CN104563996A - Fracturing tubular column dragged under pressure and fracturing method thereof - Google Patents

Fracturing tubular column dragged under pressure and fracturing method thereof Download PDF

Info

Publication number
CN104563996A
CN104563996A CN201310520275.3A CN201310520275A CN104563996A CN 104563996 A CN104563996 A CN 104563996A CN 201310520275 A CN201310520275 A CN 201310520275A CN 104563996 A CN104563996 A CN 104563996A
Authority
CN
China
Prior art keywords
fracturing
construction
tubing string
perforating
perforation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310520275.3A
Other languages
Chinese (zh)
Inventor
刘明
刘江波
任勇
赵振峰
王在强
胡相君
张安康
李旭梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201310520275.3A priority Critical patent/CN104563996A/en
Publication of CN104563996A publication Critical patent/CN104563996A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures

Abstract

The invention discloses a fracturing tubular column dragged under pressure and a fracturing method thereof, which are designed for increasing the tool construction efficiency and lowering the construction cost. The fracturing tubular column consists of a hydraulic controllable switching valve and a perforation fracturing tubular column which are connected with each other through an oil pipe. Before perforation fracturing construction, the perforation fracturing tubular column is placed into a well, the hydraulic controllable switching valve is arranged at a position above a kickoff point, and normal perforation fracturing construction is performed; after construction, the hydraulic controllable switching valve is closed by projecting a ball, and the perforation fracturing tubular column is dragged under pressure to a next-segment reservoir stratum position to perform next-segment perforation fracturing construction; after fracturing construction of all perforation segments is finished, blowout is performed once, and the well is washed completely. By adopting the method, blowout after perforation fracturing construction of each segment can be prevented, the construction time is saved, and environmental pollution caused by blowout liquid is prevented; stratum overflow liquid can be prevented from damaging the perforation tubular column after perforation fracturing, and the construction efficiency is increased; the labor intensity of workers is lowered, the requirement of expansion of a well site for blowout is omitted, and the construction cost is lowered.

Description

Drag fracturing tubing string with pressure and fracturing process thereof
Technical field
The present invention relates to a kind of drag fracturing tubing string with pressure and fracturing process thereof, belong to oil-gas field fracturing renovation technique field.
Background technology
At present, oil field mainly adopts hydro-jet fracturing technology to carry out staged fracturing of horizontal well and old well reform, and this technique obtains with features such as its exclusive perforating and fracturing integration operation, high efficiency of construction and low-risks and applies widely.But, after oil well transformation, adjust drilling tool with open flow, to carry out next section of rebuilding construction.Open flow construction will extend well site, prepares the mud pit depositing hydrojet, supporting all kinds of correlative and facility.The blowout prevention time reaches 20 hours most, and construction period lengthens, and cost is high, constrains the development of staged fracturing of horizontal well renovation technique to high efficiency and low cost direction.
Summary of the invention
The object of the present invention is to provide a kind of drag fracturing tubing string with pressure and fracturing process thereof, pollute to reduce open flow operation and to return discharge opeing, improve instrument efficiency of construction, reduce costs.
The perforating and fracturing tubing string that drag fracturing tubing string with pressure of the present invention is provided with ejector by the hydraulic pressure gate-controlled switch valve connected by oil pipe and upper end forms.Before carrying out perforating and fracturing construction, by perforating and fracturing tubing string lower going-into-well, hydraulic pressure gate-controlled switch valve position is arranged on the position of more than kickoff point (KOP), then carries out normal perforating and fracturing construction; After construction terminates, hydraulic pressure gate-controlled switch valve is closed in pitching, and dragging perforating and fracturing tubing string with pressure, to next section of reservoir position, carries out the perforating and fracturing construction of next section; Treat the complete open flow of whole perforated interval pressing crack construction, through wash well.
This method can be avoided carrying out open flow after every section of perforating and fracturing construction, can save the engineering time, avoid open flow liquid contaminated environment; After reducing perforating and fracturing construction, stratum returning fluid body injures perforating and fracturing tool tubular column, improves instrument efficiency of construction, shortens completion period; Can labor strength be reduced, exempt open flow to the needs expanding well site, need not mud sump be dug, the construction that minimizing material loss or other facilities produce and expense.
Accompanying drawing explanation
Fig. 1 is drag fracturing tubing string schematic diagram with pressure.
Detailed description of the invention
Embodiment:
With reference to Fig. 1, embodiments of the invention are further illustrated:
The perforating and fracturing tubing string 3 that this drag fracturing tubing string with pressure is provided with ejector 4 by the hydraulic pressure gate-controlled switch valve 2 connected by oil pipe 1 and upper end forms.
The fracturing process of this drag fracturing tubing string with pressure is as follows:
1, first, by normal for perforating and fracturing tubing string 3 lower going-into-well;
2, according to engineering design, hydraulic pressure gate-controlled switch valve 2 is arranged on the position at more than kickoff point (KOP) O five oil pipe places, kickoff point (KOP) can not be entered down during to guarantee that tubing string is movable, then, oil pipe 1 is connected to Blowout prevention wellhead;
3, connect surface line and carry out first paragraph reservoir perforating and fracturing construction after, pull down oil pipe 1, inject pipeline, install lubricator, drop into steel ball;
4, reconnect oil 1, inject pipeline, suppress, steel ball is coordinated with the ball seat in hydraulic pressure gate-controlled switch valve 2, closing passage, close oil pipe 1;
5, after pressure release, dismounting well head, operation blowout preventer set, shutoff oil jacket annular space, dragging perforating and fracturing tubing string 3 to next section reservoir position with pressure, continues construction.
6, after complete full well reservoir construction, disposable open flow, trips out perforating and fracturing tubing string 3.

Claims (3)

1. a drag fracturing tubing string with pressure, is characterized in that:
The perforating and fracturing tubing string (3) that this drag fracturing tubing string with pressure is provided with ejector (4) by the hydraulic pressure gate-controlled switch valve (2) connected by oil pipe (1) and upper end forms.
2. the fracturing process of a drag fracturing tubing string with pressure, it is characterized in that this method is before carrying out perforating and fracturing construction, by in perforating and fracturing tubing string (3) lower going-into-well, hydraulic pressure gate-controlled switch valve position is arranged on the position of more than kickoff point (KOP), then carries out normal perforating and fracturing construction; After construction terminates, hydraulic pressure gate-controlled switch valve (2) is closed in pitching, and dragging perforating and fracturing tubing string (3) with pressure, to next section of reservoir position, carries out the perforating and fracturing construction of next section; Treat the complete open flow of whole perforated interval pressing crack construction, through wash well.
3. the fracturing process of drag fracturing tubing string with pressure according to claim 2, is characterized in that its concrete operation step is as follows:
1) first, by normal for perforating and fracturing tubing string (3) lower going-into-well;
2) according to engineering design, hydraulic pressure gate-controlled switch valve (2) is arranged on the position at more than kickoff point (KOP) O five oil pipe places, kickoff point (KOP) can not be entered down during to guarantee that tubing string is movable, then, oil pipe 1 is connected to Blowout prevention wellhead;
3) connect surface line and carry out first paragraph reservoir perforating and fracturing construction after, pull down oil pipe (1), inject pipeline, install lubricator, drop into steel ball;
4) reconnect oil (1), inject pipeline, suppress, steel ball is coordinated with the ball seat in hydraulic pressure gate-controlled switch valve 2, closing passage, close oil pipe (1);
5), after pressure release, dismounting well head, operation blowout preventer set, shutoff oil jacket annular space, dragging perforating and fracturing tubing string (3) with pressure, to next section of reservoir position, continues construction.
6), after complete full well reservoir construction, disposable open flow, trips out perforating and fracturing tubing string (3).
CN201310520275.3A 2013-10-29 2013-10-29 Fracturing tubular column dragged under pressure and fracturing method thereof Pending CN104563996A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310520275.3A CN104563996A (en) 2013-10-29 2013-10-29 Fracturing tubular column dragged under pressure and fracturing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310520275.3A CN104563996A (en) 2013-10-29 2013-10-29 Fracturing tubular column dragged under pressure and fracturing method thereof

Publications (1)

Publication Number Publication Date
CN104563996A true CN104563996A (en) 2015-04-29

Family

ID=53080981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310520275.3A Pending CN104563996A (en) 2013-10-29 2013-10-29 Fracturing tubular column dragged under pressure and fracturing method thereof

Country Status (1)

