CN104501348A - Ventilation system of substation equipment chamber - Google Patents

Ventilation system of substation equipment chamber Download PDF

Info

Publication number
CN104501348A
CN104501348A CN201410692673.8A CN201410692673A CN104501348A CN 104501348 A CN104501348 A CN 104501348A CN 201410692673 A CN201410692673 A CN 201410692673A CN 104501348 A CN104501348 A CN 104501348A
Authority
CN
China
Prior art keywords
air
described air
air intake
intake passage
ventilating system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410692673.8A
Other languages
Chinese (zh)
Inventor
曹智勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Beijing Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410692673.8A priority Critical patent/CN104501348A/en
Publication of CN104501348A publication Critical patent/CN104501348A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F7/00Ventilation
    • F24F7/04Ventilation with ducting systems, e.g. by double walls; with natural circulation
    • F24F7/06Ventilation with ducting systems, e.g. by double walls; with natural circulation with forced air circulation, e.g. by fan positioning of a ventilator in or against a conduit
    • F24F7/08Ventilation with ducting systems, e.g. by double walls; with natural circulation with forced air circulation, e.g. by fan positioning of a ventilator in or against a conduit with separate ducts for supplied and exhausted air with provisions for reversal of the input and output systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/28Arrangement or mounting of filters

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Ventilation (AREA)

Abstract

The invention provides a ventilation system of a substation equipment chamber. The ventilation system comprises an intake channel and an exhaust channel, an intake air fan and an air filter are arranged in the intake channel, and the intake air fan is located on the upstream of the air filter; an exhaust fan is arranged in the exhaust channel. By the arrangement, problems that normal operation of equipment is affected due to a great deal of dust and moisture in the equipment chamber of a substation and labor intensity is high for workers cleaning equipment in the prior art are solved.

Description

The ventilating system of substation equipment room
Technical field
The present invention relates to transformer station's room ventilation field, in particular to a kind of ventilating system of substation equipment room.
Background technology
In the canyon of transformer station, staff is all provided with blower fan on its body of wall, and the main application of blower fan is the pernicious gas of device for transferring indoor and the temperature reduced in canyon.The wind direction of the blower fan of existing canyon is to outdoor air draft by indoor, thus cause the air pressure in canyon to be negative pressure relative to the air pressure outside canyon, and in daily real work, the situation that blower fan uses as the ventilation equipment exhaled pernicious gases is less, generally, blower fan is the equipment used in substation equipment room as cooling system.
Ventilating system in the canyon of Generic Substation uses as cooling, and ventilating system when carrying out cooling work to canyon is temperature by thermometer checkout equipment indoor and controls the blower fan running of ventilating system.Blower fan is outdoor by the high temperature air device for transferring in canyon, thus makes the direct access arrangement of the air outside canyon indoor to realize ventilation cooling by the negative pressure effect in canyon.
The ventilating system of the canyon of Generic Substation operationally, canyon outer air access arrangement is indoor, but the dust contained in the air outside canyon, moisture are also all brought in canyon, these dusts and moisture can cause adverse influence to the normal operation of the normal work of the equipment of indoor and room, station.Every year, the dust alleviation work of the canyon room of transformer station all needs at substantial manpower and materials, and can only carry out when interruption maintenance when staff carries out cleaning works to the equipment of canyon, but the interval time of the cleaning works of adjacent twice is long, the dust that equipment deposits is more, and the labour intensity of staff is large.
Summary of the invention
Main purpose of the present invention is the ventilating system providing a kind of substation equipment room, to solve dust in the canyon of transformer station in prior art, moisture is more, affect the normal operation of equipment, and the problem that the labour intensity that cleans equipment of staff is large.
To achieve these goals, the invention provides a kind of ventilating system of substation equipment room, comprising: air intake passage, be provided with air inlet fan and air cleaner in air intake passage, air inlet fan is positioned at the upstream of air cleaner; Air exhaust passage, is provided with blowing machine in air exhaust passage.
Further, be also provided with filter protection net in air intake passage, filter protection net, air cleaner and air inlet fan set gradually along air intake direction.
Further, the position of air exhaust passage is higher than the position of air intake passage.
Further, air exhaust passage is positioned at the top of air intake passage.
Further, air intake passage and air exhaust passage are multiple.
Further, air intake passage and air exhaust passage are all opened on the same side body of wall of substation equipment room.
Further, air intake passage has the outdoor extension of the outside extending out to substation equipment room, in air cleaner and filter protection net extension all disposed in the outdoor.
Further, air intake passage has the indoor extension of the inside extending into canyon.
Further, indoor extension offers multiple air intake entrance.
Further, the air flow outlet of air intake passage is provided with shutter.
Apply technical scheme of the present invention, this ventilating system has air intake passage and air exhaust passage, air is transported in canyon from air intake passage, then send canyon from air exhaust passage, and, be provided with air cleaner in air intake passage, before air is sent in canyon, air first carries out dedusting, dehumidification treatments in air cleaner, eliminate in air with dust and drying process is carried out to air, make the air of feed arrangement indoor totally and dry.Apply technical scheme of the present invention, decrease the dust of deposition in canyon, reduce the wetness of canyon, thus ensure that the normal operation of the equipment in canyon, decrease the number of times of staff to the cleaning works of canyon simultaneously, decrease workload and the working strength of staff.
Accompanying drawing explanation
The Figure of description forming a application's part is used to provide a further understanding of the present invention, and schematic description and description of the present invention, for explaining the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 shows the structural representation of the embodiment according to ventilating system of the present invention;
Fig. 2 shows the schematic cross sectional views of the structure of the embodiment according to ventilating system of the present invention.
Wherein, above-mentioned accompanying drawing comprises the following drawings mark:
10, air intake passage; 20, air exhaust passage
11, air inlet fan; 12, air cleaner;
13, filter protection net; 21, blowing machine;
22, air exhaust passage filter screen; 100, canyon.
Detailed description of the invention
It should be noted that, when not conflicting, the embodiment in the application and the feature in embodiment can combine mutually.Below with reference to the accompanying drawings and describe the present invention in detail in conjunction with the embodiments.
As depicted in figs. 1 and 2, according to embodiments of the invention, provide a kind of ventilating system of substation equipment room 100.This ventilating system comprises air intake passage 10 and air exhaust passage 20.Air intake passage 10 is provided with air inlet fan 11 and air cleaner 12, air inlet fan 11 is positioned at the upstream of air cleaner 12, be provided with blowing machine 21 in air exhaust passage 20, and be provided with air exhaust passage filter screen 22 in air exhaust passage 20, to prevent in the foreign material access arrangement room 100 outside canyon 100.
This ventilating system has air intake passage and air exhaust passage, air is transported in canyon from air intake passage, then send canyon from air exhaust passage, and, be provided with air cleaner in air intake passage, before air is sent in canyon, air first carries out dedusting, dehumidification treatments in air cleaner, eliminate in air with dust and drying process is carried out to air, make the air of feed arrangement indoor totally and dry.The technical scheme of application the present embodiment, decrease the dust of deposition in canyon, reduce the wetness of canyon, thus ensure that the normal operation of the equipment in canyon, decrease the number of times of staff to the cleaning works of canyon simultaneously, decrease workload and the working strength of staff.
Refer again to as shown in Figure 2, in the present embodiment, be also provided with filter protection net 13 in air intake passage 10, filter protection net 13, air cleaner 12 set gradually along air intake direction with air inlet fan 11.Like this, when outdoor air is led to indoor by unlatching air inlet fan 11, the larger foreign material of the such as fallen leaves and so in air can be isolated in the outside of canyon 100 by filter protection net 13, then, air is by air cleaner 12, and air filters in air cleaner 12, thus the dust contained in air and Mist filtration is fallen, the dust content of the air in final access arrangement room 100 is reduced, and the steam contained in air reduce.
Particularly, the position of air exhaust passage 20 is higher than the position of air intake passage 10.Preferably, air exhaust passage 20 is positioned at the top of air intake passage 10.Like this, the air-flow in access arrangement room 100 upwards can flow from the below of canyon 100, and air-flow purges the equipment in canyon 100, to reach the effect of lowering the temperature to equipment.
In an embodiment of the present invention, in order to meet the good result of the equipment in canyon 100 being carried out to air cooling, air intake passage 10 and air exhaust passage 20 are multiple, can improve the air mass flow in canyon 100 like this, and improve the speed of air flowing and the frequency of air exchange.
Preferably, air intake passage 10 and air exhaust passage 20 are all opened on the same side body of wall of substation equipment room 100, to facilitate the arrangement of the pipeline of air intake passage 10 and air exhaust passage 20.Wind is got at the shady and cool ventilation place that the air inlet pipeline of ventilating system is built outdoor, then air is after filtration after protection network 13 and air cleaner 12, again by air inlet fan 11 feed arrangement room 100, air circulates in canyon 100, thus reaches the object of the equipment in cooling device room 100.
Particularly, air intake passage 10 has the outdoor extension of the outside extending out to substation equipment room 100, and air cleaner 12 is with in filter protection net 13 extension all disposed in the outdoor.Facilitate staff air cleaner 12 and filter protection net 13 being arranged in the air intake passage 10 on the wall of canyon 100 like this.
In order to make the scope of the air covering blown in canyon 100 larger, thus air intake passage has the indoor extension of the inside extending into canyon 100, and indoor extension offers multiple air intake entrance.
And the air flow outlet of air intake passage 10 is provided with shutter.Shutter had both made canyon 100 more attractive in appearance, can also have the effect of shutoff to the passway of air intake passage 10.
As can be seen from the above description, the above embodiments of the present invention achieve following technique effect:
Apply technical scheme of the present invention, decrease the dust of deposition in canyon 100, reduce the wetness of canyon 100, thus ensure that the normal operation of the equipment in canyon 100, decrease the number of times of staff to the cleaning works of canyon 100 simultaneously, decrease workload and the working strength of staff.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (10)

1. a ventilating system for substation equipment room, is characterized in that, comprising:
Air intake passage (10), be provided with air inlet fan (11) and air cleaner (12) in described air intake passage (10), described air inlet fan (11) is positioned at the upstream of described air cleaner (12);
Air exhaust passage (20), is provided with blowing machine (21) in described air exhaust passage (20).
2. ventilating system according to claim 1, it is characterized in that, also be provided with filter protection net (13) in described air intake passage (10), described filter protection net (13), described air cleaner (12) set gradually along air intake direction with described air inlet fan (11).
3. ventilating system according to claim 1, is characterized in that, the position of described air exhaust passage (20) is higher than the position of described air intake passage (10).
4. ventilating system according to claim 3, is characterized in that, described air exhaust passage (20) is positioned at the top of described air intake passage (10).
5. ventilating system according to claim 4, is characterized in that, described air intake passage (10) and described air exhaust passage (20) are multiple.
6. ventilating system according to claim 5, is characterized in that, described air intake passage (10) and described air exhaust passage (20) are all opened on the same side body of wall of described substation equipment room.
7. ventilating system according to claim 2, it is characterized in that, described air intake passage (10) has the outdoor extension of the outside extending out to described substation equipment room, and described air cleaner (12) and described filter protection net (13) are all arranged in described outdoor extension.
8. ventilating system according to claim 7, is characterized in that, described air intake passage has the indoor extension of the inside extending into described canyon.
9. ventilating system according to claim 8, is characterized in that, described indoor extension offers multiple air intake entrance.
10. ventilating system according to any one of claim 1 to 9, is characterized in that, the air flow outlet of described air intake passage (10) is provided with shutter.
CN201410692673.8A 2014-11-26 2014-11-26 Ventilation system of substation equipment chamber Pending CN104501348A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410692673.8A CN104501348A (en) 2014-11-26 2014-11-26 Ventilation system of substation equipment chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410692673.8A CN104501348A (en) 2014-11-26 2014-11-26 Ventilation system of substation equipment chamber

Publications (1)

Publication Number Publication Date
CN104501348A true CN104501348A (en) 2015-04-08

Family

ID=52942775

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410692673.8A Pending CN104501348A (en) 2014-11-26 2014-11-26 Ventilation system of substation equipment chamber

Country Status (1)

Country Link
CN (1) CN104501348A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105098629A (en) * 2015-08-27 2015-11-25 国家电网公司 Ventilation and dustproof device applied to transformer substation
CN106703652A (en) * 2016-12-26 2017-05-24 宁波顺舸贸易有限公司 Dampness-proof door window
CN107063623A (en) * 2017-05-04 2017-08-18 中国航发沈阳发动机研究所 A kind of gas handling system of aerodynamic noise test
CN111013367A (en) * 2019-12-31 2020-04-17 国网河北省电力有限公司 Inside air purification equipment of power supply station
CN113885625A (en) * 2021-11-08 2022-01-04 国网山东省电力公司乳山市供电公司 Ventilation control system of unattended substation

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030060120A (en) * 2002-01-07 2003-07-16 (주) 스카이시스템 the inside change of air system of building
CN2888333Y (en) * 2006-04-25 2007-04-11 闫成林 Intelligent temperature control power saving device for communication apparatus room
CN201095874Y (en) * 2007-08-17 2008-08-06 梁照阳 Energy-saving environment-friendly healthy comfortable house
CN201199080Y (en) * 2008-03-26 2009-02-25 李向恩 Communication base station aeration cooling system
CN201327143Y (en) * 2008-10-08 2009-10-14 蒲忠义 Air exchange system for unmanned communication room
CN201589364U (en) * 2009-12-27 2010-09-22 广东美的电器股份有限公司 Aeration-cooling device in constant heat source room
CN202171301U (en) * 2011-06-15 2012-03-21 上海聚舍机械制造有限公司 Fresh air energy-saving system device in machine room
CN202452633U (en) * 2011-12-29 2012-09-26 深圳市海生机房技术有限公司 Intelligent ventilation system
CN202494191U (en) * 2012-03-29 2012-10-17 四川科伦药业股份有限公司 Air circulating system
CN102829517A (en) * 2011-06-14 2012-12-19 上海聚舍机械制造有限公司 Fresh air energy-saving system for small communication machine room
CN203928269U (en) * 2014-06-26 2014-11-05 廊坊洁风岭新风技术有限公司 Green wind system
CN204254818U (en) * 2014-11-26 2015-04-08 国家电网公司 The ventilating system of substation equipment room

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030060120A (en) * 2002-01-07 2003-07-16 (주) 스카이시스템 the inside change of air system of building
KR100434654B1 (en) * 2002-01-07 2004-06-07 (주) 스카이시스템 the inside change of air system of building
CN2888333Y (en) * 2006-04-25 2007-04-11 闫成林 Intelligent temperature control power saving device for communication apparatus room
CN201095874Y (en) * 2007-08-17 2008-08-06 梁照阳 Energy-saving environment-friendly healthy comfortable house
CN201199080Y (en) * 2008-03-26 2009-02-25 李向恩 Communication base station aeration cooling system
CN201327143Y (en) * 2008-10-08 2009-10-14 蒲忠义 Air exchange system for unmanned communication room
CN201589364U (en) * 2009-12-27 2010-09-22 广东美的电器股份有限公司 Aeration-cooling device in constant heat source room
CN102829517A (en) * 2011-06-14 2012-12-19 上海聚舍机械制造有限公司 Fresh air energy-saving system for small communication machine room
CN202171301U (en) * 2011-06-15 2012-03-21 上海聚舍机械制造有限公司 Fresh air energy-saving system device in machine room
CN202452633U (en) * 2011-12-29 2012-09-26 深圳市海生机房技术有限公司 Intelligent ventilation system
CN202494191U (en) * 2012-03-29 2012-10-17 四川科伦药业股份有限公司 Air circulating system
CN203928269U (en) * 2014-06-26 2014-11-05 廊坊洁风岭新风技术有限公司 Green wind system
CN204254818U (en) * 2014-11-26 2015-04-08 国家电网公司 The ventilating system of substation equipment room

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
黎连业: "《机房工程设计施工与管理维护技术》", 30 June 2013 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105098629A (en) * 2015-08-27 2015-11-25 国家电网公司 Ventilation and dustproof device applied to transformer substation
CN106703652A (en) * 2016-12-26 2017-05-24 宁波顺舸贸易有限公司 Dampness-proof door window
CN107063623A (en) * 2017-05-04 2017-08-18 中国航发沈阳发动机研究所 A kind of gas handling system of aerodynamic noise test
CN111013367A (en) * 2019-12-31 2020-04-17 国网河北省电力有限公司 Inside air purification equipment of power supply station
CN113885625A (en) * 2021-11-08 2022-01-04 国网山东省电力公司乳山市供电公司 Ventilation control system of unattended substation

Similar Documents

Publication Publication Date Title
CN104501348A (en) Ventilation system of substation equipment chamber
CN106895521A (en) Constant temperature, constant humidity, permanent net quiet indoor air stream
CN204254818U (en) The ventilating system of substation equipment room
CN204503733U (en) Supplementary air type vent cabinet
CN107350972A (en) Sanding Room with recovery function
CN106016526A (en) Wall-mounted fresh air purifier
CN107883479A (en) With fresh air except the air-conditioning system of the independent temperature-humidity control of haze self-cleaning function
CN201787694U (en) Air supply system for press room
CN208108408U (en) A kind of industrial premises air pollutants entirety controlling device
CN206905185U (en) A kind of building intellectualization central ventilation system
CN207214359U (en) A kind of wall-mounted fresh air purifying all-in-one
CN206281148U (en) A kind of novel air air curtain
CN205965331U (en) VOC preparation room filters wind channel structure
CN205372766U (en) Purify PM2. 5 heat recovery fresh air ventilator
CN205897358U (en) Dust removal air conditioning equipment
CN105546706B (en) Basement flows back to wind and dehumidification system during reverse construction
CN208075172U (en) A kind of household dehumidifier
CN208779597U (en) Air duct cleaning control system
CN208635127U (en) A kind of forming machine air draft white cigarette cancellation element
CN208739818U (en) A kind of rabbit home heat recovering ventilation apparatus
CN206786975U (en) A kind of wall-mounted new blower fan
CN208365748U (en) A kind of haze air curtain device
CN206981084U (en) A kind of finish-baking room for automobile air-supply arrangement
CN206847000U (en) A kind of VMC of outdoor host computer type
CN207479122U (en) Dust-free purification room is into door

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150408