CN104493961B - A kind of prefab-form system for many case corrugated steel web box beams that broaden - Google Patents

A kind of prefab-form system for many case corrugated steel web box beams that broaden Download PDF

Info

Publication number
CN104493961B
CN104493961B CN201410754060.2A CN201410754060A CN104493961B CN 104493961 B CN104493961 B CN 104493961B CN 201410754060 A CN201410754060 A CN 201410754060A CN 104493961 B CN104493961 B CN 104493961B
Authority
CN
China
Prior art keywords
module
fixed width
corrugated steel
steel web
bed die
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410754060.2A
Other languages
Chinese (zh)
Other versions
CN104493961A (en
Inventor
张鸿
张永涛
王敏
郑和晖
黄跃
巫兴发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Communications Second Navigation Bureau Science And Engineering Wuhan Co ltd
Original Assignee
China Shipping Two Air Traffic Control Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shipping Two Air Traffic Control Engineering Co Ltd filed Critical China Shipping Two Air Traffic Control Engineering Co Ltd
Priority to CN201410754060.2A priority Critical patent/CN104493961B/en
Publication of CN104493961A publication Critical patent/CN104493961A/en
Application granted granted Critical
Publication of CN104493961B publication Critical patent/CN104493961B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0029Moulds or moulding surfaces not covered by B28B7/0058 - B28B7/36 and B28B7/40 - B28B7/465, e.g. moulds assembled from several parts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0002Auxiliary parts or elements of the mould
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0029Moulds or moulding surfaces not covered by B28B7/0058 - B28B7/36 and B28B7/40 - B28B7/465, e.g. moulds assembled from several parts
    • B28B7/0055Mould pallets; Mould panels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/28Cores; Mandrels
    • B28B7/30Cores; Mandrels adjustable, collapsible, or expanding

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of prefab-form system for many case corrugated steel web box beams that broaden, the prefab-form system includes:Side Template component, outboard template component, bed die board component and interior membrane module, wherein the end template component includes:Fixed width bed die block for fixing the box beam base plate;Broaden bed die block, its both sides for being detachably connected the fixed width bed die block;The interior membrane module is arranged in the chamber of the box beam, including:Fixed width inner module and the inner module that broadens for fixing the box beam chamber top board;The inner module that broadens extends in the presence of the scalable crossbeam along the chamber top board inwall;The prefab-form system also includes the removable venting closure for fixing the corrugated steel web.The prefabricated installation of its many chamber Wavelike steel webplate bridge subsection that can realize broadening is simple, easy to disassemble, applied widely.

Description

A kind of prefab-form system for many case corrugated steel web box beams that broaden
Technical field
The present invention relates to the fabricated device of corrugated steel web box beam, relate more specifically to a kind of suitable for different structure ginseng Number, particularly for the prefab-form system of many case corrugated steel web box beams that broaden.
Background technology
The girder of corrugated steel web bridge is made up of concrete roof and floor and corrugated steel web.As shown in figure 1, it includes mixing Solidifying soil top board 3, concrete floor 2 and corrugated steel web 1.At present, Wavelike steel webplate combined bridge has been obtained quickly at home Development.The conventional construction method of the type bridge is raft support method, incremental launching method, cantilever-construction etc., raft support method and Incremental launching method is respectively adapted to small across footpath bridge, uiform section Medium Span bridge construction, and cantilever construction rule is suitable to Large Span Bridges Construction.
In recent years since, precast segment assembling method with its speed of application it is fast, quality is easily controllable, good environmental protection the advantages of It is widely used, the technique is applied into Wavelike steel webplate bridge construction will also become a reality.Short segment matching is prefabricated Technique is a kind of advanced construction technology, has main steps that and for bridge more long to be divided into short segment, and short-term mould is used in factory Transport to spelling at bridge location is mounted to bridge after plate is prefabricated;Its realization it is critical only that and be obtained by the control to sections physical dimension Desired planform is obtained, wherein good template system is important guarantee.In actual bridge structure, structure type is various more Sample, even if in same bridge block, there is also the change of structural parameters, such as width of box beam, the size of box beam inside chamber. The corrugated steel web bridge structure difference maximum with common Prestressed Concrete Bridges structure is web, is existed in Specific construction Following problem:
(1) corrugated steel web beam uses corrugated steel because of web, without setting up web side template casting concrete;(2) ripple Line steel web needs the enough fixations of intensity during casting concrete, vibrated concrete, to ensure the precision after shaping; (3) corrugated steel web and concrete slab boundary position are, it is necessary to extra template.
Meanwhile, becoming broad box girder typically has following characteristics;
(1) contours profiles are constant, i.e., have identical geometric shape inside and outside box beam at chamfering;
(2) top board width, baseplate width change.
Therefore, for different structure type, especially many chamber types that broaden in wide cut bridge, need to research and develop a set of work( Complete, easy construction and the matching prefab-form system of Wavelike steel webplate sections can be suitable to.
The content of the invention
Regarding to the issue above, it is an object of the invention to provide a kind of prefabricated molds for many case corrugated steel web box beams that broaden Plate system, it uses fixed form in the part of box beam fixed width, and the mould of variable-width is also provided with fixed form two ends Plate, at the same corrugated steel web end template using the removable gland that agrees with therewith.Meet with Different structural parameters, especially It is the prefabricated of many case corrugated steel web box girder segments that broaden.
Prefab-form system for many case corrugated steel web box beams that broaden of the present invention, including:It is Side Template component, outer Side form board component, bed die board component and interior membrane module, wherein, the bed die board component includes:For fixing the box beam base plate Fixed width bed die block, it is for example arranged on being shared at steel web from adjacent two chamber for many case corrugated steel web box beams that broaden The part backplane lower section extended to both sides, for fixing the part backplane;Broaden bed die block, and it is detachably connected the fixed width The both sides of bed die block, such as fixing remainder base plate, for example, be made up of multiple retractable plates;In the fixed width bed die block Bottom is fixedly connected with the end template chassis for moving the fixed width bed die block.The bed die block that broadens can be according to actual production The chamber width of box beam elongated or shortened, its length is for example increased by increasing module, be achieved in the bed die Plate it is broadening.
The interior membrane module is arranged in the chamber of the box beam, and it includes:Internal mould supporter, it has scalable crossbeam; The scalable crossbeam for example carries out horizontal extension by hydraulic jack.Rotating shaft is connected to the expansion link of the crossbeam, described to stretch Contracting bar is, for example, multiple hydraulic stems, and its one end is linked on telescoping crossbeam by rotating shaft.Connect the fixed width of the expansion link free end Inner module and the inner module that broadens for fixing the box beam chamber top board;The inner module that broadens for example is connected by hydraulic stem It is connected on the scalable crossbeam, for example, extends along the direction parallel to the crossbeam.Wherein, the inner module that broadens is described Extend along the chamber top board inwall in the presence of scalable crossbeam.Thus, the inner membrane member can be according to wanted prefabricated Broadened described in the width adjustment of many each chambers of case corrugated steel web box beam inner module width be used for fix many case ripples The top board of steel web box girder.Meanwhile, the inner module that broadens is, for example, that multiple modules are detachably connected, or multiple scalable Plate is formed by connecting, and can be installed or removed according to different in width, so the interior membrane module has easy for installation, is easy to tear open Unload, can at any time be adjusted according to the box beam of Different structural parameters, the features such as applied widely.
The prefab-form system also includes the removable venting closure for fixing the corrugated steel web, and it includes detachably Connect the first gland of the interior membrane module;It is detachably connected the second gland of the outboard template.In the corrugated steel web Removable venting closure is respectively provided with two faces, for fixing the corrugated steel web, it is easy to assembly and disassembly.
Preferably, the Side Template component includes:Fixed width end module group, the end module that broadens group and described fixed for fixing The first support of wide end module group, the end module that broadens group;The fixed width module group includes being located at middle corrugated steel web first end Fixed width base plate end module, the fixed width top board end module positioned at the end of middle corrugated steel web second and positioned at the chamber outside The angle end module and flange plate end module at corrugated steel web two ends;Middle corrugated steel web is, for example, to share between adjacent two chamber Corrugated steel web, such as on two corrugated steel web box beams of chamber, corrugated steel web two between adjacent two chamber The width of the corresponding top board in end and bottom parts is fixed, so the corresponding mould for fixed base plate and top board herein Block may be selected by the fixed width base plate end module and fixed width top board end module of width fixation.The end module group that broadens includes Positioned at broaden base plate end module and the top board end module that broadens positioned at the chamber ceiling location of the chamber base plate position.Institute Top board and base plate center section that the end module that broadens for example is arranged on the chamber are stated, because the width of this part can be more real Changed the need for border produces, the corresponding end module for being used to fix this part also has different width.The fixed width Base plate end module and fixed width top board end module are for example bolted.By the quantity or length of the end module that broadened described in change Degree can just produce many case corrugated steel web prefabricated box -beam sections of different in width chamber.Without changing template, life is reduced Cost is produced, artificial input is reduced.
Preferably, the fixed width inner module includes the base plate interior angle of the chamber plate inner wall corner for fixing the box beam Module and the top board inner corner module for fixing the chamber top board inwall corner of the box beam, the inner module that broadens include centre Fixed width portion and the widening section at the flexible connection middle fixed width portion two ends;The widening section by first support bar connect it is described can Telescoping crossbeam, during installation, rises the middle fixed width portion to target location first, then adjusts the scalable crossbeam up to target Width, preferably rises first support bar and adjusts to target location the widening section, complete described in broaden the installation of inner module.Institute State middle fixed width portion and be for example bolted the widening section.
Preferably, the fixed width inner module is connected on the scalable crossbeam by expansion link, and the expansion link is liquid Pressure push rod, in the presence of the hydraulic push rod, the fixed width inner module is moved into target location;The inner module that broadens The middle fixed width portion is connected on the scalable crossbeam by hydraulic push rod, and effect by hydraulic push rod rises to target Position;The first support bar is also hydraulic push rod.Hydraulic system is set in template system, can complete the assembling of template each several part with And the precise control of beam sections size.
Preferably, the partial circumferential of the removable venting closure has and the corrugated steel web shape identical ripple;Edge Its remainder periphery offers fixing hole, and first gland is fixedly connected on one of fixed width inner module, and described second Gland is fixedly connected on the outboard template component, and by adjusting the position of fixed width inner module and outboard template, realization is described can Dismounting gland clamps the corrugated steel web.
Preferably, the internal mould supporter also includes vertically connecting the cross beam support frame of described scalable crossbeam one end, described Cross beam support frame is arranged on a sliding rail, is moved along the sliding rail, and the sliding rail is set on the ground.
Preferably, the outboard template component includes:For fixing the chamber lateral wall of the box beam and connecting described First outside module of two glands, and for fixing the second outside module of flange plate, and support the outside module the One support, first outside module and the second outside module connect the first support by hydraulic push rod.It is described removable Gland is for example located at concrete roof and floor and steel web junction, and with internal model or side form bolt connection;
Preferably, the three-dimensional position for adjusting bed die position is installed on the end template chassis of the bed die component Adjusting apparatus, many hydraulic jacks that the adjusting apparatus include laterally and are vertically arranged.
Preferably, it is connected with hydraulic push rod on the bed die block that broadens of the bed die component, broaden bottom described in liftable Module, is coupled to the fixed width bed die block and holding level.
Wherein in one embodiment, the end membrane module is connected and fixes with its support, by between adjustment and support The horizontal and vertical degree of screw rod adjustment end membrane module.
Hydraulic push rod is set between the outside membrane module and its support, is easily installed and dismounting.
The interior membrane module is designed to gang form, and each module is using the rod-adjurstable above the scalable crossbeam of internal mould supporter Support, meets the supporting and space requirement of different in width top board bed die.Whole inner formwork system is fixed in skid beam, can be by hydraulic system Complete vertical direction to stretch and laterally open, close, and removal is put in by dedicated trolley.The bed die component is divided into fixed width Module and the module that can broaden, bottom die trolley are provided with perpendicular, horizontal for example each 4 hydraulic jacks, can be used for bed die and matching beam The three-dimensional position adjustment of section.The hydraulic system for example includes bottom die trolley hydraulic pressure three-dimensional positioning jack, side form hydraulic push rod And the part such as internal model strut.
Prefab-form system for many case corrugated steel web box beams that broaden of the present invention, when mounted, installs first The end template chassis and the fixed width bed die component;Secondly, horizontally movable outboard template component and first support are installed; Internal mould supporter and scalable crossbeam are finally installed, the interior membrane module are separately fixed on the interior membrane support, you can.
After installation, template system can enter working condition:1st, the interior membrane module by the first support from pre- Beam position processed is exited;2nd, the lifting of baseplate reinforcing bar cage is put into base plate position, that is, is placed on end template, had good positioning;3rd, by interior module Part and first support push the position designed by box beam inside by sliding rail;4th, corrugated steel is placed in designed web Position, and coarse positioning;5th, the hydraulic stem in adjusting in membrane module, to adjust the base plate inner corner module in the interior membrane module, top The position of plate inner corner module, and it is fixed;6th, the backform plate part that broadens in adjusting in membrane module, according to the knot of the box beam to be produced Structure parameter, the cover half board component that broadens is adjusted to target location;The 7th, roof steel bar cage is placed in the top board position of the chamber Put, transpose;8th, accurate adjustment corrugated steel position, by the removable gland that its is stuck, first gland is fixedly connected On one of fixed width inner module, second gland is fixedly connected on the outboard template component.9th, complete above step it Afterwards, can casting concrete, maintenance removes gland to specification prescribed strength, release in membrane module, unclamp side form component, will be prefabricated Good beam hangs away, into next circulation.
Prefab-form system for many case corrugated steel web box beams that broaden of the present invention in stencil design, in fixation Width segments use fixed form, in the part that broadens using the template that broadens.The end template of corrugated steel web is used and agreed with therewith Removable gland, be can be recycled in prefabrication process, that is, installed in pouring, after concrete hardening remove.It has following Beneficial effect:
(1) template system be suitable to many chamber Wavelike steel webplate sections matching it is prefabricated:Prefab-form is big rigidity, all-hydraulic Formula, is easy to assembling and form removal, including fixing end mould and support, side form and support, internal model and support, removable gland, bed die And bottom die trolley.
(2) template system is suitable to the beam precast that broadens:Fixing end mould, internal model and bed die be both designed as fixed width module and Can be broadened module, and end mould holder and side form support can be moved horizontally along track, internal mould supporter crossbeam retractable, and these are all Ensure that template system is quickly adjusted, adapt to the prefabricated of beam section that broaden.
(3) the features such as template system has high precision, assembled and convenient disassembly, highly versatile, template each several part mechanical electronic hydraulic Integration ensures speed of application, additionally, can be added in box beam standard paragraphs according to the different physical dimension of box girder with corrugated steel webs The active segment of different length is adjusted, and meets that plate is thickening, and what external form broadened be required to meet the construction requirement of all beam type.
(4) removable gland is added at corrugated steel web, to be applicable the prefabricated of sections corrugated steel web beam.
Brief description of the drawings
Fig. 1 is the structural representation of corrugated steel web box beam of the present invention;
Fig. 2 is that the structure of the prefab-form system for many case corrugated steel web box beams that broaden described in the embodiment of the present invention is shown It is intended to;
Fig. 3 is the prefab-form system for many case corrugated steel web box beams that broaden described in one of embodiment of the invention The terminal membrane modular construction schematic diagram;
Fig. 4 is the detachable of the prefab-form system for many case corrugated steel web box beams that broaden described in the embodiment of the present invention The structural representation of gland;
Fig. 5 is in the part of the prefab-form system for many case corrugated steel web box beams that broaden described in the embodiment of the present invention Membrane module structural representation.
Specific embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings, to make those skilled in the art with reference to specification text Word can be implemented according to this.
As shown in Fig. 2 the prefab-form system for many case corrugated steel web box beams that broaden of the present invention, including:End Template assembly 100, outboard template component 200, bed die board component 300 and interior membrane module 400, wherein, the bed die board component 300 Including:Fixed width bed die block 301 for fixing the box beam base plate, it is for example arranged on many case corrugated steel web casees that broaden The part backplane lower section extended to both sides from the shared steel web of adjacent two chamber of beam, for fixing the part backplane;Become Bed die block 302 wide, its both sides for being detachably connected the fixed width bed die block 301, such as fixing remainder base plate, for example It is made up of multiple retractable plates;It is fixedly connected with for moving the fixed width bed die block in the bottom of fixed width bed die block 301 End template chassis 303.The bed die block 302 that broadens can be elongated or shortened according to the chamber width of the box beam of actual production, For example increase its length by increasing module, be achieved in the broadening of the end template.The bottom of the bed die component 300 Three-dimensional position adjusting apparatus for adjusting bed die position are installed on formwork jumbo 303, the adjusting apparatus include laterally and Many hydraulic jacks 304 being vertically arranged.Hydraulic push rod 305 is connected with the bed die block that broadens of the bed die component, Broaden bed die block 302 described in liftable, is coupled to the fixed width bed die block 302 and holding level.
The interior membrane module 400 is arranged in the chamber of the box beam, and it includes:Internal mould supporter, it has scalable horizontal stroke Beam 4011;The scalable crossbeam 4011 for example carries out horizontal extension by hydraulic jack.Rotating shaft is connected to stretching for the crossbeam Contracting bar 402, the expansion link 402 is, for example, multiple hydraulic stems, and its one end is linked on telescoping crossbeam by rotating shaft.Stretched described in connection The fixed width inner module 403 of the free end of contracting bar 402 and the inner module 404 that broadens for fixing the box beam chamber top board;It is described The inner module that broadens for example is connected on the scalable crossbeam by hydraulic stem, for example, prolong along the direction parallel to the crossbeam Stretch.Wherein, the inner module that broadens extends in the presence of the scalable crossbeam 4011 along the chamber top board inwall.By This, the inner membrane member 400 can be according to the width adjustment of wanted prefabricated many each chambers of case corrugated steel web box beam The width of inner module of broadening is used to fix the top board of many case corrugated steel web box beams.Meanwhile, it is described to broaden inner module for example For multiple modules are detachably connected, or multiple retractable plates are formed by connecting, and can be installed or removed according to different in width, So the interior membrane module have it is easy for installation, it is easy to disassemble, can at any time be adjusted according to the box beam of Different structural parameters, fit With scope it is wide the features such as.The fixed width inner module 403 includes the base plate of the chamber plate inner wall corner for fixing the box beam Inner corner module 4031 and the top board inner corner module 4032 for fixing the chamber top board inwall corner of the box beam, it is described broaden in Module 404 includes middle fixed width portion 4041 and is flexibly connected the widening section 4042 at the middle fixed width portion two ends;The widening section 4042 connect the scalable crossbeam 4011 by first support bar 4043, during installation, the middle fixed width portion are risen first 4041 to target location, then adjusts the scalable crossbeam 4011 up to target width, and preferably rising first support bar 4043 will The widening section 4042 is adjusted to target location, complete described in broaden the installation of inner module 4042.The first support bar 4043 It is hydraulic push rod.
The fixed width inner module 403 is connected on the scalable crossbeam 4011 by expansion link 402, the expansion link 402 is hydraulic push rod, and in the presence of the hydraulic push rod, the fixed width inner module 403 is moved into target location;The change The described middle fixed width portion 4041 of inner module wide 404 is connected on the scalable crossbeam 4011 by hydraulic push rod, and is passed through The effect of hydraulic push rod rises to target location.
As shown in figure 5, the internal mould supporter also includes vertically connecting the cross beam support of described one end of scalable crossbeam 4011 Frame 405, the cross beam support frame 405 is arranged on a sliding rail 406, is moved along the sliding rail 406, the slip rail Road 406 is set on the ground.
As shown in figure 3, the Side Template component 100 includes:Fixed width end module group, the end module that broadens group and for fixing The fixed width end module group, the first support 103 of the end module that broadens group;The fixed width module group includes being located at middle corrugated steel abdomen The fixed width base plate end module 1011 of plate first end, the fixed width top board end module 1012 positioned at the end of middle corrugated steel web second and The angle end module 1013 and flange plate end module 1014 at corrugated steel web two ends on the outside of the chamber;Middle corrugated steel web The corrugated steel web shared between for example, adjacent two chamber, such as on two corrugated steel web box beams of chamber, phase The width of top board and bottom parts between adjacent two chambers corresponding to corrugated steel web two ends is fixed, so corresponding use The fixed width base plate end module and the fixed width top board end of width fixation are may be selected by the module of fixed base plate and top board herein Module.The end module group that broadens includes the base plate end module 1021 and positioned at the case of broadening positioned at the chamber base plate position The top board end module 1022 that broadens of ceiling Board position.The end module that broadens for example is arranged in the top board and base plate of the chamber Between part it is corresponding to be used to fix this part because the width of this part can change more the need for actual production End module also have different width.Difference can just be produced by the quantity or length of the end module that broadened described in change Many case corrugated steel web prefabricated box -beam sections of width chamber.Without changing template, production cost is reduced, reduce artificial throwing Enter.
As shown in figure 4, the prefab-form system also includes the removable venting closure for fixing the corrugated steel web 500, its first gland 501 for including being detachably connected the interior membrane module;It is detachably connected the second pressure of the outboard template Lid 502.Removable venting closure is respectively provided with two faces of the corrugated steel web, for fixing the corrugated steel web, it is just In assembly and disassembly.
The partial circumferential of the removable venting closure has and the corrugated steel web shape identical ripple;Along its its remaining part Periphery is divided to offer fixing hole 503, first gland 501 is fixedly connected on one of fixed width inner module, second pressure Lid 502 is fixedly connected on the outboard template component, and by adjusting the position of fixed width inner module and outboard template, realization is described can Dismounting gland clamps the corrugated steel web.The fixing hole 503 is for example respectively provided with internal thread, and its attachment screw will be described removable Venting closure 500 is fixed on the outboard template component and interior membrane module, clamps the corrugated steel web.
As shown in Fig. 2 the outboard template component 200 includes:For fixing the chamber lateral wall of the box beam and connecting First outside module 201 of second gland 502, and for fixing the second outside module 202 of flange plate, and support institute The first support 203 of outside module is stated, 202 modules of the outside of first outside module 201 and second pass through hydraulic push rod 204 Connect the first support 203.
Step is as follows during installation:The 1st, bottom die trolley and bed die component are installed, the movement bottom die trolley 303 will be described Fixed width bed die block 301 is placed on target location, hydraulic push rod 305 is started afterwards the bed die block 302 that broadens is adjusted into target Position, can select the bed die block 302 that broadens of different in width according to the width of the box beam of actual production.2nd, install horizontally movable Outside membrane module, mobile first support 203 drives the outside module to move to target location.3rd, internal mould supporter and interior is installed Membrane module, the interior membrane module is attached on the scalable crossbeam 4011, and the scalable crossbeam 4011 is arranged on described On cross beam support frame 405, the cross beam support frame 405 is moved to target location along the sliding rail 406.The 4th, terminal membrane group is installed Part.
The course of work:After template system installation above-mentioned steps, template system can enter working condition:1st, interior module Part 400 is exited by cross beam support frame 405 from precast beam position;2nd, the lifting of baseplate reinforcing bar cage is put into base plate position, that is, is placed in institute State fixed width bed die block 301 and broaden on bed die block 302, have good positioning;3rd, by interior membrane module 400 and the cross beam support frame 405 Position designed by box beam inside is pushed by the sliding rail 406;4th, corrugated steel is placed in designed web position, And coarse positioning;5th, the hydraulic stem in adjusting in membrane module, to adjust the position of fixed width inner module 403, and fixes it;6th, in adjusting The part of inner module 404 that broadens in membrane module, to reach design attitude;7th, roof steel bar cage is placed in ceiling location, is adjusted Whole position;8th, accurate adjustment corrugated steel position, stuck by its by removable gland 500.9th, complete after above step, can pour Concrete is built, maintenance to specification prescribed strength is removed gland, releases internal model, unclamps side form, and prefabricated beam is hung away, is entered Next circulation.
Although embodiment of the present invention is disclosed as above, it is not restricted to listed in specification and implementation method With, it can be applied to various suitable the field of the invention completely, for those skilled in the art, can be easily Other modification is realized, therefore under the universal limited without departing substantially from claim and equivalency range, the present invention is not limited In specific details and shown here as the legend with description.

Claims (7)

1. a kind of prefab-form system for many case corrugated steel web box beams that broaden, the prefab-form system includes:End mould Board component, outboard template component, bed die board component and interior membrane module, it is characterised in that
The bed die board component includes:Fixed width bed die block for fixing the box beam base plate;Broaden bed die block, and it detachably connects The both sides of the fixed width bed die block are connect, is made up of multiple retractable plates;At the fixed width bottom module bottom be fixedly connected with for The end template chassis of the movement fixed width bed die block;
The interior membrane module is arranged in the chamber of the box beam, and it includes:Internal mould supporter, it has scalable crossbeam;Rotating shaft It is connected to the expansion link of the crossbeam;Connect the fixed width inner module of the expansion link free end and for fixing the box beam case The inner module that broadens of ceiling plate;Wherein, it is described broaden inner module in the presence of the scalable crossbeam along the chamber top board Inwall extends;
The prefab-form system also includes the removable venting closure for fixing the corrugated steel web, and it includes being detachably connected First gland of the interior membrane module;It is detachably connected the second gland of the outboard template component;The internal mould supporter is also wrapped The cross beam support frame for vertically connecting described scalable crossbeam one end is included, the cross beam support frame is arranged on a sliding rail, edge The sliding rail movement, the sliding rail is set on the ground;Pacify on the end template chassis of the bed die board component Equipped with the three-dimensional position adjusting apparatus for adjusting bed die position, many liquid that the adjusting apparatus include laterally and are vertically arranged Pressure jack.
2. as claimed in claim 1 for the prefab-form system of many case corrugated steel web box beams that broaden, it is characterised in that institute Stating Side Template component includes:Fixed width end module group, the end module that broadens group and for fix the fixed width end module group, become wide end The first support of module group;The fixed width end module group includes being located at the fixed width base plate end mould of middle corrugated steel web first end Block, the fixed width top board end module positioned at the end of middle corrugated steel web second and the corrugated steel web two ends on the outside of the chamber Angle end module and flange plate end module;The end module group that broadens is included positioned at the base plate end that broadens of the chamber base plate position Module and the top board end module that broadens positioned at the chamber ceiling location.
3. as claimed in claim 1 for the prefab-form system of many case corrugated steel web box beams that broaden, it is characterised in that institute State fixed width inner module include for fix the box beam chamber plate inner wall corner base plate inner corner module and for fixing The top board inner corner module of the chamber top board inwall corner of box beam is stated, the inner module that broadens includes middle fixed width portion and flexible connection The widening section at the middle fixed width portion two ends;The widening section connects the scalable crossbeam by first support bar, installs When, the middle fixed width portion is risen first to target location, the scalable crossbeam up to target width is then adjusted, rise first Support bar adjusts to target location the widening section, complete described in broaden the installation of inner module.
4. as claimed in claim 3 for the prefab-form system of many case corrugated steel web box beams that broaden, it is characterised in that institute State fixed width inner module to be connected on the scalable crossbeam by expansion link, the expansion link is hydraulic push rod, in the hydraulic pressure In the presence of push rod, the fixed width inner module is moved into target location;The described middle fixed width portion of the inner module that broadens leads to Hydraulic push rod is crossed to be connected on the scalable crossbeam, and effect by hydraulic push rod rises to target location;Described first Strut is also hydraulic push rod.
5. as claimed in claim 1 for the prefab-form system of many case corrugated steel web box beams that broaden, it is characterised in that institute The partial circumferential for stating removable venting closure has and the corrugated steel web shape identical ripple;Opened up along its remainder periphery There is fixing hole, first gland is fixedly connected on one of fixed width inner module, and second gland is fixedly connected on institute State on outboard template component, by adjusting the position of fixed width inner module and outboard template component, realize the removable venting closure folder The tight corrugated steel web.
6. as claimed in claim 1 for the prefab-form system of many case corrugated steel web box beams that broaden, it is characterised in that institute Stating outboard template component includes:For fixing the chamber lateral wall of the box beam and connecting the first outer side mold of second gland Block, and for fixing the second outside module of flange plate, and support the first support of the outboard template component, described first Outside module and the second outside module connect the first support by hydraulic push rod.
7. as claimed in claim 1 for the prefab-form system of many case corrugated steel web box beams that broaden, it is characterised in that institute State and hydraulic push rod is connected with the bed die block that broadens of bed die board component, broaden bed die block described in liftable, is coupled to The fixed width bed die block simultaneously keeps level.
CN201410754060.2A 2014-12-10 2014-12-10 A kind of prefab-form system for many case corrugated steel web box beams that broaden Active CN104493961B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410754060.2A CN104493961B (en) 2014-12-10 2014-12-10 A kind of prefab-form system for many case corrugated steel web box beams that broaden

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410754060.2A CN104493961B (en) 2014-12-10 2014-12-10 A kind of prefab-form system for many case corrugated steel web box beams that broaden

Publications (2)

Publication Number Publication Date
CN104493961A CN104493961A (en) 2015-04-08
CN104493961B true CN104493961B (en) 2017-06-06

Family

ID=52935460

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410754060.2A Active CN104493961B (en) 2014-12-10 2014-12-10 A kind of prefab-form system for many case corrugated steel web box beams that broaden

Country Status (1)

Country Link
CN (1) CN104493961B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104859048B (en) * 2015-06-19 2016-06-22 中交一公局第五工程有限公司 A kind of self-propelled integrated hydraulic prefabricated case beam plate device
CN105848839B (en) * 2016-03-31 2018-05-04 中交第二航务工程局有限公司 Short-term for Wavelike steel webplate combining structure beam bridge matches prefab-form system
CN106120561B (en) * 2016-07-04 2017-09-26 中国三冶集团有限公司 A kind of cast-in-situ box girder template construct installation method
CN106978783B (en) * 2017-05-16 2024-06-07 中铁八局集团第二工程有限公司 Hanging basket for pouring inclined web type continuous beam cantilever
CN108297255B (en) * 2018-02-02 2019-01-11 内蒙古路桥集团有限责任公司 A kind of integrated hydraulic applied to prefabricated box -beam is at template
CN110067210B (en) * 2019-06-12 2024-04-05 中交第四公路工程局有限公司 Construction system and construction method for bridge flange plate
CN110374007A (en) * 2019-07-22 2019-10-25 中铁大桥局集团有限公司 A kind of mobile formwork and its construction method reducing die sinking distance
CN110847050B (en) * 2019-11-26 2021-01-22 中交一公局第六工程有限公司 Large-span prefabricated corrugated steel web composite beam top and bottom plate synchronous pouring template and application method thereof
CN113944324B (en) * 2021-10-14 2023-04-07 中建桥梁有限公司 Hydraulic inner template of assembled corrugated steel web combined box girder
CN117283687A (en) * 2023-09-05 2023-12-26 广州铁路投资建设集团有限公司 Segmental precast beam template

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004017645A (en) * 2002-06-14 2004-01-22 Matsushiro Kaoru Form device for pre-cast concrete foundation block, pre-cast concrete foundation block, and foundation technique using pre-cast concrete foundation block
CN201573265U (en) * 2009-12-10 2010-09-08 吴真珍 Precast box girder inner formwork device of bridge beam
CN202428530U (en) * 2011-12-16 2012-09-12 北京联东投资(集团)有限公司 Segment hydraulic internal mold device capable of adjusting size
CN203307719U (en) * 2013-05-13 2013-11-27 中交第二航务工程局有限公司 Large-cantilever steel web carinal box girder section
CN204414305U (en) * 2014-12-10 2015-06-24 中交第二航务工程局有限公司 A kind of prefab-form system for many casees corrugated steel web case beam that broadens

Also Published As

Publication number Publication date
CN104493961A (en) 2015-04-08

Similar Documents

Publication Publication Date Title
CN104493961B (en) A kind of prefab-form system for many case corrugated steel web box beams that broaden
CN204414305U (en) A kind of prefab-form system for many casees corrugated steel web case beam that broadens
KR101259031B1 (en) Form traveller having transversal frame, and launching method for the same
CN203768814U (en) High-pier minor-radius curve cast-in-situ box girder novel moving die carrier
CN104999548B (en) Magnetic floats the mechanical template system of curve track beam and application method
CN102660925B (en) Moveable formwork for variable-width curved bridge
CN110513126A (en) A kind of tunnel double-lining trolley that section-variable can be recycled
JP2002088718A (en) Inner form device for concrete box girder bridge and moving method therefor
CN105544397A (en) High concrete pier construction formwork device
CN208533372U (en) A kind of General reinforced cage binding moulding bed
CN110777674A (en) Hydraulic self-propelled anti-collision wall formwork trolley
CN205112063U (en) Integral hydraulic pressure exterior sheathing of precast box girder
CN207942538U (en) A kind of prefabricated case beam external mold harden structure and exterior sheathing disassembly system
CN109505271A (en) A kind of complete construction of mobile hydraulic trolley arch culvert
CN205521918U (en) Prefabricated formwork system of T roof beam batch production
CN209686260U (en) A kind of crown formwork jumbo for the construction of diplopore arch culvert
CN108005684B (en) Separated steel mould trolley and construction method thereof
CN106089257B (en) A kind of tunnel ditch cable trough construction trolley
CN110883920B (en) Prefabricated T roof beam self-propelled hydraulic pressure template device and template system
CN213918812U (en) Integral template device for prefabricating box girder
CN208250935U (en) A kind of conveniently stripped mass concrete support shuttering
CN208777175U (en) A kind of overlapping constructing device of I-shaped steel reinforced concrete combination beam concrete
CN112160339A (en) Construction method for lifting and pouring concrete retaining wall
CN207105211U (en) Element precast mould
CN219380983U (en) Box girder prefabricated hydraulic template convenient to disassemble and assemble

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170427

Address after: Double Willow Street Road 431400 Hubei Xuelin city of Wuhan province Xinzhou District

Applicant after: CCCC SHEC STRUCTURAL ENGINEERING CO.,LTD.

Address before: 430048 Wuhan, East Lake District, Hubei Jin Lake Road, No. 11

Applicant before: CCCC SECOND HARBOR ENGINEERING Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 431400 Xuelin Road, Shuangliu Street, Xinzhou District, Wuhan City, Hubei Province

Patentee after: China Communications Second Navigation Bureau Science and Engineering (Wuhan) Co.,Ltd.

Country or region after: China

Address before: 431400 Xuelin Road, Shuangliu Street, Xinzhou District, Wuhan City, Hubei Province

Patentee before: CCCC SHEC STRUCTURAL ENGINEERING CO.,LTD.

Country or region before: China

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 430000, No. 158 Xinggu Avenue, Shuangliu Street, Xinzhou District, Wuhan City, Hubei Province

Patentee after: China Communications Second Navigation Bureau Science and Engineering (Wuhan) Co.,Ltd.

Country or region after: China

Address before: 431400 Xuelin Road, Shuangliu Street, Xinzhou District, Wuhan City, Hubei Province

Patentee before: China Communications Second Navigation Bureau Science and Engineering (Wuhan) Co.,Ltd.

Country or region before: China