CN104537140A - Method for rapidly drawing coal mine high voltage supply system chart - Google Patents

Method for rapidly drawing coal mine high voltage supply system chart Download PDF

Info

Publication number
CN104537140A
CN104537140A CN201410639428.0A CN201410639428A CN104537140A CN 104537140 A CN104537140 A CN 104537140A CN 201410639428 A CN201410639428 A CN 201410639428A CN 104537140 A CN104537140 A CN 104537140A
Authority
CN
China
Prior art keywords
pel
high voltage
voltage supply
supply system
coordinate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410639428.0A
Other languages
Chinese (zh)
Other versions
CN104537140B (en
Inventor
王新良
杨茜惠
刘汉玉
靳翔
李辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Technology
Original Assignee
Henan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Technology filed Critical Henan University of Technology
Priority to CN201410639428.0A priority Critical patent/CN104537140B/en
Publication of CN104537140A publication Critical patent/CN104537140A/en
Application granted granted Critical
Publication of CN104537140B publication Critical patent/CN104537140B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Landscapes

  • Processing Or Creating Images (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a method for rapidly drawing a coal mine high voltage supply system chart. The method comprises the steps of drawing corresponding pixel according to diversified electrical equipment, and giving major parameter and a datum point coordinate of a basic element in the pixel detailed definitions; according to the datum point coordinate of the pixel, computing distances between each connecting point in the pixel and all connecting points in the finished high voltage supply system chart, wherein if the distance is less than or equal to a preset capture distance, the capture succeeds; in an actual drawing coordinate system, modifying the datum point coordinate of the pixel according to the connecting point coordinate of the captured finished high voltage supply system chart, and finishing automatic alignment of directly connected electrical equipment to realize rapid drawing of the high voltage supply system chart. The method realizes automatic capture of the connecting points of the directly connected electrical equipment, effectively improves the alignment speed of corresponding connecting points of two directly connected electrical equipment, has the characteristics of high accuracy and fast speed, and can be effectively applied to rapid drawing of the coal mine high voltage supply system chart.

Description

The fast drawing method of a kind of colliery high voltage supply system figure
Technical field
The invention discloses the fast drawing method of a kind of colliery high voltage supply system figure.
Background technology
Also exist in the high voltage supply system figure drawing process of colliery and draw difficult and the slow problem of speed, current colliery, in the process of drawing colliery high voltage supply system figure, mainly completes the drafting to colliery high voltage supply system figure by CAD software.Drawing process is as follows:
1) some the basic drawing instruments provided by CAD software complete the drafting of relevant device pel;
2) use drawn element figure to combine the drafting of high voltage supply system figure, the Note tools such as text can be used in drawing process to mark relevant pel.
Said method is used to there are some problems, specific as follows: accompanying drawing 1 is the electric power system figure of certain colliery-200 electric substation, connection between figure mesohigh outlet switch and high-voltage terminal switch does not use connecting line, simultaneously, high-voltage terminal switch and motor or transformer are also direct connections, do not use connecting line.
direct-connected electrical equipmentimplication refer to and do not need to use connecting line and the direct electrical connection of two electrical equipments can be completed, therefore requiring between them must close alignment, otherwise just there will be mistake in follow-up high voltage supply system figure topology learning process.Therefore, the mode of artificial alignment is mainly adopted at present when drawing the electrical equipment that these needs directly connect.This will cause electric power system figure drawing process loaded down with trivial details, slow, and can because human error, causes the situation of to fail between partial high pressure outlet switch or between high-voltage terminal switch and other electrical equipment to align.
Summary of the invention
In order to solve the problems referred to above of existence, improve the drafting efficiency of colliery high voltage supply system figure and draw accuracy, the present invention proposes the fast drawing method of a kind of colliery high voltage supply system figure, concrete technical scheme is as follows.
1, picture library builds
Electrical equipment pel is built for the various electrical equipment in colliery.In the Electrical Equipments of Coal Mine pel drawn, for each pel is provided with corresponding tie point, all tie points are an all corresponding little square frame, as shown in Figure 2.When needing directly to connect between electrical equipment, need to guarantee two electrical equipments separately corresponding tie point want complete matching, as shown in Figure 3;
For often kind of pel build its picture library time, the pel original coordinate system of use as shown in Figure 4, reality draw high voltage supply system figure time, the actual drawing coordinate system of use as shown in Figure 5:
After pel is completed, the fundamental element related in pel is with XML(extend markup language) form of file preserves, the fundamental element related to and tie point element and correlation parameter are as shown in accompanying drawing 6 and accompanying drawing 7, the reference point of various element is as shown in accompanying drawing 6 and accompanying drawing 7, in pel original coordinate system, reference point coordinate calculating process is as follows: the reference point coordinate of RECTANGLE element is used represent, the reference point coordinate of WIRE element is used , the reference point coordinate of ELLIPSE element is used represent, the reference point coordinate of PIN element is used represent, then the concrete computation process of each elemental basis point coordinate is as follows:
2, pel reference point coordinate calculates (pel original coordinate system)
In pel original coordinate system, calculate the reference point coordinate of each element related in pel respectively, assuming that exist in pel individual element, the individual elemental basis point coordinate is used ( ) represent, pel reference point coordinate is used ( ) represent, then , .Pel reference point coordinate calculation process as shown in Figure 8.
3, pel reference point coordinate calculated examples
Pel shown in accompanying drawing 9 is the high-voltage switch gear of double lead, and there are 4 tie points, its XML file is as follows:
Be respectively for the reference point coordinate of coherent element in above-mentioned pel example:
The then reference point coordinate of this pel .
4, direct-connected electrical equipment fast drawing method
Direct-connected electrical equipment fast drawing method can complete the automatic capturing between electrical equipment, realizes the Fast Drawing of high voltage supply system figure.When having needed the direct electrical connection of two electrical equipments, when not needing again to use connecting line, use the method, the mobile equipment needing to connect, when it is near equipment to be connected, can catch tie point automatically, can realize the direct electrical connection of two equipment after confirmation, detailed process is as follows:
1) bee-line of automatically catching tie point is set ;
2) when drawing high voltage supply system figure, select certain pel, such as high-voltage terminal switch is (assuming that tie point has individual), calculate in pel original coordinate system this pel reference point coordinate ( ), assuming that in metafile individual tie point corresponding coordinate in pel original coordinate system be ( ), then this tie point in pel original coordinate system with the relative coordinate of reference point coordinate be ( ), and ;
3) start to draw this pel on drawing interface, as shown in Figure 5, the reference point location coordinate of pel is identical with the position coordinates of mouse when drawing in actual drawing coordinate system.Along with the movement of mouse, this pel is along with movement.The changing coordinates of mouse in actual drawing coordinate system is assumed to ( ), this pel tie point actual coordinate in actual drawing coordinate be ( ), then ;
4) from all tie points of this pel, a tie point be not traversed is selected , perform step 5;
5) an optional tie point be not traversed from all tie points drawing electric power system figure , the coordinate in actual drawing coordinate system be ( ), calculate it to pel tie point distance , ; If , then with tie point actual coordinate centered by coordinate draw a red small circle, prompting user captured distance join point a nearest tie point , then acquisition success, after user confirms by clicking the mouse, the coordinate of pel reference point in actual drawing coordinate system is corrected for , realize the automatic aligning of direct-connected electrical equipment, specifically as shown in accompanying drawing 10 and accompanying drawing 11; Otherwise, then step 6 is performed;
6) whether all tie points having drawn electric power system figure have all traveled through complete, if traveled through, perform step 7; Otherwise, perform step 5;
7) wait whether all tie points drawing pel travel through complete, if traveled through, then wait that drawing pel terminates at the direct-connected electrical equipment Fast Drawing of current location; Otherwise, perform step 4.
Method idiographic flow as shown in Figure 12.
Accompanying drawing explanation
Fig. 1 is certain colliery-200 electric substation electric power system figure; Fig. 2 is Electrical Equipments of Coal Mine pel tie point schematic diagram; Fig. 3 is direct-connected electrical equipment tie point alignment schematic diagram; Fig. 4 is pel original coordinate system schematic diagram; Fig. 5 is actual drawing coordinate system schematic diagram; Fig. 6 is fundamental element parameter schematic diagram; Fig. 7 is tie point element parameter schematic diagram; Fig. 8 is pel reference point coordinate calculation flow chart; Fig. 9 is double lead high-voltage switch gear pel schematic diagram; Figure 10 is high-voltage switch gear and high-voltage switch gear automatic aligning schematic diagram; Figure 11 is high-voltage switch gear and transformer automatic aligning schematic diagram; Figure 12 is direct-connected electrical equipment fast drawing method process flow diagram.

Claims (4)

1. a fast drawing method of colliery high voltage supply system figure, is characterized in that, described fast drawing method comprises the steps:
Step 11, draws corresponding pel for various types of electrical equipment, builds colliery high voltage supply system electrical equipment picture library;
Step 12, according to each tie point in the reference point coordinate calculating pel of pel and the distance of having drawn all tie points in high voltage supply system figure, if distance is less than or equal to the engagement range pre-set, then acquisition success;
Step 13, in actual drawing coordinate system, the high voltage supply system of the drafting figure tie point coordinate according to capturing is revised pel reference point coordinate, completes the automatic aligning of direct-connected electrical equipment, realizes the Fast Drawing of high voltage supply system figure.
2. the fast drawing method of a kind of colliery high voltage supply system figure according to claim 1, it is characterized in that: in a step 11, fundamental element RECTANGLE(rectangle in pel), WIRE(circuit), ELLIPSE(is oval) and PIN(tie point) major parameter and reference point coordinate carry out detailed definition, pel fundamental element is used to draw corresponding pel, and in the form of an xml-file primitive information is preserved, build colliery high voltage supply system electrical equipment picture library.
3. the fast drawing method of a kind of colliery high voltage supply system figure according to claim 1, needs the electrical equipment directly connected can realize automatically catching of tie point for two, it is characterized in that: in step 12, mainly carry out following steps:
Step 31: in pel original coordinate system, the reference point coordinate according to all elements in pel calculates pel reference point coordinate;
Step 32: with pel reference point coordinate for reference coordinate, in calculating pel, all tie points are relative to the relative coordinate of pel reference point coordinate;
Step 33: in actual drawing coordinate system, the position coordinates of pel reference point is identical with the position coordinates of mouse, now, calculates the actual coordinate waiting to draw each tie point of pel according to the actual coordinate waiting to draw pel reference point;
Step 34: for waiting each tie point drawing pel, calculate the distance of all tie points in itself and the current high voltage supply system figure drawn, if distance is less than or equal to the detection threshold preset, then acquisition success, realize automatically catching of direct-connected electrical equipment tie point.
4. the fast drawing method of a kind of colliery high voltage supply system figure according to claim 1, is characterized in that: in step 13, realizes the automatic aligning of direct-connected electrical equipment; In actual drawing coordinate system, according to certain tie point i of pel, from the high voltage supply system figure drawn, automatically capture corresponding tie point j; Carry out auto modification with the tie point j captured at the reference point coordinate of distance to pel of X-direction and Y direction according to pel tie point i, complete the automatic aligning of direct-connected electrical equipment, realize the Fast Drawing of high voltage supply system figure.
CN201410639428.0A 2014-11-14 2014-11-14 A kind of fast drawing method of colliery high voltage supply system figure Expired - Fee Related CN104537140B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410639428.0A CN104537140B (en) 2014-11-14 2014-11-14 A kind of fast drawing method of colliery high voltage supply system figure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410639428.0A CN104537140B (en) 2014-11-14 2014-11-14 A kind of fast drawing method of colliery high voltage supply system figure

Publications (2)

Publication Number Publication Date
CN104537140A true CN104537140A (en) 2015-04-22
CN104537140B CN104537140B (en) 2017-11-03

Family

ID=52852667

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410639428.0A Expired - Fee Related CN104537140B (en) 2014-11-14 2014-11-14 A kind of fast drawing method of colliery high voltage supply system figure

Country Status (1)

Country Link
CN (1) CN104537140B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002328913A (en) * 2001-04-27 2002-11-15 Keio Gijuku Numerical analysis device by discrete nabla operator and non-storage type coefficient matrix
US20050210434A1 (en) * 2004-01-09 2005-09-22 Airbus France Process for the production of an electrical wiring diagram
CN102103578A (en) * 2009-12-17 2011-06-22 珠海金山软件有限公司 Method and system for performing fine adjustment on tables by using computer
CN102736837A (en) * 2011-05-10 2012-10-17 新奥特(北京)视频技术有限公司 Subtitle editing method based on grid

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002328913A (en) * 2001-04-27 2002-11-15 Keio Gijuku Numerical analysis device by discrete nabla operator and non-storage type coefficient matrix
US20050210434A1 (en) * 2004-01-09 2005-09-22 Airbus France Process for the production of an electrical wiring diagram
CN102103578A (en) * 2009-12-17 2011-06-22 珠海金山软件有限公司 Method and system for performing fine adjustment on tables by using computer
CN102736837A (en) * 2011-05-10 2012-10-17 新奥特(北京)视频技术有限公司 Subtitle editing method based on grid

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郝小绘: "煤矿井下供电设计可视化软件系统理论研究与应用", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Also Published As

Publication number Publication date
CN104537140B (en) 2017-11-03

Similar Documents

Publication Publication Date Title
CN101957745B (en) Method for converting ladder diagram language into structure text language
CN102360398B (en) IEC61850-based CAD electric power graphic generation analysis method
CN111316284A (en) Lane line detection method, device and system, vehicle and storage medium
CN105375574A (en) Charging system and charging method
AU2017345227A1 (en) Method and system for generating navigation data transporting object
CN104657986A (en) Quasi-dense matching extension method based on subspace fusion and consistency constraint
CN111353466B (en) Lane line recognition processing method, equipment and storage medium
CN113705515A (en) Training of semantic segmentation model and generation method and equipment of high-precision map lane line
CN103838935A (en) Drawing system and method for subway signal system designing
CN103900555A (en) Mobile electronic device and location method of mobile electronic device
CN106293485B (en) A kind of terminal control method and device based on touch track
CN114055468A (en) Track reproduction method, system and terminal equipment
CN108228186B (en) Substation five-prevention locking rule expression verification method based on responsibility chain mode
CN104269709A (en) Quick charge adapter connector and control method thereof, and electronic devices
CN104537140A (en) Method for rapidly drawing coal mine high voltage supply system chart
CN105279574A (en) Satellite cable shortest path planning method based on digraph optimization technology
CN103383552A (en) Random plane circular interpolation motion controller and control method thereof
CN104142992A (en) Method and device for processing information
CN104102526A (en) Collaborative interface for co-simulation of PSCAD (power system computer aided design) with third-party simulation software or hardware
CN106331809A (en) Television control method and television control system
CN103246512B (en) A kind of is the method for Visio figure by VG Graphic Exchanging
CN103035139B (en) Simulating training system and training method thereof for distribution network cable line inspection tour
CN103093039B (en) The engineer applied method of traffic route data is extracted from electronic chart
CN106303153A (en) A kind of image processing method and device
CN111159830B (en) Orthogonal line segment inflection point merging line layout method based on characteristic shape

Legal Events

Date Code Title Description
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant