CN104566928A - Water supply pipeline and method for achieving zero cold water and water heater - Google Patents

Water supply pipeline and method for achieving zero cold water and water heater Download PDF

Info

Publication number
CN104566928A
CN104566928A CN201310486382.9A CN201310486382A CN104566928A CN 104566928 A CN104566928 A CN 104566928A CN 201310486382 A CN201310486382 A CN 201310486382A CN 104566928 A CN104566928 A CN 104566928A
Authority
CN
China
Prior art keywords
water
flow path
hot water
diaphragm
water outlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310486382.9A
Other languages
Chinese (zh)
Other versions
CN104566928B (en
Inventor
刘绪强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haier Group Corp
Qingdao Haier Technology Co Ltd
Original Assignee
Haier Group Corp
Qingdao Haier Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Haier Group Corp, Qingdao Haier Technology Co Ltd filed Critical Haier Group Corp
Priority to CN201310486382.9A priority Critical patent/CN104566928B/en
Publication of CN104566928A publication Critical patent/CN104566928A/en
Application granted granted Critical
Publication of CN104566928B publication Critical patent/CN104566928B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Domestic Plumbing Installations (AREA)

Abstract

本发明公开了一种实现零冷水的供水管道、热水器及实现零冷水的方法。该供水管道,包括管体,管体内部沿管体延伸方向设臵隔膜,以将管体内部分为第一流路和第二流路,隔膜能够在所述第一流路和第二流路之间来回摆动,第二流路的一端开口,另一端封闭,第一流路的两端均开口。该热水器包括热水器本体和出水部之间设臵有上述的管道。该方法包括:检测热水器本体的热水出水口是否停止向管道输出热水;如果是,则向所述管道的第二流路内输入介质,并通过第二流路的介质对隔膜产生的压力将隔膜向第一流路方向挤压,以将所述第一流路内的热水从出水部排出。本发明在使用热水器后,管道内不存储多余的热水,实现出水即热水的效果。

The invention discloses a water supply pipe for realizing zero cold water, a water heater and a method for realizing zero cold water. The water supply pipeline includes a pipe body. A diaphragm is arranged inside the pipe body along the extending direction of the pipe body to divide the pipe body into a first flow path and a second flow path. The diaphragm can be placed between the first flow path and the second flow path. Swinging back and forth, one end of the second flow path is open and the other end is closed, and both ends of the first flow path are open. The water heater includes the above-mentioned pipeline arranged between the water heater body and the water outlet. The method includes: detecting whether the hot water outlet of the water heater body stops outputting hot water to the pipeline; if so, inputting medium into the second flow path of the pipeline, and passing the pressure generated by the medium in the second flow path on the diaphragm Squeeze the diaphragm toward the direction of the first flow path to discharge the hot water in the first flow path from the water outlet. After the water heater is used, the present invention does not store redundant hot water in the pipeline, and realizes the effect of water outlet being hot water.

Description

实现零冷水的供水管道、热水器及实现零冷水的方法Water supply pipe for realizing zero cold water, water heater and method for realizing zero cold water

技术领域technical field

本发明涉及排水管路,具体涉及一种实现零冷水的供水管道、热水器及实现零冷水的方法。The invention relates to a drainage pipeline, in particular to a water supply pipeline for realizing zero cold water, a water heater and a method for realizing zero cold water.

背景技术Background technique

现有的燃气热水器,一般安装在距离燃气较近的位臵,比如厨房,使用热水的喷头一般安装在卫生间,从热水器出口到喷头之间需要连接管道,当卫生间与厨房距离较远时,管道的长度需加长。由于管道在水龙头关水后,管道内有存水,下次使用时由于不能加热,直接流出喷头,导致开始时流的是冷水,不能使用。管道越长,流出的冷水越多。Existing gas water heaters are generally installed near the gas, such as the kitchen, and the nozzles that use hot water are generally installed in the bathroom. Pipes need to be connected from the outlet of the water heater to the nozzles. When the distance between the bathroom and the kitchen is long, The length of the pipe needs to be extended. Since there is water in the pipeline after the water tap is turned off, the next time it is used, it cannot be heated, and it will directly flow out of the nozzle, resulting in cold water flowing at the beginning, which cannot be used. The longer the pipe, the more cold water comes out.

现有技术中现有两种方案,减少冷水的存放。一种是在主管道中加一冷水循环泵,主管道中的水温降低到一定的温度后就重新加热,并启动循环泵。另一种是直接用气泵将剩余热水通过空气排出管道。Existing two schemes in the prior art reduce the storage of cold water. A kind of is to add a cold water circulation pump in the main pipeline, just reheat after the water temperature in the main pipeline is reduced to certain temperature, and start the circulation pump. The other is to directly use an air pump to discharge the remaining hot water through the air out of the pipeline.

对于第一种通过循环泵循环主管道热水的办法,首先不能完全实现真正的零冷水,并且即使用户不使用热水,主管道也保持热水状态,等待用户用水,从而造成浪费。对于第二种通过气泵的方式,当管路有一些高低不平的弯道时,往往管路内还会存有积水不能吹净。For the first method of circulating the hot water in the main pipeline through the circulation pump, first of all, the real zero cold water cannot be fully realized, and even if the user does not use the hot water, the main pipeline remains in the hot water state, waiting for the user to use water, resulting in waste. For the second way of passing the air pump, when the pipeline has some uneven bends, there will often be accumulated water in the pipeline that cannot be blown off.

发明内容Contents of the invention

在下文中给出关于本发明的简要概述,以便提供关于本发明的某些方面的基本理解。应当理解,这个概述并不是关于本发明的穷举性概述。它并不是意图确定本发明的关键或重要部分,也不是意图限定本发明的范围。其目的仅仅是以简化的形式给出某些概念,以此作为稍后论述的更详细描述的前序。A brief overview of the invention is given below in order to provide a basic understanding of some aspects of the invention. It should be understood that this summary is not an exhaustive overview of the invention. It is not intended to identify key or critical parts of the invention nor to delineate the scope of the invention. Its purpose is merely to present some concepts in a simplified form as a prelude to the more detailed description that is discussed later.

本发明实施例的目的是针对上述现有技术的缺陷,提供一种能够将管道内的热水排放干净,实现使用时即出热水的实现零冷水的供水管道。The purpose of the embodiment of the present invention is to provide a zero-cold water supply pipeline capable of draining hot water in the pipeline and realizing hot water immediately when in use, aiming at the defects of the above-mentioned prior art.

本发明的另一目的提供一种零冷水热水器及基于该零冷水热水器实现零冷水的方法。Another object of the present invention is to provide a zero-cold water heater and a method for realizing zero-cold water based on the zero-cold water heater.

为了实现上述目的,本发明采取的技术方案是:In order to achieve the above object, the technical scheme that the present invention takes is:

一种实现零冷水的供水管道,包括管体,所述管体内部沿管体延伸方向设臵隔膜,以将所述管体内部分为第一流路和第二流路,所述隔膜能够在所述第一流路和第二流路之间来回摆动,所述第二流路的一端开口,另一端封闭,所述第一流路的两端均开口。A water supply pipeline for realizing zero cold water, comprising a pipe body, a diaphragm is arranged inside the pipe body along the extension direction of the pipe body, so as to divide the pipe body into a first flow path and a second flow path, and the diaphragm can Swing back and forth between the first flow path and the second flow path, one end of the second flow path is open and the other end is closed, and both ends of the first flow path are open.

本发明还提供一种零冷水热水器,包括出水部和设臵有热水出水口的热水器本体,所述热水器本体和所述出水部之间设臵有上述的实现零冷水的供水管道,其中:所述第一流路一开口端连通所述热水出水口,另一开口端连通所述出水部;所述第二流路的封闭端靠近所述出水部,开口端连通收集装臵。The present invention also provides a zero-cold water water heater, which includes a water outlet and a water heater body provided with a hot water outlet. The above-mentioned water supply pipeline for realizing zero cold water is arranged between the water heater body and the water outlet, wherein: One open end of the first flow path is connected to the hot water outlet, and the other open end is connected to the water outlet; the closed end of the second flow path is close to the water outlet, and the open end is connected to the collecting device.

本发明又提供一种基于该零冷水热水器实现零冷水的方法,包括:The present invention further provides a method for realizing zero cold water based on the zero cold water water heater, including:

检测热水器本体的热水出水口是否停止向供水管道的第一流路输出热水;Detecting whether the hot water outlet of the water heater body stops outputting hot water to the first flow path of the water supply pipeline;

如果是,则向所述供水管道的第二流路内输入介质,并通过第二流路的介质对隔膜产生的压力将隔膜向第一流路方向挤压,以将所述第一流路内的热水从热水器的出水部排出。If so, then input the medium into the second flow path of the water supply pipeline, and the pressure generated by the medium passing through the second flow path on the diaphragm will squeeze the diaphragm toward the direction of the first flow path, so as to push the diaphragm in the first flow path Hot water is discharged from the water outlet of the water heater.

与现有技术相比,本发明的有益效果是:Compared with prior art, the beneficial effect of the present invention is:

本发明通过设臵双层管路结构,在热水器停机后,第二流路的冷水通过隔膜挤压第一流路内的热水,将热水从喷头排出,下次使用时,第一流路热水挤压隔膜,从而挤压第二流路的冷水,冷水回流到收集装臵,从而实现出水即热水的效果。In the present invention, a double-layer pipe structure is arranged. After the water heater is shut down, the cold water in the second flow path squeezes the hot water in the first flow path through the diaphragm, and the hot water is discharged from the nozzle. When the water heater is used next time, the heat in the first flow path The water squeezes the diaphragm, thereby squeezing the cold water in the second flow path, and the cold water flows back to the collecting device, so as to realize the effect of hot water when the water comes out.

附图说明Description of drawings

为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only These are some embodiments of the present invention. For those skilled in the art, other drawings can also be obtained according to these drawings without any creative effort.

图1为本发明实施例提供的管道结构示意图;Fig. 1 is the pipeline structure schematic diagram that the embodiment of the present invention provides;

图2为图1的I处放大图;Figure 2 is an enlarged view of the I place of Figure 1;

图3为图1中A-A向剖视图;Fig. 3 is A-A direction sectional view in Fig. 1;

图4为本发明实施例提供的热水器的结构示意图;Fig. 4 is a schematic structural view of a water heater provided by an embodiment of the present invention;

图5为本发明实施例提供的一种停止使用热水的流程图;Fig. 5 is a flow chart of stopping the use of hot water provided by an embodiment of the present invention;

图6为本发明实施例提供的一种开始使用热水的流程图。Fig. 6 is a flow chart of starting to use hot water provided by an embodiment of the present invention.

附图标记:Reference signs:

1-管体;2-隔膜;3-第一流路;4-第二流路;5-毛细管;6-小孔;7-热水器本体;8-出水阀门;9-供水管道;10-收集装臵;11-进口阀门;12-出水部;13-连接管,14-热水出水口。1-tube body; 2-diaphragm; 3-first flow path; 4-second flow path; 5-capillary; 6-small hole; 7-water heater body; 8-water outlet valve; 9-water supply pipe; 10-collection device 11-inlet valve; 12-water outlet; 13-connecting pipe, 14-hot water outlet.

具体实施方式Detailed ways

为使本发明实施例的目的、技术方案和优点更加清楚,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明一部分实施例,而不是全部的实施例。在本发明的一个附图或一种实施方式中描述的元素和特征可以与一个或更多个其它附图或实施方式中示出的元素和特征相结合。应当注意,为了清楚的目的,附图和说明中省略了与本发明无关的、本领域普通技术人员已知的部件和处理的表示和描述。基于本发明中的实施例,本领域普通技术人员在没有付出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments It is a part of embodiments of the present invention, but not all embodiments. Elements and features described in one drawing or one embodiment of the present invention may be combined with elements and features shown in one or more other drawings or embodiments. It should be noted that representation and description of components and processes that are not related to the present invention and known to those of ordinary skill in the art are omitted from the drawings and descriptions for the purpose of clarity. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

参见图1和图2,一种实现零冷水的供水管道,包括管体1,管体1内部沿管体1延伸方向设臵隔膜2,以将管体1内部分为第一流路3和第二流路4,隔膜2能够在第一流路3和第二流路4之间来回摆动,第二流路4的一端开口,另一端封闭,所述第一流路的两端均开口。Referring to Fig. 1 and Fig. 2, a water supply pipe for realizing zero cold water includes a pipe body 1, and a diaphragm 2 is arranged inside the pipe body 1 along the extending direction of the pipe body 1 to divide the inside of the pipe body 1 into a first flow path 3 and a second flow path 3. The second flow path 4, the diaphragm 2 can swing back and forth between the first flow path 3 and the second flow path 4, one end of the second flow path 4 is open and the other end is closed, and both ends of the first flow path are open.

本发明所述的供水管道可以实现通过第二流路的介质挤压第一流路的介质,从而使第一流路内的介质不留存,达到排空的目的。The water supply pipeline of the present invention can squeeze the medium of the first flow path through the medium of the second flow path, so that the medium in the first flow path does not remain and the purpose of emptying is achieved.

参见图1和图3,当需要使用第一流路的介质时,为了使第一流路内介质的流通量大,在第二流路4内设有毛细管5,毛细管5上间隔设有小孔6。通过设臵毛细管尽可能多的将第二流路的介质通过毛细管排空。Referring to Figure 1 and Figure 3, when the medium of the first flow path needs to be used, in order to increase the flow rate of the medium in the first flow path, a capillary 5 is provided in the second flow path 4, and small holes 6 are arranged on the capillary 5 at intervals . Evacuate the medium of the second flow path through the capillary as much as possible by setting the capillary.

本实施例中,为了保证隔膜具有一定的摆动量,隔膜2为柔性隔离膜。柔性隔离膜优选聚酰亚胺薄膜材料,弹性大约有30%,耐高温,耐腐蚀,耐磨性好。In this embodiment, in order to ensure that the diaphragm has a certain amount of swing, the diaphragm 2 is a flexible diaphragm. The flexible isolation film is preferably polyimide film material, with about 30% elasticity, high temperature resistance, corrosion resistance, and good wear resistance.

参见图1和图3,为了尽可能将第一流路或第二流路的介质排空,隔膜2处于最大振幅摆动状态时贴合在管体1的内壁上。Referring to FIG. 1 and FIG. 3 , in order to empty the medium of the first flow path or the second flow path as much as possible, the diaphragm 2 is attached to the inner wall of the tube body 1 when it is in the state of maximum vibration swing.

参见图4,一种零冷水热水器,包括出水部12和设臵有热水出水口14的热水器本体7,热水器本体7和出水部12之间设臵供水管道9,其中:第一流路3一开口端连通热水出水口14,另一开口端连通出水部12;第二流路4的封闭端靠近出水部12,开口端连通收集装臵10。Referring to Fig. 4, a zero-cold water water heater includes a water outlet 12 and a water heater body 7 provided with a hot water outlet 14, and a water supply pipeline 9 is arranged between the water heater body 7 and the water outlet 12, wherein: the first flow path 3- The open end is connected to the hot water outlet 14 , and the other open end is connected to the water outlet 12 ; the closed end of the second flow path 4 is close to the water outlet 12 , and the open end is connected to the collecting device 10 .

本发明的热水器使用的热水管为双通道水管,水管内部有一柔性隔离层,将水管内部分为两个通道,通过通道内介质的挤压,从而将热水挤压出热水通道,保证管道内部积存热水,为下次使用热水提供便利,同时避免了水资源及能源的浪费。The hot water pipe used in the water heater of the present invention is a double-channel water pipe, and there is a flexible isolation layer inside the water pipe, which divides the inside of the water pipe into two channels, and the hot water is extruded out of the hot water channel through the extrusion of the medium in the channel, ensuring Hot water is stored inside the pipeline, which provides convenience for the next use of hot water and avoids waste of water resources and energy.

本实施例中,出水部12为喷头。可以通过软管连接喷头。热水出水口14设臵有出水阀门8,出水阀门可以控制热水的输入或停止输入,和/或,第二流路4的开口端连接进口阀门11,进口阀门11通过连接管13连接收集装臵10。通过设臵进口阀门,可以控制第二流路介质的流量大小,以便于将第一流路的热水排空。In this embodiment, the water outlet part 12 is a shower head. The spray head can be connected by a hose. The hot water outlet 14 is provided with a water outlet valve 8, which can control the input of hot water or stop the input, and/or, the open end of the second flow path 4 is connected to the inlet valve 11, and the inlet valve 11 is connected to the collector through the connecting pipe 13. device 10. By setting the inlet valve, the flow rate of the medium in the second flow path can be controlled to facilitate the emptying of the hot water in the first flow path.

本实施例中,出水阀门8为电动阀,和/或,进口阀门11为带泵的电磁阀。In this embodiment, the outlet valve 8 is an electric valve, and/or the inlet valve 11 is a solenoid valve with a pump.

设臵为电动阀,能够实现自动控制。It is set as an electric valve, which can realize automatic control.

本发明还提供一种基于上述的热水器实现排空管道热水的方法,如图5所示,该方法包括:The present invention also provides a method for emptying pipeline hot water based on the above-mentioned water heater, as shown in FIG. 5 , the method includes:

S101:检测热水出水口是否停止向供水管道输出热水;S101: Detect whether the hot water outlet stops outputting hot water to the water supply pipe;

S102:如果是,向所述供水管道的第二流路内输入介质;S102: If yes, input a medium into the second flow path of the water supply pipeline;

S103:将第一流路内的热水从出水部排出。S103: Discharging the hot water in the first flow path from the water outlet.

在该方法中,通过第二流路的介质对隔膜产生的压力将隔膜向第一流路方向挤压,以将所述第一流路内的热水从出水部排出。In this method, the pressure generated by the medium passing through the second flow path on the diaphragm presses the diaphragm toward the direction of the first flow path, so as to discharge the hot water in the first flow path from the water outlet.

如图6所示,该方法还包括:As shown in Figure 6, the method also includes:

S201:检测是否存在热水输出的指令输入;S201: Detect whether there is an instruction input for hot water output;

S202:如果是,经热水出水口向所述第一流路输出热水;S202: If yes, output hot water to the first flow path through the hot water outlet;

经所述热水器本体的热水出水口向所述第一流路输出热水;Outputting hot water to the first flow path through the hot water outlet of the water heater body;

S203:将第二流路内的介质经其开口端回引至收集装臵。S203: Return the medium in the second flow path to the collection device through its open end.

在该方法中,通过第一流路的热水对隔膜产生的压力将隔膜向第二流路方向挤压,以使所述第二流路内的介质经其开口端回引至收集装臵。In this method, the pressure generated by the hot water passing through the first flow path on the diaphragm presses the diaphragm toward the direction of the second flow path, so that the medium in the second flow path is led back to the collecting device through its open end.

即:Right now:

使用热水时,将本体内的热水充满第一流路,热水通过隔膜挤压第二流路的介质,第二流路的介质回收到收集装臵;When using hot water, fill the first flow path with hot water in the main body, press the medium of the second flow path through the diaphragm, and recover the medium of the second flow path to the collection device;

停止使用热水时,给第二流路内充满介质,第二流路的介质挤压第一流路,将第一流路的热水从喷头排出。When the hot water is stopped, the medium in the second flow path is filled, the medium in the second flow path squeezes the first flow path, and the hot water in the first flow path is discharged from the nozzle.

本实施例中,所述第二流路的介质为液体或气体。液体可以是冷水或其他液体,也可以选用气体,同样能达到将热水管道的水挤压排出的作用。In this embodiment, the medium of the second flow path is liquid or gas. Liquid can be cold water or other liquids, also can select gas for use, can reach the effect that the water of hot water pipeline is squeezed out equally.

当介质选用冷水时,收集装臵为供水装臵,第二流路通过外部供水管路连接供水装臵,以增加挤压第一流路的压力,将热水彻底排空。When the medium is cold water, the collection device is the water supply device, and the second flow path is connected to the water supply device through an external water supply pipeline to increase the pressure of squeezing the first flow path and completely drain the hot water.

本发明实施例优选的方法,包括以下步骤:The preferred method of the embodiment of the present invention comprises the following steps:

使用热水时,打开出水阀门,将本体内的热水充满第一流路,打开进口阀门,启动泵,将冷水完全排出第二流路。当检测到第一流路内的热水流量在一段时间恒定时,关闭带泵的电磁阀,停止泵运行;When using hot water, open the water outlet valve, fill the first flow path with hot water in the body, open the inlet valve, start the pump, and completely discharge the cold water from the second flow path. When it is detected that the hot water flow in the first flow path is constant for a period of time, close the electromagnetic valve with the pump and stop the pump;

停止使用热水时,关闭热水进水口的阀门,同时开启进口阀门,给第二流路内充满冷水,第二流路的冷水挤压第一流路,将第一流路的热水从喷头排出。When you stop using hot water, close the valve of the hot water inlet, and open the inlet valve at the same time, fill the second flow path with cold water, the cold water in the second flow path squeezes the first flow path, and discharge the hot water in the first flow path from the nozzle .

本发明的热水器尤指燃气热水器,其中使用的热水管为双通道水管,水管内部有一柔性隔离层,将热水通道与冷水通道隔离开。接水龙头的出水端,冷水通道进行密封处理,热水通道直接同水龙头连接。使用热水时,热水器将热水注入热水通道,同时开启冷水回流装臵,使热水充满整个管道,出水口流出的只是热水。使用完毕后,断开给热水通道的供水,启动冷水挤压通道,从而将热水挤压除管道。The water heater of the present invention is especially a gas water heater, wherein the hot water pipe used is a double-channel water pipe, and there is a flexible isolation layer inside the water pipe to isolate the hot water channel from the cold water channel. The water outlet of the faucet is connected, the cold water passage is sealed, and the hot water passage is directly connected with the faucet. When using hot water, the water heater injects hot water into the hot water channel, and at the same time opens the cold water return device, so that the hot water fills the entire pipe, and only hot water flows out of the water outlet. After use, cut off the water supply to the hot water passage, start the cold water extrusion passage, thereby extruding the hot water out of the pipe.

采用本发明的方法,用户用热水时,将接于热水进水口的电磁阀打开,同时打开带泵的电磁阀,启动泵,将第二流路内的冷水抽回用户的收集装臵,由于热水进入第一流路,柔性隔离膜在热水的挤压、带泵电磁阀及毛细管共同作用下,冷水很快都回流到用户的收集装臵,同时热水充满出水管道,由于出水口冷水端密封,所以流出的都为热水。当热水器检测到水流量一段时间恒定时,将带泵的电磁阀关闭,泵停止运行。With the method of the present invention, when the user uses hot water, the solenoid valve connected to the hot water inlet is opened, and at the same time, the solenoid valve with the pump is opened to start the pump, and the cold water in the second flow path is pumped back to the collection device of the user. , as the hot water enters the first flow path, the flexible isolation membrane is squeezed by the hot water, the electromagnetic valve with the pump, and the capillary, and the cold water quickly returns to the collection device of the user, and the hot water fills the outlet pipe at the same time. The cold water end of the nozzle is sealed, so all the outflow is hot water. When the water heater detects that the water flow is constant for a period of time, the electromagnetic valve with the pump is closed, and the pump stops running.

热水使用完毕之后,主控板切断热水器出水口的电磁阀,同时开启冷水带泵的电磁阀,此处的带泵的电磁阀与外部的自来水管道连接,在用户用水管道自身压力作用下,冷水充满第二流路,同时将剩余热水挤压出出水口,从而保证用户下次用水时,热水管路无残存水。After the hot water is used, the main control board cuts off the solenoid valve at the outlet of the water heater, and at the same time opens the solenoid valve with the cold water pump. The solenoid valve with the pump here is connected to the external tap water pipe. Under the pressure of the user's water pipe itself, The cold water fills the second flow path, and at the same time squeezes the remaining hot water out of the water outlet, so as to ensure that there is no residual water in the hot water pipeline when the user uses water next time.

其中毛细管是保证热水充满管道时,将管道内的冷水全部抽回收集装臵,柔性隔离膜由于水压力的作用,保证用热水时,热水充满整个管路,不用热水时,冷水充满整个管路。Among them, the capillary is to ensure that when the hot water fills the pipeline, all the cold water in the pipeline is drawn back to the collection device. Due to the effect of water pressure, the flexible isolation membrane ensures that when hot water is used, the hot water fills the entire pipeline. Fill the entire line.

本发明在用户使用热水器后,管道内不存储多余的热水,并且通过第二流路的冷水,将剩余热水挤出管道,从而实现了真正的零冷水。同时避免了水资源及能源的浪费,为用户提供了满意的用水解决方案。In the present invention, after the user uses the water heater, excess hot water is not stored in the pipeline, and the cold water passing through the second flow path squeezes the remaining hot water out of the pipeline, thereby realizing real zero cold water. At the same time, it avoids the waste of water resources and energy, and provides users with satisfactory water solutions.

在本发明上述各实施例中,实施例的序号仅仅便于描述,不代表实施例的优劣。对各个实施例的描述都各有侧重,某个实施例中没有详述的部分,可以参见其他实施例的相关描述。In the above-mentioned embodiments of the present invention, the serial numbers of the embodiments are only for convenience of description, and do not represent the advantages and disadvantages of the embodiments. The description of each embodiment has its own emphases, and for the part that is not described in detail in a certain embodiment, refer to the relevant descriptions of other embodiments.

在本发明的装臵和方法等实施例中,显然,各部件或各步骤是可以分解、组合和/或分解后重新组合的。这些分解和/或重新组合应视为本发明的等效方案。同时,在上面对本发明具体实施例的描述中,针对一种实施方式描述和/或示出的特征可以以相同或类似的方式在一个或更多个其它实施方式中使用,与其它实施方式中的特征相组合,或替代其它实施方式中的特征。In the embodiments of the device and method of the present invention, obviously, each component or each step can be decomposed, combined and/or recombined after decomposing. These decompositions and/or recombinations should be considered equivalents of the present invention. Meanwhile, in the above descriptions of specific embodiments of the present invention, features described and/or shown for one embodiment can be used in one or more other embodiments in the same or similar manner, and combination of features, or replace features in other embodiments.

应该强调,术语“包括/包含”在本文使用时指特征、要素、步骤或组件的存在,但并不排除一个或更多个其它特征、要素、步骤或组件的存在或附加。It should be emphasized that the term "comprising/comprising" when used herein refers to the presence of a feature, element, step or component, but does not exclude the presence or addition of one or more other features, elements, steps or components.

最后应说明的是:虽然以上已经详细说明了本发明及其优点,但是应当理解在不超出由所附的权利要求所限定的本发明的精神和范围的情况下可以进行各种改变、替代和变换。而且,本发明的范围不仅限于说明书所描述的过程、设备、手段、方法和步骤的具体实施例。本领域内的普通技术人员从本发明的公开内容将容易理解,根据本发明可以使用执行与在此所述的相应实施例基本相同的功能或者获得与其基本相同的结果的、现有和将来要被开发的过程、设备、手段、方法或者步骤。因此,所附的权利要求旨在在它们的范围内包括这样的过程、设备、手段、方法或者步骤。Finally, it should be noted that although the present invention and its advantages have been described in detail above, it should be understood that various changes, substitutions and modifications can be made without departing from the spirit and scope of the present invention defined by the appended claims. transform. Moreover, the scope of the present invention is not limited to the specific embodiments of the procedures, devices, means, methods and steps described in the specification. Those of ordinary skill in the art will readily appreciate from the disclosure of the present invention that existing and future designs that perform substantially the same function or obtain substantially the same results as the corresponding embodiments described herein can be used in accordance with the present invention. The developed process, device, means, method or steps. Accordingly, the appended claims are intended to include within their scope such processes, means, means, methods or steps.

Claims (12)

1.一种实现零冷水的供水管道,其特征在于,包括管体,所述管体内部沿管体延伸方向设臵隔膜,以将所述管体内部分为第一流路和第二流路,所述隔膜能够在所述第一流路和第二流路之间来回摆动,所述第二流路的一端开口,另一端封闭,所述第一流路的两端均开口。1. A water supply pipeline for realizing zero cold water, characterized in that it includes a pipe body, and a diaphragm is arranged inside the pipe body along the extension direction of the pipe body to divide the pipe body into a first flow path and a second flow path, The diaphragm can swing back and forth between the first flow path and the second flow path, one end of the second flow path is open and the other end is closed, and both ends of the first flow path are open. 2.根据权利要求1所述的实现零冷水的供水管道,其特征在于,所述第二流路内设有毛细管,所述毛细管上间隔设有小孔。2 . The water supply pipeline for realizing zero cold water according to claim 1 , wherein capillaries are arranged in the second flow path, and small holes are arranged at intervals on the capillaries. 3 . 3.根据权利要求1或2所述的实现零冷水的供水管道,其特征在于,所述隔膜为柔性隔离膜。3. The water supply pipeline for realizing zero cold water according to claim 1 or 2, characterized in that the diaphragm is a flexible diaphragm. 4.根据权利要求3所述的实现零冷水的供水管道,其特征在于,所述隔膜为聚酰亚胺薄膜。4. The water supply pipeline for realizing zero cold water according to claim 3, characterized in that, the diaphragm is a polyimide film. 5.一种零冷水热水器,包括出水部和设臵有热水出水口的热水器本体,其特征在于,所述热水器本体和所述出水部之间设臵有根据权利要求1-3任一项所述的实现零冷水的供水管道,其中:所述第一流路一开口端连通所述热水出水口,另一开口端连通所述出水部;所述第二流路的封闭端靠近所述出水部,开口端连通收集装臵。5. A zero-cold water water heater, comprising a water outlet and a water heater body provided with a hot water outlet, characterized in that, a water heater according to any one of claims 1-3 is arranged between the water heater body and the water outlet. The water supply pipeline for realizing zero cold water, wherein: one open end of the first flow path is connected to the hot water outlet, and the other open end is connected to the water outlet; the closed end of the second flow path is close to the The water outlet, the open end is connected to the collecting device. 6.根据权利要求5所述的零冷水热水器,其特征在于,所述出水部为喷头。6. The zero cold water water heater according to claim 5, characterized in that the water outlet part is a spray head. 7.根据权利要求5或6所述的零冷水热水器,其特征在于,所述热水出水口设臵有出水阀门,和/或,所述第二流路的开口端连接进口阀门,所述进口阀门通过连接管连接收集装臵。7. The zero cold water water heater according to claim 5 or 6, characterized in that, the hot water outlet is provided with a water outlet valve, and/or, the open end of the second flow path is connected to an inlet valve, and the The inlet valve is connected to the collection device through the connecting pipe. 8.根据权利要求7所述的零冷水热水器,其特征在于,所述出水阀门为电动阀;和/或,所述进口阀门为带泵的电磁阀。8. The zero cold water water heater according to claim 7, characterized in that, the outlet valve is an electric valve; and/or, the inlet valve is a solenoid valve with a pump. 9.一种基于权利要求5-8任一权利要求所述的零冷水热水器实现零冷水的方法,其特征在于,包括:9. A method for realizing zero cold water based on the zero cold water water heater according to any one of claims 5-8, characterized in that it comprises: 检测热水器本体的热水出水口是否停止向供水管道的第一流路输出热水;Detecting whether the hot water outlet of the water heater body stops outputting hot water to the first flow path of the water supply pipeline; 如果是,则向所述供水管道的第二流路内输入介质,并通过第二流路的介质对隔膜产生的压力将隔膜向第一流路方向挤压,以将所述第一流路内的热水从热水器的出水部排出。If so, then input the medium into the second flow path of the water supply pipeline, and the pressure generated by the medium passing through the second flow path on the diaphragm will squeeze the diaphragm toward the direction of the first flow path, so as to push the diaphragm in the first flow path Hot water is discharged from the water outlet of the water heater. 10.根据权利要求9所述的方法,其特征在于,还包括:10. The method of claim 9, further comprising: 检测是否存在热水输出的指令输入;Detect whether there is an instruction input for hot water output; 如果是,则经所述热水器本体的热水出水口向所述第一流路输出热水,并通过第一流路的热水对隔膜产生的压力将隔膜向第二流路方向挤压,以使所述第二流路内的介质经其开口端回引至收集装臵。If yes, output hot water to the first flow path through the hot water outlet of the water heater body, and press the diaphragm toward the second flow path by the pressure generated by the hot water passing through the first flow path to the second flow path. The medium in the second flow path is led back to the collection device through its open end. 11.根据权利要求10所述的方法,其特征在于,还包括:11. The method of claim 10, further comprising: 当检测到存在热水输出的指令输入时;打开出水阀门、进口阀门,启动泵,当检测到第一流路内的热水流量在一段时间恒定时,关闭带泵的电磁阀,停止泵运行。When it is detected that there is a command input for hot water output; open the water outlet valve and inlet valve, start the pump, and when it is detected that the hot water flow in the first flow path is constant for a period of time, close the solenoid valve with the pump and stop the pump. 12.根据权利要求9-11任一项所述的方法,其特征在于,所述第二流路的介质为液体或气体。12. The method according to any one of claims 9-11, wherein the medium of the second flow path is liquid or gas.
CN201310486382.9A 2013-10-16 2013-10-16 Realize the water supply line, water heater and the method for realizing zero cold water of zero cold water Active CN104566928B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310486382.9A CN104566928B (en) 2013-10-16 2013-10-16 Realize the water supply line, water heater and the method for realizing zero cold water of zero cold water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310486382.9A CN104566928B (en) 2013-10-16 2013-10-16 Realize the water supply line, water heater and the method for realizing zero cold water of zero cold water

Publications (2)

Publication Number Publication Date
CN104566928A true CN104566928A (en) 2015-04-29
CN104566928B CN104566928B (en) 2017-09-29

Family

ID=53083582

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310486382.9A Active CN104566928B (en) 2013-10-16 2013-10-16 Realize the water supply line, water heater and the method for realizing zero cold water of zero cold water

Country Status (1)

Country Link
CN (1) CN104566928B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106679152A (en) * 2016-07-09 2017-05-17 西北工业大学 Instantaneous gas water heater
CN111527939A (en) * 2020-05-25 2020-08-14 国网浙江省电力有限公司湖州供电公司 A kind of automatic adjustment system of production factors in greenhouse planting
CN111536686A (en) * 2020-05-22 2020-08-14 珠海格力电器股份有限公司 Water heater and control method thereof
CN111637623A (en) * 2020-05-26 2020-09-08 珠海格力电器股份有限公司 Water heater and control method thereof
CN112880203A (en) * 2021-02-26 2021-06-01 沈敬 Heat-reducing delay pipeline system of water heater
CN112880202A (en) * 2021-02-26 2021-06-01 沈敬 Heat-reducing delay pipeline system of water heater

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2534530Y (en) * 2002-04-08 2003-02-05 张雪祥 Automatic feeding water and emptying combined apparatus for solar energy water heater
CN1828176A (en) * 2006-03-26 2006-09-06 俞惠东 Solar energy water heater pipe emptier and water charging and discharging structure, function-changing device and fittings
CN2916512Y (en) * 2005-12-27 2007-06-27 杨明 Solar water heater emptying device
JP2009243855A (en) * 2008-03-31 2009-10-22 Osaka Gas Co Ltd Bath equipment
CN201488240U (en) * 2009-09-02 2010-05-26 美的集团有限公司 Heating device of electric heater with internal residual water easy to discharge
CN202660799U (en) * 2012-07-25 2013-01-09 山东琴耐尔新能源有限公司 Floating pipe type solar water heater pipeline emptier

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2534530Y (en) * 2002-04-08 2003-02-05 张雪祥 Automatic feeding water and emptying combined apparatus for solar energy water heater
CN2916512Y (en) * 2005-12-27 2007-06-27 杨明 Solar water heater emptying device
CN1828176A (en) * 2006-03-26 2006-09-06 俞惠东 Solar energy water heater pipe emptier and water charging and discharging structure, function-changing device and fittings
JP2009243855A (en) * 2008-03-31 2009-10-22 Osaka Gas Co Ltd Bath equipment
CN201488240U (en) * 2009-09-02 2010-05-26 美的集团有限公司 Heating device of electric heater with internal residual water easy to discharge
CN202660799U (en) * 2012-07-25 2013-01-09 山东琴耐尔新能源有限公司 Floating pipe type solar water heater pipeline emptier

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106679152A (en) * 2016-07-09 2017-05-17 西北工业大学 Instantaneous gas water heater
CN111536686A (en) * 2020-05-22 2020-08-14 珠海格力电器股份有限公司 Water heater and control method thereof
CN111527939A (en) * 2020-05-25 2020-08-14 国网浙江省电力有限公司湖州供电公司 A kind of automatic adjustment system of production factors in greenhouse planting
CN111637623A (en) * 2020-05-26 2020-09-08 珠海格力电器股份有限公司 Water heater and control method thereof
CN112880203A (en) * 2021-02-26 2021-06-01 沈敬 Heat-reducing delay pipeline system of water heater
CN112880202A (en) * 2021-02-26 2021-06-01 沈敬 Heat-reducing delay pipeline system of water heater

Also Published As

Publication number Publication date
CN104566928B (en) 2017-09-29

Similar Documents

Publication Publication Date Title
CN104566928B (en) Realize the water supply line, water heater and the method for realizing zero cold water of zero cold water
US8333169B2 (en) Water heater special for bathroom
CN103498494B (en) Anti-freezing sewage collection system and anti-freezing method of same
CN202511477U (en) Temperature-control water-saving device for water heater
CN103884096B (en) Heat pump water heater and water tank sectional heating method of heat pump water heater
CN103919465B (en) A kind of energy-conservation humidification water dispenser
CN208222812U (en) A storage-type electric water heater with zero cold water
CN100494809C (en) Horizontal volumetric energy-saving electric water heater
CN202119107U (en) Shower water saving system capable of providing comfortable water temperature
CN104154315B (en) A kind of hot water tap with intelligent water-saving control function
CN106766126A (en) Storage-type electric water heater
CN202675691U (en) Water-saving easily-cleaned efficient solar water heater
CN211261301U (en) Cold water recycling device at front section of water heater
CN206669027U (en) A kind of water saving loop apparatus based on self-supporting temperature-sensing valve
CN105672406B (en) A kind of hot and cold water water supply installation and cold and hot water supply system
CN108253633A (en) Water-saving water heater without cold water discharge
CN107514819A (en) A kind of water-saving device of water heater
CN107906756B (en) Waste heat utilization device for water heater in office area
CN203240012U (en) Solar pipeline emptying valve
CN206514528U (en) A kind of unidirectional pipeline internal circulation apparatus
CN202869048U (en) Solar water heater automatic water feed device
CN206347314U (en) Steam conveying device with injection pipeline
CN111964285B (en) A pipeline energy-saving drainer
CN201903178U (en) Three-way frost valve for gas water heating device
CN201187892Y (en) Double-emptying solar water heater

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant