煤运移模拟实验系统及实验方法 |
CN112665982B (zh) * | 2020-12-28 | 2024-02-13 | 河南理工大学 | 一种监测相似模拟煤层底板压力场变化的装置及使用方法 |
CN113029794B (zh) * | 2021-03-08 | 2022-02-11 | 中国矿业大学 | 急倾斜煤层采空区矸石自溜充填三维相似模拟装置及方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101245706A (zh) * | 2007-07-03 | 2008-08-20 | 中国矿业大学(北京) | 煤与瓦斯共采三维模拟实验台 |
CN101377479A (zh) * | 2008-09-25 | 2009-03-04 | 山东科技大学 | 采场矿压三维物理模拟试验台 |
CN102182509A (zh) * | 2011-05-12 | 2011-09-14 | 中国矿业大学 | 充填开采三维模拟试验装置及方法 |
CN102262148A (zh) * | 2011-04-19 | 2011-11-30 | 中国矿业大学(北京) | 煤矿固体充填开采三维模拟实验平台 |
CN102261972A (zh) * | 2011-04-19 | 2011-11-30 | 中国矿业大学(北京) | 煤矿综采支架与围岩关系实验平台 |
CN102402892A (zh) * | 2011-05-12 | 2012-04-04 | 中国矿业大学 | 充填开采平面应变模拟试验装置及方法 |
CN203869942U (zh) * | 2014-01-04 | 2014-10-08 | 山东科技大学 | 一种煤矿井下充填材料力学性能测试装置 |
CN204536123U (zh) * | 2015-01-30 | 2015-08-05 | 河北煤炭科学研究院 | 固体充填法采煤二维物理模拟实验装置 |
-
2015
- 2015-01-30 CN CN201510050081.0A patent/CN104568593B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101245706A (zh) * | 2007-07-03 | 2008-08-20 | 中国矿业大学(北京) | 煤与瓦斯共采三维模拟实验台 |
CN101377479A (zh) * | 2008-09-25 | 2009-03-04 | 山东科技大学 | 采场矿压三维物理模拟试验台 |
CN102262148A (zh) * | 2011-04-19 | 2011-11-30 | 中国矿业大学(北京) | 煤矿固体充填开采三维模拟实验平台 |
CN102261972A (zh) * | 2011-04-19 | 2011-11-30 | 中国矿业大学(北京) | 煤矿综采支架与围岩关系实验平台 |
CN102182509A (zh) * | 2011-05-12 | 2011-09-14 | 中国矿业大学 | 充填开采三维模拟试验装置及方法 |
CN102402892A (zh) * | 2011-05-12 | 2012-04-04 | 中国矿业大学 | 充填开采平面应变模拟试验装置及方法 |
CN203869942U (zh) * | 2014-01-04 | 2014-10-08 | 山东科技大学 | 一种煤矿井下充填材料力学性能测试装置 |
CN204536123U (zh) * | 2015-01-30 | 2015-08-05 | 河北煤炭科学研究院 | 固体充填法采煤二维物理模拟实验装置 |
Also Published As
Publication number | Publication date |
---|---|
CN104568593A (zh) | 2015-04-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104568593B (zh) | 固体充填法采煤二维物理模拟实验装置及实验方法 | |
CN105510534B (zh) | 一种可模拟不同倾角含水煤层充填注浆试验装置及方法 | |
CN102182509B (zh) | 充填开采三维模拟试验装置及方法 | |
CN207198149U (zh) | 一种基于数值模拟研究近距煤层群保水开采实验装置 | |
CN103983742B (zh) | 煤层覆岩破断煤岩体瓦斯运移及抽采实验系统 | |
CN107831295B (zh) | 用于模拟采动断层活化灾变的试验方法 | |
CN102402892B (zh) | 充填开采平面应变模拟试验装置及方法 | |
CN107179396A (zh) | 多功能拼装式岩土工程物理相似试验系统 | |
CN106950070B (zh) | 用于矩形顶管顶进施工全过程模拟的试验装置 | |
CN204536123U (zh) | 固体充填法采煤二维物理模拟实验装置 | |
CN106053755B (zh) | 一种煤与瓦斯共采三维物理模拟综合实验系统 | |
CN107144470A (zh) | 隧道及地下工程中突水突泥灾害实时监测装置与操作方法 | |
Zhang et al. | Large-scale geo-mechanical model tests for the stability assessment of deep underground complex under true-triaxial stress | |
CN108868770A (zh) | 一种充填开采岩层位态精准控制设计方法 | |
CN108982219A (zh) | 隧道断层错动模型试验装置及错动模型试验系统 | |
CN107014673A (zh) | 一种三维动载荷加载大型相似材料模拟平台 | |
CN103604698B (zh) | 煤矿老采空区冒落带破碎岩体二次变形压实模拟实验方法 | |
CN102262148A (zh) | 煤矿固体充填开采三维模拟实验平台 | |
CN211602719U (zh) | 一种多功能顶底板突水的采场矿压三维物理模拟试验平台 | |
CN103061774A (zh) | 一种盾构隧道施工环境模拟装置 | |
CN110514806B (zh) | 一种相似模拟试验装置及方法 | |
Hustrulid et al. | Modelling of cut-and-fill mining systems–Näsliden revisited | |
CN205445669U (zh) | 一种可模拟不同倾角含水煤层充填注浆试验装置 | |
CN109826633A (zh) | 一种盾构机下穿已有盾构隧道模拟装置及模拟方法 | |
CN109975117A (zh) | 顶管实验箱及实验方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Hai Long Inventor after: Sui Shumei Inventor after: You Zhizhong Inventor after: Liu Jiangong Inventor after: Zhao Litao Inventor after: Zeng Ruiping Inventor before: Liu Jiangong Inventor before: Hai Long Inventor before: Zhao Litao Inventor before: Zeng Ruiping |
|
COR | Change of bibliographic data | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 054000, 126 West Main Street, Hebei, Xingtai Patentee after: Hebei Coal Science Research Institute Co.,Ltd. Address before: 054000, 126 West Main Street, Hebei, Xingtai Patentee before: HEBEI COAL Research Institute |
|
CP01 | Change in the name or title of a patent holder |