CN104536047A - 一种微地震在冲击地压监测上的应用技术 - Google Patents
一种微地震在冲击地压监测上的应用技术 Download PDFInfo
- Publication number
- CN104536047A CN104536047A CN201510000734.4A CN201510000734A CN104536047A CN 104536047 A CN104536047 A CN 104536047A CN 201510000734 A CN201510000734 A CN 201510000734A CN 104536047 A CN104536047 A CN 104536047A
- Authority
- CN
- China
- Prior art keywords
- rock burst
- stress
- microearthquake
- technology
- moment tensor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000011435 rock Substances 0.000 title claims abstract description 40
- 238000005516 engineering process Methods 0.000 title claims abstract description 23
- 238000012544 monitoring process Methods 0.000 title claims abstract description 15
- 238000000034 method Methods 0.000 claims abstract description 11
- 239000000203 mixture Substances 0.000 claims description 2
- 230000035882 stress Effects 0.000 description 34
- 230000009172 bursting Effects 0.000 description 3
- 238000005065 mining Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000003245 coal Substances 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 230000006353 environmental stress Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 238000004613 tight binding model Methods 0.000 description 1
Landscapes
- Geophysics And Detection Of Objects (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510000734.4A CN104536047B (zh) | 2015-01-04 | 2015-01-04 | 一种微地震在冲击地压监测上的应用方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510000734.4A CN104536047B (zh) | 2015-01-04 | 2015-01-04 | 一种微地震在冲击地压监测上的应用方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104536047A true CN104536047A (zh) | 2015-04-22 |
CN104536047B CN104536047B (zh) | 2018-08-21 |
Family
ID=52851609
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510000734.4A Expired - Fee Related CN104536047B (zh) | 2015-01-04 | 2015-01-04 | 一种微地震在冲击地压监测上的应用方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104536047B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112379419A (zh) * | 2020-10-29 | 2021-02-19 | 中国矿业大学 | 一种基于矿震群破裂机制反演的采动裂隙发育特征判别方法 |
CN113671568A (zh) * | 2021-08-20 | 2021-11-19 | 中国科学院武汉岩土力学研究所 | 一种扰动应力-微震同时空集成传感系统及方法 |
CN116184500A (zh) * | 2023-03-30 | 2023-05-30 | 中铁隧道局集团有限公司 | 一种基于微震信息的隧道的地应力实时反演方法及装置 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2010080366A1 (en) * | 2009-01-09 | 2010-07-15 | Exxonmobil Upstream Research Company | Hydrocarbon detection with passive seismic data |
WO2014009866A2 (en) * | 2012-07-11 | 2014-01-16 | Schlumberger Technology B.V. | Fracture monitoring and characterisation |
CN103926620A (zh) * | 2014-05-09 | 2014-07-16 | 南京大学 | 基于阵列反褶积处理的水力压裂监测方法 |
-
2015
- 2015-01-04 CN CN201510000734.4A patent/CN104536047B/zh not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2010080366A1 (en) * | 2009-01-09 | 2010-07-15 | Exxonmobil Upstream Research Company | Hydrocarbon detection with passive seismic data |
WO2014009866A2 (en) * | 2012-07-11 | 2014-01-16 | Schlumberger Technology B.V. | Fracture monitoring and characterisation |
CN103926620A (zh) * | 2014-05-09 | 2014-07-16 | 南京大学 | 基于阵列反褶积处理的水力压裂监测方法 |
Non-Patent Citations (1)
Title |
---|
A.KUBO等: "由浅源地震矩张量推断的沿琉球岛弧和冲绳海槽的应力场", 《世界地震译丛》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112379419A (zh) * | 2020-10-29 | 2021-02-19 | 中国矿业大学 | 一种基于矿震群破裂机制反演的采动裂隙发育特征判别方法 |
CN112379419B (zh) * | 2020-10-29 | 2022-01-11 | 中国矿业大学 | 一种基于矿震群破裂机制反演的采动裂隙发育特征判别方法 |
CN113671568A (zh) * | 2021-08-20 | 2021-11-19 | 中国科学院武汉岩土力学研究所 | 一种扰动应力-微震同时空集成传感系统及方法 |
CN116184500A (zh) * | 2023-03-30 | 2023-05-30 | 中铁隧道局集团有限公司 | 一种基于微震信息的隧道的地应力实时反演方法及装置 |
Also Published As
Publication number | Publication date |
---|---|
CN104536047B (zh) | 2018-08-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Xu et al. | Microseismic monitoring and stability evaluation for the large scale underground caverns at the Houziyan hydropower station in Southwest China | |
Li et al. | Stability analysis and failure mechanism of the steeply inclined bedded rock masses surrounding a large underground opening | |
Ghosh et al. | Application of underground microseismic monitoring for ground failure and secure longwall coal mining operation: A case study in an Indian mine | |
Levy et al. | Analysis of seismic signals recorded on a prone-to-fall rock column (Vercors massif, French Alps) | |
Lu et al. | Microseismic low-frequency precursor effect of bursting failure of coal and rock | |
Tang et al. | Stability evaluation of deep-buried TBM construction tunnel based on microseismic monitoring technology | |
Li et al. | Microseismic monitoring and numerical simulation on the stability of high-steep rock slopes in hydropower engineering | |
CN106154334A (zh) | 基于网格搜索的井下微地震事件实时反演定位方法 | |
CN106501848B (zh) | 一种隧道掘进过程中隐性断层超前物探方法 | |
Wang et al. | Influence of wavelength-to-excavation span ratio on ground motion around deep underground excavations | |
Kozłowska et al. | Atypical evolution of seismicity patterns resulting from the coupled natural, human-induced and coseismic stresses in a longwall coal mining environment | |
CN105550441A (zh) | 一种基于连续介质的工程岩体破裂劣化数值模拟方法 | |
CN107727737A (zh) | 一种开挖卸荷作用下地下工程未知地质构造活化识别方法 | |
Naoi et al. | Twenty thousand aftershocks of a very small (M 2) earthquake and their relation to the mainshock rupture and geological structures | |
Moriya et al. | Delineation of large localized damage structures forming ahead of an active mining front by using advanced acoustic emission mapping techniques | |
CN103323530A (zh) | 利用爆破作业震动波检测巷道群围岩稳定性的方法 | |
CN104730574A (zh) | 构建近地表结构模型的方法 | |
Cao et al. | Seismic effort of blasting wave transmitted in coal-rock mass associated with mining operation | |
CN104536047A (zh) | 一种微地震在冲击地压监测上的应用技术 | |
Adushkin et al. | From the alternating-sign explosion response of rocks to the pendulum waves in stressed geomedia. Part II | |
Naoi et al. | Quasi‐static slip patch growth to 20 m on a geological fault inferred from acoustic emissions in a South African gold mine | |
Occhiena et al. | A microseismic-based procedure for the detection of rock slope instabilities | |
Rasskazov et al. | Geomechanics and seismicity of the antey deposit rock mass | |
Liu et al. | Rupture and migration law of disturbed overburden during slicing mining of steeply dipping thick coal seam | |
CN107783180A (zh) | 一种巷道反射波地震超前探测方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Wang Shaoquan Inventor before: Wang Shaoquan Inventor before: Wang Yilin |
|
COR | Change of bibliographic data | ||
DD01 | Delivery of document by public notice |
Addressee: AOFEI (BEIJING) PETROLEUM TECHNOLOGY CO.,LTD. Document name: Notice of extension |
|
DD01 | Delivery of document by public notice |
Addressee: Wang Shaoquan Document name: Notification of Approving Refund |
|
DD01 | Delivery of document by public notice | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100028 Chaoyang District, Beijing, 18 East, west dam, three yuan building 6. Patentee after: Aofi (Beijing) Energy Technology Co.,Ltd. Address before: 100028 Chaoyang District, Beijing, 18 East, west dam, three yuan building 6. Patentee before: AOFEI (BEIJING) PETROLEUM TECHNOLOGY CO.,LTD. |
|
CP01 | Change in the name or title of a patent holder | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180821 |