CN104550254A - Method for correcting second flow on head part of strip steel - Google Patents

Method for correcting second flow on head part of strip steel Download PDF

Info

Publication number
CN104550254A
CN104550254A CN201410647612.XA CN201410647612A CN104550254A CN 104550254 A CN104550254 A CN 104550254A CN 201410647612 A CN201410647612 A CN 201410647612A CN 104550254 A CN104550254 A CN 104550254A
Authority
CN
China
Prior art keywords
flow
band steel
described band
steel
strip steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410647612.XA
Other languages
Chinese (zh)
Inventor
崔二宝
董立杰
辛艳辉
范建鑫
杨要兵
李彬
江潇
谢天伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang Co Ltd
Original Assignee
Beijing Shougang Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang Co Ltd filed Critical Beijing Shougang Co Ltd
Priority to CN201410647612.XA priority Critical patent/CN104550254A/en
Publication of CN104550254A publication Critical patent/CN104550254A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • B21B2037/002Mass flow control

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Control Of Metal Rolling (AREA)

Abstract

The invention discloses a method for correcting the second flow on the head part of strip steel, which is used for controlling the threading stability of the head part of hot continuous rolling thin gauge strip steel. The method comprises the steps of obtaining the second flow Fn of the strip steel on an upstream rack; obtaining the second flow Fn+1 of the strip steel on a downstream rack; comparing the second flow Fn with the second flow Fn+1 to obtain a correction factor K; correcting the second flow Fn of the strip steel on the upstream rack according to the correction factor K to obtain the corrected second flow Fm of the strip steel on the upstream rack, wherein the corrected second flow Fm is equal to K times of Fn. According to the method disclosed by the invention, the technical defects in the traditional technology that since the second flow change between every two adjacent racks is larger, the threading of the head part of the strip steel is extremely unstable, and expansion development and stable and continuous production of thin gauge branded steel are limited to a larger extent are overcome; the method is suitable for stable tension setting control on the head part of the hot continuous rolling strip steel, and the threading stability of the head part of the hot continuous rolling thin gauge strip steel during hot continuous rolling is increased.

Description

A kind of method for correction tape steel head second flow
Technical field
The invention belongs to hot continuous rolling technical field, particularly a kind of method for correction tape steel head second flow.
Background technology
In prior art, strip steel head threading stability affects larger by head sideslip, head roll force setting accuracy, when threading sideslip, head roll force setting accuracy are not high, kink is often caused to lift too high, very easily occur that head threading is unstable, cause head roll rotten, roll the situation such as useless and occur; Especially for when rolling Thin Specs, because roll-force is larger, mill speed is very fast, under identical rolling force setup deviation, second flow between adjacent rack (upstream stand, downstream frame) can be caused to change greatly, thus causing head threading extremely unstable, the Expansion development and the steady and continuous that limit Thin Specs variety steel are largely produced.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of method for correction tape steel head second flow, the method achieve and frame second flow is revised, when reaching tandem rolling, adjacent rack second flow is constant or keep necessary second flow difference to control object, overcome in conventional art because second flow between adjacent rack changes greatly, thus cause strip steel head threading extremely unstable, the Expansion development of upper restriction Thin Specs variety steel and the steady and continuous technological deficiency of producing largely.
For solving the problems of the technologies described above, the invention provides a kind of method for correction tape steel head second flow, be applied to and control hot continuous rolling thin specification strip steel head threading stability, described method comprises: obtain the second flow F of described band steel at upstream stand n; Obtain the second flow F of described band steel in downstream frame n+1; By described second flow F nwith described second flow F n+1contrast, obtain adjusted coefficient K; According to described adjusted coefficient K to the second flow F of described band steel at upstream stand nrevise, show that described band steel is at the revised second flow F of upstream stand m, wherein, described revised second flow F mequal K F doubly n; Wherein n be more than or equal to 1 integer.
Further, the described band steel of described acquisition is at the second flow F of upstream stand ncomprise: measure the outlet initial velocity of described band steel at upstream stand; Measure the export goal thickness of described band steel at upstream stand; The second flow F of described band steel at upstream stand is drawn at the outlet initial velocity of upstream stand and export goal thickness according to measured described band steel n.
Further, the described band steel of described acquisition is at the second flow F of downstream frame n+1comprise: measure the outlet initial velocity of described band steel in downstream frame; Measure the export goal thickness of described band steel in downstream frame; The second flow F of described band steel in downstream frame is drawn at the outlet initial velocity of downstream frame and export goal thickness according to measured described band steel n+1.
A kind of method for correction tape steel head second flow provided by the invention, first by obtaining the second flow F of band steel at upstream stand n; Then the second flow F of band steel in downstream frame is obtained n+1; Again by second flow F nwith second flow F n+1contrast, obtain adjusted coefficient K; Last foundation adjusted coefficient K is to the second flow F of band steel at upstream stand nrevise, show that band steel is at the revised second flow F of upstream stand mrealize revising the initial velocity of frame setting, when reaching tandem rolling, adjacent rack second flow is constant or keep necessary second flow difference to control object, overcome in conventional art because second flow between adjacent rack changes greatly, thus cause strip steel head threading extremely unstable, the Expansion development of upper restriction Thin Specs variety steel and the steady and continuous technological deficiency of producing largely, the present invention is applicable to hot-continuous-rolling strip steel head steady and builds and control, and improves head threading stability when hot rolling connects thin gauge strip tandem rolling.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
The schematic flow sheet of a kind of method for correction tape steel head second flow that Fig. 1 provides for the embodiment of the present invention; And
The another schematic flow sheet of a kind of method for correction tape steel head second flow that Fig. 2 provides for the embodiment of the present invention; And
A schematic flow sheet again of a kind of method for correction tape steel head second flow that Fig. 3 provides for the embodiment of the present invention; And
The working state schematic representation of adjacent two frames that Fig. 4 provides for the embodiment of the present invention.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, be clearly and completely described the technical scheme in the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, the every other embodiment that those of ordinary skill in the art obtain, all belongs to the scope of protection of the invention.
In the embodiment of the present invention, elaborating for ease of technical scheme, spy makes an explanation to alphabetical implication involved in following embodiment, specific as follows:
N, represents shelf number; H n, representative band steel is at the export goal thickness of the n-th frame; H n+1, representative band steel is at the export goal thickness of the (n+1)th frame; V n, representative band steel is at the outlet initial velocity of the n-th frame; V n+1, representative band steel is at the outlet initial velocity of the (n+1)th frame; F n, representative is with steel at the second flow of the n-th frame, F n+1, representative band steel is at the second flow of the (n+1)th frame; Wherein, the n-th frame relative to the (n+1)th frame as upstream stand, the (n+1)th frame relative to the n-th frame as downstream frame.
Refer to Fig. 1, a kind of method for correction tape steel head second flow that the embodiment of the present invention provides, the initial velocity of frame setting is revised, reach tandem rolling second of time constant flow or keep necessary second flow difference to control object, be applicable to hot-continuous-rolling strip steel head steady and build a control, to improve head threading stability when hot rolling connects thin gauge strip tandem rolling, the method comprises the steps:
Step 101: obtain the second flow F of described band steel at upstream stand n;
Refer to Fig. 2, specifically, pair hot rolling of this step 101 connects the second flow F of thin gauge strip at upstream stand nobtain, for showing that hot rolling connects the second flow of thin gauge strip at upstream stand, connect for heavy gauge steel strip relative to hot rolling, when rolling think gauge, because roll-force is less, and mill speed is lower, even if when little deviation appears in roll-force, it is also less to the interference of second flow between adjacent rack, generally can not have influence on hot rolling connect think gauge head threading stablize; But when rolling Thin Specs, because roll-force is larger, mill speed is very fast, under identical rolling force setup deviation, second flow between adjacent rack can be caused to change greatly, thus cause head threading extremely unstable, the Expansion development and the steady and continuous that limit Thin Specs variety steel are largely produced, therefore this step 101 is directed to hot rolling and connects thin gauge strip, obtains its second flow F at upstream stand n, this step 101 specifically comprises following sub-step: step 101a, measures the outlet initial velocity of described band steel at upstream stand; Step 101b, measures the export goal thickness of described band steel at upstream stand; Step 101c, draws the second flow F of described band steel at upstream stand according to measured described band steel at the outlet initial velocity of upstream stand and export goal thickness n.Wherein, band steel can be set at the outlet initial velocity of upstream stand as V n, band steel is at the export goal thickness H of upstream stand n, then F n=V n* H n;
Step 102: obtain the second flow F of described band steel in downstream frame n+1;
Refer to Fig. 3, specifically, this step 102 is similar with above-mentioned steps 101 principle, namely connects the second flow F of thin gauge strip in downstream frame for hot rolling n+1obtain, for showing that hot rolling connects the second flow of thin gauge strip in downstream frame, for correction tape steel head second flow provides hot rolling to connect basic data (the second flow F of thin gauge strip in downstream frame n+1), this step 102 specifically comprises following sub-step: step 102a, measures the outlet initial velocity of described band steel in downstream frame; Step 102b, measures the export goal thickness of described band steel in downstream frame; Step 102c, draws the second flow F of described band steel in downstream frame according to measured described band steel at the outlet initial velocity of downstream frame and export goal thickness n+1.Wherein, band steel can be set at the outlet initial velocity of downstream frame as V n+1, band steel is at the export goal thickness H of downstream frame n+1, then F n+1=V n+1* H n+1.
Further, the embodiment of the present invention obtains hot rolling successively by step 101, step 102 just and connects the second flow F of thin gauge strip at upstream stand n, at the second flow F of downstream frame n+1, owing to connecting thin gauge strip to thick hot rolling, roll-force is less, and mill speed is lower, even if when little deviation appears in roll-force, it is also less to the interference of second flow between adjacent rack, generally can not have influence on head threading and stablize; But for rolling thin gauge strip, because roll-force is larger, mill speed is very fast, under identical rolling force setup deviation, second flow between adjacent rack can be caused to change greatly, thus causing head threading extremely unstable, Expansion development and steady and continuous therefore for ensureing Thin Specs variety steel are produced, and are badly in need of connecting the second flow F of thin gauge strip in downstream frame according to hot rolling n+1the second flow F of thin gauge strip at upstream stand is connected to hot rolling nrevise, to overcome the impact caused rolling thin gauge strip because roll-force is comparatively large, mill speed is very fast.
Step 103: by described second flow F nwith described second flow F n+1contrast, obtain adjusted coefficient K; Wherein, F n* K-F n+1=0; This step 103 Following step 102, by connecting the second flow F of thin gauge strip in downstream frame by hot rolling n+1the second flow F of thin gauge strip at upstream stand is connected with hot rolling ncontrast, according to F n* K-F n+1=0 obtains adjusted coefficient K, and 104 couples of second flow F as follows nrevise.
Step 104: according to described adjusted coefficient K to the second flow F of described band steel at upstream stand nrevise, show that described band steel is at the revised second flow F of upstream stand m, wherein, described revised second flow F mequal K F doubly n.
In more detail, refer to Fig. 4, generally speaking, a set angle of building of kink is 22 degree, when kink build subtended angle degree be greater than 22 degree time, all think the unstable phenomenon of a kind of threading; Be with steel crossing process schematic diagram between adjacent two milling trains when Fig. 4 is tandem rolling, band steel is at the outlet initial velocity V of upstream stand (the n-th frame) n, export goal thickness H n, band steel exports initial velocity V in downstream frame (the (n+1)th frame) n+1, export goal thickness H n+1, playing cover angle is α (standard is 22 degree), when rolling think gauge, roll-force is less, and mill speed is lower, even if when little deviation appears in roll-force, it is also less to the interference of second flow between adjacent rack, generally can not have influence on head threading and stablize; But when rolling Thin Specs, because roll-force is larger, mill speed is very fast, under identical rolling force setup deviation, second flow between adjacent rack can be caused to change greatly, thus causing head threading extremely unstable, the Expansion development and the steady and continuous that limit Thin Specs variety steel are largely produced; And a kind of method for correction tape steel head second flow provided by the invention, just for when rolling Thin Specs, the initial velocity of frame setting is revised, reach tandem rolling second of time constant flow or keep necessary second flow difference to control object, be applicable to hot-continuous-rolling strip steel head steady to build and control, to improve head threading stability when hot rolling connects thin gauge strip tandem rolling.Further, the present invention can carry out Speed Setting intervention to single or multiple frame second flow before the rolling, ensure that each kink plays cover angle, and stable when reaching high speed threading builds Zhang Xiaoguo, meets stability requirement during Thin Specs threading.Such as: all provide adjusted coefficient K=-1 to the correction of F1-F5 gantry speed, the second flow correction ratio of so each frame is as follows:
That is, the second flow of F1-F5 frame successively reduction be respectively 5%, 4%, 3%, 2%, 1%.
A kind of method for correction tape steel head second flow provided by the invention, first by obtaining the second flow F of band steel at upstream stand n; Then the second flow F of band steel in downstream frame is obtained n+1; Again by second flow F nwith second flow F n+1contrast, obtain adjusted coefficient K; Last foundation adjusted coefficient K is to the second flow F of band steel at upstream stand nrevise, show that band steel is at the revised second flow F of upstream stand mrealize revising the initial velocity of frame setting, when reaching tandem rolling, adjacent rack second flow is constant or keep necessary second flow difference to control object, overcome in conventional art because second flow between adjacent rack changes greatly, thus cause strip steel head threading extremely unstable, the Expansion development of upper restriction Thin Specs variety steel and the steady and continuous technological deficiency of producing largely, the present invention is applicable to hot-continuous-rolling strip steel head steady and builds and control, and improves head threading stability when hot rolling connects thin gauge strip tandem rolling.
It should be noted last that, above detailed description of the invention is only in order to illustrate technical scheme of the present invention and unrestricted, although with reference to example to invention has been detailed description, those of ordinary skill in the art is to be understood that, can modify to technical scheme of the present invention or equivalent replacement, and not departing from the spirit and scope of technical solution of the present invention, it all should be encompassed in the middle of right of the present invention.

Claims (3)

1., for a method for correction tape steel head second flow, be applied to and control hot continuous rolling thin specification strip steel head threading stability, described method comprises:
Obtain the second flow F of described band steel at upstream stand n;
Obtain the second flow F of described band steel in downstream frame n+1;
By described second flow F nwith described second flow F n+1contrast, obtain adjusted coefficient K;
According to described adjusted coefficient K to the second flow F of described band steel at upstream stand nrevise, show that described band steel is at the revised second flow F of upstream stand m, wherein, described revised second flow F mequal K F doubly n, wherein n be more than or equal to 1 integer.
2. according to method according to claim 1, it is characterized in that, the described band steel of described acquisition is at the second flow F of upstream stand ncomprise:
Measure the outlet initial velocity of described band steel at upstream stand;
Measure the export goal thickness of described band steel at upstream stand;
The second flow F of described band steel at upstream stand is drawn at the outlet initial velocity of upstream stand and export goal thickness according to measured described band steel n.
3. according to method according to claim 1, it is characterized in that, the described band steel of described acquisition is at the second flow F of downstream frame n+1comprise:
Measure the outlet initial velocity of described band steel in downstream frame;
Measure the export goal thickness of described band steel in downstream frame;
The second flow F of described band steel in downstream frame is drawn at the outlet initial velocity of downstream frame and export goal thickness according to measured described band steel n+1.
CN201410647612.XA 2014-11-14 2014-11-14 Method for correcting second flow on head part of strip steel Pending CN104550254A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410647612.XA CN104550254A (en) 2014-11-14 2014-11-14 Method for correcting second flow on head part of strip steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410647612.XA CN104550254A (en) 2014-11-14 2014-11-14 Method for correcting second flow on head part of strip steel

Publications (1)

Publication Number Publication Date
CN104550254A true CN104550254A (en) 2015-04-29

Family

ID=53067930

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410647612.XA Pending CN104550254A (en) 2014-11-14 2014-11-14 Method for correcting second flow on head part of strip steel

Country Status (1)

Country Link
CN (1) CN104550254A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009018957A1 (en) * 2007-08-04 2009-02-12 Sms Siemag Ag Method for the production of a strip made of steel
CN101716606A (en) * 2009-12-31 2010-06-02 中冶南方(武汉)自动化有限公司 Rolling mill AGC control system
CN102407240A (en) * 2010-09-26 2012-04-11 鞍钢股份有限公司 Method for controlling strip steel finishing elongation by second flow
CN102764771A (en) * 2012-07-31 2012-11-07 中冶赛迪电气技术有限公司 Second-flow based self-adaptive method for controlling thickness of plate of single-stand reversing rolling mill
CN102950155A (en) * 2012-10-16 2013-03-06 河北钢铁股份有限公司唐山分公司 AGC (Automatic Gain Control) method capable of calculating thickness based on second flow
CN103639207A (en) * 2013-12-19 2014-03-19 西南铝业(集团)有限责任公司 Second-flow thickness control method and system for single-frame four-roll high-speed cold-rolling mill

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009018957A1 (en) * 2007-08-04 2009-02-12 Sms Siemag Ag Method for the production of a strip made of steel
CN101716606A (en) * 2009-12-31 2010-06-02 中冶南方(武汉)自动化有限公司 Rolling mill AGC control system
CN102407240A (en) * 2010-09-26 2012-04-11 鞍钢股份有限公司 Method for controlling strip steel finishing elongation by second flow
CN102764771A (en) * 2012-07-31 2012-11-07 中冶赛迪电气技术有限公司 Second-flow based self-adaptive method for controlling thickness of plate of single-stand reversing rolling mill
CN102950155A (en) * 2012-10-16 2013-03-06 河北钢铁股份有限公司唐山分公司 AGC (Automatic Gain Control) method capable of calculating thickness based on second flow
CN103639207A (en) * 2013-12-19 2014-03-19 西南铝业(集团)有限责任公司 Second-flow thickness control method and system for single-frame four-roll high-speed cold-rolling mill

Similar Documents

Publication Publication Date Title
CN107363105B (en) A kind of control method and device of hot rolled coil head thickness
CN104043654B (en) Control method and the device of high grade non-oriented silicon steel finish rolling threading plate shape stability
CN106475420B (en) A kind of board-shape control method based on the setting of cold-strip steel target flatness
CN104907341B (en) A kind of control method of thin plate Hot Line mm finishing mill unit AGC system
CN103418618A (en) Performance feed-forward thickness control method for continuous cold rolling mill
CN106345819B (en) A kind of control method of hot continuous rolling fine-rolling strip steel afterbody rolling stability
CN107321797B (en) The online roll-changing method of short route ESP mm finishing mill unit
CN103071683B (en) Comprehensive adjustment rolling technology for double-frame S-shaped four-roll cold rolling mill
CN104338753B (en) A kind of dynamic variable specification control method of cold continuous rolling
CN107790505A (en) A kind of cold continuous rolling tension force dynamic setting method of stable rolling
CN107413856A (en) It is a kind of that roller method is removed based on the change online roll change of specification of ESP mm finishing mill units
CN103551389B (en) Flying gauge change control method of tandem cold mill
CN106623441A (en) Method for controlling finish rolling roll bending force on tail of hot-rolled strip
CN106607460B (en) Sendzimir 20 high mill Edge shape control method
CN104772341A (en) Optimal setting method for bending roller of hot-continuous-rolling finishing mill set
US9630228B2 (en) Dual cascade control system for a long rolling mill
CN106269908B (en) Strip wedge shape autocontrol method based on heredity
CN102601124A (en) Method for controlling bottom width full-length fluctuation of steel rail
CN103042041A (en) Control method for reducing tail flicking of hot-rolled strip steel
CN104550254A (en) Method for correcting second flow on head part of strip steel
JP6324259B2 (en) Rolling control device, rolling control method, and rolling control program
JPH05154524A (en) Method and device for narrowing allowable tolerance regarding shaping and dimensional stability of product rolled into line of steel wires and/or rods
JPS6083711A (en) Load distribution controlling method of continuous rolling mill
CN109047340B (en) Control method for hot rolling and finish rolling multistage threading speed
CN105013834B (en) A kind of finishing stand method of adjustment and roll line control system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150429

RJ01 Rejection of invention patent application after publication