CN104481587A - 大采深、大跨度综放采煤工作面顶板砂岩裂隙水探防方法 - Google Patents
大采深、大跨度综放采煤工作面顶板砂岩裂隙水探防方法 Download PDFInfo
- Publication number
- CN104481587A CN104481587A CN201410628931.6A CN201410628931A CN104481587A CN 104481587 A CN104481587 A CN 104481587A CN 201410628931 A CN201410628931 A CN 201410628931A CN 104481587 A CN104481587 A CN 104481587A
- Authority
- CN
- China
- Prior art keywords
- water
- sandstone
- top board
- mining
- face
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 86
- 238000005065 mining Methods 0.000 title claims abstract description 41
- 238000000034 method Methods 0.000 title claims abstract description 29
- 239000003245 coal Substances 0.000 title abstract description 13
- 238000001514 detection method Methods 0.000 claims abstract description 25
- 238000005553 drilling Methods 0.000 claims abstract description 16
- 238000012544 monitoring process Methods 0.000 claims abstract description 16
- 238000011161 development Methods 0.000 claims abstract description 13
- 238000011156 evaluation Methods 0.000 claims abstract description 7
- 230000002265 prevention Effects 0.000 claims abstract description 6
- 239000011435 rock Substances 0.000 claims description 45
- 238000004088 simulation Methods 0.000 claims description 14
- 238000013461 design Methods 0.000 claims description 13
- 238000002474 experimental method Methods 0.000 claims description 9
- 238000012795 verification Methods 0.000 claims description 9
- 239000012530 fluid Substances 0.000 claims description 8
- 238000012360 testing method Methods 0.000 claims description 8
- 238000004519 manufacturing process Methods 0.000 claims description 7
- 230000003111 delayed effect Effects 0.000 claims description 4
- 238000003384 imaging method Methods 0.000 claims description 4
- 238000007789 sealing Methods 0.000 claims description 4
- 230000009172 bursting Effects 0.000 claims description 3
- 238000004458 analytical method Methods 0.000 abstract description 4
- 238000007689 inspection Methods 0.000 abstract 2
- 238000011084 recovery Methods 0.000 abstract 1
- 230000000694 effects Effects 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 4
- 238000010291 electrical method Methods 0.000 description 3
- 238000000605 extraction Methods 0.000 description 2
- JEGUKCSWCFPDGT-UHFFFAOYSA-N h2o hydrate Chemical compound O.O JEGUKCSWCFPDGT-UHFFFAOYSA-N 0.000 description 2
- 230000002209 hydrophobic effect Effects 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 238000013508 migration Methods 0.000 description 2
- 230000005012 migration Effects 0.000 description 2
- 238000013459 approach Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009533 lab test Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V11/00—Prospecting or detecting by methods combining techniques covered by two or more of main groups G01V1/00 - G01V9/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F17/00—Methods or devices for use in mines or tunnels, not covered elsewhere
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Geophysics (AREA)
- Geophysics And Detection Of Objects (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410628931.6A CN104481587B (zh) | 2014-11-10 | 2014-11-10 | 大采深、大跨度综放采煤工作面顶板砂岩裂隙水探防方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410628931.6A CN104481587B (zh) | 2014-11-10 | 2014-11-10 | 大采深、大跨度综放采煤工作面顶板砂岩裂隙水探防方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104481587A true CN104481587A (zh) | 2015-04-01 |
CN104481587B CN104481587B (zh) | 2018-09-14 |
Family
ID=52756179
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410628931.6A Expired - Fee Related CN104481587B (zh) | 2014-11-10 | 2014-11-10 | 大采深、大跨度综放采煤工作面顶板砂岩裂隙水探防方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104481587B (zh) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105259051A (zh) * | 2015-11-16 | 2016-01-20 | 中国矿业大学 | 一种工程岩体力学特性的快速测试方法 |
CN106014407A (zh) * | 2016-06-30 | 2016-10-12 | 太原理工大学 | 利用顶板裂隙水原位弱化主控煤岩层控制灾害的方法 |
CN106814670A (zh) * | 2017-03-22 | 2017-06-09 | 重庆高略联信智能技术有限公司 | 一种河道采砂智能监管方法及系统 |
CN107165626A (zh) * | 2017-06-30 | 2017-09-15 | 徐州市耐力高分子科技有限公司 | 一种具有裂隙发育围岩顶板的采煤工作面水灾预防方法 |
CN107227959A (zh) * | 2017-06-22 | 2017-10-03 | 中国矿业大学 | 一种爆破松动边界煤柱/体促进裂隙闭合的水害防治方法 |
CN107842394A (zh) * | 2017-10-23 | 2018-03-27 | 青岛理工大学 | 大跨度地下硐室开采顶板稳定性的动弹模探测方法 |
CN107944778A (zh) * | 2018-01-16 | 2018-04-20 | 安徽理工大学 | 一种基于层次分析的砂岩赋水性评价方法 |
CN108374637A (zh) * | 2018-03-26 | 2018-08-07 | 四川川煤华荣能源股份有限公司 | 适应于大倾角松散煤层探放水钻孔施工方法 |
CN109681269A (zh) * | 2019-01-16 | 2019-04-26 | 内蒙古上海庙矿业有限责任公司 | 软岩条件下水-沙混合突涌防治技术方法 |
CN110700875A (zh) * | 2019-11-18 | 2020-01-17 | 伊犁永宁煤业化工有限公司 | 采空区自燃三带测定系统及方法 |
CN110735629A (zh) * | 2019-09-26 | 2020-01-31 | 天地科技股份有限公司 | 一种基于仰上钻孔钻进速度的导水裂缝带高度判定方法 |
CN112709565A (zh) * | 2021-01-27 | 2021-04-27 | 国家能源集团宁夏煤业有限责任公司双马煤矿 | 一种采煤区废弃石油井封堵深度的确定方法 |
CN113250684A (zh) * | 2021-04-22 | 2021-08-13 | 内蒙古上海庙矿业有限责任公司 | 一种侏罗系富水软岩的富水性评价及水害分级防控方法 |
CN113404484A (zh) * | 2021-07-27 | 2021-09-17 | 中国矿业大学 | 一种富含水地层采动岩层内部移动的地面双裸孔联合监测方法 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108843385B (zh) * | 2018-06-25 | 2020-04-14 | 河南理工大学 | 一种采动泥岩含水顶板巷道高效探放水方法及装置 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101526010A (zh) * | 2009-03-25 | 2009-09-09 | 华北科技学院 | 矿井突水灾害监测预警系统及其控制方法 |
CN101660427A (zh) * | 2009-05-18 | 2010-03-03 | 中国矿业大学(北京) | 煤层顶板涌(突)水条件定量评价预测的三图双预测法 |
CN101881182A (zh) * | 2010-07-14 | 2010-11-10 | 中国矿业大学(北京) | 矿井断裂构造延迟突水模拟预测评价方法 |
CN102400714A (zh) * | 2010-09-11 | 2012-04-04 | 中国矿业大学 | 一种高水压、高应力和自动开采的矿井水害综合模拟系统及试验方法 |
CN103995947A (zh) * | 2013-04-08 | 2014-08-20 | 中国矿业大学(北京) | 改进的煤层底板突水脆弱性评价方法 |
-
2014
- 2014-11-10 CN CN201410628931.6A patent/CN104481587B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101526010A (zh) * | 2009-03-25 | 2009-09-09 | 华北科技学院 | 矿井突水灾害监测预警系统及其控制方法 |
CN101660427A (zh) * | 2009-05-18 | 2010-03-03 | 中国矿业大学(北京) | 煤层顶板涌(突)水条件定量评价预测的三图双预测法 |
CN101881182A (zh) * | 2010-07-14 | 2010-11-10 | 中国矿业大学(北京) | 矿井断裂构造延迟突水模拟预测评价方法 |
CN102400714A (zh) * | 2010-09-11 | 2012-04-04 | 中国矿业大学 | 一种高水压、高应力和自动开采的矿井水害综合模拟系统及试验方法 |
CN103995947A (zh) * | 2013-04-08 | 2014-08-20 | 中国矿业大学(北京) | 改进的煤层底板突水脆弱性评价方法 |
Cited By (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105259051A (zh) * | 2015-11-16 | 2016-01-20 | 中国矿业大学 | 一种工程岩体力学特性的快速测试方法 |
CN105259051B (zh) * | 2015-11-16 | 2018-06-01 | 中国矿业大学 | 一种工程岩体力学特性的快速测试方法 |
CN106014407B (zh) * | 2016-06-30 | 2018-09-11 | 太原理工大学 | 利用顶板裂隙水原位弱化主控煤岩层控制灾害的方法 |
CN106014407A (zh) * | 2016-06-30 | 2016-10-12 | 太原理工大学 | 利用顶板裂隙水原位弱化主控煤岩层控制灾害的方法 |
CN106814670A (zh) * | 2017-03-22 | 2017-06-09 | 重庆高略联信智能技术有限公司 | 一种河道采砂智能监管方法及系统 |
CN107227959A (zh) * | 2017-06-22 | 2017-10-03 | 中国矿业大学 | 一种爆破松动边界煤柱/体促进裂隙闭合的水害防治方法 |
CN107227959B (zh) * | 2017-06-22 | 2019-05-07 | 中国矿业大学 | 一种爆破松动边界煤柱/体促进裂隙闭合的水害防治方法 |
CN107165626A (zh) * | 2017-06-30 | 2017-09-15 | 徐州市耐力高分子科技有限公司 | 一种具有裂隙发育围岩顶板的采煤工作面水灾预防方法 |
CN107842394B (zh) * | 2017-10-23 | 2019-03-26 | 青岛理工大学 | 大跨度地下硐室开采顶板稳定性的动弹模探测方法 |
CN107842394A (zh) * | 2017-10-23 | 2018-03-27 | 青岛理工大学 | 大跨度地下硐室开采顶板稳定性的动弹模探测方法 |
CN107944778A (zh) * | 2018-01-16 | 2018-04-20 | 安徽理工大学 | 一种基于层次分析的砂岩赋水性评价方法 |
CN108374637A (zh) * | 2018-03-26 | 2018-08-07 | 四川川煤华荣能源股份有限公司 | 适应于大倾角松散煤层探放水钻孔施工方法 |
CN109681269A (zh) * | 2019-01-16 | 2019-04-26 | 内蒙古上海庙矿业有限责任公司 | 软岩条件下水-沙混合突涌防治技术方法 |
CN110735629A (zh) * | 2019-09-26 | 2020-01-31 | 天地科技股份有限公司 | 一种基于仰上钻孔钻进速度的导水裂缝带高度判定方法 |
CN110735629B (zh) * | 2019-09-26 | 2023-08-29 | 天地科技股份有限公司 | 一种基于仰上钻孔钻进速度的导水裂隙带高度判定方法 |
CN110700875A (zh) * | 2019-11-18 | 2020-01-17 | 伊犁永宁煤业化工有限公司 | 采空区自燃三带测定系统及方法 |
CN112709565A (zh) * | 2021-01-27 | 2021-04-27 | 国家能源集团宁夏煤业有限责任公司双马煤矿 | 一种采煤区废弃石油井封堵深度的确定方法 |
CN113250684A (zh) * | 2021-04-22 | 2021-08-13 | 内蒙古上海庙矿业有限责任公司 | 一种侏罗系富水软岩的富水性评价及水害分级防控方法 |
CN113250684B (zh) * | 2021-04-22 | 2022-10-14 | 内蒙古上海庙矿业有限责任公司 | 一种侏罗系富水软岩的富水性评价及水害分级防控方法 |
CN113404484A (zh) * | 2021-07-27 | 2021-09-17 | 中国矿业大学 | 一种富含水地层采动岩层内部移动的地面双裸孔联合监测方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104481587B (zh) | 2018-09-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104481587A (zh) | 大采深、大跨度综放采煤工作面顶板砂岩裂隙水探防方法 | |
Ghosh et al. | Application of underground microseismic monitoring for ground failure and secure longwall coal mining operation: A case study in an Indian mine | |
Hatherly | Overview on the application of geophysics in coal mining | |
CN101581234B (zh) | 煤层采动顶底板岩层变形与破坏井下综合测试方法 | |
Sun et al. | Multi-field coupling of water inrush channel formation in a deep mine with a buried fault | |
Huang et al. | Experimental investigation of the variations in hydraulic properties of a fault zone in Western Shandong, China | |
Tan et al. | In situ investigations of failure zone of floor strata in mining close distance coal seams | |
WO2015158153A1 (zh) | 一种用于采煤过程中的保水方法 | |
CN104730585A (zh) | 一种采动工作面底板破坏深度实时监测方法 | |
Shen et al. | Investigation of overburden behaviour for grout injection to control mine subsidence | |
CN106869997A (zh) | 一种煤矿多含水层防治方法 | |
CN110609335A (zh) | 一种基于多手段的残采区复杂条件探测方法 | |
Marwan | Numerical and geophysical tools applied for the prediction of mine induced seismicity in French coalmines | |
Zhu et al. | Overburden movement characteristics of top-coal caving mining in multi-seam areas | |
Li et al. | Effects of an underlying drainage gallery on coal bed methane capture effectiveness and the mechanical behavior of a gate road | |
Meng et al. | In situ investigation and numerical simulation of the failure depth of an inclined coal seam floor: a case study | |
Jian et al. | Determining areas in an inclined coal seam floor prone to water-inrush by micro-seismic monitoring | |
Xu et al. | Comprehensive exploration, safety evaluation and grouting of karst collapse columns in the Yangjian coalmine of the Shanxi province, China | |
CN103670511B (zh) | 一种顶板岩层破裂程度的分析计算方法 | |
Alber | Strength of faults–A concern for mining engineers? | |
Kasperczyk et al. | Tiltmeter monitoring to verify growth of hydraulic fractures used for preconditioning of strong roof rock | |
Zhang et al. | Detection and evaluation of crack development near the fault zone under the influence of coal mining | |
Li et al. | Karst paleo-collapses and their impacts on mining and the environment in Northern China | |
Yang et al. | Investigation on the Height of Fracture Zone in Goaf of Steep Coal Seam Based on Microseismic Monitoring | |
Fowler et al. | The use of borehole breakout for geotechnical investigation of an open pit mine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Niu Chao Inventor after: Qiu Mei Inventor after: Zhu Lu Inventor after: Shi Longqing Inventor before: Shi Longqing Inventor before: Niu Chao Inventor before: Qiu Mei Inventor before: Zhu Lu |
|
CB03 | Change of inventor or designer information | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20180706 Address after: 710054 Yanta South Road, Yanta District, Xi'an, Shaanxi Province, No. 54 Applicant after: Xi'an University of Science and Technology Applicant after: Shandong Univ. of Science & Technology Address before: 266590 No. 579, Qian Wan Gang Road, Qingdao economic and Technological Development Zone, Shandong Applicant before: Shandong Univ. of Science & Technology |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180914 Termination date: 20201110 |
|
CF01 | Termination of patent right due to non-payment of annual fee |