CN104525587A - Through water assembly device - Google Patents

Through water assembly device Download PDF

Info

Publication number
CN104525587A
CN104525587A CN201410778767.7A CN201410778767A CN104525587A CN 104525587 A CN104525587 A CN 104525587A CN 201410778767 A CN201410778767 A CN 201410778767A CN 104525587 A CN104525587 A CN 104525587A
Authority
CN
China
Prior art keywords
water
water pipe
guide groove
wear
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410778767.7A
Other languages
Chinese (zh)
Other versions
CN104525587B (en
Inventor
张立祥
陈飞
洪键
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JINYE METALLURGICAL EQUIPMENT CO Ltd JIANGSU PROV
Original Assignee
JINYE METALLURGICAL EQUIPMENT CO Ltd JIANGSU PROV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JINYE METALLURGICAL EQUIPMENT CO Ltd JIANGSU PROV filed Critical JINYE METALLURGICAL EQUIPMENT CO Ltd JIANGSU PROV
Priority to CN201410778767.7A priority Critical patent/CN104525587B/en
Publication of CN104525587A publication Critical patent/CN104525587A/en
Application granted granted Critical
Publication of CN104525587B publication Critical patent/CN104525587B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Special Spraying Apparatus (AREA)

Abstract

A through water assembly device comprises a through water guide pipe, guide grooves, a guide groove base and water pipes; the water pipe I and the water pipe II are communicated into a whole through a plurality of connecting pipes; the water pipe III and the water pipe IV are communicated into a whole through connecting pipes; the water pipe I, the water pipe II, the water pipe III and the water pipe IV are provided with a guide groove base II, a through water base I, a plurality of through water device bases II, a through water device base III and a plurality of guide groove bases I which are used for installing the guide groove I from left to right; the through water device base I is provided with four through water guide pipes I and four forward blowing nozzles; the through water device base II is provided with four groups of forward blowing nozzles and every group is provided with two forward blowing nozzles; the through water device base III is provided with four groups of backward blowing nozzles and four through water guide pipes II and every group of backward blowing nozzle is provided with two backward blowing nozzles I and a backward blowing nozzle. The through water assembly device is skillful and reasonable in structure, improves the product quality, the production efficiency and the cooling effect to a large extent, reduces the production costs to a large extent and reduces environmental pollution.

