CN104484748A - County and municipal electricity utilization information counting and transmitting method - Google Patents
County and municipal electricity utilization information counting and transmitting method Download PDFInfo
- Publication number
- CN104484748A CN104484748A CN201410740864.7A CN201410740864A CN104484748A CN 104484748 A CN104484748 A CN 104484748A CN 201410740864 A CN201410740864 A CN 201410740864A CN 104484748 A CN104484748 A CN 104484748A
- Authority
- CN
- China
- Prior art keywords
- level
- electric energy
- county
- city
- statistical form
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000005611 electricity Effects 0.000 title claims abstract description 15
- 238000000034 method Methods 0.000 title claims abstract description 14
- 230000004907 flux Effects 0.000 claims description 9
- 230000005540 biological transmission Effects 0.000 claims description 8
- 238000004458 analytical method Methods 0.000 abstract description 3
- 238000007619 statistical method Methods 0.000 abstract description 3
- 239000007795 chemical reaction product Substances 0.000 description 1
- 238000007405 data analysis Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- G—PHYSICS
- G08—SIGNALLING
- G08C—TRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
- G08C19/00—Electric signal transmission systems
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- General Physics & Mathematics (AREA)
- Strategic Management (AREA)
- Physics & Mathematics (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- General Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- Public Health (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Water Supply & Treatment (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The invention discloses a county and municipal electricity utilization information counting and transmitting method. The method comprises the following steps of acquiring electricity utilization information in county and municipal level; transmitting to a provincial dispatching EMS (energy management system) for statistical analysis management; transmitting the acquired data and the analysis and management data to a cloud platform. The information is managed and analyzed by the provincial dispatching EMS in a united way, a daily electric energy statistical table, a monthly electric energy statistical table, an annual electric energy statistical table and an annual electricity utilization curve chart are made, a method for respectively managing county and municipal electricity utilization information is simplified, statistical data is more accurate and clear, the management workload is reduced, the acquired data and the statistical analysis charts are uploaded to the cloud platform and are more conveniently checked and managed by workers of an electric power system.
Description
Technical field
The present invention relates to electric energy management field, specifically a kind of counties and cities level power information statistics transmission method.
Background technology
Power information Application of Statistic Methods, among the various acquisition terminals of power user power consumption information acquisition system, wherein mainly comprises the end product such as electricity load management terminal, concentrator.Counties and cities' level power information is all carry out acquisition management respectively, and the power information that the staff of electric system is difficult to call other region is checked, does not utilize analysis and the management of whole electric system.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of counties and cities level power information statistics transmission method, adopting to economize adjusts EMS system to carry out statistical study management, then transfer to high in the clouds platform, the staff in other region can call and check the data in the platform of high in the clouds, conveniently carries out managing and analyzing.
Technical scheme of the present invention is:
Counties and cities' level power information statistics transmission method, specifically comprises the following steps:
(1), SCADA main website Real-time Collection at county level electric energy data at county level, city-level SCADA supervisory system Real-time Collection city-level electric energy information;
(2), electric energy information is transferred to province and adjusts EMS system by SCADA main website at county level and city-level SCADA supervisory system;
(3), economize adjust EMS system counties and cities' level electric energy data record is formed electric flux day statistical form, monthly returns and year statistical form, and respectively year electricity consumption energy trace figure is drawn to electric energy data at county level and city-level electric energy information;
(4), economize adjust EMS system by electric energy data at county level, city-level electric energy data, electric flux day statistical form, monthly returns, year statistical form and year electricity consumption energy trace figure be stored in high in the clouds platform.
Electric energy information is transferred to province by SG186 marketing system and adjusts EMS system by described SCADA main website at county level and city-level SCADA supervisory system.
Described province adjust EMS system by electric energy data at county level, city-level electric energy data, electric flux day statistical form, monthly returns, year statistical form and year electricity consumption energy trace figure store, and compressed by Shell batch processing derived data, and then be uploaded to high in the clouds platform.
Advantage of the present invention:
The present invention adopts province to adjust EMS system to carry out unified management analysis, make electric flux day statistical form, monthly returns, year statistical form and year electricity consumption energy trace figure, simplify the method that power information counties and cities level carries out managing respectively, statistics is more accurately clear, reduce the workload of management, image data and statistical analysis charts are uploaded to high in the clouds platform, and the staff of electric system of being also more convenient for carries out checking management.
Embodiment
Counties and cities' level power information statistics transmission method, is characterized in that: specifically comprise the following steps:
(1), SCADA main website Real-time Collection at county level electric energy data at county level, city-level SCADA supervisory system Real-time Collection city-level electric energy information;
(2), electric energy information is transferred to province by SG186 marketing system and adjusts EMS system by SCADA main website at county level and city-level SCADA supervisory system;
(3), economize adjust EMS system counties and cities' level electric energy data record is formed electric flux day statistical form, monthly returns and year statistical form, and respectively year electricity consumption energy trace figure is drawn to electric energy data at county level and city-level electric energy information;
(4), economize adjust EMS system by electric energy data at county level, city-level electric energy data, electric flux day statistical form, monthly returns, year statistical form and year electricity consumption energy trace figure store, and compressed by Shell batch processing derived data, and then be uploaded to high in the clouds platform.
Claims (3)
1. counties and cities' level power information statistics transmission method, is characterized in that: specifically comprise the following steps:
(1), SCADA main website Real-time Collection at county level electric energy data at county level, city-level SCADA supervisory system Real-time Collection city-level electric energy information;
(2), electric energy information is transferred to province and adjusts EMS system by SCADA main website at county level and city-level SCADA supervisory system;
(3), economize adjust EMS system counties and cities' level electric energy data record is formed electric flux day statistical form, monthly returns and year statistical form, and respectively year electricity consumption energy trace figure is drawn to electric energy data at county level and city-level electric energy information;
(4), economize adjust EMS system by electric energy data at county level, city-level electric energy data, electric flux day statistical form, monthly returns, year statistical form and year electricity consumption energy trace figure be stored in high in the clouds platform.
2. counties and cities according to claim 1 level power information statistics transmission method, is characterized in that: electric energy information is transferred to province by SG186 marketing system and adjusts EMS system by described SCADA main website at county level and city-level SCADA supervisory system.
3. counties and cities according to claim 1 level power information statistics transmission method, it is characterized in that: described province adjust EMS system by electric energy data at county level, city-level electric energy data, electric flux day statistical form, monthly returns, year statistical form and year electricity consumption energy trace figure store, and compressed by Shell batch processing derived data, and then be uploaded to high in the clouds platform.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410740864.7A CN104484748A (en) | 2014-11-27 | 2014-11-27 | County and municipal electricity utilization information counting and transmitting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410740864.7A CN104484748A (en) | 2014-11-27 | 2014-11-27 | County and municipal electricity utilization information counting and transmitting method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104484748A true CN104484748A (en) | 2015-04-01 |
Family
ID=52759289
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410740864.7A Pending CN104484748A (en) | 2014-11-27 | 2014-11-27 | County and municipal electricity utilization information counting and transmitting method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104484748A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104867059A (en) * | 2015-05-27 | 2015-08-26 | 南京国云电力有限公司 | Power load distribution analysis method |
CN109494879A (en) * | 2018-12-25 | 2019-03-19 | 湖北师范大学 | A kind of data acquisition platform for electric system |
CN105277783B (en) * | 2015-07-31 | 2020-08-14 | 杭州赫智电子科技有限公司 | Mass data acquisition method for electricity consumption information data |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009151667A (en) * | 2007-12-21 | 2009-07-09 | Chugoku Electric Power Co Inc:The | Power failure information integration system and power failure information integration method |
CN202550680U (en) * | 2012-03-27 | 2012-11-21 | 上海市电力公司 | Electric energy collection and operation management system |
CN103532136A (en) * | 2013-10-16 | 2014-01-22 | 国网安徽省电力公司 | On-line computation and aid decision making system and on-line computation and aid decision making method for province-prefecture-country integrated network loss |
-
2014
- 2014-11-27 CN CN201410740864.7A patent/CN104484748A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009151667A (en) * | 2007-12-21 | 2009-07-09 | Chugoku Electric Power Co Inc:The | Power failure information integration system and power failure information integration method |
CN202550680U (en) * | 2012-03-27 | 2012-11-21 | 上海市电力公司 | Electric energy collection and operation management system |
CN103532136A (en) * | 2013-10-16 | 2014-01-22 | 国网安徽省电力公司 | On-line computation and aid decision making system and on-line computation and aid decision making method for province-prefecture-country integrated network loss |
Non-Patent Citations (1)
Title |
---|
王贤: "基于分布式的电能量采集与监控系统设计与实现", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104867059A (en) * | 2015-05-27 | 2015-08-26 | 南京国云电力有限公司 | Power load distribution analysis method |
CN105277783B (en) * | 2015-07-31 | 2020-08-14 | 杭州赫智电子科技有限公司 | Mass data acquisition method for electricity consumption information data |
CN109494879A (en) * | 2018-12-25 | 2019-03-19 | 湖北师范大学 | A kind of data acquisition platform for electric system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104134163A (en) | Power distribution network graph and model management system and power distribution network graph and model management method based on CIM/E and CIM/G | |
CN103310294A (en) | Energy performance contracting system | |
CN104484748A (en) | County and municipal electricity utilization information counting and transmitting method | |
CN103036229B (en) | Line loss analysis method based on power distribution automation platform | |
CN104574207A (en) | Regional power grid electric quantity analyzing and counting system | |
CN104317868A (en) | Control integration method based on single-front and multi-SCADA (Supervisory Control and Data Acquisition) application | |
CN202886016U (en) | On-line monitoring terminal for operation environment of secondary device of transformer substation | |
CN204423369U (en) | Based on the distributed photovoltaic power station data base management system of MongoDB | |
CN204390295U (en) | A kind of panel box information management system | |
CN104502647A (en) | Remote meter reading automatic metering system for electric energy meter | |
CN205176932U (en) | Data collection and transmission system for intelligence measurement platform | |
Wang | The design of modern agriculture control system based on internet of things | |
CN203882180U (en) | Object monitoring system based on Internet-of-things | |
CN202614839U (en) | Multi-channel energy consumption collecting device | |
CN204360412U (en) | A kind of management information system of power-consuming | |
CN104682562A (en) | Remote real-time centralized monitoring system with clean energy of electric grid | |
CN204442016U (en) | Electrical network clean energy resource access remote real-time centralized supervisory control system | |
CN204288298U (en) | A kind of power marketing data collector | |
CN202494911U (en) | Controlling circuit of environmental protection monitoring system | |
CN204669382U (en) | Hand-hold type networking CHINA RFTCOM Co Ltd tester | |
CN202924496U (en) | Elevator general protocol collecting device | |
CN203643536U (en) | Distribution line power monitoring system | |
CN202075786U (en) | Intelligent on-site working supervision and management device for electric power marketing | |
Yagüe et al. | Meter data Management for Smart Monitoring Power Networks | |
CN103794040A (en) | Collector with metering function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150401 |