CN104499653A - Automatic tool anchor plate - Google Patents

Automatic tool anchor plate Download PDF

Info

Publication number
CN104499653A
CN104499653A CN201410718188.3A CN201410718188A CN104499653A CN 104499653 A CN104499653 A CN 104499653A CN 201410718188 A CN201410718188 A CN 201410718188A CN 104499653 A CN104499653 A CN 104499653A
Authority
CN
China
Prior art keywords
tool anchor
anchor plate
anchor slab
baffle plate
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410718188.3A
Other languages
Chinese (zh)
Inventor
吕少华
黄弘生
黄新宇
李兰芬
黄湛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIUZHOU QIAOSHA ENGINEERING TUBING Co Ltd
Original Assignee
LIUZHOU QIAOSHA ENGINEERING TUBING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIUZHOU QIAOSHA ENGINEERING TUBING Co Ltd filed Critical LIUZHOU QIAOSHA ENGINEERING TUBING Co Ltd
Priority to CN201410718188.3A priority Critical patent/CN104499653A/en
Publication of CN104499653A publication Critical patent/CN104499653A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to the field of prestress devices, and in particular relates to an automatic tool anchor plate which comprises a tool anchor plate (1). The automatic tool anchor plate further comprises a baffle (3), pins (2) used for connecting the tool anchor plate (1) with the baffle (3), fastening bolts (4) used for fastening the pins (2) and the baffle (3), and springs (5) sleeving the outer sides of the fastening bolts (4). The tool anchor plate further comprises a through hole, and the baffle (3) is provided with a second through hole in a position corresponding to the through hole in the tool anchor plate (1). By using the technical scheme, the tool anchor plate and a work clamping piece can be mounted at one time and dismounted at one time; the mounting time of a prestress device is greatly saved; the automatic tool anchor plate is has the timesaving and laborsaving effects and is convenient to use; and the structure is simple and practical.

Description

A kind of automated tool anchor slab
Technical field
The present invention relates to prestressing apparatus field, particularly relate to a kind of automated tool anchor slab.
Background technology
Traditional instrument anchor slab and work clip sheet separate before the mounting, when there being need of work integral installation, just coordinate wire rope to be assembled into together them.Such design substantially prolongs this device set-up time on-site.Reduce operating efficiency.
Summary of the invention
For solving the problems of the technologies described above, the present invention proposes following technical scheme: a kind of automated tool anchor slab, comprise instrument anchor slab, described automated tool anchor slab also comprises baffle plate, connects the pin of described instrument anchor slab and described baffle plate, the fastening bolt of fastening described pin and described baffle plate, be enclosed within spring outside described fastening bolt, described instrument anchor slab also comprises through hole, and on the corresponding instrument anchor slab of described baffle plate, the position of through hole is also provided with the second through hole.
Further technical scheme of the present invention is: described automated tool anchor slab also comprises handle, and described handle connects described baffle plate.
The invention has the beneficial effects as follows: this technical scheme makes instrument anchor slab and the disposable installation of work clip sheet, also disposablely can dismantle, greatly saves the set-up time of prestressing apparatus, time saving and energy saving, easy to use, simple and practical.
Accompanying drawing explanation
Fig. 1 is the schematic diagram that the embodiment of the present invention provides.
Detailed description of the invention
Embodiments of the invention are a kind of automated tool anchor slab as shown in Figure 1, comprise instrument anchor slab 1, described automated tool anchor slab also comprises baffle plate 3, connects the pin 2 of described instrument anchor slab 1 and described baffle plate 3, the fastening bolt 4 of fastening described pin 2 and described baffle plate 3, be enclosed within spring 5 outside described fastening bolt 4, described instrument anchor slab also comprises through hole, and on the corresponding instrument anchor slab 1 of described baffle plate 3, the position of through hole is also provided with the second through hole.
Described automated tool anchor slab also comprises handle 6, and described handle 6 connects described baffle plate 3.
Installation process of the present invention: the precalculated position first work clip sheet being loaded into described instrument anchor slab 1, then described pin 2 is fixed on described instrument anchor slab 1, subsequently described baffle plate 3 is fastened on described pin 2, is tightened on described pin 2 after finally described fastening bolt 4 being put described spring 5.
When this automated tool anchor slab used by needs, only need to utilize described handle 6 to strengthen distance between described baffle plate 3 and described instrument anchor slab 1, then wire rope inserts and specifies cavity.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, all any amendments done within the spirit and principles in the present invention, equivalent replacement and improvement etc., all should be included within protection scope of the present invention.

Claims (2)

1. an automated tool anchor slab, comprise instrument anchor slab (1), it is characterized in that: the spring (5) that described automated tool anchor slab also comprises baffle plate (3), connects the fastening bolt (4) of the pin (2) of described instrument anchor slab (1) and described baffle plate (3), fastening described pin (2) and described baffle plate (3), is enclosed within described fastening bolt (4) outside, described instrument anchor slab also comprises through hole, and the position of the upper through hole of the corresponding instrument anchor slab (1) of described baffle plate (3) is also provided with the second through hole.
2. a kind of automated tool anchor slab according to claim 1, it is characterized in that: described automated tool anchor slab also comprises handle (6), described handle (6) connects described baffle plate (3).
CN201410718188.3A 2014-12-01 2014-12-01 Automatic tool anchor plate Pending CN104499653A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410718188.3A CN104499653A (en) 2014-12-01 2014-12-01 Automatic tool anchor plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410718188.3A CN104499653A (en) 2014-12-01 2014-12-01 Automatic tool anchor plate

Publications (1)

Publication Number Publication Date
CN104499653A true CN104499653A (en) 2015-04-08

Family

ID=52941094

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410718188.3A Pending CN104499653A (en) 2014-12-01 2014-12-01 Automatic tool anchor plate

Country Status (1)

Country Link
CN (1) CN104499653A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109083331A (en) * 2018-09-28 2018-12-25 朱建玉 Concrete construction ready-package prestressed anchor
CN111236653A (en) * 2020-04-02 2020-06-05 吕路 Construction engineering prestressed concrete construction equipment
CN112211348A (en) * 2020-09-10 2021-01-12 湖南联智智能科技有限公司 Steel strand wires smooth silk protector
CN113445427A (en) * 2021-07-08 2021-09-28 北京工业大学 Prestressed steel strand temporary stay cable integral anchor unloading device and construction process thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6490315A (en) * 1987-06-19 1989-04-06 Shimizu Construction Co Ltd Earth anchor
JPH07197600A (en) * 1993-12-28 1995-08-01 Kajima Corp Steel frame column base anchoring structure
JPH08260620A (en) * 1995-03-27 1996-10-08 Kurosawa Kensetsu Kk Ground anchor heat fixture structure
CN102297190A (en) * 2010-06-22 2011-12-28 孙正龙 Pressure spring type compound die bolt
CN203392788U (en) * 2013-07-01 2014-01-15 柳州黔桥工程材料有限公司 Intelligent jack with automatic tool anchor

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6490315A (en) * 1987-06-19 1989-04-06 Shimizu Construction Co Ltd Earth anchor
JPH07197600A (en) * 1993-12-28 1995-08-01 Kajima Corp Steel frame column base anchoring structure
JP2859117B2 (en) * 1993-12-28 1999-02-17 鹿島建設株式会社 Steel column base anchoring structure
JPH08260620A (en) * 1995-03-27 1996-10-08 Kurosawa Kensetsu Kk Ground anchor heat fixture structure
CN102297190A (en) * 2010-06-22 2011-12-28 孙正龙 Pressure spring type compound die bolt
CN203392788U (en) * 2013-07-01 2014-01-15 柳州黔桥工程材料有限公司 Intelligent jack with automatic tool anchor

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109083331A (en) * 2018-09-28 2018-12-25 朱建玉 Concrete construction ready-package prestressed anchor
CN109083331B (en) * 2018-09-28 2020-09-01 柳州盛泰预应力技术有限公司 Fast-assembling prestressed anchorage for concrete building
CN111236653A (en) * 2020-04-02 2020-06-05 吕路 Construction engineering prestressed concrete construction equipment
CN111236653B (en) * 2020-04-02 2021-09-17 吕路 Construction engineering prestressed concrete construction equipment
CN112211348A (en) * 2020-09-10 2021-01-12 湖南联智智能科技有限公司 Steel strand wires smooth silk protector
CN113445427A (en) * 2021-07-08 2021-09-28 北京工业大学 Prestressed steel strand temporary stay cable integral anchor unloading device and construction process thereof

Similar Documents

Publication Publication Date Title
CN203245813U (en) Bush dismantling tool
CN104499653A (en) Automatic tool anchor plate
CN102452006A (en) Clamp for machining gearbox
CN103358150A (en) Connecting rod big end hole fine boring fixture
CN201728509U (en) Storage battery tray welded installing and fixing device
CN103831645B (en) A kind of mark hole drilling jig for plunger member
CN105382575A (en) Cutting clamp for cable bridge
CN201856108U (en) Fixture for cam
CN202388199U (en) Fixture structure for mounting clamp
CN201856186U (en) Assembly fixture
CN205714726U (en) Easy-to-mount drilling pump clip
CN103418896A (en) Tool structure for positioning iron core
CN201889645U (en) Processing fixture for handle hole of face cover of volute
CN105364781A (en) Spreader
CN203817826U (en) Special part processing equipment
CN203459847U (en) Carling assembly fixture of pumper subframe
CN204412882U (en) Standard punching model
CN202498390U (en) Pneumatic fixture for lamp holders
CN204094686U (en) A kind of pump housing clamping device of brake pump piston cylinder parts automatic assembling machine
CN205111639U (en) Take air jig of work piece stocker
CN203510002U (en) Clamping mechanism for precision part machining
CN203092463U (en) Fin mounting workbench applicable to various auto radiators
CN203738286U (en) Novel welding fixture
CN203730918U (en) Structure for fixing submerged pump water pump
CN203282119U (en) Jig for locating web in one direction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150408

RJ01 Rejection of invention patent application after publication