Description

One wears the total forming apparatus of water
Technical field
The present invention relates to hot-rolled reinforced bar corollary equipment, refer more particularly to one and wear the total forming apparatus of water.
Background technology
Wear after the total forming apparatus of water is arranged on mm finishing mill unit, utilize rolled piece after finish rolling rapid deformation, cool fast immediately, pass through deformation induced trans-formation, control the grain growth under the reinforcing bar condition of high temperature, and then obtain fine ferrite crystal grain, by refined crystalline strengthening, improve the comprehensive mechanical performance of reinforcing bar comprehensively.Original structure: four lines, four water pipes, temperature, the pressure of every root water pipe are inconsistent, and it is also different to wear water reinforcing bar temperature out, are just blowing after part point-like sprays, are doing turbulent flowing, to strengthen the heat exchange of rolled piece and cooling medium through turbulent in-pipe flow.Bring following shortcoming: 1. because of reinforcing bar head chilling when wearing water, easily produce abnormal structure, tension, surrender are very high; 2. wear water conservancy project skill because of inhomogeneous cooling, easily produce wave steel, produce waste product.3. wear water reinforcing bar to wear long after water and produce a large amount of steam, especially in the winter time, a large amount of steam causes workshop fog very large, and visibility is extremely low, and security is very poor; A large amount of steam accelerates the corrosion of factory roof structure simultaneously.4. equipment chilling temperature is inconsistent, and the tissue of steel is just different, and performance is just different, and cooling effect is weak, and need reduce reinforcing bar when wearing water and wear water speed, covert reduces output.
Summary of the invention
The object of this invention is to provide one and wear the total forming apparatus of water, this device structure is ingenious rationally, product quality, production efficiency and cooling effect can be increased substantially, significantly reduce production cost, reduce environmental pollution.
The present invention is achieved in that one wears the total forming apparatus of water, comprise wear water conduit, wear hydrophone base, guide groove, guide groove base, water pipe, it is characterized in that: water pipe one is communicated with integral with water pipe two by several tube connectors, water pipe three and water pipe four are also communicated with integral by tube connector; Water pipe one and water pipe two and water pipe three and water pipe four are provided with from left to right guide groove one is installed guide groove base two, wear hydrophone base one, several are worn hydrophone base two, wear hydrophone base three and several guide groove bases one; Wear hydrophone base one is provided with four wear water conduit one and four just blow and spray mouth; Wear and hydrophone base two is provided with four groups just blows and sprays mouth, often group is provided with two and just blows and sprays mouth; Wear hydrophone base three is provided with four groups of blowback nozzles and four wear water conduit two, often organize blowback nozzle and be provided with two blowback nozzles one and a blowback nozzle two; Each guide groove base one is provided with four guide grooves two.
Water pipe one of the present invention and water pipe two are provided with opposing steam flow cover one, water pipe three and water pipe four are provided with opposing steam flow cover two, opposing steam flow cover one and opposing steam flow cover two are set side by side with several header tanks below.
Water pipe one of the present invention, water pipe two right-hand member are respectively arranged with two admitting pipe joints.
Tube connector of the present invention is provided with and the arm worn hydrophone base two and be connected, just blows nozzle supplies water to two.
The guide groove two that two, the left side of the present invention guide groove base one is arranged be arranged in parallel, the inside oblique setting of guide groove two that remaining guide groove base one is arranged.
Pressure gauge and valve is provided with before admitting pipe joint of the present invention.
The present invention is just blowing part and is adopting ring-type cooling, make current through rebar surface, produce eddy current, and the vortex that outermost is produced rotates towards the rebar surface of current process; Change the flow of water and pressure by increasing or reduce pad adjusting play, reach the object that control is cold, add three blowback water by just blowing of several, control reinforcing bar and wear temperature after water.
Structure of the present invention is rationally ingenious, has increased substantially product quality, production efficiency and cooling effect, has considerably reduced production cost, decreased environmental pollution.
Accompanying drawing illustrates:
Fig. 1 is the front view in structural representation of the present invention;
Fig. 2 is A-A sectional view in Fig. 1;
Fig. 3 is B-B sectional view in Fig. 2;
In figure 1, opposing steam flow cover one, 2, opposing steam flow cover two, 3, guide groove one, 4, water pipe one, 5, wear water conduit one, 6, wear hydrophone base one, 8, just mouth is blowed and sprayed, 9, hydrophone base two, 11, arm is worn, 12, blowback nozzle one, 13, blowback nozzle two, 14, wear water conduit two, 15, guide groove two, 16, guide groove base one, 19, header tank, 21, hydrophone base three, 22, guide groove base two, 23, water pipe two is worn, 24, tube connector, 25, admitting pipe joint, 26, water pipe three, 27, water pipe four.
Detailed description of the invention:
Below in conjunction with accompanying drawing, the present invention is further described:
With reference to accompanying drawing, one wears the total forming apparatus of water, comprise wear water conduit, wear hydrophone base, guide groove, guide groove base, water pipe, it is characterized in that: water pipe 1 is communicated with integral with water pipe 2 23 by several tube connectors 24, water pipe 3 26 and water pipe 4 27 are also communicated with integral by tube connector; Water pipe 1 and water pipe 2 23 and water pipe 3 26 and water pipe 4 27 are provided with from left to right guide groove 1 is installed guide groove base 2 22, wear hydrophone base 1, several are worn hydrophone base 29, wear hydrophone base 3 21 and several guide groove bases 1; Wear hydrophone base 1 is provided with four wear water conduit 1 and four just blowing and spraying mouth 8; Wear and hydrophone base 29 is provided with four groups just blows and sprays mouth, often group is provided with two and is is just blowing and spraying mouth 8; Wear hydrophone base 3 21 is provided with four groups of blowback nozzles and four wear water conduit 2 14, often organize blowback nozzle and be provided with two blowback nozzles 1 and a blowback nozzle 2 13; Each guide groove base 1 is provided with four guide grooves 2 15.Described water pipe 1 and water pipe 2 23 are provided with opposing steam flow cover 1, water pipe 3 26 and water pipe 4 27 are provided with opposing steam flow cover 22, opposing steam flow cover 1 and opposing steam flow cover 22 are set side by side with several header tanks 19 below.Described water pipe 1, water pipe 2 23 right-hand member are respectively arranged with two admitting pipe joints 25.Described tube connector 24 is provided with and the arm 11 worn hydrophone base 29 and be connected, is is just blowing and spraying mouth 8 to two and supplying water.The guide groove 2 15 that two, left side guide groove base 1 is arranged be arranged in parallel, the inside oblique setting of guide groove 2 15 that remaining guide groove base 1 is arranged.Described admitting pipe joint 25 is provided with Pressure gauge and valve above.Just blowing part and adopting ring-type cooling, make current through rebar surface, produce eddy current, and the vortex that outermost is produced is rotating towards the rebar surface of current process; Change the flow of water and pressure by increasing or reduce pad adjusting play, reach the object that control is cold, add three blowback water by just blowing of several, control reinforcing bar and wear temperature after water.
During concrete enforcement, the present invention is just blowing part and is adopting ring-type cooling, make current through rebar surface, produce eddy current, and the vortex that outermost is produced rotates towards the rebar surface of current process, reaches the quick object cooled.After hand control valve goalkeeper hydraulic pressure is transferred to process set value, changes flow and the pressure of water by increasing or reduce pad adjusting play, reach the object that control is cold; Blowback part adopts water cooling, the flow direction of blowback nozzle water with just blow contrary, with the kinetic energy of reverse water alleviation forward water, fall into tank, the effect reaching scale removal He anhydrate; Add three blowback water by just blowing of several, control reinforcing bar fast and wear temperature after water, obtain fine ferrite crystal grain, by refined crystalline strengthening, improve the comprehensive mechanical performance of reinforcing bar comprehensively.Because water pipe one is communicated with water pipe two, the temperature and pressure therefore four lines controlled is substantially identical, and after wearing water, the comprehensive mechanical performance of reinforcing bar is stablized.Reinforcing bar is derived and is made the reinforcing bar of splitting rolling reach width below needed for flying shear by certain angle that collects by four groups of guide grooves two.Feature of the present invention: 1) by after quick cooling, refined crystalline strengthening, improves the comprehensive mechanical performance of reinforcing bar comprehensively, improve production efficiency, reduce production cost, and reinforcing bar per ton can reduce by 40 yuan of production costs.2) during splitting rolling, segmentation lines evenly without obvious aberration, 3) prevent steam from producing in a large number, reduce the corrosion of environmental pollution to finish rolling region and factory building.4) wave reduced when wearing water bends, and flexibility reaches GB, improves lumber recovery, stabilizes production.5) device structure particular design, cooling effect is powerful, and annual production can increase about 200,000 tons.

Claims (7)

1. wear the total forming apparatus of water for one kind, comprise wear water conduit, wear hydrophone base, guide groove, guide groove base, water pipe, it is characterized in that: water pipe one (4) is communicated with integral with water pipe two (23) by several tube connectors (24), water pipe three (26) is also communicated with integral with water pipe four (27) by tube connector; Water pipe one (4) and water pipe two (23) and water pipe three (26) and water pipe four (27) are provided with from left to right guide groove one (3) is installed guide groove base two (22), wear hydrophone base one (6), several are worn hydrophone base two (9), wear hydrophone base three (21) and several guide groove bases one (16); Wear hydrophone base one (6) is provided with four wear water conduit one (5) and four just blowing and spraying mouth (8); Wear and hydrophone base two (9) is provided with four groups just blows and sprays mouth, often group is provided with two and is is just blowing and spraying mouth (8); Wear hydrophone base three (21) is provided with four groups of blowback nozzles and four wear water conduit two (14), often organize blowback nozzle and be provided with two blowback nozzles one (12) and a blowback nozzle two (13); Each guide groove base one (16) is provided with four guide grooves two (15).
2. one according to claim 1 wears the total forming apparatus of water, it is characterized in that: described water pipe one (4) and water pipe two (23) are provided with opposing steam flow cover one (1), water pipe three (26) and water pipe four (27) are provided with opposing steam flow cover two (2), and opposing steam flow cover one (1) and opposing steam flow cover two (2) are set side by side with several header tanks (19) below.
3. one according to claim 1 wears the total forming apparatus of water, it is characterized in that: described water pipe one (4), water pipe two (23) right-hand member are respectively arranged with two admitting pipe joints (25).
4. one according to claim 1 wears the total forming apparatus of water, it is characterized in that: described tube connector (24) is provided with and the arm (11) worn hydrophone base two (9) and be connected, and is is just blowing and spraying mouth (8) supply water to two.
5. one according to claim 1 wears the total forming apparatus of water, it is characterized in that: the upper guide groove two (15) arranged of two, left side guide groove base one (16) be arranged in parallel, the upper inside oblique setting of guide groove two (15) arranged of remaining guide groove base one (16).
6. one according to claim 3 wears the total forming apparatus of water, it is characterized in that: described admitting pipe joint (25) is provided with Pressure gauge and valve above.
7. one according to claim 1 wears the total forming apparatus of water, it is characterized in that: just blowing part and adopting ring-type cooling, make current through rebar surface, produce eddy current, and the vortex that outermost is produced is rotating towards the rebar surface of current process; Change the flow of water and pressure by increasing or reduce pad adjusting play, reach the object that control is cold, add three blowback water by just blowing of several, control reinforcing bar and wear temperature after water.
CN201410778767.7A 2014-12-17 2014-12-17 One wears the total forming apparatus of water Active CN104525587B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410778767.7A CN104525587B (en) 2014-12-17 2014-12-17 One wears the total forming apparatus of water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410778767.7A CN104525587B (en) 2014-12-17 2014-12-17 One wears the total forming apparatus of water

Publications (2)

Publication Number Publication Date
CN104525587A true CN104525587A (en) 2015-04-22
CN104525587B CN104525587B (en) 2016-11-30

Family

ID=52841318

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410778767.7A Active CN104525587B (en) 2014-12-17 2014-12-17 One wears the total forming apparatus of water

Country Status (1)

Country Link
CN (1) CN104525587B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105195535A (en) * 2015-10-22 2015-12-30 首钢水城钢铁(集团)有限责任公司 Cooling device for rolled high-speed wire rod and method thereof
CN110479775A (en) * 2019-08-21 2019-11-22 中天钢铁集团有限公司 A kind of process control method shortening high line water cooling section temperature difference

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5930415A (en) * 1982-08-10 1984-02-18 Kawasaki Steel Corp Removing method of cooling water
JPH11290934A (en) * 1998-04-10 1999-10-26 Nkk Corp Cooling device for rear surface of high temperature plate
CN101869919A (en) * 2009-04-27 2010-10-27 江苏东方成套设备制造有限公司 Turbulent pipe for high-speed passing water cooler
CN203664376U (en) * 2014-01-02 2014-06-25 杭州钢铁集团公司 Intensive pressure water cooling device
CN204320822U (en) * 2014-12-17 2015-05-13 江苏金冶冶金设备有限公司 Wear the total forming apparatus of water

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5930415A (en) * 1982-08-10 1984-02-18 Kawasaki Steel Corp Removing method of cooling water
JPH11290934A (en) * 1998-04-10 1999-10-26 Nkk Corp Cooling device for rear surface of high temperature plate
CN101869919A (en) * 2009-04-27 2010-10-27 江苏东方成套设备制造有限公司 Turbulent pipe for high-speed passing water cooler
CN203664376U (en) * 2014-01-02 2014-06-25 杭州钢铁集团公司 Intensive pressure water cooling device
CN204320822U (en) * 2014-12-17 2015-05-13 江苏金冶冶金设备有限公司 Wear the total forming apparatus of water

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105195535A (en) * 2015-10-22 2015-12-30 首钢水城钢铁(集团)有限责任公司 Cooling device for rolled high-speed wire rod and method thereof
CN105195535B (en) * 2015-10-22 2018-07-13 首钢水城钢铁(集团)有限责任公司 A kind of high-speed wire mill roll after cooling device and its method
CN110479775A (en) * 2019-08-21 2019-11-22 中天钢铁集团有限公司 A kind of process control method shortening high line water cooling section temperature difference

Also Published As

Publication number Publication date
CN104525587B (en) 2016-11-30

Similar Documents

Publication Publication Date Title
CN101890437B (en) Cooling system after rolling for hot-rolled strip steel production line
CN102430733B (en) Secondary cooling water amplitude-cutting control method of slab continuous casting machine
CN103894427A (en) Medium and heavy plate online multifunctional cooling device
CN102371283A (en) Method for improving ultra-fast cooling uniformity of medium and heavy plate after rolling
CN100430163C (en) Laminated flowing cooling water side-jetting sweeping system after high-strength low-alloy steel being rolled
CN102069097A (en) System and process for cooling after H-shaped steel is hot-rolled
CN204320822U (en) Wear the total forming apparatus of water
CN102274864B (en) Ultrafast cooling technology-based cooling-after-rolling system
CN103357677A (en) Cooling equipment for large bar material
CN104646438A (en) Water penetration cooling line of controlled rolling and controlled cooling equipment
CN104525587A (en) Through water assembly device
CN103302262B (en) Continuous casting plate blank surface quenching technology and used device
CN102284523A (en) Method for descaling billets by rough rolling
CN201744506U (en) Controllable hot-rolled strip steel laminar cooling device shaped like cooling panel
CN101507980B (en) Controlled cooling system of medium and heavy plate after rolling
CN203380195U (en) Cooling device for cast-rolling H-steel
CN107175264A (en) A kind of hot-rolled thick plank swings cooling means
CN204892574U (en) Equipment is descaled to hot rolling water under high pressure
CN103357675B (en) Hot rolled H-shaped cold bed aerosol cooling method and device thereof
CN204892573U (en) Mill coil simply descale spray gun
CN204725233U (en) Numerical control keyway planer Pneumatic cooler
CN204974604U (en) Double -ring rotation bull mould jetter
CN212168539U (en) Dust removing device of high-speed wire and bar rolling mill
CN206716986U (en) The quick cleaning tool of continuous casting two cold spray boom shower nozzle
CN202490829U (en) Fast clearing device for water vapor on surface of water-quenched hot rolled steel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant