CN104528514A CN201410793874.7A CN201410793874A CN104528514A CN 104528514 A CN104528514 A CN 104528514A CN 201410793874 A CN201410793874 A CN 201410793874A CN 104528514 A CN104528514 A CN 104528514A
Authority
CN
China
Prior art keywords
pulley
sheave shaft
suspension hook
side plate
installation structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410793874.7A
Other languages
Chinese (zh)
Inventor
付江
李君伟
种均文
牟亚宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Crane Works Co Ltd
Original Assignee
Chongqing Crane Works Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Crane Works Co Ltd filed Critical Chongqing Crane Works Co Ltd
Priority to CN201410793874.7A priority Critical patent/CN104528514A/en
Publication of CN104528514A publication Critical patent/CN104528514A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/22Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks
    • B66C1/34Crane hooks

Abstract

The invention discloses a hook assembly pulley installation structure. The hook assembly pulley installation structure comprises two opposite side plates, a first pulley block and a second pulley block, which are arranged between the two side plates, the first pulley block and the second pulley block are arranged in a mirror symmetry manner, the first pulley block comprises two first pulleys which are arranged symmetrically, the two first pulleys are supported between the two side plates through a first pulley shaft, the first pulleys are obliquely arranged, and an angle alpha is formed between the radial central axis of each first pulley and the corresponding side plate. The hook assembly pulley installation structure is simple and novel in structure, convenient to install and high in universality, the jumping risk of a wire rope can be reduced, the application reliability of a crane can be guaranteed, the abrasion of the wire rope can be alleviated, and the service life of the wire rope can be effectively prolonged.

Description

Suspension hook group pulley installation structure
Technical field
The present invention relates to a kind of crane parts, especially a kind of suspension hook group pulley installation structure.
Background technology
Suspension hook group is the important process parts of hoisting crane, in traditional suspension hook group, pulley is arranged in parallel, owing to there is distance between reel and dead sheave group, there is comparatively mitre to the steel rope on reel and dead sheave in lifting hook pulley, the easy bracket (steel rope is deviate from from pulley groove) when steel rope moves, simultaneously because angle is larger, steel rope is long-term with pulley rim friction, rope service-life is shortened, affects and lift by crane safety.
Summary of the invention
For solving above technical matters, the invention provides a kind of suspension hook group pulley installation structure, suspension hook group steel rope bracket risk and the rate of wear can be reduced, improve device security, increase the service life.
Its technical scheme is as follows:
A kind of suspension hook group pulley installation structure, comprise two blocks of side plates be oppositely arranged and the first assembly pulley be arranged between biside plate and the second assembly pulley, its main points are: described first assembly pulley and the second assembly pulley specular are arranged, this first assembly pulley comprises two symmetrically arranged first pulleys, two first pulleys are supported between the side plate of both sides by the first sheave shaft, first pulley is obliquely installed, and has angle α between its radial center axis and side plate.
Adopt above structure, there is between two assembly pulleys and adjacent side plates the angle of opposite angles, hoisting crane operating room can be prevented, suspension hook group steel rope bracket, and reduce steel rope abrasion, extension device service life.
Preferably, described second assembly pulley comprises two symmetrically arranged second pulleys, two second pulleys are supported between the side plate of both sides by the second sheave shaft, second pulley is obliquely installed, have angle-α between its radial center axis and side plate, described second sheave shaft and the first sheave shaft are positioned in same level.This structure makes two pulley block structures consistent, and convenient manufacture, is conducive to saving production cost, and improves the mutual property of parts.
Preferably, corresponding first sheave shaft of described side plate and the second sheave shaft end position are provided with sheave shaft via hole, and this sheave shaft via hole is obliquely installed, and to facilitate installation sheave shaft, and comparatively reasonably realizes the inclination of assembly pulley.
Preferably, for convenience of dead sheave axle, prevent it from rotating, be provided with former outside described sheave shaft via hole, this former and side plate are fixed, and are provided with square opening in the middle part of it, the first sheave shaft and the second sheave shaft stretch out the end of side plate and this square opening suitable.
Preferably, the angle of angle α is determined with steel rope position on reel according to suspension hook dead sheave when driving a vehicle limes superiors, is generally 3 ~ 8 °, in the present invention preferably 5 °.
Preferably, be provided with suspension hook transverse axis below described first sheave shaft, these suspension hook transverse axis two ends are installed on the side plate of both sides, and suspension hook transverse axis is arranged with suspension hook, and this topology layout is reasonable, convenient for assembly.
The invention has the beneficial effects as follows:
1, structure is simple, novel, and cost aspect is comparatively economical;
2, easy for installation, installation method similar to traditional suspension hook can be adopted;
3, with traditional hanger components highly versatile, except side plate, substantially can realize parts exchange;
4, reduce groove skipping of steel rope while risk, ensure the reliability that hoisting crane uses;
5, decrease steel rope abrasion, effectively extend the service life of steel rope.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the A-A cutaway view of Fig. 1;
Fig. 3 is the mounting structure schematic diagram of biside plate in the present invention;
Fig. 4 is using state reference diagram of the present invention.
Detailed description of the invention
Below in conjunction with embodiment and accompanying drawing, the invention will be further described.
A kind of suspension hook group pulley installation structure as shown in Figures 1 to 4, comprise two blocks of side plates be oppositely arranged 1 and be arranged on the first assembly pulley 2 and the second assembly pulley 3 between biside plate 1, side plate 1 is vertically arranged, by the first sheave shaft 22 between biside plate 1, second sheave shaft 32 and 5 three, suspension hook transverse axis are connected and fixed, side plate 1 structure roughly triangular in shape, bottom is protruded downwards, second sheave shaft 32 and the first sheave shaft 22 are positioned in same level, suspension hook transverse axis 5 is positioned at below the first sheave shaft 22 and the second sheave shaft 32 place horizontal surface, these suspension hook transverse axis 5 two ends are bolted on both sides side plate 1, suspension hook 6 is provided with by bearing carrier ring in the middle part of suspension hook transverse axis 5.
As seen from Figure 2, described first assembly pulley 2 and the second assembly pulley 3 specular are arranged, this first assembly pulley 2 comprises two symmetrically arranged first pulleys 21, two first pulleys 21 are supported between both sides side plate 1 by the first sheave shaft 22, antifriction-bearing box is provided with between first pulley 21 and the first sheave shaft 22, first pulley 21 is obliquely installed, and has the angle α of 3 ~ 8 ° between its radial center axis and side plate 1, is preferably 5 ° in the present invention.
Described second assembly pulley 3 structure is identical with the first assembly pulley 2, and specular each other, this second assembly pulley 3 comprises two symmetrically arranged second pulleys 31, two second pulleys 31 are supported between both sides side plate 1 by the second sheave shaft 32, second pulley 31 is obliquely installed, and between its radial center axis and side plate 1, tool angle is the angle of-α.
Please refer to Fig. 3, corresponding first sheave shaft 22 of described side plate 1 and the second sheave shaft 32 end position are provided with sheave shaft via hole 11, and this sheave shaft via hole 11 is obliquely installed, and between sheave shaft via hole 11 central axis and side plate, angle is similarly α.
Composition graphs 2 and Fig. 3, former 4 is provided with outside described sheave shaft via hole 11, this former 4 is fixed by bolt and side plate 1, square opening 4a is provided with in the middle part of former 4, the end of the first sheave shaft 22 and the second sheave shaft 32 is through sheave shaft via hole 11 and stretch in square opening 4a, the first sheave shaft 22 and the second sheave shaft 32 end shape and this square opening 4a suitable.
As shown in Figure 4, above side plate 1 and assembly pulley, both sides are respectively equipped with reel 7 and dead sheave group 8, and connected by steel rope 9, because bracket and wearing and tearing occur in suspension hook 6 upper extreme position nearest apart from dead sheave group 8 mostly, therefore angle α angle is determined with steel rope 9 position on reel 7 according to suspension hook dead sheave group 8 when driving a vehicle limes superiors.
Finally it should be noted that; foregoing description is only the preferred embodiments of the present invention; those of ordinary skill in the art is under enlightenment of the present invention; under the prerequisite without prejudice to present inventive concept and claim; can make like multiple types and representing, such conversion all falls within protection scope of the present invention.

Claims (6)

1. a suspension hook group pulley installation structure, comprise two pieces of side plates be oppositely arranged (1) and the first assembly pulley (2) be arranged between biside plate (1) and the second assembly pulley (3), it is characterized in that: described first assembly pulley (2) and the second assembly pulley (3) specular are arranged, this first assembly pulley (2) comprises two symmetrically arranged first pulleys (21), two first pulleys (21) are supported between both sides side plate (1) by the first sheave shaft (22), first pulley (21) is obliquely installed, between its radial center axis and side plate (1), there is angle α.
2. suspension hook group pulley installation structure according to claim 1, it is characterized in that: described second assembly pulley (3) comprises two symmetrically arranged second pulleys (31), two second pulleys (31) are supported between both sides side plate (1) by the second sheave shaft (32), second pulley (31) is obliquely installed, have angle-α between its radial center axis and side plate (1), described second sheave shaft (32) and the first sheave shaft (22) are positioned in same level.
3. suspension hook group pulley installation structure according to claim 2, it is characterized in that: corresponding first sheave shaft (22) of described side plate (1) and the second sheave shaft (32) end position are provided with sheave shaft via hole (11), and this sheave shaft via hole (11) is obliquely installed.
4. suspension hook group pulley installation structure according to claim 3, it is characterized in that: described sheave shaft via hole (11) outside is provided with former (4), this former (4) is fixed with side plate (1), be provided with square opening (4a) in the middle part of it, the first sheave shaft (22) and the second sheave shaft (32) stretch out the end of side plate (1) and this square opening (4a) suitable.
5. suspension hook group pulley installation structure according to any one of claim 1 to 4, is characterized in that: described angle α is 3 ~ 8 °.
6. suspension hook group pulley installation structure according to claim 5, it is characterized in that: described first sheave shaft (22) below is provided with suspension hook transverse axis (5), these suspension hook transverse axis (5) two ends are installed on both sides side plate (1), and suspension hook transverse axis (5) is arranged with suspension hook (6).
CN201410793874.7A 2014-12-19 2014-12-19 Hook assembly pulley installation structure Pending CN104528514A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410793874.7A CN104528514A (en) 2014-12-19 2014-12-19 Hook assembly pulley installation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410793874.7A CN104528514A (en) 2014-12-19 2014-12-19 Hook assembly pulley installation structure

Publications (1)

Publication Number Publication Date
CN104528514A true CN104528514A (en) 2015-04-22

Family

ID=52844213

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410793874.7A Pending CN104528514A (en) 2014-12-19 2014-12-19 Hook assembly pulley installation structure

Country Status (1)

Country Link
CN (1) CN104528514A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104860199A (en) * 2015-05-14 2015-08-26 天津港欧亚国际集装箱码头有限公司 Groove-disengagement-preventing device for steel wire rope on upper rack of gantry crane lifting appliance
CN108249337A (en) * 2018-03-05 2018-07-06 苏州库力铁重工有限公司 Lifting hook pulley component
CN108263943A (en) * 2018-03-05 2018-07-10 苏州库力铁重工有限公司 Hook gear used for electric hoist

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104860199A (en) * 2015-05-14 2015-08-26 天津港欧亚国际集装箱码头有限公司 Groove-disengagement-preventing device for steel wire rope on upper rack of gantry crane lifting appliance
CN108249337A (en) * 2018-03-05 2018-07-06 苏州库力铁重工有限公司 Lifting hook pulley component
CN108263943A (en) * 2018-03-05 2018-07-10 苏州库力铁重工有限公司 Hook gear used for electric hoist

Similar Documents

Publication Publication Date Title
CN104528514A (en) Hook assembly pulley installation structure
CN2918358Y (en) Combination apparatus for preventing running vehicle fixed block wire rope from disengaging
CN204960281U (en) Automatic raise scaffold
CN202785251U (en) Crane hook fixture
CN203497929U (en) Slant pulley lifting hook group of crane
CN201334306Y (en) Hoisting machine for upright post member
CN204454325U (en) Bridge crane structure
CN204847923U (en) Hoist anti -swing puts device
CN204434077U (en) Crane hook group pulley installation structure
CN103058069A (en) Horizontal arm tower-type crane
CN102992203A (en) Simple hoisting device for steel structure bridge installation
CN202440231U (en) Gantry crane lifting hook device
CN202757453U (en) Novel furnace door lifting device
CN202449763U (en) Simple pneumatic crane
CN205294554U (en) Revolve mode rope sheave group
CN106006378A (en) Rotatable electric hoist type crane
CN101428732A (en) Ultra-long electric block
CN203021213U (en) Rotary one-arm crane
CN204727436U (en) A kind of hoisting crane special hanger
CN204751863U (en) Roof beam hoist gyration hoist is hung to electromagnetism
CN210885082U (en) Heavy ring hoisting equipment device for wind power flange
CN202449728U (en) Double-pulley lifting hook device of gantry crane
CN101672101A (en) One-drive multi-hoisting-point hoisting system
CN204138161U (en) A kind of electric block lifting hook device
CN202022668U (en) Mine bridge crane

Legal Events

Date Code Title Description
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150422