CN104563476A - Interior constructing device for large spherical tank - Google Patents

Interior constructing device for large spherical tank Download PDF

Info

Publication number
CN104563476A
CN104563476A CN201510014546.7A CN201510014546A CN104563476A CN 104563476 A CN104563476 A CN 104563476A CN 201510014546 A CN201510014546 A CN 201510014546A CN 104563476 A CN104563476 A CN 104563476A
Authority
CN
China
Prior art keywords
spherical tank
portable plate
fixed head
level board
hydraulic lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510014546.7A
Other languages
Chinese (zh)
Other versions
CN104563476B (en
Inventor
王强
冯精良
邓贵德
胡斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Jiliang University
Original Assignee
China Jiliang University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Jiliang University filed Critical China Jiliang University
Priority to CN201510014546.7A priority Critical patent/CN104563476B/en
Publication of CN104563476A publication Critical patent/CN104563476A/en
Application granted granted Critical
Publication of CN104563476B publication Critical patent/CN104563476B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)
  • Sewage (AREA)

Abstract

The invention provides an interior constructing device for a large spherical tank, including support lugs, a fixed strip, a horizontal bearing, a stop plate, four support rods, a hydraulic lifting column, an operating platform and horizontal plates, wherein the hydraulic lifting column is introduced into middle of the interior of the spherical tank through a manhole of the spherical tank, the bottom of the hydraulic lifting column is fixed on the ground, an annular column sleeve of the first horizontal plate sleeves the hydraulic lifting column, the groove of the second horizontal plate is clamped on the clamping groove of the first horizontal plate, one end of each support rod is fixedly connected with the support lug on the hydraulic lifting column while the other end of the same is fixedly connected with the support lug on the corresponding horizontal plate, and the operating platform is fixed on a movable plate through a fixed hole penetrating through the movable plate. The interior constructing device can be used when the spherical tank is assembled, and also can be used for constructing at any position in the spherical tank when the spherical tank is maintained. The interior constructing device for the large spherical tank provides platform installing and disassembly, thus being convenient and greatly shortening construction period, and can meet the requirement of construction with one or more persons.

Description

A kind of large-size spherical tank interior construction device
Technical field
The present invention relates to a kind of interior construction device, particularly relate to a kind of large-size spherical tank interior construction device.
Background technology
Large-size spherical tank is as the efficient three class pressure reservoir containers of one, and with its safety, stable performance is more and more widely used in the industries such as metallurgy, combustion gas, oil, the chemical industry energy.And present the development trend of maximization.
When no matter being maintenance and maintenance when spherical tank is set up or after spherical tank uses certain time limit,
All need to construct in spherical tank inside.Be typically employed in spherical tank inside and set up interim scaffold, take full multilayer scaffold in spherical tank inside, every one deck spreads flat board, to meet job requirements from the bottom up.
Although such method can ensure in spherical tank interior construction, but it is large to set up scaffold working strength layer by layer, particularly for large-size spherical tank, needs the material of at substantial, add the cost of construction, too increase the work period that spherical tank is set up and checked simultaneously.And safety is also poor, because in spherical tank, light is bad, operating personnel, through working long hours, easily causes danger.
Summary of the invention
The present invention is directed to the deficiencies in the prior art, propose a kind of large-size spherical tank interior construction device.
A kind of large-size spherical tank interior construction device, comprises journal stirrup, fixed strip, horizontal bearing, limiting plate, four support bars, hydraulic lifting post, operating platform and level boards;
Level board comprises the first level board and the second level board, first level board comprises annular column sleeve, the first fixed head and two piece of first portable plate, annular column sleeve is provided with bottom the first described fixed head, annular slot is provided with in annular column sleeve, the top of the first fixed head has draw-in groove, and the first fixed head is hollow, and two piece of first portable plate is that cavity is connected by horizontal bearing and the first fixed head, horizontal bearing is provided with limiting plate, and the end of the first portable plate is provided with and multiplely penetrates fixing hole;
Second level board comprises the second fixed head and the second portable plate, the bottom of the second fixed head has the draw-in groove matched with the draw-in groove on the first fixed head, second fixed head is hollow, two piece of second portable plate is that cavity is connected by horizontal bearing and the second fixed head, horizontal bearing is provided with limiting plate, and the end of the second portable plate is provided with and multiplely penetrates fixing hole;
Hydraulic lifting post is passed to spherical tank bosom by the lower manhole of spherical tank, and the bottom of hydraulic lifting post fixes on the ground, and the top of hydraulic lifting post is provided with the fixed strip of annular; The annular column sleeve of the first level board is enclosed within hydraulic lifting post, fixed strip is stuck in the annular slot in annular column sleeve, the groove of the second level board is stuck on the draw-in groove of the first level board, first level board and the second level board orthogonal, one end of every root support bar is fixedly connected with the journal stirrup on hydraulic lifting post, the other end is fixedly connected with the journal stirrup on level board, four support bar projections are in the horizontal plane orthogonal, and operating platform is fixed on portable plate by the fixing hole that penetrates on portable plate.
Expansion link is provided with between first fixed head and the first portable plate; The distance between the first fixed head and the first portable plate end is controlled by expansion link.
Expansion plate is provided with between second fixed head and the second portable plate; The distance between the second fixed head and the second portable plate end is controlled by expansion plate.
Described expansion link controls it by motor driver and stretches.
Operating platform is made up of four pieces of quadrant ring plates, and every block ring plate two ends have the through hole two and portable plate penetrating fixing hole and match, and are bolted between ring plate and portable plate.
Operating desk is made up of multiple size ring plate, and the level board diameter respectively with hydraulic lifting post when differing heights is corresponding.
The junction of the first portable plate and expansion link is provided with spacing preiection.
The junction of the second portable plate and expansion link is provided with spacing preiection.
The present invention not only can use when installing and setting up at spherical tank, and can also to construct in the inner any position of spherical tank fast when overhauling.Stage+module provided by the invention, convenient disassembly substantially reduce construction period, and can meet single or many people and construct simultaneously.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of spherical tank interior construction device of the present invention;
Fig. 2 is the top view of a kind of spherical tank interior construction device of the present invention;
Fig. 3 is the first level board graphics of the present invention;
Fig. 4 is the graphics of the second level board of the present invention.
Detailed description of the invention
For making the object of the embodiment of the present invention, technical scheme and advantage clearly, below in conjunction with the accompanying drawing in the embodiment of the present invention, technical scheme in the embodiment of the present invention is clearly and completely described, obviously, described embodiment is the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
As shown in Figure 1 and Figure 2, a kind of large-size spherical tank interior construction device, comprises journal stirrup 1, fixed strip 2, horizontal bearing 4, limiting plate 5, four support bars 8, hydraulic lifting post 9, operating platform 13 and level boards;
As shown in Figure 3, level board comprises the first level board 14 and the second level board 15, first level board 14 comprises annular column sleeve 31, first fixed head 32 and two piece of first portable plate 33, annular column sleeve is provided with bottom the first described fixed head, annular slot is provided with in annular column sleeve, the top of the first fixed head has draw-in groove, first fixed head is hollow, two piece of first portable plate 33 is that cavity is connected by horizontal bearing and the first fixed head, horizontal bearing is provided with limiting plate 5, and the end of the first portable plate is provided with and multiplely penetrates fixing hole; Expansion link 6 is provided with between first fixed head and the first portable plate; Control the distance between the first fixed head and the first portable plate end by expansion link 6, the junction of the first portable plate and expansion link is provided with spacing preiection.
As shown in Figure 4, second level board 15 comprises the second fixed head 34 and the second portable plate 35, the bottom of the second fixed head 34 has the draw-in groove matched with the draw-in groove on the first fixed head 35, second fixed head is hollow, two piece of second portable plate is that cavity is connected by horizontal bearing and the second fixed head, horizontal bearing is provided with limiting plate, and the end of the second portable plate is provided with and multiplely penetrates fixing hole; Expansion plate is provided with between second fixed head and the second portable plate; Control the distance between the second fixed head and the second portable plate end by expansion plate, described expansion link controls it by motor driver 7 and stretches, and the junction of the second portable plate and expansion link is provided with spacing preiection.
Hydraulic lifting post 9 is passed to spherical tank bosom by the lower manhole 11 of spherical tank 10, and the bottom of hydraulic lifting post fixes on the ground, and the top of hydraulic lifting post is provided with the fixed strip 2 of annular, the annular column sleeve of the first level board is enclosed within hydraulic lifting post, fixed strip is stuck in the annular slot in annular column sleeve, the groove of the second level board is stuck on the draw-in groove of the first level board, first level board and the second level board orthogonal, one end of every root support bar 8 is fixedly connected with the journal stirrup 1 on hydraulic lifting post, the other end is fixedly connected with the journal stirrup 1 on level board, four support bar 8 projections are in the horizontal plane orthogonal, operating platform 13 is fixed on portable plate by the fixing hole that penetrates on portable plate, operating platform is made up of four pieces of quadrant ring plates, every block ring plate two ends have the through hole two and portable plate penetrating fixing hole and match, be bolted between ring plate and portable plate, operating desk is made up of multiple size ring plate, and the level board diameter respectively with hydraulic lifting post when differing heights is corresponding.
Concrete implementation step is as follows:
The first step, be fixed on by hydraulic lifting post immediately below lower manhole, the other end is placed in spherical tank inside by lower manhole, is enclosed within hydraulic lifting post by the cylindrical groove on the first level board, and the fixed strip on hydraulic lifting post is stuck in the draw-in groove of annular.
Second step, is fixed the journal stirrup on two each and every one support bars and the first level board and hydraulic lifting post by screw.Second level board is placed on the first level board, two level boards, two grooves are interlocked.By screw, the journal stirrup on two support bars and the second level board and hydraulic lifting post is fixed.
3rd step, adjusts to the height that interior construction needs by hydraulic lifting post, regulate the length of level board to spherical tank inner surface 30cm place, be screwed by operating platform and can carry out operation on level board by expansion link.
4th step, when construction height changes, first pulls down operating desk, equipment is placed on level board projecting end; Repeat the 3rd step to construct at the inner diverse location of spherical tank.

Claims (8)

1. a large-size spherical tank interior construction device, comprises journal stirrup, fixed strip, horizontal bearing, limiting plate, four support bars, hydraulic lifting post, operating platform and level boards;
It is characterized in that: level board comprises the first level board and the second level board, first level board comprises annular column sleeve, the first fixed head and two piece of first portable plate, annular column sleeve is provided with bottom the first described fixed head, annular slot is provided with in annular column sleeve, the top of the first fixed head has draw-in groove, first fixed head is hollow, two piece of first portable plate is that cavity is connected by horizontal bearing and the first fixed head, horizontal bearing is provided with limiting plate, and the end of the first portable plate is provided with and multiplely penetrates fixing hole;
Second level board comprises the second fixed head and the second portable plate, the bottom of the second fixed head has the draw-in groove matched with the draw-in groove on the first fixed head, second fixed head is hollow, two piece of second portable plate is that cavity is connected by horizontal bearing and the second fixed head, horizontal bearing is provided with limiting plate, and the end of the second portable plate is provided with and multiplely penetrates fixing hole;
Hydraulic lifting post is passed to spherical tank bosom by the lower manhole of spherical tank, and the bottom of hydraulic lifting post fixes on the ground, and the top of hydraulic lifting post is provided with the fixed strip of annular; The annular column sleeve of the first level board is enclosed within hydraulic lifting post, fixed strip is stuck in the annular slot in annular column sleeve, the groove of the second level board is stuck on the draw-in groove of the first level board, first level board and the second level board orthogonal, one end of every root support bar is fixedly connected with the journal stirrup on hydraulic lifting post, the other end is fixedly connected with the journal stirrup on level board, four support bar projections are in the horizontal plane orthogonal, and operating platform is fixed on portable plate by the fixing hole that penetrates on portable plate.
2. a kind of large-size spherical tank interior construction device according to claim 1, is characterized in that: be provided with expansion link between the first fixed head and the first portable plate; The distance between the first fixed head and the first portable plate end is controlled by expansion link.
3. a kind of large-size spherical tank interior construction device according to claim 1, is characterized in that: be provided with expansion plate between the second fixed head and the second portable plate; The distance between the second fixed head and the second portable plate end is controlled by expansion plate.
4. a kind of large-size spherical tank interior construction device according to claim 1, is characterized in that: described expansion link controls it by motor driver and stretches.
5. a kind of large-size spherical tank interior construction device according to claim 1, is characterized in that:
Operating platform is made up of four pieces of quadrant ring plates, and every block ring plate two ends have the through hole two and portable plate penetrating fixing hole and match, and are bolted between ring plate and portable plate.
6. a kind of large-size spherical tank interior construction device according to claim 1, is characterized in that:
Operating desk is made up of multiple size ring plate, and the level board diameter respectively with hydraulic lifting post when differing heights is corresponding.
7. a kind of large-size spherical tank interior construction device according to claim 1, is characterized in that: the junction of the first portable plate and expansion link is provided with spacing preiection.
8. a kind of large-size spherical tank interior construction device according to claim 1, is characterized in that: the junction of the second portable plate and expansion link is provided with spacing preiection.
CN201510014546.7A 2015-01-12 2015-01-12 A kind of large-size spherical tank interior construction device Expired - Fee Related CN104563476B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510014546.7A CN104563476B (en) 2015-01-12 2015-01-12 A kind of large-size spherical tank interior construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510014546.7A CN104563476B (en) 2015-01-12 2015-01-12 A kind of large-size spherical tank interior construction device

Publications (2)

Publication Number Publication Date
CN104563476A true CN104563476A (en) 2015-04-29
CN104563476B CN104563476B (en) 2016-09-28

Family

ID=53080476

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510014546.7A Expired - Fee Related CN104563476B (en) 2015-01-12 2015-01-12 A kind of large-size spherical tank interior construction device

Country Status (1)

Country Link
CN (1) CN104563476B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107363805A (en) * 2017-07-20 2017-11-21 西南交通大学 Detection workbench inside a kind of spherical tank
CN108975237A (en) * 2018-08-30 2018-12-11 武汉市锅炉压力容器检验研究所 A kind of spherical tank internal inspection device
CN110593543A (en) * 2019-10-17 2019-12-20 无锡市创新低温环模设备科技有限公司 Scaffold of spherical vacuum container

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5431615A (en) * 1977-08-12 1979-03-08 Yoshiyuki Mizuyama Internal scaffold for spherical tank
JPH07280191A (en) * 1994-04-07 1995-10-27 Nippon Steel Corp Scaffolding for inspecting inside of tank
CN2332780Y (en) * 1998-02-27 1999-08-11 克拉玛依天圣实业总公司 Internal operation lift rack for spherical storage tank
CN201679220U (en) * 2010-05-25 2010-12-22 中国建筑科学研究院建筑机械化研究分院 Single mast climbing working platform
CN203891440U (en) * 2014-05-22 2014-10-22 天津开发区埃尼科技发展有限公司 Freely-rotating in-storage-tank overhauling work platform
CN204510765U (en) * 2015-01-12 2015-07-29 中国计量学院 Large-size spherical tank interior construction device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5431615A (en) * 1977-08-12 1979-03-08 Yoshiyuki Mizuyama Internal scaffold for spherical tank
JPH07280191A (en) * 1994-04-07 1995-10-27 Nippon Steel Corp Scaffolding for inspecting inside of tank
CN2332780Y (en) * 1998-02-27 1999-08-11 克拉玛依天圣实业总公司 Internal operation lift rack for spherical storage tank
CN201679220U (en) * 2010-05-25 2010-12-22 中国建筑科学研究院建筑机械化研究分院 Single mast climbing working platform
CN203891440U (en) * 2014-05-22 2014-10-22 天津开发区埃尼科技发展有限公司 Freely-rotating in-storage-tank overhauling work platform
CN204510765U (en) * 2015-01-12 2015-07-29 中国计量学院 Large-size spherical tank interior construction device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107363805A (en) * 2017-07-20 2017-11-21 西南交通大学 Detection workbench inside a kind of spherical tank
CN107363805B (en) * 2017-07-20 2023-04-07 西南交通大学 Work platform for detecting inside of spherical tank
CN108975237A (en) * 2018-08-30 2018-12-11 武汉市锅炉压力容器检验研究所 A kind of spherical tank internal inspection device
CN108975237B (en) * 2018-08-30 2024-01-30 武汉市锅炉压力容器检验研究所 Spherical tank internal inspection device
CN110593543A (en) * 2019-10-17 2019-12-20 无锡市创新低温环模设备科技有限公司 Scaffold of spherical vacuum container

Also Published As

Publication number Publication date
CN104563476B (en) 2016-09-28

Similar Documents

Publication Publication Date Title
CN104563476A (en) Interior constructing device for large spherical tank
CN203499229U (en) Operating platform for construction of elevator shaft
CN102733397A (en) Inner supporting connecting element with variable dimension and force transmission direction for retaining and protecting foundation pit
CN204057851U (en) Performance stage booth lifting mechanism
CN203867159U (en) Sleeve type cantilever scaffold structure
CN204024045U (en) A kind of movable assembled high-supported formwork bracing or strutting arrangement
CN201762973U (en) Lifting scaffold
CN204510765U (en) Large-size spherical tank interior construction device
CN104532850A (en) Foundation pit supporting system
CN204094726U (en) A kind of heavy pin shaft fast assembling-disassembling frock
CN103741709B (en) A kind of tower crane pre-embedded bolt mould
CN202467649U (en) Telescopic support leg and vehicle-mounted coal seam pneumatic drilling machine using telescopic support legs
CN105436759A (en) Welding device
CN203728491U (en) Jacking device for heavy type parts for machining automobiles
CN204022392U (en) Building decoration jacking apparatus
CN202829424U (en) Indoor movable type hoisting tool
CN204867531U (en) Folding flexible drilling equipment of assembled
CN204487097U (en) Filtering oil for transformer pump tool specially for attaching and detaching
CN204108387U (en) A kind of adjustable angle Anti-slip type rig aerial platform
CN204179792U (en) Hydro-generator lower frame inspection platform
CN103896179A (en) Hydraulic lifter with locking-up device
CN104064961B (en) Two guide rail transformer stations secondary door framework assists place system
CN205342264U (en) Welding set
CN202689518U (en) Cap type pressing rod for safety supporting scaffold
CN203690760U (en) Hydraulic push-in current transformer replacement device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Wang Qiang

Inventor after: Feng Jingliang

Inventor after: Deng Guide

Inventor after: Hu Bin

Inventor after: Kong Xiangyi

Inventor after: Qi Xiaobing

Inventor before: Wang Qiang

Inventor before: Feng Jingliang

Inventor before: Deng Guide

Inventor before: Hu Bin

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160928

Termination date: 20200112