Country Link
CN (1) CN104563996A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113530512A (en) * 2020-04-22 2021-10-22 中国石油天然气股份有限公司 Fracturing string and fracturing method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2415637A1 (en) * 2000-07-11 2002-01-17 Halliburton Energy Services, Inc. Well management system
CN200993001Y (en) * 2006-12-29 2007-12-19 大港油田集团有限责任公司 Non-clogging stratified fracturing pipe string and its non-clogging stratified fracturing device
US20090008088A1 (en) * 2007-07-06 2009-01-08 Schultz Roger L Oscillating Fluid Flow in a Wellbore
CN201372806Y (en) * 2009-01-23 2009-12-30 毛万里 Annular hydraulic control multi-switching valve
CN102691495A (en) * 2012-05-18 2012-09-26 中国石油天然气股份有限公司 High-broken-pressure stratum horizontal well sectional-fracturing method for well cementation and completion of casing
CN102777156A (en) * 2012-07-20 2012-11-14 中国石油化工股份有限公司 Fracturing method for multi-interval oil and gas wells
CN103132969A (en) * 2011-12-05 2013-06-05 中国石油化工股份有限公司 Staged fracturing sliding sleeve used for oil well and device and usage method thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2415637A1 (en) * 2000-07-11 2002-01-17 Halliburton Energy Services, Inc. Well management system
CN200993001Y (en) * 2006-12-29 2007-12-19 大港油田集团有限责任公司 Non-clogging stratified fracturing pipe string and its non-clogging stratified fracturing device
US20090008088A1 (en) * 2007-07-06 2009-01-08 Schultz Roger L Oscillating Fluid Flow in a Wellbore
CN201372806Y (en) * 2009-01-23 2009-12-30 毛万里 Annular hydraulic control multi-switching valve
CN103132969A (en) * 2011-12-05 2013-06-05 中国石油化工股份有限公司 Staged fracturing sliding sleeve used for oil well and device and usage method thereof
CN102691495A (en) * 2012-05-18 2012-09-26 中国石油天然气股份有限公司 High-broken-pressure stratum horizontal well sectional-fracturing method for well cementation and completion of casing
CN102777156A (en) * 2012-07-20 2012-11-14 中国石油化工股份有限公司 Fracturing method for multi-interval oil and gas wells

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
姜德铭 等: "水力喷射拖动分压工艺在水平井的应用", 《油气井测试》 *
王元基主编: "《水平井油田开发技术文集》", 31 May 2010 *
谢涛等: "工艺危害分析在带压拖动压裂工艺中的应用", 《科技和产业》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113530512A (en) * 2020-04-22 2021-10-22 中国石油天然气股份有限公司 Fracturing string and fracturing method

Similar Documents

Publication Publication Date Title
CN105804680B (en) A kind of oil gas field workover operation device with pressure and method
CN109630060B (en) Repeatable non-killing well completion production string and construction method
CN104695927A (en) Fracturing and completion integrated method adopting coiled tubing and production tubing combined tubing string
CN203081417U (en) Multifunctional integrated gas lift technique pipe column
CN203321476U (en) Coiled tubing controllable packer technique pipe for repeated reconstruction of old wells
CN103470239B (en) A kind of continuous fracturing technology method of dragging with pressure
CN105239984A (en) Method for controlling coal mine underground fracturing crack propagation
CN103912257B (en) A kind of dragging multiple fracturing device with pressure
CN106930746A (en) The alternative expression coal seam anti-reflection method that drilling acetone invasion and attack are combined with hydraulic fracturing
CN104481489A (en) Coiled tube fracturing and well completion integration technological method for vertical gas well
CN203626820U (en) Gas-lift flow-aiding horizontal well water exploration tubular column
CN104563996A (en) Fracturing tubular column dragged under pressure and fracturing method thereof
CN102691492B (en) System and process of screen pipe completion and cross oil layer cementing for steam injection heavy oil well
RU2533470C2 (en) Procedure for recovery of tightness in flow strings
CN204041042U (en) A kind of coiled tubing drag fracturing tubing string
CN202866733U (en) Novel well repair seal device for oil field
CN204386577U (en) The protective jacket in sliding sleeve fracturing hole and sliding sleeve
CN203394469U (en) PE screen pipe well completion device for coalbed methane horizontal well
CN203347747U (en) Anti-pollution thermal washing tubular column
CN206205870U (en) A kind of fluid erosion prevention petroleum pipeline deferent pipe nipple component
CN109252824B (en) Fishing device and method for underground sand-buried pipe column of oil-water well
CN204024609U (en) Play long well section perforation gun apparatus
CN115992672A (en) On-line cleaning process technology and equipment for sucker rod of low-pressure overflow well
CN103711452B (en) A kind of gel slug packing well control method
CN205036340U (en) Sucker rod antifouling blowout preventer that goes into well

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150429

RJ01 Rejection of invention patent application after publication