CN104500056B - A kind of low pressure reservoir coal bed gas well DST well-logging methods - Google Patents

A kind of low pressure reservoir coal bed gas well DST well-logging methods Download PDF

Info

Publication number
CN104500056B
CN104500056B CN201410663654.2A CN201410663654A CN104500056B CN 104500056 B CN104500056 B CN 104500056B CN 201410663654 A CN201410663654 A CN 201410663654A CN 104500056 B CN104500056 B CN 104500056B
Authority
CN
China
Prior art keywords
well
valve
packer
flowing
shut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410663654.2A
Other languages
Chinese (zh)
Other versions
CN104500056A (en
Inventor
曹运兴
石玢
张大庆
曹永恒
周丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN ARK NEW ENERGY Co Ltd
Original Assignee
HENAN ARK NEW ENERGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN ARK NEW ENERGY Co Ltd filed Critical HENAN ARK NEW ENERGY Co Ltd
Priority to CN201410663654.2A priority Critical patent/CN104500056B/en
Publication of CN104500056A publication Critical patent/CN104500056A/en
Application granted granted Critical
Publication of CN104500056B publication Critical patent/CN104500056B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • E21B49/08Obtaining fluid samples or testing fluids, in boreholes or wells
    • E21B49/087Well testing, e.g. testing for reservoir productivity or formation parameters
    • E21B49/088Well testing, e.g. testing for reservoir productivity or formation parameters combined with sampling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure

Abstract

A kind of low pressure reservoir coal bed gas well DST well-logging methods, which is characterized in that including steps are as follows:Logical, well-flushing, according to the requirement through wash well of regulation;It measures tubing string and calculates packer set position;Lower tubular column;Packer setting;One opens flowing;One closes recovery;Two open flowing;Two close recovery;Removing seal for packer;Play test string;Sampling;Electronic pressure gauge data readback stores after the assay was approved.This method can it is accurate, comprehensively, quickly obtain coal seam reservoirs parameter, surveyed parameter is closer to coal seam reservoirs self character.

Description

A kind of low pressure reservoir coal bed gas well DST well-logging methods
Technical field
The invention belongs to a kind of reservoir coal bed gas well DST well-logging methods, especially disclose a kind of low pressure reservoir coal bed gas Well DST well-logging methods.
Background technology
Coal seam reservoirs parameter testing is the key technology of cbm development, and Chinese coal seam reservoirs largely have the characteristics that low pressure, It is more serious to the pollution of coal seam reservoirs in drilling process.Traditional coal seam reservoirs parameter testing technology all based on injection, injection rate is small, Testing time is long, and contaminated zone may be not passed through by injecting fluid during the test so that get parms distortion;Coal seam is physical property Sensitive reservoir by essence changes coal seam reservoirs property for low pressure, ultralow pressure reservoir injection fluid, can not be obtained by test Take reliable reservoir parameter.
Invention content
The purpose of the present invention is to provide a kind of low pressure reservoir coal bed gas well DST well-logging methods, this method can be accurate, complete Face quickly obtains coal seam reservoirs parameter, and surveyed parameter is closer to coal seam reservoirs self character.
In order to achieve the above objectives, the present invention adopts the following technical scheme that:A kind of well testing sides low pressure reservoir coal bed gas well DST Method, which is characterized in that including steps are as follows:Logical, well-flushing, according to the requirement through wash well of regulation;It measures tubing string and calculates packer Setting position;Lower tubular column;Pressure gauge enrolls data programming, after by check problem, the pressure gauge support that is fitted into test string Cylinder, the program that electronics shut-in valve opens two passes according to two are set, and ground experiment is primary, it is ensured that shut-in valve works normally;Electronics closes Well valve is gone into the well with closed state, and being first switched on from going into the well shut-in valve will there are time enough to complete lower tubular column and packer It sets;Packer setting;According to the model of packer and principle is set, selection suitably sets parameter, implements packer setting; Annulus liquid level is observed, leakage situation is checked, such as finds leakage, need to ascertain the reason and set again;One opens flowing;Until electronics closing well The first time well opening time of valve setting, electronics shut-in valve automatically opens, due to inside tubing string at this time and atmosphere, coal seam reservoirs stream Body automatically flows under the action of itself in tubing string, and certain drop dirt de-plugging is played the role of in this time flowing, and flowing time is set as 5min;One closes recovery;After one opens flowing, electronics shut-in valve is automatically closed, and coal seam reservoirs pressure starts slowly to restore, this Process setting is 2-3h;Two open flowing;One, which closes recovery, terminates, and electronics shut-in valve automatically opens again, starts second and flows, and two It is 20-30min to open flowing time;Two close recovery;After two open flowing, electronics shut-in valve is closed, and it is extensive to start second of pressure Multiple, this time pressure recovery data will be used for data interpretation, this process is set as continuing 18-20h, it may be necessary to be appropriately extended; Removing seal for packer;After two close pressure recovery, electronics shut-in valve implements removing seal for packer still in closed state;Play test Tubing string;Height when seeing liquid level in tubing string is observed when playing test string, to verify water yield;Sampling;Tubing string is whole When taking-up, the liquid taken in tubing string is packed into specified container, is sent into lab analysis chemical examination;Electron pressure counts back It puts, store after the assay was approved.
Beneficial effects of the present invention are:
One open flowing during can to drilling process in coal seam reservoirs pollution play the role of certain de-plugging;It can survey The water yield for obtaining coal seam reservoirs, reference is provided for subsequent mining;Coal seam reservoirs fluid sample can be obtained, and carries out analytical test, Reference is provided for coal seam reservoirs fracturing reform;Testing time is short, general 24 hours;It is not injected into fluid, avoids exotic pair The interference of coal seam reservoirs characteristic, characteristic of the test data closer to coal seam reservoirs itself.
Description of the drawings
Fig. 1 is the test string mounting structure schematic diagram of the present invention.
Specific implementation mode
Below in conjunction with embodiment, next the present invention will be described in detail.
A kind of low pressure reservoir coal bed gas well DST well-logging methods, which is characterized in that including steps are as follows:
(a) lead to, well-flushing, according to the requirement through wash well of regulation;
(b) it measures tubing string and calculates packer set position;
(c) lower tubular column;
Pressure gauge enrolls data programming, and after by check problem, the manometer being fitted into test string, electronics closes The program that well valve opens two passes according to two is set, and ground experiment is primary, it is ensured that shut-in valve works normally;Electronics shut-in valve is to close State is gone into the well, and being first switched on from going into the well shut-in valve will there are time enough to complete lower tubular column and packer setting;
(e) packer setting
According to the model of packer and principle is set, selection suitably sets parameter, implements packer setting;Observe annular space Liquid level checks leakage situation, such as finds leakage, need to ascertain the reason and set again;
(f) one flowing is opened
Until the first time well opening time of electronics shut-in valve setting, electronics shut-in valve automatically opens, due in tubing string at this time Portion and atmosphere, coal seam reservoirs fluid automatically flow under the action of itself in tubing string, and certain drop dirt solution is played in this time flowing Stifled effect, flowing time are set as 5min;
(g) one recovery is closed
After one opens flowing, electronics shut-in valve is automatically closed, and coal seam reservoirs pressure starts slowly to restore, this process is set It is set to 2-3h;
(h) two flowing is opened
One pass restores to terminate, and electronics shut-in valve automatically opens again, starts second and flows, and two open flowing time as 20- 30min;
(i) two recovery is closed
After two open flowing, electronics shut-in valve is closed, and starts second of pressure recovery, and this time pressure recovery data are used In data interpretation, this process is set as continuing 18-20h, it may be necessary to be appropriately extended;
(j) removing seal for packer
After two close pressure recovery, electronics shut-in valve implements removing seal for packer still in closed state;
(l) test string is played
Height when seeing liquid level in tubing string is observed when playing test string, to verify water yield;
(m) it samples
When tubing string all takes out, the liquid taken in tubing string is packed into specified container, is sent into lab analysis chemical examination;
(n) electronic pressure gauge data readback, store after the assay was approved.

Claims (1)

1. a kind of low pressure reservoir coal bed gas well DST well-logging methods, which is characterized in that including steps are as follows:
(a) lead to, well-flushing, according to the requirement through wash well of regulation;
(b) it measures tubing string and calculates packer set position;
(c) lower tubular column;
Pressure gauge enrolls data programming, after by check problem, the manometer being fitted into test string, and electronics shut-in valve The program that two passes are opened according to two is set, and ground experiment is primary, it is ensured that shut-in valve works normally;Electronics shut-in valve is with closed state It goes into the well, being first switched on from going into the well shut-in valve will there are time enough to complete lower tubular column and packer setting;
(e) packer setting
According to the model of packer and principle is set, selection suitably sets parameter, implements packer setting;Observe annular space liquid Face checks leakage situation, such as finds leakage, need to ascertain the reason and set again;
(f) one flowing is opened
Until the first time well opening time of electronics shut-in valve setting, electronics shut-in valve automatically opens, due to inside tubing string at this time and Atmosphere, coal seam reservoirs fluid automatically flow under the action of itself in tubing string, and this time flowing is played certain drop dirt de-plugging and made With flowing time is set as 5min;
(g) one recovery is closed
After one opens flowing, electronics shut-in valve is automatically closed, and coal seam reservoirs pressure starts slowly to restore, this process setting is 2-3h;
(h) two flowing is opened
One pass restores to terminate, and electronics shut-in valve automatically opens again, starts second and flows, and two open flowing time as 20- 30min;
(i) two recovery is closed
After two open flowing, electronics shut-in valve is closed, and starts second of pressure recovery, and this time pressure recovery data will be used to provide Material explains that this process is set as continuing 18-20h;
(j) removing seal for packer
After two close pressure recovery, electronics shut-in valve implements removing seal for packer still in closed state;
(1) test string is played
Height when seeing liquid level in tubing string is observed when playing test string, to verify water yield;
(m) it samples
When tubing string all takes out, the liquid taken in tubing string is packed into specified container, is sent into lab analysis chemical examination;
(n) electronic pressure gauge data readback, store after the assay was approved.
CN201410663654.2A 2014-11-18 2014-11-18 A kind of low pressure reservoir coal bed gas well DST well-logging methods Active CN104500056B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410663654.2A CN104500056B (en) 2014-11-18 2014-11-18 A kind of low pressure reservoir coal bed gas well DST well-logging methods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410663654.2A CN104500056B (en) 2014-11-18 2014-11-18 A kind of low pressure reservoir coal bed gas well DST well-logging methods

Publications (2)

Publication Number Publication Date
CN104500056A CN104500056A (en) 2015-04-08
CN104500056B true CN104500056B (en) 2018-11-06

Family

ID=52941495

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410663654.2A Active CN104500056B (en) 2014-11-18 2014-11-18 A kind of low pressure reservoir coal bed gas well DST well-logging methods

Country Status (1)

Country Link
CN (1) CN104500056B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106812521A (en) * 2015-11-30 2017-06-09 中国石油天然气股份有限公司 Formation testing device and formation testing tubing string

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493788A (en) * 2011-12-15 2012-06-13 中国石油天然气股份有限公司 Method of gas recovery by water drainage for high-coal-rank coal-bed methane well
CN102720473A (en) * 2011-03-31 2012-10-10 中联煤层气有限责任公司 Method for exploiting coal bed gas
CN103382834A (en) * 2013-07-25 2013-11-06 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Separated-layer pressure measurement technology by adopting intelligent switches
CN103590813A (en) * 2013-10-30 2014-02-19 中国石油天然气股份有限公司 Method, tubular column and device for testing dynamic reserves of two-layer commingled producing gas well
CN203570308U (en) * 2013-10-11 2014-04-30 中煤科工集团西安研究院有限公司 Formation testing system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB201012176D0 (en) * 2010-07-20 2010-09-01 Metrol Tech Ltd Well

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720473A (en) * 2011-03-31 2012-10-10 中联煤层气有限责任公司 Method for exploiting coal bed gas
CN102493788A (en) * 2011-12-15 2012-06-13 中国石油天然气股份有限公司 Method of gas recovery by water drainage for high-coal-rank coal-bed methane well
CN103382834A (en) * 2013-07-25 2013-11-06 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Separated-layer pressure measurement technology by adopting intelligent switches
CN203570308U (en) * 2013-10-11 2014-04-30 中煤科工集团西安研究院有限公司 Formation testing system
CN103590813A (en) * 2013-10-30 2014-02-19 中国石油天然气股份有限公司 Method, tubular column and device for testing dynamic reserves of two-layer commingled producing gas well

Also Published As

Publication number Publication date
CN104500056A (en) 2015-04-08

Similar Documents

Publication Publication Date Title
US8418546B2 (en) In-situ fluid compatibility testing using a wireline formation tester
WO2018184397A1 (en) Integrated evaluation, testing and simulation apparatus for wellbore sand-control blocking and unblocking, and method
US9816376B2 (en) In situ evaluation of unconventional natural gas reservoirs
US11506051B2 (en) Contamination prediction of downhole pumpout and sampling
CN105547958B (en) A kind of spontaneous imbibition measurement method for shale
WO2021081202A1 (en) Core sampling and analysis using a sealed pressurized vessel
CN106677772B (en) A kind of simulation experiment method for coal bed gas well mining
CN106401577A (en) Visual testing device and method for simulating bottom water coning of bottom water gas reservoir gas well
CN108287123A (en) A kind of measurement CO2The visualization device and method of solid-carrying performance under the conditions of fracturing fluid high pressure dynamic filtration
Ma et al. Simulation and interpretation of the pressure response for formation testing while drilling
CN105021513A (en) Full-size sand-prevention high-temperature and high-pressure steam simulation system
CN104500056B (en) A kind of low pressure reservoir coal bed gas well DST well-logging methods
CN104018824A (en) Zonation testing method used for downhole intelligent well shutdown
Pan et al. CO2 injectivity in a multi-lateral horizontal well in a low permeability coal seam: results from a field trial
CN103277093B (en) A kind of method for testing strata and formation tester
CN204831980U (en) Full -scale high temperature high pressure steam sand control analog system that takes in and send out
Azari et al. Well-testing challenges in unconventional and tight-gas-formation reservoirs
CN108166974A (en) The test made with perforation connection samples integrated device
CN109594980B (en) Visual experiment device for simulating dynamic sand blocking law of gravel layer
CN104420836A (en) Water finding tubular column of horizontal well section seat sealing wellhead flow method and water finding method thereof
CN105372405B (en) Reservoir gas supply capacity detecting system and application method
CN103806901A (en) Oil well downhole rapid test system and test method
US11768138B2 (en) Methods to use chemo-resistive sensors for wellbore production
CN205532579U (en) Experimental device for it forms to be used for monitoring artificial gas cap
CN209231171U (en) Engineering geology reconnaissance water-pressure test automatic checkout device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant