CN104532937B - The step pump standing posture drainage system of built acid waste water regulation warehouse and technique - Google Patents
The step pump standing posture drainage system of built acid waste water regulation warehouse and technique Download PDFInfo
- Publication number
- CN104532937B CN104532937B CN201410754900.5A CN201410754900A CN104532937B CN 104532937 B CN104532937 B CN 104532937B CN 201410754900 A CN201410754900 A CN 201410754900A CN 104532937 B CN104532937 B CN 104532937B
- Authority
- CN
- China
- Prior art keywords
- platform
- level
- storehouse
- dam body
- water level
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F1/00—Methods, systems, or installations for draining-off sewage or storm water
Landscapes
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
- Structures Of Non-Positive Displacement Pumps (AREA)
Abstract
The invention discloses a kind of step pump standing posture drainage system and technique of built acid waste water regulation warehouse, key dam body is disposed with first order platform and second level platform from the inside to the outside to the side in storehouse, and the end face of key dam body, first order platform or second level platform is all provided with self priming pump according to corresponding water level.Built acid waste water regulation warehouse key dam body arranges self priming pump, water level in storehouse is drained into first row water level; At next-door neighbour key dam body place, heap is built; Centre is provided with interlayer, and interlayer cloth is equipped with geo-grid; Water level in storehouse is drained into second row water level, piles again at next-door neighbour first order platform place, reservoir area and build formation second level platform, with the self priming pump on the platform of the second level, water level in storehouse is drained into the 3rd draining position, so that storehouse Nei Shui is drained into face, bottom of the reservior.The present invention can construct under the condition not destroying built acid waste water regulation warehouse impervious element, and major part is constructed on the coast, and subaqueous construction is less, and working security is higher.
Description
Technical field
The present invention relates to a kind of construction technology technology, specifically relate to the step pump standing posture drainage system for draining in built acid waste water regulation warehouse and technique.
Background technology
Along with the exploitation in more and more sulphide ore mine, in mine, the waste-rock yard of low position barren rock stored up by stope and being used for, the draining that its rainfall leaching produces mostly is containing acid waste water containing heavy metal ions, in order to meet mine water supply balance and environmental requirement, usually need to arrange acid waste water regulation warehouse to store and regulate, and small pieces of cloth used for patches HDPE antiseepage film carries out Anti-seeping technology, newly-built waste water regulation warehouse can arrange the drainage of complete set usually, but mine is for a long time exploited for some, because built acid waste water regulating time is remote, mining is intermittent, and the factor such as field control is ineffective, drainage in its storehouse can not use mostly, for the acid waste water regulation warehouse of this situation, newly-built a set of drainage is very necessary.
In built acid waste water regulation warehouse, the existing technique of draining mainly contains: fixed pump standing posture drainage technology, inverted-siphon formula drainage technology and movable pump station formula drainage technology.Wherein fixed pump standing posture drainage technology needs in storehouse built-in fixed pump station, and this will bring pumping plant basis preservative treatment, and easily destroys the problems such as reservoir area antiseepage film.Inverted-siphon formula drainage technology then can be subject to the restriction of water level in storehouse and water fully can not be drained.Movable pump station formula drainage technology can bring the anticorrosion difficult problem of pumping plant equally, and the aspects such as the operation of pumping plant, management, maintenance are more difficult.
Summary of the invention
Technical problem to be solved by this invention is the deficiency existed for existing built acid waste water regulation warehouse drainage pattern, proposes a kind of restriction not destroying impervious element, be not subject to water level in storehouse, and can ensure drainage system and the method for construction safety.
The present invention realizes above-mentioned purpose by the following technical solutions.The step pump standing posture drainage system of built acid waste water regulation warehouse, key dam body is disposed with first order platform and second level platform from the inside to the outside to the side in storehouse, bottom surface and the end face of described first order platform and described second level platform are all equipped with geo-grid, and be provided with interlayer between described bottom surface to described end face, interlayer is equipped with geo-grid, the periphery of described first order platform and described second level platform is all with geotechnological Filter-screen bag, and the end face of key dam body, first order platform or second level platform is all provided with self priming pump according to corresponding water level.
The spacing of described interlayer is 2 ~ 3m.
