CN104533401B - A kind of electric copying device suitable for percolation rule in heavy oil reservoir - Google Patents

A kind of electric copying device suitable for percolation rule in heavy oil reservoir Download PDF

Info

Publication number
CN104533401B
CN104533401B CN201410664365.4A CN201410664365A CN104533401B CN 104533401 B CN104533401 B CN 104533401B CN 201410664365 A CN201410664365 A CN 201410664365A CN 104533401 B CN104533401 B CN 104533401B
Authority
CN
China
Prior art keywords
reservoir
voltage
control unit
electronic control
rule
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410664365.4A
Other languages
Chinese (zh)
Other versions
CN104533401A (en
Inventor
郭天魁
李小龙
肖雯
曲占庆
龚迪光
田雨
张伟
周丽萍
许华儒
刘晓强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Petroleum East China
Sinopec Research Institute of Petroleum Engineering Shengli Co
Original Assignee
China University of Petroleum East China
Sinopec Research Institute of Petroleum Engineering Shengli Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum East China, Sinopec Research Institute of Petroleum Engineering Shengli Co filed Critical China University of Petroleum East China
Priority to CN201410664365.4A priority Critical patent/CN104533401B/en
Publication of CN104533401A publication Critical patent/CN104533401A/en
Application granted granted Critical
Publication of CN104533401B publication Critical patent/CN104533401B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • E21B49/08Obtaining fluid samples or testing fluids, in boreholes or wells

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Electrical Discharge Machining, Electrochemical Machining, And Combined Machining (AREA)
  • Investigating Or Analyzing Materials By The Use Of Electric Means (AREA)

Abstract

The invention discloses a kind of electric copying devices suitable for percolation rule in heavy oil reservoir, it is made of power supply, ammeter, electronic control unit, switch, ballast, simulation shaft bottom or crack, probe, reservoir.Apparatus of the present invention can operate with the heavy crude reservoir with starting pressure gradient, simulate three dimensional fluid flow rule;Traditional electrolyte is substituted using mineral oil formula, is allowed to that there are breakdown voltages can effectively simulate starting pressure gradient, and Electrolysis is effectively relieved.

