CN104531926B - A kind of for the platform of sliding furnace shell in blast furnace restricted clearance and building method - Google Patents
A kind of for the platform of sliding furnace shell in blast furnace restricted clearance and building method Download PDFInfo
- Publication number
- CN104531926B CN104531926B CN201410848966.0A CN201410848966A CN104531926B CN 104531926 B CN104531926 B CN 104531926B CN 201410848966 A CN201410848966 A CN 201410848966A CN 104531926 B CN104531926 B CN 104531926B
- Authority
- CN
- China
- Prior art keywords
- platform
- furnace shell
- slideway
- fire door
- sliding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B7/00—Blast furnaces
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B5/00—Making pig-iron in the blast furnace
Abstract
The invention discloses a kind of for the platform of sliding furnace shell in blast furnace restricted clearance, including fire door, the first platform, the second platform, the first platform it is provided with on described fire door, described first platform connects the second platform, be provided with first on described first platform to smooth, described second platform be provided with the second slideway, this technology can in limited blast furnace space sliding furnace shell efficient, safe, reduce production cost, it is ensured that construction quality.
Description
Technical field
The invention belongs to the technical field to the plant maintenance that blast furnace is reconstructed, especially relate to a kind of in blast furnace restricted clearance
The platform of sliding furnace shell and building method.
Background technology
Tradition BF expansion reconstruction is overall reconstruction, and on the basis of retaining original furnace roof feeding system and blast furnace general frame, will
Original blast-furnace body system is removed enlarging and is belonged to emerging way.Tradition furnace shell slide installation method cannot realize carrying out blast furnace greatly
Scale is reconstructed.There is drawback in tradition furnace shell slide installation method, and first, taking construction in a large number has ground, reduces production efficiency;、
Second, huge structure, build complexity, time and effort consuming;3rd, production cost is high, dangerous strong.
Summary of the invention
For problems of the prior art, the present invention provide a kind of in blast furnace restricted clearance sliding furnace shell platform and
Building method, this technology can in limited blast furnace space sliding furnace shell efficient, safe, reduce production cost, it is ensured that construction
Quality.
For solving problems of the prior art, the present invention adopts the following technical scheme that and implements:
A kind of for the platform of sliding furnace shell in blast furnace restricted clearance, including fire door, the first platform, the second platform, described fire door
On be provided with the first platform, described first platform connects the second platform, and described first platform is provided with the first slideway,
It is provided with the first slideway described in the second slideway on described second platform to be connected with described first platform by four groups of reinforcement elements,
Described second slideway is connected with described second platform by four groups of reinforcement elements, and described first installation of slide track is away from described fire door
At the ring-shaped edge 2m of both sides, its one end is connected with described first platform edges, the other end stretch out described first platform edges 2~
3m。
Described reinforcement elements is made up of bearing diagonal beam and block.
For solving problems of the prior art, the present invention can also adopt the following technical scheme that and implement, a kind of for
In blast furnace restricted clearance, the platform building method of sliding furnace shell, comprises the steps:
First, above fire door, build the first platform, the second platform;
Second, by the first installation of slide track at the ring-shaped edge 2m of fire door both sides, its one end is welded with the first platform edges, another
End stretches out the first platform edges 2~3m, and is welded with the first platform surface by four groups of reinforcement units;
3rd, by the second installation of slide track on the second platform, and by four groups of reinforcement units and the second platform welding;
4th, furnace shell is placed on the second slideway by the first hanging device, then by pulling equipment, furnace shell is placed on first
On slideway, find furnace shell and fire door position accurately;
5th, by the second hanging device, furnace shell is sling, after removing the first slideway, furnace shell is put into fire door, complete furnace shell
Building of sliding.
The invention has the beneficial effects as follows: first, the present invention makes over heavy, expense by arranging two groups of slideways at table
Time the work of furnace shell sliding become light, quick.Second, the present invention reduces construction area, saves manpower and throws
Entering, reduce production cost, there is quality guarantor's duration.3rd, present configuration is reasonable, it is simple to build, user
Just, it is suitable for promoting.
Accompanying drawing explanation
Fig. 1 is that the present invention is a kind of for the platform structure schematic diagram of sliding furnace shell in blast furnace restricted clearance.
Fig. 2 is that the present invention is a kind of for the platform building state reference map of sliding furnace shell in blast furnace restricted clearance.
Reference
1 fire door 2 first platform 3 second platform 4 first slideway 5 second slideway
6 reinforcement elements 7 first hanging device 8 second hanging device 9-pulling equipment 10 furnace shells
Detailed description of the invention
It is understood to make the present invention be easier to, below in conjunction with the embodiment shown in the drawings skill to the present invention
Art scheme is described in detail.