A technique for the step pump standing posture drainage system of built acid waste water regulation warehouse, its step is as follows:
Step 1, built acid waste water regulation warehouse key dam body arranges self priming pump, water level in storehouse is drained into first row water level;
Step 2, utilizes lifting appliance to sink in storehouse in water by earth bag, and at next-door neighbour key dam body place, heap is built;
Step 3, adopt inverse row's mode, from the base of dam of key dam body, sink to earth bag, and move back platform to the dam crest direction of key dam body, the bottom of first order platform and top are all equipped with geo-grid interlayer, and the bottom of first order platform and crown center interlayer lay geo-grid;
Step 4, after first order table top exceeds the water surface, be with geotechnological Filter-screen bag at its edge, intermediate hierarchical bankets;
Step 5, then self priming pump on key dam body top is moved to first order table top carry out draining, the water level in storehouse is drained into second row water level;
Step 6, and again utilize lifting appliance to sink in storehouse in water by earth bag, at next-door neighbour first order platform place, heap is built;
Step 7, repeats step 3 and step 4, is close to first order platform place and piles to build again and form second level platform, and move on on the platform of the second level by the self priming pump on first order platform in storehouse;
Step 8, drains into the 3rd water level H6 with the self priming pump on the platform of the second level by water level in storehouse, storehouse Nei Shui can be drained into face, bottom of the reservior.
The invention has the advantages that: 1, can construct under the condition not destroying built acid waste water regulation warehouse impervious element.2, season is little to this drainage technology construction infection.3, major part is constructed on the coast, and subaqueous construction is less, and working security is higher.4, can water level in storehouse be drained into minimum.Therefore in some specific acid waste water regulation warehouses, draining has advantage.
Accompanying drawing explanation
Fig. 1 is acid waste water regulation warehouse step pump standing posture drainage system generalized section of the present invention.
In figure: 1. key dam body, 2. self priming pump, 3. first order platform, 4. second level platform, 5. geotechnological Filter-screen bag, 6. geo-grid, 7. in storehouse, 8. bottom of the reservior.
H0. dam crest, the existing liquid level of H1., H2. first order platform absolute altitude, H3. first row water level, H4. second level platform absolute altitude, H5. second row water level, H6. the 3rd draining position, face, H7. bottom of the reservior.
Detailed description of the invention
Now the invention will be further described in conjunction with the accompanying drawings and embodiments.See Fig. 1, the step pump standing posture drainage system of built acid waste water regulation warehouse, key dam body 1 in storehouse 7 side be disposed with first order platform 3 and second level platform 4 from the inside to the outside, bottom surface and the end face of described first order platform 3 and described second level platform 4 are all equipped with geo-grid 6, and be provided with interlayer between described bottom surface to described end face, interlayer is equipped with geo-grid 6, the periphery of described first order platform 3 and described second level platform 4 is all with geotechnological Filter-screen bag 5, key dam body 1, the end face of first order platform 3 or second level platform 4 is all provided with self priming pump 2 according to corresponding water level.
The spacing of described interlayer is 2 ~ 3m.
A step pump standing posture drainage technology for built acid waste water regulation warehouse, it is characterized in that, its step is as follows:
Step 1, built acid waste water regulation warehouse key dam body 1 arranges self priming pump 2,7 water levels in storehouse is drained into first row water level H3;
Step 2, utilizes lifting appliance to be sunk to by earth bag in storehouse in 7 water, and at next-door neighbour key dam body 1 place, heap is built;
Step 3, adopt inverse row's mode, from the base of dam of key dam body 1, sink to earth bag, and move back platform to the dam crest direction of key dam body 1, the bottom of first order platform 3 and top are all equipped with geo-grid 6 interlayer, and the bottom of first order platform 3 and crown center interlayer lay geo-grid 6;
Step 4, after first order platform 3 top exceeds the water surface, be with geotechnological Filter-screen bag 5 at its edge, intermediate hierarchical bankets;
Step 5, then key dam body 1 is pushed up upper self priming pump 2 and move to first order platform 3 top and carry out draining, by storehouse 7 water level drain into second row water level H5;
Step 6, and again utilize lifting appliance to be sunk to by earth bag in storehouse in 7 water, at next-door neighbour first order platform 3 place, heap is built;
Step 7, repeats step 3 and step 4, and in storehouse, 7 next-door neighbour first order platform 3 places pile to build again and form second level platform 4, and move on on second level platform 4 by the self priming pump 2 on first order platform 3;
7 water levels in storehouse are drained into the 3rd water level H6 with the self priming pump 2 on second level platform 4 by step 8, storehouse Nei Shui can be drained into face, bottom of the reservior H7.
Embodiment: the step pump standing posture draining of the built acid waste water regulation warehouse of certain project, its processing step is as follows: first on built acid waste water regulation warehouse key dam body 1 dam crest H0 (dam crest H0 absolute altitude is ± 0.00 meter), arrange four self priming pumps 2 (125WFB-C type), 7 water levels in storehouse are drained into first row water level H3 (namely about-4.00 meters) from existing liquid level H1; Then lifting appliance is utilized the earth bag submerged of quartz conglomerate will to be housed, in storehouse, 7 next-door neighbour key dam body 1 places, profundal zone form the first order platform 3 (first order platform absolute altitude H2 is-3.00 meters) of 9m × 3m, platform heap is built in process and is adopted inverse row's mode, sink to from base of dam, platform is moved back to dam crest H0 direction, platform side slope 1:2.25, for reducing differential settlement, the bottom of first order platform 3 and top should arrange the geo-grid 6 layers of HDPE material, one deck geo-grid 6 is arranged every 2-3m, to reach the effect of uniform settlement in centre.After first order platform 3 exceeds the water surface, its edge adopts the geotechnological Filter-screen bag 5 of PP material to enclose heap, the middle mode adopting layered backfill, every about 3m arranges one deck geo-grid 6, final formation first order platform 3, then the self priming pump 2 on dam crest H0 is moved to this first order platform 3 top and carries out draining, by storehouse 7 water level drain into second row water level H5 (namely about-7.00 meters); And then repeat to adopt with upper mounting plate heap building method, in storehouse, 7 next-door neighbour first order platform 3 places form the second level platform 4 (second level platform absolute altitude H4 is for-6.00 meters) of 9m × 3m again, and the self priming pump 2 on first order platform 3 is moved on on second level platform 4, thus 7 water levels in storehouse are drained into the 3rd draining position H6 (namely about-10.00 meters) further, 7 water in storehouse can be drained into face, bottom of the reservior H7 water level.
Claims (3)
1. the step pump standing posture drainage system of built acid waste water regulation warehouse, it is characterized in that, key dam body is disposed with first order platform and second level platform from the inside to the outside to the side in storehouse, bottom surface and the end face of described first order platform and described second level platform are all equipped with geo-grid, and be provided with interlayer between described bottom surface to described end face, interlayer is equipped with geo-grid, the periphery of described first order platform and described second level platform is all with geotechnological Filter-screen bag, and the end face of key dam body, first order platform or second level platform is all provided with self priming pump according to corresponding water level.
2. the step pump standing posture drainage system of built acid waste water regulation warehouse according to claim 1, is characterized in that, the spacing of described interlayer is 2 ~ 3m.
3. a technique for the step pump standing posture drainage system of built acid waste water regulation warehouse as claimed in claim 1, it is characterized in that, its step is as follows:
Step 1, built acid waste water regulation warehouse key dam body arranges self priming pump, water level in storehouse is drained into first row water level;
Step 2, utilizes lifting appliance to sink in storehouse in water by earth bag, and at next-door neighbour key dam body place, heap is built;
Step 3, adopt inverse row's mode, from the base of dam of key dam body, sink to earth bag, and move back platform to the dam crest direction of key dam body, the bottom of first order platform and top are all equipped with geo-grid interlayer, and the bottom of first order platform and crown center interlayer lay geo-grid;
Step 4, after first order table top exceeds the water surface, be with geotechnological Filter-screen bag at its edge, intermediate hierarchical bankets;
Step 5, then self priming pump on key dam body top is moved to first order table top carry out draining, the water level in storehouse is drained into second row water level;
Step 6, and again utilize lifting appliance to sink in storehouse in water by earth bag, at next-door neighbour first order platform place, heap is built;
Step 7, repeats step 3 and step 4, is close to first order platform place and piles to build again and form second level platform, and move on on the platform of the second level by the self priming pump on first order platform in storehouse;
Step 8, drains into the 3rd water level H6 with the self priming pump on the platform of the second level by water level in storehouse, storehouse Nei Shui can be drained into face, bottom of the reservior.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410754900.5A CN104532937B (en) | 2014-12-11 | 2014-12-11 | The step pump standing posture drainage system of built acid waste water regulation warehouse and technique |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410754900.5A CN104532937B (en) | 2014-12-11 | 2014-12-11 | The step pump standing posture drainage system of built acid waste water regulation warehouse and technique |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104532937A CN104532937A (en) | 2015-04-22 |
CN104532937B true CN104532937B (en) | 2016-01-13 |
Family
ID=52848544
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410754900.5A Active CN104532937B (en) | 2014-12-11 | 2014-12-11 | The step pump standing posture drainage system of built acid waste water regulation warehouse and technique |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104532937B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3799217A (en) * | 1972-01-17 | 1974-03-26 | Bauer Eng Inc | Liquid loading system |
JPH0995983A (en) * | 1995-09-29 | 1997-04-08 | Akou:Kk | Height water pumping device |
CN103967496A (en) * | 2014-04-16 | 2014-08-06 | 中钢集团马鞍山矿山研究院有限公司 | Novel method suitable for valley type tailings stacking dam slope tailings recovery |
CN204356877U (en) * | 2014-12-11 | 2015-05-27 | 中国瑞林工程技术有限公司 | The step pump standing posture drainage system of built acid waste water regulation warehouse |
CN204370558U (en) * | 2014-12-04 | 2015-06-03 | 浙江奇峰泵业有限公司 | Novel sewage Boosting pumping station |
-
2014
- 2014-12-11 CN CN201410754900.5A patent/CN104532937B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3799217A (en) * | 1972-01-17 | 1974-03-26 | Bauer Eng Inc | Liquid loading system |
JPH0995983A (en) * | 1995-09-29 | 1997-04-08 | Akou:Kk | Height water pumping device |
CN103967496A (en) * | 2014-04-16 | 2014-08-06 | 中钢集团马鞍山矿山研究院有限公司 | Novel method suitable for valley type tailings stacking dam slope tailings recovery |
CN204370558U (en) * | 2014-12-04 | 2015-06-03 | 浙江奇峰泵业有限公司 | Novel sewage Boosting pumping station |
CN204356877U (en) * | 2014-12-11 | 2015-05-27 | 中国瑞林工程技术有限公司 | The step pump standing posture drainage system of built acid waste water regulation warehouse |
Also Published As
Publication number | Publication date |
---|---|
CN104532937A (en) | 2015-04-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Zheng et al. | Experimental study on the artificial recharge of semiconfined aquifers involved in deep excavation engineering | |
AU2011288096A1 (en) | Process for in-situ leaching by liquid injection | |
CN204023501U (en) | A kind of reinforcement Anti-seeping technology structure for earth and rockfill dam | |
CN106975653A (en) | It is a kind of to prevent the permeable reactive barrier in-situ remediation method of pollution of underground aquifers | |
CN102612882A (en) | Method and salt leaching and inhibiting system for improving coastal beach by burying plant stalks in ditches | |
CN104762982B (en) | The construction method that a kind of rich water red sandstone geology level of ground water controls | |
CN104532865A (en) | Underground blind ditch and permanent water-collecting well comprehensive dewatering system applied to basement | |
AU2013347674B2 (en) | Opencast coal mine underground water reservoir | |
CN106368176B (en) | The high dam structure being built on earth material scarcity area deeply covered layer | |
CN204356877U (en) | The step pump standing posture drainage system of built acid waste water regulation warehouse | |
CN202688016U (en) | In-situ repair device for underground water | |
CN205224119U (en) | Seepage prevention structure of mine wet process system dump leaching field | |
CN104532937B (en) | The step pump standing posture drainage system of built acid waste water regulation warehouse and technique | |
CN113027522B (en) | Coal mine drainage same-layer recharging method | |
CN103243694A (en) | Reinforced soil composite structure drainage ditch | |
CN104594367B (en) | A kind of combined type cofferdam structure and construction method | |
CN203924082U (en) | Anti-floating of underground building structure | |
CN105484229A (en) | Overlying mud layer seal vacuum pre-pressing method suitable for water area soft foundation | |
CN105275021A (en) | Dry heap sealing and storing and pollution preventing method of heavy metal tailings | |
CN202187360U (en) | Well point positioning water pumping tube well | |
CN104355324A (en) | Lake salt lean ore mining process | |
CN206956831U (en) | A kind of antiseep water cellar | |
CN204491644U (en) | A kind of drainage of foundation pit system | |
CN104846917B (en) | Gravel cobble permeable layer in thin silt and construction process thereof | |
CN205975937U (en) | Underground tank of disconnect -type |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 330031 No. 888, Qian Hu Road, Hongjiao Island, Nanchang, Jiangxi. Patentee after: China ruim engineering technology Limited by Share Ltd Address before: 330063 No. 888, Qian Hu Road, Hongjiao Island, Nanchang, Jiangxi. Patentee before: China Nerin Engineering Co., Ltd. |