CN104563950A - Impact holing boring slurry isolation device based on slurry outlet pipe and slag inlet pipe - Google Patents

Impact holing boring slurry isolation device based on slurry outlet pipe and slag inlet pipe Download PDF

Info

Publication number
CN104563950A
CN104563950A CN201410827758.2A CN201410827758A CN104563950A CN 104563950 A CN104563950 A CN 104563950A CN 201410827758 A CN201410827758 A CN 201410827758A CN 104563950 A CN104563950 A CN 104563950A
Authority
CN
China
Prior art keywords
steel plate
outlet pipe
wire rope
pipe
slurry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410827758.2A
Other languages
Chinese (zh)
Inventor
魏小楠
龙万学
向一鸣
廖斌
曾庆展
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Transportation Planning Survey and Design Academe Co Ltd
Original Assignee
Guizhou Transportation Planning Survey and Design Academe Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Transportation Planning Survey and Design Academe Co Ltd filed Critical Guizhou Transportation Planning Survey and Design Academe Co Ltd
Priority to CN201410827758.2A priority Critical patent/CN104563950A/en
Publication of CN104563950A publication Critical patent/CN104563950A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices, or the like
    • E21B33/138Plastering the borehole wall; Injecting into the formation

Abstract

The invention discloses an impact holing boring slurry isolation device based on a slurry outlet pipe and a slag inlet pipe. A circular steel plate is arranged on a position, away from the hole bottom impact drill bit for a movable range, of a borehole in the impact holing construction process, the slurry with relatively large viscosity and relatively large density is arranged in holes in the upper part of the steel plate, the hole wall can be effectively protected, and the collapse of the hole wall can be prevented. The slurry with relatively small viscosity and relatively small density is arranged in holes in the lower part of the steel plate, when the drill bit impacts the hole in the lower part of the steel plate, the resistance of the slurry can be reduced, and the impact holing efficiency can be improved; the slurry outlet pipe and the slag inlet pipe are arranged on the lower end of the steel plate, and the clean water forms upward pressure for the slurry on the bottom, so that the extraction efficiency of the slurry can be improved, and the clean water can be prevented from being extracted when the slurry is extracted.

Description

A kind of impact holing drilling slurry spacer assembly based on outlet pipe and slag feed pipe
Technical field
The present invention relates to Geotechnical Engineering field, particularly relate to a kind of impact holing drilling slurry spacer assembly based on outlet pipe and slag feed pipe.
Background technology
Along with the fast development of China's transport development, most of highway construction is carried out in western mountainous areas.Carry out highway construction in mountain area, bridge occupies significant proportion, when constructing to bridge pier, many times adopts impact holing mode to construct to pile foundation of bridge pier.When adopting impact holing mode to construct, in order to keep hole wall to stablize, preventing hole wall collapse, generally all adopting the method for mud off to carry out.Now along with the continuous expansion of bridge scale, the pile foundation of bridge pier is more and more darker.In impact holing process; in order to protect the stability of hole wall; viscosity and the severe of mud are increasing, although protect the stability of hole wall in work progress, because the viscosity of mud increases; the viscous drag when drilling hole burst of drill bit increases; in order to overcome the viscous drag of mud, the impact energy of drill bit consumes in mud greatly, causes fractured rock efficiency at the bottom of hole not high; rate of penetration is slow, and pore-forming efficiency is extremely low.
Summary of the invention
In view of this, the invention provides a kind of impact holing drilling slurry spacer assembly based on outlet pipe and slag feed pipe, solve the drill bit problem that resistance is excessive in mud when impact holing, thus drilling efficiency when improving impact holing.
Based on an impact holing drilling slurry spacer assembly for outlet pipe and slag feed pipe, comprise steel plate, inlet pipe, residue outlet, wire rope, wire rope lay mechanism, outlet pipe and slag feed pipe, wherein:
Described steel plate is disc, and its diameter is less than bore diameter, and steel plate circle centre position arranges lacing hole, and the card of steel plate is provided with the slag notch relative to center of circle symmetry and stock inlet; 3 wire rope tie points are circumferentially evenly provided with at described steel plate edge;
Described wire rope lays mechanism 3, is evenly fixed on boring edge; Three wire rope tie points of steel plate fix three wire rope one end respectively, and the wire rope other end is connected to wire rope and lays in mechanism; The wire rope of drill bit described in crane hanging component passes from described lacing hole, and steel plate is lifted above drill bit in the borehole by wire rope level; The stock inlet upper end of described steel plate connects described inlet pipe, and described slag notch upper end connects described residue outlet; The free end of described inlet pipe and slag notch is arranged on the edge of boring; The lower end of described stock inlet connects described outlet pipe one end, and the lower end of described slag notch connects described slag feed pipe one end; Wherein, the other end of described outlet pipe is close to the upper end of drill bit, and the other end of described slag notch is bell mouth shape, and the free end of described inlet pipe is pumped to clear water, and the free end of described slag notch arranges electrodynamic pump and extracted out from steel plate bottom by mud.
Preferably, the diameter of described steel plate 20cm less of bore diameter; The thickness of described steel plate is 5mm ~ 10mm; The diameter of described lacing hole is 10cm; The diameter of described slag notch and stock inlet is 20cm; Described slag notch center and mud mouth center and steel plate 1 Edge Distance are 30cm; Described wire rope tie point is apart from steel plate edge 20cm; The horn mouth of described slag feed pipe is higher than the soffit near steel plate.
The present invention has following beneficial effect:
Spacer assembly of the present invention, in impact holing work progress, more than drill hammer scope of activities at the bottom of hole spacing hole; one circular steel plate is set; be the mud that viscosity ratio is comparatively large and density is larger in the hole on steel plate top, effectively can protect hole wall, control hole wall collapse.And in the hole of steel plate bottom, be the mud that viscosity and density are less, in the hole of drill bit steel plate bottom again during impact holing, can slurry resistance be reduced, put forward impact holing efficiency; By arranging outlet pipe and slag feed pipe in steel plate lower end, clear water is formed mud in bottom and upwards pressure, and improves the extraction efficiency of mud, meanwhile, avoids also being taken away by clear water when extracting mud.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the percussive drilling inner structure in the present invention;
Fig. 2 is the schematic diagram of the steel plate structure in the present invention.
1-steel plate, 2-residue outlet, 3-inlet pipe, 4-wire rope, 5-top mud, 6-bottom mud, 7-wire rope tie point, 8-slag notch, 9-stock inlet, 10-lacing hole, 11-wire rope lays mechanism, 12-drill bit, 13-crane, 14-outlet pipe, 15-slag feed pipe.
Detailed description of the invention
To develop simultaneously embodiment below in conjunction with accompanying drawing, describe the present invention.
Below in conjunction with drawings and Examples, the present invention is described in further detail.
When mud viscosity and density affect the percussion drilling efficiency of drill bit comparatively greatly in holing, first the lacing hole 10 connected on drill hammer 12 steel wire penetrating steel plate 1, connect drill hammer 12 and drill bit is put into boring.Again on steel plate 1 coupling together with wire rope tie point 7 wire rope 4 with fixation steel plate 1 on steel plate 1, residue outlet 2 and steel plate are exported 8 and are connected and are tightly connected and locate, inlet pipe 3 and steel plate are entered mud mouth 9 and is connected and is tightly connected and locate.Then by wire rope 4, steel plate being put into precalculated position, hole, resistance when putting into reduce, steel plate 1 certain angle that tilts can be put into.After precalculated position put into by steel plate 1, pump into clear water to inlet pipe 3 upper end, extracted out by the mud in boring by residue outlet 2, so, the mud of steel plate less than 1 is replaced by the clear water that inlet pipe 3 pumps into, and changes viscosity and the density of mud in steel plate 1 bottom hole.Like this, the mud on steel plate 1 top owing to keeping larger viscosity and density, thus keeps the stable of hole wall, and viscosity and the density of the mud of steel plate 1 bottom are less, reduce the resistance of motion of drill hammer 12, improve drilling efficiency.
The present invention is also provided with outlet pipe 14 and slag feed pipe 15 in steel plate 1 bottom, and the lower end of stock inlet 9 is connected outlet pipe 14 one end, and the lower end of slag notch 8 connects slag feed pipe 15 one end; Wherein, the other end of described outlet pipe 14 is close to the upper end of drill bit 12, and the other end of described slag feed pipe 15 is bell mouth shape, near the lower surface of steel plate 1.After inlet pipe 3 pumps into clear water, the end due to outlet pipe 14 is arranged on the position close to drill bit 12, and clear water pumps into from the bottom of boring; Simultaneously, slag feed pipe 15 is arranged on the position of steel plate 1 lower surface, when after the electric priming pump that residue outlet 2 connects, trumpet-shaped slag feed pipe 15 starts to extract mud on the top of boring 12, so, clear water is formed mud in bottom and upwards pressure, and improves the extraction efficiency of mud, meanwhile, avoid when extracting mud, clear water also being taken away.
In sum, these are only preferred embodiment of the present invention, be not intended to limit protection scope of the present invention.Within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (8)