As it is shown in figure 1, the present invention provides a kind of for the platform of sliding furnace shell in blast furnace restricted clearance, including fire door 1, first
Platform the 2, second platform 3, on described fire door, 1 is provided with the first platform 2, and described first platform 1 connects the second platform
2, described first platform 1 is provided with the first slideway 4, described second platform 3 is provided with the second slideway 5.
Described first slideway 4 is arranged at described fire door 1 both sides ring-shaped edge 2m, its one end and described first platform 2 edge
Connecting, the other end stretches out described first platform 2 edge 2~3m.
Described first slideway leads to 4 four groups of reinforcement elements 6 excessively and is connected with described first platform 2.Described second slideway 5 is by four groups
Reinforcement elements 6 is connected with described second platform 3.Described reinforcement elements 6 is made up of bearing diagonal beam and block.Described
One slideway 4 stretches out one end of table 1 apart from described second slideway 5 about between 1~2m.Described first slideway 4,
Two slideways 5 all use H profile steel assembly welding, and the first slideway 4 supports used by furnace shell 10 as final;
Second slideway 5 as transition slideway, for by furnace shell 10 from outer platform slide transitional to blast furnace foundation overhead.
As in figure 2 it is shown, invention can also adopt the following technical scheme that and implement, a kind of for sliding in blast furnace restricted clearance
Move the platform building method of furnace shell, comprise the steps:
The first, on table 1, build first platform the 2, second platform 3;
Second, the first slideway 4 is arranged at the ring-shaped edge 2m of fire door 1 both sides, its one end is welded with the first platform 2 edge,
The other end stretches out the first platform 2 edge 2~3m, and by four groups of reinforcement units 6 and the first platform 2 surface soldered;
3rd, the second slideway 5 is arranged on the second platform 3, and by four groups of reinforcement units 6 and the second platform welding;
4th, furnace shell 10 is placed on the second slideway 5 by the first hanging device 7, then by pulling equipment 9 by furnace shell 10
It is placed on the first slideway 4, finds furnace shell 10 and fire door 1 position accurately;In actual build process, can be at stove
Shell-side face arranges two stress points, and its position and the lifting drum lower limb in pulling equipment are in same level
On, start hoist engine, make furnace shell slide onto the first slideway from the second slideway.
5th, by the second hanging device 8, furnace shell 10 is sling, about behind 200mm position, after removing the first slideway 4,
Furnace shell 10 is put into fire door 1, completes building of furnace shell 10 sliding.
Above by reference to drawings and Examples, being schematically described the present invention, this description is the most restricted.
Those of ordinary skill in the art will be understood that in actual applications, and in the present invention, the set-up mode of each parts is equal
It may happen that some changes, and other staff are likely to make the similar Design of various ways under it enlightens.Need
It is noted that without departing from the design aim of the present invention, all obvious changes and similar Design thereof,
Within being all contained in protection scope of the present invention.
Claims (3)
1. for a platform for sliding furnace shell in blast furnace restricted clearance, including fire door, the first platform, the second platform, on described fire door
Being provided with the first platform, described first platform connects the second platform, it is characterised in that: it is provided with first on described first platform
Slideway, described second platform is provided with the second slideway, and described first slideway is by four groups of reinforcement elements with described first platform even
Connecing, described second slideway is connected with described second platform by four groups of reinforcement elements, and described first installation of slide track is away from described fire door
At the ring-shaped edge 2m of both sides, its one end is connected with described first platform edges, and the other end stretches out described first platform edges 2~3m.
It is a kind of for the platform of sliding furnace shell in blast furnace restricted clearance, it is characterised in that;Described reinforcing is single
Unit is made up of bearing diagonal beam and block.
