CN104499653A - Automatic tool anchor plate - Google Patents
Automatic tool anchor plate Download PDFInfo
- Publication number
- CN104499653A CN104499653A CN201410718188.3A CN201410718188A CN104499653A CN 104499653 A CN104499653 A CN 104499653A CN 201410718188 A CN201410718188 A CN 201410718188A CN 104499653 A CN104499653 A CN 104499653A
- Authority
- CN
- China
- Prior art keywords
- tool anchor
- anchor plate
- anchor slab
- baffle plate
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention relates to the field of prestress devices, and in particular relates to an automatic tool anchor plate which comprises a tool anchor plate (1). The automatic tool anchor plate further comprises a baffle (3), pins (2) used for connecting the tool anchor plate (1) with the baffle (3), fastening bolts (4) used for fastening the pins (2) and the baffle (3), and springs (5) sleeving the outer sides of the fastening bolts (4). The tool anchor plate further comprises a through hole, and the baffle (3) is provided with a second through hole in a position corresponding to the through hole in the tool anchor plate (1). By using the technical scheme, the tool anchor plate and a work clamping piece can be mounted at one time and dismounted at one time; the mounting time of a prestress device is greatly saved; the automatic tool anchor plate is has the timesaving and laborsaving effects and is convenient to use; and the structure is simple and practical.
Description
Technical field
The present invention relates to prestressing apparatus field, particularly relate to a kind of automated tool anchor slab.
Background technology
Traditional instrument anchor slab and work clip sheet separate before the mounting, when there being need of work integral installation, just coordinate wire rope to be assembled into together them.Such design substantially prolongs this device set-up time on-site.Reduce operating efficiency.
Summary of the invention
For solving the problems of the technologies described above, the present invention proposes following technical scheme: a kind of automated tool anchor slab, comprise instrument anchor slab, described automated tool anchor slab also comprises baffle plate, connects the pin of described instrument anchor slab and described baffle plate, the fastening bolt of fastening described pin and described baffle plate, be enclosed within spring outside described fastening bolt, described instrument anchor slab also comprises through hole, and on the corresponding instrument anchor slab of described baffle plate, the position of through hole is also provided with the second through hole.
Further technical scheme of the present invention is: described automated tool anchor slab also comprises handle, and described handle connects described baffle plate.
The invention has the beneficial effects as follows: this technical scheme makes instrument anchor slab and the disposable installation of work clip sheet, also disposablely can dismantle, greatly saves the set-up time of prestressing apparatus, time saving and energy saving, easy to use, simple and practical.
Accompanying drawing explanation
Fig. 1 is the schematic diagram that the embodiment of the present invention provides.
Detailed description of the invention
Embodiments of the invention are a kind of automated tool anchor slab as shown in Figure 1, comprise instrument anchor slab 1, described automated tool anchor slab also comprises baffle plate 3, connects the pin 2 of described instrument anchor slab 1 and described baffle plate 3, the fastening bolt 4 of fastening described pin 2 and described baffle plate 3, be enclosed within spring 5 outside described fastening bolt 4, described instrument anchor slab also comprises through hole, and on the corresponding instrument anchor slab 1 of described baffle plate 3, the position of through hole is also provided with the second through hole.
Described automated tool anchor slab also comprises handle 6, and described handle 6 connects described baffle plate 3.
Installation process of the present invention: the precalculated position first work clip sheet being loaded into described instrument anchor slab 1, then described pin 2 is fixed on described instrument anchor slab 1, subsequently described baffle plate 3 is fastened on described pin 2, is tightened on described pin 2 after finally described fastening bolt 4 being put described spring 5.
When this automated tool anchor slab used by needs, only need to utilize described handle 6 to strengthen distance between described baffle plate 3 and described instrument anchor slab 1, then wire rope inserts and specifies cavity.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, all any amendments done within the spirit and principles in the present invention, equivalent replacement and improvement etc., all should be included within protection scope of the present invention.
Claims (2)
1. an automated tool anchor slab, comprise instrument anchor slab (1), it is characterized in that: the spring (5) that described automated tool anchor slab also comprises baffle plate (3), connects the fastening bolt (4) of the pin (2) of described instrument anchor slab (1) and described baffle plate (3), fastening described pin (2) and described baffle plate (3), is enclosed within described fastening bolt (4) outside, described instrument anchor slab also comprises through hole, and the position of the upper through hole of the corresponding instrument anchor slab (1) of described baffle plate (3) is also provided with the second through hole.
2. a kind of automated tool anchor slab according to claim 1, it is characterized in that: described automated tool anchor slab also comprises handle (6), described handle (6) connects described baffle plate (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410718188.3A CN104499653A (en) | 2014-12-01 | 2014-12-01 | Automatic tool anchor plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410718188.3A CN104499653A (en) | 2014-12-01 | 2014-12-01 | Automatic tool anchor plate |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104499653A true CN104499653A (en) | 2015-04-08 |
Family
ID=52941094
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410718188.3A Pending CN104499653A (en) | 2014-12-01 | 2014-12-01 | Automatic tool anchor plate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104499653A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109083331A (en) * | 2018-09-28 | 2018-12-25 | 朱建玉 | Concrete construction ready-package prestressed anchor |
CN111236653A (en) * | 2020-04-02 | 2020-06-05 | 吕路 | Construction engineering prestressed concrete construction equipment |
CN112211348A (en) * | 2020-09-10 | 2021-01-12 | 湖南联智智能科技有限公司 | Steel strand wires smooth silk protector |
CN113445427A (en) * | 2021-07-08 | 2021-09-28 | 北京工业大学 | Prestressed steel strand temporary stay cable integral anchor unloading device and construction process thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6490315A (en) * | 1987-06-19 | 1989-04-06 | Shimizu Construction Co Ltd | Earth anchor |
JPH07197600A (en) * | 1993-12-28 | 1995-08-01 | Kajima Corp | Steel frame column base anchoring structure |
JPH08260620A (en) * | 1995-03-27 | 1996-10-08 | Kurosawa Kensetsu Kk | Ground anchor heat fixture structure |
CN102297190A (en) * | 2010-06-22 | 2011-12-28 | 孙正龙 | Pressure spring type compound die bolt |
CN203392788U (en) * | 2013-07-01 | 2014-01-15 | 柳州黔桥工程材料有限公司 | Intelligent jack with automatic tool anchor |
-
2014
- 2014-12-01 CN CN201410718188.3A patent/CN104499653A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6490315A (en) * | 1987-06-19 | 1989-04-06 | Shimizu Construction Co Ltd | Earth anchor |
JPH07197600A (en) * | 1993-12-28 | 1995-08-01 | Kajima Corp | Steel frame column base anchoring structure |
JP2859117B2 (en) * | 1993-12-28 | 1999-02-17 | 鹿島建設株式会社 | Steel column base anchoring structure |
JPH08260620A (en) * | 1995-03-27 | 1996-10-08 | Kurosawa Kensetsu Kk | Ground anchor heat fixture structure |
CN102297190A (en) * | 2010-06-22 | 2011-12-28 | 孙正龙 | Pressure spring type compound die bolt |
CN203392788U (en) * | 2013-07-01 | 2014-01-15 | 柳州黔桥工程材料有限公司 | Intelligent jack with automatic tool anchor |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109083331A (en) * | 2018-09-28 | 2018-12-25 | 朱建玉 | Concrete construction ready-package prestressed anchor |
CN109083331B (en) * | 2018-09-28 | 2020-09-01 | 柳州盛泰预应力技术有限公司 | Fast-assembling prestressed anchorage for concrete building |
CN111236653A (en) * | 2020-04-02 | 2020-06-05 | 吕路 | Construction engineering prestressed concrete construction equipment |
CN111236653B (en) * | 2020-04-02 | 2021-09-17 | 吕路 | Construction engineering prestressed concrete construction equipment |
CN112211348A (en) * | 2020-09-10 | 2021-01-12 | 湖南联智智能科技有限公司 | Steel strand wires smooth silk protector |
CN113445427A (en) * | 2021-07-08 | 2021-09-28 | 北京工业大学 | Prestressed steel strand temporary stay cable integral anchor unloading device and construction process thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203245813U (en) | Bush dismantling tool | |
CN104499653A (en) | Automatic tool anchor plate | |
CN102452006A (en) | Clamp for machining gearbox | |
CN103358150A (en) | Connecting rod big end hole fine boring fixture | |
CN201728509U (en) | Storage battery tray welded installing and fixing device | |
CN103831645B (en) | A kind of mark hole drilling jig for plunger member | |
CN105382575A (en) | Cutting clamp for cable bridge | |
CN201856108U (en) | Fixture for cam | |
CN202388199U (en) | Fixture structure for mounting clamp | |
CN201856186U (en) | Assembly fixture | |
CN205714726U (en) | Easy-to-mount drilling pump clip | |
CN103418896A (en) | Tool structure for positioning iron core | |
CN201889645U (en) | Processing fixture for handle hole of face cover of volute | |
CN105364781A (en) | Spreader | |
CN203817826U (en) | Special part processing equipment | |
CN203459847U (en) | Carling assembly fixture of pumper subframe | |
CN204412882U (en) | Standard punching model | |
CN202498390U (en) | Pneumatic fixture for lamp holders | |
CN204094686U (en) | A kind of pump housing clamping device of brake pump piston cylinder parts automatic assembling machine | |
CN205111639U (en) | Take air jig of work piece stocker | |
CN203510002U (en) | Clamping mechanism for precision part machining | |
CN203092463U (en) | Fin mounting workbench applicable to various auto radiators | |
CN203738286U (en) | Novel welding fixture | |
CN203730918U (en) | Structure for fixing submerged pump water pump | |
CN203282119U (en) | Jig for locating web in one direction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150408 |
|
RJ01 | Rejection of invention patent application after publication |