CN104481138B - Mark time tooth raft formula from fissure of displacement external angle formwork - Google Patents

Mark time tooth raft formula from fissure of displacement external angle formwork Download PDF

Info

Publication number
CN104481138B
CN104481138B CN201410795473.5A CN201410795473A CN104481138B CN 104481138 B CN104481138 B CN 104481138B CN 201410795473 A CN201410795473 A CN 201410795473A CN 104481138 B CN104481138 B CN 104481138B
Authority
CN
China
Prior art keywords
fissure
displacement
angle
bridge
scrap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410795473.5A
Other languages
Chinese (zh)
Other versions
CN104481138A (en
Inventor
赵克勤
俞满江
肖宗跃
景士云
李斌
赵勇
方国泰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG SHENGDA CONSTRUCTION GROUP CO Ltd
Zhejiang Zhancheng Construction Group Co Ltd
Original Assignee
ZHEJIANG SHENGDA CONSTRUCTION GROUP CO Ltd
Zhejiang Zhancheng Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG SHENGDA CONSTRUCTION GROUP CO Ltd, Zhejiang Zhancheng Construction Group Co Ltd filed Critical ZHEJIANG SHENGDA CONSTRUCTION GROUP CO Ltd
Priority to CN201410795473.5A priority Critical patent/CN104481138B/en
Publication of CN104481138A publication Critical patent/CN104481138A/en
Application granted granted Critical
Publication of CN104481138B publication Critical patent/CN104481138B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Moulds, Cores, Or Mandrels (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses one and mark time tooth raft formula from fissure of displacement external angle formwork, belong to building template, current mechanism plate is at the easy spillage of seam crossing, cause slag inclusion, necking down defect, the present invention is the right angle imposite being made into integration by plastics and including two right-angle sides, the inner side of two right-angle sides is respectively provided with a tooth raft marked time, the tooth raft that one is marked time refers to and arranges a fissure of displacement scrap (bridge) in the thickness range of right-angle side, the step form that a square column type fissure of displacement step is constituted is formed in imposite angle, right angle, the thickness of fissure of displacement scrap (bridge), 1/2 thickness of slab of the riser height of fissure of displacement step respectively right-angle side, the thickness of two right-angle sides is equal to the thickness of slab of template。Being placed in the external corner place being intended to build concrete during use as bezel cover plate, built the template overlap joint coupling of the plane of concrete by tooth raft structure and being intended to, formwork efficiency is high, water smash concrete corner will not spillage, stop slag inclusion, necking down defect;It is made by plastics, can recycle after damage, reduces waste of material。

Description

Mark time tooth raft formula from fissure of displacement external angle formwork
Technical field
The invention belongs to building template, specifically one marks time tooth raft formula from fissure of displacement external angle formwork。
Background technology
The existing template being widely used in architectural engineering formwork system, mostly it is " mechanism plate " (general designation of mechanism wooden splint and bamboo slab rubber), not recoverable after damage, waste of material is serious, formwork efficiency is low, at form joint place (particularly in watering the corner smashing concrete) easily spillage, cause slag inclusion, necking down defect。
Summary of the invention
The technical assignment of the technical problem to be solved in the present invention and proposition is to overcome current mechanism plate at the easy spillage of seam crossing, cause the defect of slag inclusion, necking down, there is provided one to mark time tooth raft formula from fissure of displacement external angle formwork, water the problem smashing the easy spillage of concrete external corner part and cause slag inclusion, necking down in order to solving。
For reaching above-mentioned purpose, the tooth raft formula of marking time of the present invention is from fissure of displacement external angle formwork, it is characterized in that: it is made into integration the right angle imposite including two right-angle sides by plastics, the inner side of two right-angle sides is respectively provided with a tooth raft marked time, the tooth raft that one is marked time refers to and arranges a fissure of displacement scrap (bridge) in the thickness range of described right-angle side, the step form that a square column type fissure of displacement step is constituted is formed in imposite angle, described right angle, the thickness of described fissure of displacement scrap (bridge), 1/2 thickness of slab of the riser height of fissure of displacement step respectively described right-angle side, the thickness of two described right-angle sides is equal to the thickness of slab of template。
As optimization technique means: the width of the fissure of displacement scrap (bridge) of said two right-angle side is equal。
As optimization technique means: the width of the fissure of displacement scrap (bridge) of said two right-angle side is 25mm。
As optimization technique means: the thickness of described two right-angle sides is 2cm。
As optimization technique means: the distance of one fissure of displacement scrap (bridge) width in edge of the described fissure of displacement this end of scrap (bridge) is extended in one end of described fissure of displacement step, the distance of one fissure of displacement scrap (bridge) width in the edge of the fissure of displacement this end of scrap (bridge) described in the other end indentation of described fissure of displacement step。
As optimization technique means: the width center line of described fissure of displacement scrap (bridge) sets fastening screw, and be described fastening screw configuration bolt, described bolt include leading portion for the thread segment coordinated with described fastening screw, the undergauge section in stage casing, afterbody turret head, the length of described thread segment is suitable with the thickness of described fissure of displacement scrap (bridge), the diameter of described undergauge section is not more than the diameter of described fastening screw, and the length of described undergauge section is not less than the thickness of described fissure of displacement scrap (bridge)。
As optimization technique means: with pad on the turret head of described bolt。
As optimization technique means: described fastening screw is bury nut in described fissure of displacement scrap (bridge) underground to be formed。
As optimization technique means: the periphery lining of described nut strengthens steel disc。
As optimization technique means: on each described fissure of displacement scrap (bridge) two-end part fastening screw one end corresponding to this fissure of displacement scrap (bridge) right angle imposite edge between the width that distance is 2 times of fissure of displacement scrap (bridge)s。
As optimization technique means: described right angle imposite includes the metallic framework being covered by inside。
The invention has the beneficial effects as follows: be placed in the external corner place being intended to build concrete during use as bezel cover plate, built the template overlap joint coupling of the plane of concrete by tooth raft structure and being intended to, formwork efficiency is high, water smash concrete corner will not spillage, stop slag inclusion, necking down defect;It is made by plastics, can recycle after damage, reduces waste of material。
Accompanying drawing explanation
Fig. 1 is that the present invention marks time a tooth raft formula orthographic projection view from fissure of displacement external angle formwork;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is the top view of Fig. 1;
Fig. 4 is that the A-A of Fig. 1 is to sectional view;
Fig. 5 is the schematic diagram of the bolt that the present invention coordinates with fastening screw;
The external angle formwork of the present invention is laid to the schematic diagram being intended to build concrete external corner part by Fig. 6;
The external angle formwork that Fig. 7 is the present invention is laid in the schematic diagram being intended to build concrete external corner part;
Number in the figure illustrates:
01-right-angle side;
02-tooth raft, 21-fissure of displacement scrap (bridge), 22-fissure of displacement step, 23-fastens screw;
03-bolt, 31-thread segment, 32-undergauge section, 33-turret head;
04-plane template;
05-concrete;
The thickness of T-fissure of displacement scrap (bridge);
The riser height of H-fissure of displacement step;
The width of W-fissure of displacement scrap (bridge)。
Detailed description of the invention
Below in conjunction with Figure of description, the present invention will be further described。
As Figure 1-4, the tooth raft formula of marking time of the present invention is from fissure of displacement external angle formwork, it it is the right angle imposite being made into integration by plastics and including two right-angle sides 01, the inner side of two right-angle sides 01 is respectively provided with a tooth raft 02 marked time, the tooth raft that one is marked time refers to the step form arranging a fissure of displacement scrap (bridge) 21 in the thickness range of right-angle side 01, constituting at imposite angle, right angle one square column type fissure of displacement step 22 of formation, the thickness T of fissure of displacement scrap (bridge) 21, fissure of displacement step 22 1/2 thickness of slab of riser height H respectively right-angle side, the thickness of two right-angle sides is equal to the thickness of slab of template。
During use, as shown in Figure 6,7, this external angle formwork can be covered as bezel cover plate at the external corner place being intended to build concrete 05, coupling is overlapped by the tooth raft of external angle formwork and the tooth raft being intended to build the plane template 04 of concrete 05, formwork efficiency is high, water smash concrete corner will not spillage, stop slag inclusion, necking down defect;It is made by plastics, can recycle after damage, reduces waste of material。
Described plane template 04, it is be respectively provided with a tooth raft marked time in the edge of plastics plane imposite, this the tooth raft marked time refers to the step form arranging a fissure of displacement scrap (bridge) in the thickness range of plane imposite and being formed higher than a fissure of displacement step of fissure of displacement scrap (bridge), the thickness of fissure of displacement scrap (bridge), fissure of displacement step 1/2 thickness of slab of riser height respectively plane imposite, the edge of plane imposite lays respectively on the limit of a rectangle, and the thickness of plane imposite is equal to the thickness of slab of template。
In order to increase compatibility, the width W of the fissure of displacement scrap (bridge) of two right-angle sides is equal, and the width of the fissure of displacement scrap (bridge) of two right-angle sides is 25mm, and the thickness of two right-angle sides is 2cm。Therefore, the riser height respectively 1cm of the thickness of fissure of displacement scrap (bridge), fissure of displacement step。It is thus possible to it is compatible with now widely used " mechanism plate ";Make modulo reduction simultaneously。
Same in order to increase compatibility, make this external angle formwork and plane template can overlap coupling, the distance of one fissure of displacement scrap (bridge) width in edge of this end of fissure of displacement scrap (bridge) 21 is extended in one end (diagram upper end) of fissure of displacement step 22, the distance of one fissure of displacement scrap (bridge) width in edge of the other end (diagram lower end) indentation this end of fissure of displacement scrap (bridge) 21 of fissure of displacement step 22。
In order to fasten external angle formwork and plane template, the width center line of the fissure of displacement scrap (bridge) of the two sets fastening screw, and configure bolt 03 as shown in Figure 5 for fastening screw, bolt 03 include leading portion for fastening screw coordinate thread segment 31, the undergauge section 32 in stage casing, afterbody turret head 33, the length of thread segment is suitable with the thickness of fissure of displacement scrap (bridge), the diameter of undergauge section is not more than the diameter of fastening screw, and the length of undergauge section is not less than the thickness of fissure of displacement scrap (bridge)。Concrete, with pad on the turret head of bolt, fastening screw is formed for burying nut in fissure of displacement scrap (bridge) underground, and the periphery lining of nut strengthens steel disc。
On each fissure of displacement scrap (bridge) two-end part fastening screw one end corresponding to this fissure of displacement scrap (bridge) right angle imposite edge between the width that distance is 2 times of fissure of displacement scrap (bridge)s。
In order to increase intensity, rigidity, right angle imposite includes the metallic framework being covered by inside。

Claims (9)

1. mark time tooth raft formula from fissure of displacement external angle formwork, it is characterized in that: it is made into integration the right angle imposite including two right-angle sides (01) by plastics, the inner side of two right-angle sides is respectively provided with a tooth raft (02) marked time, the tooth raft that one is marked time refers to and arranges a fissure of displacement scrap (bridge) (21) in the thickness range of described right-angle side, the step form that square column type fissure of displacement step (22) is constituted is formed in imposite angle, described right angle, the thickness (T) of described fissure of displacement scrap (bridge) (21), 1/2 thickness of slab of riser height (H) the respectively described right-angle side of fissure of displacement step (22), the thickness of two described right-angle sides is equal to the thickness of slab of template;
The width (W) of the fissure of displacement scrap (bridge) of said two right-angle side is equal;
The distance of one fissure of displacement scrap (bridge) width in edge of described this end of fissure of displacement scrap (bridge) (21) is extended in one end of described fissure of displacement step (22), the distance of one fissure of displacement scrap (bridge) width in edge of fissure of displacement scrap (bridge) (21) this end described in the other end indentation of described fissure of displacement step (22)。
2. tooth raft formula of marking time according to claim 1 is from fissure of displacement external angle formwork, it is characterized in that: the width (W) of the fissure of displacement scrap (bridge) of said two right-angle side is 25mm。
3. tooth raft formula of marking time according to claim 1 is from fissure of displacement external angle formwork, it is characterized in that: the thickness of described two right-angle sides (01) is 2cm。
4. tooth raft formula of marking time according to claim 1 is from fissure of displacement external angle formwork, it is characterized in that: the width center line of described fissure of displacement scrap (bridge) (21) sets fastening screw (23), and be described fastening screw configuration bolt (03), described bolt (03) includes the thread segment (31) for coordinating of leading portion with described fastening screw, the undergauge section (32) in stage casing, the turret head (33) of afterbody, the length of described thread segment (31) is suitable with the thickness (T) of described fissure of displacement scrap (bridge), the diameter of described undergauge section (32) is not more than the diameter of described fastening screw (23), the length of described undergauge section (32) is not less than the thickness (T) of described fissure of displacement scrap (bridge)。
5. tooth raft formula of marking time according to claim 4 is from fissure of displacement external angle formwork, it is characterized in that: with pad on the turret head of described bolt (03)。
6. tooth raft formula of marking time according to claim 4 is from fissure of displacement external angle formwork, it is characterized in that: described fastening screw (23) is formed for burying nut in described fissure of displacement scrap (bridge) underground。
7. tooth raft formula of marking time according to claim 6 is from fissure of displacement external angle formwork, it is characterized in that: the periphery lining of described nut strengthens steel disc。
8. tooth raft formula of marking time according to claim 4 is from fissure of displacement external angle formwork, it is characterized in that: the width that distance is 2 times of fissure of displacement scrap (bridge)s between the edge of the right angle imposite of fastening screw one end corresponding to this fissure of displacement scrap (bridge) of two-end part on each described fissure of displacement scrap (bridge)。
9. tooth raft formula of marking time according to claim 1 is from fissure of displacement external angle formwork, it is characterized in that: described right angle imposite includes being covered by the metallic framework of inside。
CN201410795473.5A 2014-12-18 2014-12-18 Mark time tooth raft formula from fissure of displacement external angle formwork Expired - Fee Related CN104481138B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410795473.5A CN104481138B (en) 2014-12-18 2014-12-18 Mark time tooth raft formula from fissure of displacement external angle formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410795473.5A CN104481138B (en) 2014-12-18 2014-12-18 Mark time tooth raft formula from fissure of displacement external angle formwork

Publications (2)

Publication Number Publication Date
CN104481138A CN104481138A (en) 2015-04-01
CN104481138B true CN104481138B (en) 2016-06-22

Family

ID=52755733

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410795473.5A Expired - Fee Related CN104481138B (en) 2014-12-18 2014-12-18 Mark time tooth raft formula from fissure of displacement external angle formwork

Country Status (1)

Country Link
CN (1) CN104481138B (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3653629A (en) * 1969-03-14 1972-04-04 Anza Pacific Corp Building corner form structure
CN2323065Y (en) * 1997-03-02 1999-06-09 张震 Combined form for concrete stairs
CN201078095Y (en) * 2007-07-05 2008-06-25 天津市富士特实业有限公司 Special-shaped external corner for building mould
CN201125529Y (en) * 2007-11-16 2008-10-01 浙江省建工集团有限责任公司 Large template corner chucking appliance for building
CN203188615U (en) * 2013-01-10 2013-09-11 李兵 Hollow internal-external corner plastic building template
CN204311744U (en) * 2014-12-18 2015-05-06 浙江展诚建设集团股份有限公司 Mark time tooth raft formula from fissure of displacement external angle formwork

Also Published As

Publication number Publication date
CN104481138A (en) 2015-04-01

Similar Documents

Publication Publication Date Title
CN203603452U (en) Folded plate small space formwork assembly
CN203945479U (en) A kind of mortar leakage prevention T girder prefabricated pedestal
CN207240471U (en) A kind of wallboard hanging piece device detachably reused
CN105822324A (en) Full-automatic tunnel end form
CN206189279U (en) Structure is assembled with bent cap to stand
CN104481138B (en) Mark time tooth raft formula from fissure of displacement external angle formwork
CN204311744U (en) Mark time tooth raft formula from fissure of displacement external angle formwork
CN204311743U (en) Mark time tooth raft formula from fissure of displacement internal corner formwork
CN104481139B (en) Mark time tooth raft formula from fissure of displacement internal corner formwork
CN204266150U (en) A kind of hard isolated column for old bridge dividing strip
CN204039857U (en) A kind of floor type hardening of concrete roads plate of efficient laying
CN201276835Y (en) Cladding plastic building mould and its combined building mould
CN104533078B (en) Mark time tooth raft formula from fissure of displacement template system
CN102628274A (en) Construction method for foundation pad oblique angle of brick moulding bed combined wood mould
CN203145455U (en) Steel mold for stairs
CN203188084U (en) In-field shoulder-stone-free secondary concrete road
CN204311742U (en) Mark time tooth raft formula from fissure of displacement seat Angle formwork
CN202826015U (en) Curbstone mold
CN206110668U (en) Clear water concrete outseam strip
CN104533085A (en) Detachable sealing-up screw
CN203783136U (en) Adjusting template provided with wedge angles
CN204703502U (en) One blocks water platform mould
CN207920081U (en) A kind of adjustable size engineering pipeline reserved opening assembling die
CN204040301U (en) The building block of a kind of loop beam forms
CN106013790A (en) Bare concrete exposed joint strip

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160622

Termination date: 20191218

CF01 Termination of patent right due to non-payment of annual fee