Description

A kind of electric copying device suitable for percolation rule in heavy oil reservoir
Technical field:
The present invention relates to a kind of electric copying devices suitable for percolation rule in heavy oil reservoir.
Background technology:
Water power analogue experiment installation is developed using the water power principle of similitude, starts within 1933 to be applied to petrol-gas permeation fluid The research of mechanics.30~fifties of 20th century mainly uses mathematical method and physical simulating method Researching Oil-gas Seepage problems. Water power analogue experiment installation have many advantages, such as it is simple in structure, easy to operate, can intuitively react underground fluid percolation law, therefore It is widely used.Recently, it is the complex structural well of representative with horizontal well, Multilateral Wells etc., seepage flow mechanism is sufficiently complex, and uses water Electrical simulation experiment can easily simulate the boundary condition of various Holes of Complicated Wells, and directly observe the mobility status of fluid, and And it is easy to measure isobar distribution etc..Its result can also be used to examine the accuracy of numerical simulation and analytic solutions.
Water power analogue experiment installation can also be used for research hydraulic fracturing, start to answer to the beginning of the sixties technology end of the forties With.This method is still fracture pattern, seam length, slit width, seam height, the biography that hydraulic fracturing formation is studied using the water power principle of similitude Relationship between conductance, fracture condudtiviy and other parameters and stimulation ratio, to instruct fracturing technology to design and mining site Construction.Electrical analogue method research pressure break problem investment is small, be widely used, experimental period is short, accuracy is high, there is universal directive significance.
In the prior art, the mostly measurement of two dimensional surface potential reflects potential energy in stratum, to obtaining two-dimensional equipotentiality Line;Analog routine oil reservoir can not simulate hypotonic, heavy crude reservoir with starting pressure gradient.
Invention content:
It is an object of the invention to overcome the deficiencies of the prior art and provide a kind of electricity suitable for percolation rule in heavy oil reservoir Simulator.
In order to solve the problems existing in background technology, the present invention uses following technical scheme:
A kind of electric copying device suitable for percolation rule in heavy oil reservoir, it by power supply, ammeter, the first electronic control unit, Second electronic control unit, switch, ballast, simulation shaft bottom or crack, probe, reservoir composition;
Power supply, ammeter, the first electronic control unit, ballast are sequentially connected by electric wire, are ultimately attached to simulating boundary Place, simulating boundary are placed in reservoir, simulate shaft bottom or crack is placed in reservoir center and is directly connected to power cathode, visit Needle can be freely in three-dimensional direction moving in reservoir, and voltmeter, the second electronic control unit are serially connected with probe and simulate shaft bottom or split Between seam;
When work, after the first electronic control unit adjusts frequency, waveform, voltage, switch is connected, ballast is started to work, will Voltage transient, which is improved to kilovolt, reaches electrolyte breakdown voltage, and voltage restores and be stable at preset state, whole electricity after breakdown Pressure, curent change data are recorded and are stored by the first electronic control unit;It measures and remembers by position of the change probe in reservoir Record the potential under different coordinates.
Further, the probe is cladded with insulating film, the only exposed 1mm metal probes in end.
Further, the ballast can instantaneously improve input voltage until reaching breakdown voltage, after electrolyte is breakdown By burning voltage, the variation of this process voltage is recorded by the first electronic control unit.
Further, the electrolyte being added in the reservoir is formed by mineral oil and vegetable oil mixing preparation, by changing Become mineral oil to change its acid value with vegetable oil mixed ratio and then adjust its electric conductivity and breakdown voltage.
Further, the simulating boundary is made of satisfactory electrical conductivity metal.
The present invention, which compares the prior art, following advantageous effect:Apparatus of the present invention can operate with starting pressure gradient Heavy crude reservoir, simulate three dimensional fluid flow rule;Traditional electrolyte is substituted using mineral oil formula, being allowed to that there are breakdown voltages can Effectively simulation starting pressure gradient, and Electrolysis is effectively relieved.
Description of the drawings:
Fig. 1 is the composed structure and schematic diagram of the present invention.
Specific implementation mode:
The invention will be further described with reference to the accompanying drawings and detailed description:
Fig. 1 is the composed structure and schematic diagram of the present invention.A kind of electric copying device suitable for percolation rule in heavy oil reservoir, It is by power supply, ammeter, the first electronic control unit, the second electronic control unit, switch, ballast, simulation shaft bottom or crack, probe, storage Liquid bath forms;1-power supply;2-ammeters;3-the first electronic control unit:Have frequency conversion, adjustment waveform, voltage, alternating current-direct current and number According to writing function;4-switches;5-ballasts:Can voltage instantaneously be improved into supreme kilovolt to meet breakdown voltage condition, and Stabling current after breakdown;6-simulation shaft bottoms or crack;7-probes:Probe is cladded with insulating film, and the only exposed 1mm metals in end are visited Needle improves vertical measurement accuracy to reduce influence of the probe with superficial part electric field when reservoir deep to test;8-reservoirs:It is deep 1m is spent, vertical percolation law can be effectively simulated;9-simulating boundaries;10-the second electronic control unit:Recording voltage changes.
Wherein, the probes probes are cladded with insulating film, the only exposed 1mm metal probes in end;The ballast can be instantaneous Raising input voltage, can be by burning voltage after electrolyte is breakdown up to reaching breakdown voltage, and the variation of this process voltage can be by electricity Control unit record;The electrolyte being added in the reservoir is formed by mineral oil and vegetable oil mixing preparation, by changing mineral Oil changes its acid value with vegetable oil mixed ratio and then adjusts its electric conductivity and breakdown voltage;Further, the simulating boundary It is made of satisfactory electrical conductivity metal, such as copper.
Apparatus of the present invention workflow:After adjusting frequency, waveform, voltage by electronic control unit, switch, ballast are connected It starts to work, voltage transient is improved to kilovolt and reaches electrolyte breakdown voltage, voltage restores and is stable at default shape after breakdown State, the data such as full range voltage, curent change are recorded and are stored by electronic control unit.By changing position of the probe in reservoir It measures and records the potential under different coordinates.
The starting pressure gradient of oil reservoir is simulated by the breakdown voltage of electrolyte, since there is no breakdown for routine experiment electrolyte Voltage, thus use electrolyte made of mineral oil and vegetable oil mixture in the device, electric conductivity and breakdown voltage and oil Itself acid value is related, can reach different acid values from vegetable oil proportioning by different minerals oil, and then obtain different electric conductivity and hit The electrolyte of voltage is worn, the oil reservoir of a variety of tape starting barometric gradients can be simulated.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention All any modification, equivalent and improvement etc., should all be included in the protection scope of the present invention made by within refreshing and principle.

Claims (5)

1. a kind of electric copying device suitable for percolation rule in heavy oil reservoir, which is characterized in that it is by power supply, ammeter, first Electronic control unit, the second electronic control unit, switch, ballast, simulation shaft bottom or crack, probe, reservoir composition;
Power supply, ammeter, the first electronic control unit, ballast are sequentially connected by electric wire, are ultimately attached at simulating boundary, mould Quasi- boundary is placed in reservoir, is simulated shaft bottom or crack and is placed in reservoir center and is directly connected to power cathode, probe in In reservoir can freely in three-dimensional direction moving, voltmeter, the second electronic control unit be serially connected with probe with simulation shaft bottom or crack it Between;
When work, after the first electronic control unit adjusts frequency, waveform, voltage, switch is connected, ballast is started to work, by voltage Instantaneous improve to kilovolt reaches electrolyte breakdown voltage, and voltage restores and be stable at preset state, full range voltage, electricity after breakdown Stream delta data is recorded and is stored by the first electronic control unit;It is measured by position of the change probe in reservoir and records difference Potential under coordinate.
2. a kind of electric copying device suitable for percolation rule in heavy oil reservoir as described in claim 1, which is characterized in that described Probe is cladded with insulating film, the only exposed 1mm metal probes in end.
3. a kind of electric copying device suitable for percolation rule in heavy oil reservoir as described in claim 1, which is characterized in that described Ballast can instantaneously improve input voltage until reaching breakdown voltage, by burning voltage, this process voltage after electrolyte is breakdown Variation is recorded by the first electronic control unit.
4. a kind of electric copying device suitable for percolation rule in heavy oil reservoir as described in claim 1, which is characterized in that described The electrolyte being added in reservoir is formed by mineral oil and vegetable oil mixing preparation, by changing mineral oil and vegetable oil mix ratio Example changes its acid value and then adjusts its electric conductivity and breakdown voltage.
5. a kind of electric copying device suitable for percolation rule in heavy oil reservoir as described in claim 1, which is characterized in that described Simulating boundary is made of satisfactory electrical conductivity metal.
CN201410664365.4A 2014-11-19 2014-11-19 A kind of electric copying device suitable for percolation rule in heavy oil reservoir Expired - Fee Related CN104533401B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410664365.4A CN104533401B (en) 2014-11-19 2014-11-19 A kind of electric copying device suitable for percolation rule in heavy oil reservoir

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410664365.4A CN104533401B (en) 2014-11-19 2014-11-19 A kind of electric copying device suitable for percolation rule in heavy oil reservoir

Publications (2)

Publication Number Publication Date
CN104533401A CN104533401A (en) 2015-04-22
CN104533401B true CN104533401B (en) 2018-07-31

Family

ID=52849001

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410664365.4A Expired - Fee Related CN104533401B (en) 2014-11-19 2014-11-19 A kind of electric copying device suitable for percolation rule in heavy oil reservoir

Country Status (1)

Country Link
CN (1) CN104533401B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106401550B (en) * 2016-10-17 2022-12-23 长江大学 Electric simulation device and test method for compact oil volume fracture starting pressure seepage law
CN106437695B (en) * 2016-10-17 2023-07-21 中国石油大学(华东) Novel electric simulation device suitable for viscous crude seepage law
CN113495045B (en) * 2020-04-01 2024-06-21 中国石油化工股份有限公司 Dense oil reservoir starting pressure gradient electric simulation system and calculation method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL160541B (en) * 1947-12-01 Shell Int Research PROCESS FOR OLGOMERISING MONO-OLEFINIC HYDROCARBONS.
CN202119759U (en) * 2011-06-09 2012-01-18 东北石油大学 Hydro-fracture electrical analogue experiment measuring device
CN202084246U (en) * 2011-06-09 2011-12-21 东北石油大学 Electric simulation experiment device for horizontal well
CN202220598U (en) * 2011-07-26 2012-05-16 中国石油化工股份有限公司 Three-dimensional electric analog experiment device of horizontal well exploitation
CN102410015B (en) * 2011-12-22 2014-12-24 中国石油大学(北京) Electric analog system and method for infiltration law of wells in complex structures

Also Published As

Publication number Publication date
CN104533401A (en) 2015-04-22

Similar Documents

Publication Publication Date Title
CN104533401B (en) A kind of electric copying device suitable for percolation rule in heavy oil reservoir
CN106021778B (en) A kind of simulation CO2The determination method of displacement dynamic miscible pressure
CN202084246U (en) Electric simulation experiment device for horizontal well
CN104564043B (en) A kind of diversion chamber of gas test compact reservoir seam net flow conductivity and its method of work
CN102590284A (en) Device for measuring water saturation distribution of rock core at high temperature and high pressure
CN102915406A (en) Calculation method for relative permeability curve of oil and water in radial flow condition
CN105092460B (en) Profit alternately soaks corrosion simulated device and method
CN104502404A (en) In-situ detection method of stratal hydrothermal parameters
CN106568621A (en) Production method of physical die rock core for simulating deep high pressure reservoir
CN106442257A (en) Novel ionic liquid based complex structural well seepage electric simulation system
CN106401550A (en) Electric simulator for tight oil volume fracturing starting pressure gradient permeability rule and testing method
CN209369793U (en) A kind of densification oil volume pressure break starting Pressure-seepage Flow rule electric copying device
CN102410015B (en) Electric analog system and method for infiltration law of wells in complex structures
CN104122593A (en) Capacitivity frequency-dispersion measuring method for exploration logging and application method
CN102607998A (en) Factice construction degree and asphalt needle penetration computer comprehensive determinator
CN107816037A (en) A kind of electro-osmosis process determination methods and pulse generating unit
CN206439044U (en) The electric analog system of horizontal well Five-point method pattern percolation law
CN110162906B (en) Seepage equivalent seepage resistance method for tight oil reservoir and hydroelectric simulation system
Guo et al. Controlled large-scale tests of practical grounding electrodes—Part I: Test facility and measurement of site parameters
CN114991728A (en) Simulated CO 2 Electrical tomography experimental device and method for gas drive oil reservoir and application
CN202119759U (en) Hydro-fracture electrical analogue experiment measuring device
CN203276679U (en) Stimulated electrostatic field plotter
CN106437695B (en) Novel electric simulation device suitable for viscous crude seepage law
CN109609130B (en) A kind of electrode friction reducer for resistivity method detection
CN208026713U (en) A kind of sandpack column well pattern note adopts polymer displacement of reservoir oil experimental provision

Legal Events

Date Code Title Description
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Guo Tiankui

Inventor after: Liu Xiaoqiang

Inventor after: Li Xiaolong

Inventor after: Xiao Wen

Inventor after: Qu Zhanqing

Inventor after: Gong Diguang

Inventor after: Tian Yu

Inventor after: Zhang Wei

Inventor after: Zhou Liping

Inventor after: Xu Huaru

Inventor before: Li Xiaolong

Inventor before: Liu Xiaoqiang

Inventor before: Qu Zhanqing

Inventor before: Guo Tiankui

Inventor before: Xiao Wen

Inventor before: Gong Diguang

Inventor before: Tian Yu

Inventor before: Zhang Wei

Inventor before: Zhou Liping

Inventor before: Xu Huaru

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180621

Address after: 266580 Changjiang Road, Huangdao District, Qingdao, Shandong Province, No. 66

Applicant after: China Petroleum University (East China)

Applicant after: Petroleum works Institute for Research and Technology of Shengli Oil Field branch company of Sinopec Group

Address before: 266580 Changjiang Road, Huangdao District, Qingdao, Shandong Province, No. 66

Applicant before: China Petroleum University (East China)

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180731

Termination date: 20181119