1. based on an impact holing drilling slurry spacer assembly for outlet pipe and slag feed pipe, it is characterized in that, comprise steel plate, inlet pipe, residue outlet, wire rope, wire rope lay mechanism, outlet pipe and slag feed pipe, wherein:
Described steel plate is disc, and its diameter is less than bore diameter, and steel plate circle centre position arranges lacing hole, and the card of steel plate is provided with the slag notch relative to center of circle symmetry and stock inlet; 3 wire rope tie points are circumferentially evenly provided with at described steel plate edge;
Described wire rope lays mechanism 3, is evenly fixed on boring edge; Three wire rope tie points of steel plate fix three wire rope one end respectively, and the wire rope other end is connected to wire rope and lays in mechanism; The wire rope of drill bit described in crane hanging component passes from described lacing hole, and steel plate is lifted above drill bit in the borehole by wire rope level; The stock inlet upper end of described steel plate connects described inlet pipe, and described slag notch upper end connects described residue outlet; The free end of described inlet pipe and slag notch is arranged on the edge of boring; The lower end of described stock inlet connects described outlet pipe one end, and the lower end of described slag notch connects described slag feed pipe one end; Wherein, the other end of described outlet pipe is close to the upper end of drill bit, and the other end of described slag notch is bell mouth shape, and the free end of described inlet pipe is pumped to clear water, and the free end of described slag notch arranges electrodynamic pump and extracted out from steel plate bottom by mud.
2. a kind of impact holing drilling slurry spacer assembly based on outlet pipe and slag feed pipe as claimed in claim 1, is characterized in that, the diameter 20cm less of bore diameter of described steel plate.
3. a kind of impact holing drilling slurry spacer assembly based on outlet pipe and slag feed pipe as claimed in claim 1, is characterized in that: the thickness of described steel plate is 5mm ~ 10mm.
4. a kind of impact holing drilling slurry spacer assembly based on outlet pipe and slag feed pipe as claimed in claim 1, is characterized in that: the diameter of described lacing hole is 10cm.
5. a kind of impact holing drilling slurry spacer assembly based on outlet pipe and slag feed pipe as claimed in claim 1, is characterized in that: the diameter of described slag notch and stock inlet is 20cm.
6. a kind of impact holing drilling slurry spacer assembly based on outlet pipe and slag feed pipe as claimed in claim 1, is characterized in that: described slag notch center and mud mouth center and steel plate 1 Edge Distance are 30cm.
7. a kind of impact holing drilling slurry spacer assembly based on outlet pipe and slag feed pipe as claimed in claim 1, is characterized in that: described wire rope tie point is apart from steel plate edge 20cm.
8. a kind of impact holing drilling slurry spacer assembly based on outlet pipe and slag feed pipe as claimed in claim 1, is characterized in that: the horn mouth of described slag feed pipe is higher than the soffit near steel plate.
CN201410827758.2A 2014-12-25 2014-12-25 Impact holing boring slurry isolation device based on slurry outlet pipe and slag inlet pipe Pending CN104563950A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410827758.2A CN104563950A (en) 2014-12-25 2014-12-25 Impact holing boring slurry isolation device based on slurry outlet pipe and slag inlet pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410827758.2A CN104563950A (en) 2014-12-25 2014-12-25 Impact holing boring slurry isolation device based on slurry outlet pipe and slag inlet pipe

Publications (1)

Publication Number Publication Date
CN104563950A true CN104563950A (en) 2015-04-29

Family

ID=53080935

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410827758.2A Pending CN104563950A (en) 2014-12-25 2014-12-25 Impact holing boring slurry isolation device based on slurry outlet pipe and slag inlet pipe

Country Status (1)

Country Link
CN (1) CN104563950A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0485483A (en) * 1990-07-27 1992-03-18 Central Res Inst Of Electric Power Ind High heat resisting packer device
CN1085981A (en) * 1993-10-26 1994-04-27 涂正武 Capsule sealing grouting and sealing device thereof
CN101634149A (en) * 2009-08-05 2010-01-27 朱奎 Prestressed anchor foundation pit support and construction method
CN102226340A (en) * 2011-04-15 2011-10-26 中国一冶集团有限公司 Construction method for rock-entering cast-in-situ bored piles with diameter of less than 1.5m
CN104213833A (en) * 2013-06-03 2014-12-17 中国石油天然气集团公司 Horizontal directional drilling crossing construction method and horizontal directional drilling crossing drilling device
CN204386549U (en) * 2014-12-25 2015-06-10 贵州省交通规划勘察设计研究院股份有限公司 A kind of impact holing drilling slurry spacer assembly based on outlet pipe and slag feed pipe

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0485483A (en) * 1990-07-27 1992-03-18 Central Res Inst Of Electric Power Ind High heat resisting packer device
CN1085981A (en) * 1993-10-26 1994-04-27 涂正武 Capsule sealing grouting and sealing device thereof
CN101634149A (en) * 2009-08-05 2010-01-27 朱奎 Prestressed anchor foundation pit support and construction method
CN102226340A (en) * 2011-04-15 2011-10-26 中国一冶集团有限公司 Construction method for rock-entering cast-in-situ bored piles with diameter of less than 1.5m
CN104213833A (en) * 2013-06-03 2014-12-17 中国石油天然气集团公司 Horizontal directional drilling crossing construction method and horizontal directional drilling crossing drilling device
CN204386549U (en) * 2014-12-25 2015-06-10 贵州省交通规划勘察设计研究院股份有限公司 A kind of impact holing drilling slurry spacer assembly based on outlet pipe and slag feed pipe

Similar Documents

Publication Publication Date Title
CN101649740B (en) Ground bored well body structure for gas extraction
CN102536240B (en) Method for preventing rock burst by adopting high-pressure fracturing
CN104563948A (en) Impact holing boring slurry isolation device based on slurry outlet pipe
CN108661697A (en) Long drilled holes gas enhanced gas extraction method under the service well of ground
CN206646497U (en) A kind of clad steel casing structure
CN101994312A (en) Soil side slope or tailings dam drainage construction method
CN204386549U (en) A kind of impact holing drilling slurry spacer assembly based on outlet pipe and slag feed pipe
CN204299468U (en) A kind of positioning and guiding system and device of hidden hole drilling boring
CN204344004U (en) A kind of impact holing drilling slurry spacer assembly based on many residue outlets and Grouting Pipe
CN204344057U (en) A kind of impact holing drilling slurry spacer assembly
CN102409978A (en) Rotary drilling hole forming method by using multi-stage alloy pilot roller bit in complex stratum cast-in-place pile construction
CN104563949A (en) High-efficient impact holing boring slurry isolation device
CN107938694A (en) Gravity type water jetting at high pressure percussion mechanism and its help heavy method
CN205444232U (en) Stock - gravity type infiltration retaining wall
CN204344058U (en) A kind of impact holing drilling slurry spacer assembly efficiently
CN204386548U (en) A kind of impact holing drilling slurry spacer assembly based on outlet pipe
CN104632100A (en) Impact hole and drilling slurry isolating device based on multiple slag outlet pipes and slurry injecting pipes
CN104563950A (en) Impact holing boring slurry isolation device based on slurry outlet pipe and slag inlet pipe
CN206617118U (en) A kind of large diameter borehole drill bit with boring mud fishing device
CN202788626U (en) Drill bit of rotary drilling machine
CN105401572A (en) Construction technique for environment-friendly cast-in-situ bored pile provided with wall protecting tube
CN206134961U (en) Earthing device for slip casing by pressure
CN206015511U (en) One implant post steel pipe column
CN104563951A (en) Isolating device for impact holing drilled slurry
CN203924043U (en) A kind of bamboo concrete stake

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150429

WD01 Invention patent application deemed withdrawn after publication