3., for a platform building method for sliding furnace shell in blast furnace restricted clearance, comprise the steps:
First, above fire door, build the first platform, the second platform;
Second, by the first installation of slide track at the ring-shaped edge 2m of fire door both sides, its one end is welded with the first platform edges, and the other end is stretched
Go out the first platform edges 2~3m, and welded with the first platform surface by four groups of reinforcement units;
3rd, by the second installation of slide track on the second platform, and by four groups of reinforcement units and the second platform welding;
4th, furnace shell is placed on the second slideway by the first hanging device, then by pulling equipment, furnace shell is placed on the first slideway
On, find furnace shell and fire door position accurately;
5th, by the second hanging device, furnace shell is sling, after removing the first slideway, furnace shell is put into fire door, complete furnace shell sliding
Operation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410848966.0A CN104531926B (en) | 2014-12-31 | 2014-12-31 | A kind of for the platform of sliding furnace shell in blast furnace restricted clearance and building method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410848966.0A CN104531926B (en) | 2014-12-31 | 2014-12-31 | A kind of for the platform of sliding furnace shell in blast furnace restricted clearance and building method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104531926A CN104531926A (en) | 2015-04-22 |
CN104531926B true CN104531926B (en) | 2016-08-24 |
Family
ID=52847545
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410848966.0A Active CN104531926B (en) | 2014-12-31 | 2014-12-31 | A kind of for the platform of sliding furnace shell in blast furnace restricted clearance and building method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104531926B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107502690A (en) * | 2017-09-13 | 2017-12-22 | 中冶天工集团天津有限公司 | A kind of point of device and replacing options with integral replacing last furnace shell |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202139243U (en) * | 2011-05-05 | 2012-02-08 | 天津二十冶建设有限公司 | Furnace shell installing and translating device for overhauling blast furnace |
CN203247279U (en) * | 2013-05-07 | 2013-10-23 | 中国十七冶集团有限公司 | Gliding platform for mounting furnace shell in major overhaul of blast furnace |
CN203360469U (en) * | 2013-07-03 | 2013-12-25 | 上海宝冶集团有限公司 | Sliding device of central feed type bell-less top charging equipment of oversized blast furnace |
-
2014
- 2014-12-31 CN CN201410848966.0A patent/CN104531926B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202139243U (en) * | 2011-05-05 | 2012-02-08 | 天津二十冶建设有限公司 | Furnace shell installing and translating device for overhauling blast furnace |
CN203247279U (en) * | 2013-05-07 | 2013-10-23 | 中国十七冶集团有限公司 | Gliding platform for mounting furnace shell in major overhaul of blast furnace |
CN203360469U (en) * | 2013-07-03 | 2013-12-25 | 上海宝冶集团有限公司 | Sliding device of central feed type bell-less top charging equipment of oversized blast furnace |
Also Published As
Publication number | Publication date |
---|---|
CN104531926A (en) | 2015-04-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105938067A (en) | External loading type shield segment mechanical property testing machine and testing method thereof | |
CN104531926B (en) | A kind of for the platform of sliding furnace shell in blast furnace restricted clearance and building method | |
CN205562159U (en) | Shield constructs section of jurisdiction mechanical testing machine | |
CN204954202U (en) | Blast furnace stove outer covering inner wall welded platform | |
CN204417000U (en) | A kind of movable stand for the dismounting of limitation Space Facilities | |
CN106089223A (en) | A kind of TBM Quick air pushes away method | |
CN207211918U (en) | Internally lifting pole | |
CN206417791U (en) | A kind of hanging apparatus for being used to install single ended bolt stretching-machine in groups | |
CN103949504A (en) | Movable hydraulic shaping machine | |
CN204954201U (en) | Blast furnace stove outer covering outer wall welding platform | |
CN205676920U (en) | Service sleeve structure removed by a kind of subway station concrete support rope saw | |
CN206174482U (en) | Outsourcing concrete ring beam reinforcing bar integral erection device of no bracket steel -pipe column | |
CN204960976U (en) | Tunnel ventilation manages simple and easy telescoping device | |
CN202780428U (en) | Shaft pressing machine | |
CN204183176U (en) | For the runing rest of pipeline welding | |
CN204022864U (en) | The hanging ladder of welding converter flue | |
CN207563843U (en) | A kind of electric beveler operating platform frame | |
CN207748738U (en) | Cyclone system integrally group to tooling | |
CN104555833A (en) | Tool for hoisting steel inner barrel of chimney and application method of tool | |
CN204680993U (en) | A kind of device changing porcelain vase for straight corner bar | |
CN205910143U (en) | Glass insulator elasticity testing arrangement | |
CN204917170U (en) | Flat -bulb steel discharge apparatus | |
CN204826587U (en) | Elevartor shaft instrument formula operation steel platform | |
CN205464638U (en) | Mantle fiber machine that long tube can advance certainly | |
CN104174780B (en) | A kind of pipe straightener feeding device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 300301 Dongli District, flawless Street Jintang Highway Bridge No. ten Applicant after: MCC TIANGONG GROUP TIANJIN CO., LTD. Address before: 300301 No. 10 bridge, Tianjin, Dongli Applicant before: Tianjin MCC20 Construction Co., Ltd. |
|
COR | Change of bibliographic data | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |