Rapid material hoister used for large-scale construction Download PDFInfo
- Publication number
- CN104477737A CN104477737A CN201410729072.XA CN201410729072A CN104477737A CN 104477737 A CN104477737 A CN 104477737A CN 201410729072 A CN201410729072 A CN 201410729072A CN 104477737 A CN104477737 A CN 104477737A
- Authority
- CN
- China
- Prior art keywords
- guide rail
- steel rope
- roof beam
- base
- beam structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B9/00—Kinds or types of lifts in, or associated with, buildings or other structures
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B7/00—Other common features of elevators
- B66B7/02—Guideways; Guides
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B7/00—Other common features of elevators
- B66B7/06—Arrangements of ropes or cables
Abstract
This invention relates to the field of industrial mechanical drive, and provides a rapid material hoister used for large-scale construction. The rapid material hoister comprises a base, an electrical system and a support beam which is vertically fixed with the base. Two vertical fixed guide rail frames are equipped on the base. A peak beam frame is arranged at the top portion of the guide rail frame. A hoisting cage component is disposed between the left guide rail frame and the right guide rail frame. The hoisting cage component is connected with the peak beam frame via a steel rope and pulleys. A load lifting limiter is equipped on one side connected with the hoisting cage component of the pulley which is mounted at the top portion of the right peak beam frame, and the other side is connected with a counterweight box via the steel rope. A lifting traction machine is connected with the pulley disposed at the top portion of the left peak beam frame via the steel rope. The lifting traction machine is mounted on the base and is connected with the electrical system. Compared with the traditional material hoister, the rapid material hoister is higher in efficiency and lower in energy consumption. Meanwhile, the developed counterweight box enables the force to be even during operation. The lifting speed is increased to 25 m per minute from 11 m per minute, and the energy consumption is reduced by 1/3 compared with a winding machine. The rapid material hoister is environment friendly and energy saving.
Description
Technical field
The present invention relates to industrial gearing field, particularly material elevator.
Background technology
Material elevator, it is a kind of mechanical load transfer device of anchor fitting, mainly be applicable to the continuous and perpendicular lifting of powdery, graininess and piece material, the lifting of loose unpacked material of the feed factory of various scale, flour mill, meter Chang, You Chang, starch factory and grain depot, port and pier etc. can be widely used in.Traditional material elevator comprises support body and winch and cage, also lacking enough efficiency and safety for during Large Construction, and power power consumption comparatively large, run also steady not.
Summary of the invention
Object of the present invention solves the problems of the technologies described above exactly, provides a kind of material fast elevator applying Large Construction, and its structure is simple, it is low to consume energy, efficiency is high, and run laborsaving, operate steadily.
Technical matters of the present invention is solved mainly through following technical proposals:
A kind of material fast elevator applying Large Construction, comprise base, electric system, and the support beam fixed vertical with base, it is characterized in that: described base is provided with two vertically fixing guide rail brackets, guide rail bracket top is provided with a day roof beam structure, cage parts are provided with between two guide rail brackets in left and right, these cage parts pass through steel rope, pulley is connected with sky roof beam structure, wherein roof beam structure its top pulleys in right sky is provided with load lifting limiter in connection cage parts side, opposite side is connected loaded van by steel rope, left sky its top pulleys of roof beam structure connects lifting towing machine by steel rope, this lifting towing machine is located at said base and is connected with electric system.
Further, described guide rail bracket parallel with support beam and both connected by attaching structure, this guide rail bracket is also provided with workplatform.
Further, described workplatform is across two, left and right guide rail bracket, and this workplatform is provided with suspension rod and suspension rod winch.
Further, describedly slide rail is also provided with to loaded van is flexibly connected with guide rail bracket.
Further, described guide rail bracket is provided with the end cage corresponding with cage parts and goes along with sb. to guard him in bottom.
Further, described sky roof beam structure, cage parts are equipped with two pulleys.
Further, described counterweight box top is provided with pulley and connects sky roof beam structure top sheave by steel rope, and the destination terminal of this steel rope is fixed on this day roof beam structure side.
As preferably, guide rail bracket adopts standard knot, and guide rail bracket base altitude is no more than 45m, wirerope diameter 12mm.
The invention has the beneficial effects as follows: the present invention is higher than conventional materials gig efficiency, power consumption is lower, and the counterweight box structure of exploitation makes in this machine operational process, uniform force, promote steadily; Moreover have employed a kind of towing machine fast in the present invention, hoisting speed, by original 11 ms/min 25 ms/min till now, consumes energy and also reduces 1/3 than winch power, energy-conserving and environment-protective simultaneously; Finally, respectively at three groups of movable pulleys that cage, counterweight, sky roof beam structure are arranged, also reduce energy consumption in labour-saving simultaneously.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is side schematic view of the present invention;
Fig. 3 is the schematic diagram of sky roof beam structure in the present invention;
Fig. 4 is the schematic diagram of middle hanger winch of the present invention;
Fig. 5 is the schematic diagram of load lifting limiter in the present invention;
Fig. 6 is the schematic diagram to loaded van in the present invention.
In figure: 1. electric system; 2. base; 3. promote towing machine; 4. guide rail bracket; 5. cage parts; 6. workplatform; 7. day roof beam structure; 8. pulley; 9. suspension bracket; 10. suspension bracket winch; 11. end cages are gone along with sb. to guard him; 12. attaching structures; 13. pairs of loaded vans; 14. load lifting limiters; 15. support beams; 16. slide rails.
Detailed description of the invention
Below by embodiment, and 1-6 by reference to the accompanying drawings, technical scheme of the present invention is described in further detail.
A kind of material fast elevator applying Large Construction, comprise base 2, electric system 1, and fixing support beam 15 vertical with base 2, support beam 15 is highly 30 meters, described base 2 is provided with two vertically fixing guide rail brackets 4, guide rail bracket 4 top is provided with day roof beam structure 7, cage parts 5 are provided with between two guide rail brackets 4 in left and right, these cage parts 5 pass through steel rope, pulley 8 is connected with sky roof beam structure 7, wherein its top pulleys 8 of right sky roof beam structure 7 is provided with load lifting limiter 14 in connection cage parts 5 side, opposite side is connected loaded van 13 by steel rope, its top pulleys 8 of left sky roof beam structure 7 connects lifting towing machine 3 by steel rope, this lifting towing machine 3 is located at said base 2 and is connected with electric system 1.This electric system 1 is fixed on base 2.
Described guide rail bracket 4 parallel with support beam 15 and both connected by attaching structure 12, this guide rail bracket 4 is also provided with workplatform 6.Described workplatform 6 is across two, left and right guide rail bracket 4, and this workplatform 6 is provided with suspension rod 9 and suspension rod winch 10, and suspension rod winch 10 is for workplatform 6 is from rising winch.Describedly slide rail 16 be also provided with to loaded van 13 be flexibly connected with guide rail bracket 4, make to loaded van 13 can outside guide rail bracket 4 upper and lower orbiting motion.Described guide rail bracket 4 is provided with the end cage corresponding with cage parts 5 and goes along with sb. to guard him 11 in bottom.Described sky roof beam structure 7, cage parts 5 are equipped with two pulleys 8.Describedly be provided with pulley 8 to loaded van 13 top and connect sky roof beam structure 7 top sheave 8 by steel rope, the destination terminal of this steel rope is fixed on this day roof beam structure 7 side.
In the present embodiment, guide rail bracket 4 base altitude 30m, guide rail bracket 4 adopts standard knot, standard knot size 600 × 714 × 2000mm, cage headroom size 1700 × 3400 × 2050mm, wirerope diameter 12mm, this equipment nominal payload 1200kg, average hoisting speed 25m/min.
The present embodiment is the embodiment of example of the present invention; for those skilled in the art; on the basis that the invention discloses application process and principle; be easy to make various types of improvement or distortion; and the structure be not limited only to described by the above-mentioned detailed description of the invention of the present invention, therefore previously described mode is preferred version, and does not have restrictive meaning; every equivalence done according to the present invention changes and amendment, all in the scope protection domain of claims of the present invention.
Claims (7)
1. apply the material fast elevator of Large Construction for one kind, comprise base, electric system, and the support beam fixed vertical with base, it is characterized in that: described base is provided with two vertically fixing guide rail brackets, guide rail bracket top is provided with a day roof beam structure, cage parts are provided with between two guide rail brackets in left and right, these cage parts pass through steel rope, pulley is connected with sky roof beam structure, wherein roof beam structure its top pulleys in right sky is provided with load lifting limiter in connection cage parts side, opposite side is connected loaded van by steel rope, left sky its top pulleys of roof beam structure connects lifting towing machine by steel rope, this lifting towing machine is located at said base and is connected with electric system.
2. a kind of material fast elevator applying Large Construction according to claim 1, is characterized in that: described guide rail bracket parallel with support beam and both connected by attaching structure, this guide rail bracket is also provided with workplatform.
3. a kind of material fast elevator applying Large Construction according to claim 2, is characterized in that: described workplatform is across two, left and right guide rail bracket, and this workplatform is provided with suspension rod and suspension rod winch.
4. a kind of material fast elevator applying Large Construction according to claim 1, is characterized in that: be describedly also provided with slide rail to loaded van and be flexibly connected with guide rail bracket.
5. a kind of material fast elevator applying Large Construction according to claim 1, is characterized in that: described guide rail bracket is provided with the end cage corresponding with cage parts and goes along with sb. to guard him in bottom.
6. a kind of material fast elevator applying Large Construction according to claim 1, is characterized in that: described sky roof beam structure, cage parts are equipped with two pulleys.
7. a kind of material fast elevator applying Large Construction according to claim 1, is characterized in that: described counterweight box top is provided with pulley and connects sky roof beam structure top sheave by steel rope, and the destination terminal of this steel rope is fixed on this day roof beam structure side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410729072.XA CN104477737A (en) | 2014-12-04 | 2014-12-04 | Rapid material hoister used for large-scale construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410729072.XA CN104477737A (en) | 2014-12-04 | 2014-12-04 | Rapid material hoister used for large-scale construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104477737A true CN104477737A (en) | 2015-04-01 |
Family
ID=52752386
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410729072.XA Pending CN104477737A (en) | 2014-12-04 | 2014-12-04 | Rapid material hoister used for large-scale construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104477737A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021072769A1 (en) * | 2019-10-16 | 2021-04-22 | 歌拉瑞电梯股份有限公司 | Authorization management system for traction-type building construction elevator |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1585269A1 (en) * | 1988-06-28 | 1990-08-15 | Московское научно-производственное объединение по строительному и дорожному машиностроению "ВНИИстройдормаш" | Construction hoist |
CN2159955Y (en) * | 1993-02-20 | 1994-03-30 | 湖南省第四工程公司 | Rope breaking protective device for gantry crane |
CN2384929Y (en) * | 1999-08-16 | 2000-06-28 | 焦作矿务局建筑安装工程总公司 | Self-raising gantry crane |
CN2450198Y (en) * | 2000-07-03 | 2001-09-26 | 天津三建东滨机械施工有限公司 | Safety self-lifting type lifter |
CN2557501Y (en) * | 2001-12-26 | 2003-06-25 | 董延凯 | Self-lifting door frame lift |
JP2007176643A (en) * | 2005-12-27 | 2007-07-12 | Sansei Kenki Kk | Top sheave device in climbing construction method of elevators for work |
CN200954972Y (en) * | 2006-08-07 | 2007-10-03 | 徐香顺 | Portal-type construction lifter for both person and goods |
CN204265181U (en) * | 2014-12-04 | 2015-04-15 | 赣州赣铁建筑机械设备有限公司 | A kind of material fast elevator applying Large Construction |
-
2014
- 2014-12-04 CN CN201410729072.XA patent/CN104477737A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1585269A1 (en) * | 1988-06-28 | 1990-08-15 | Московское научно-производственное объединение по строительному и дорожному машиностроению "ВНИИстройдормаш" | Construction hoist |
CN2159955Y (en) * | 1993-02-20 | 1994-03-30 | 湖南省第四工程公司 | Rope breaking protective device for gantry crane |
CN2384929Y (en) * | 1999-08-16 | 2000-06-28 | 焦作矿务局建筑安装工程总公司 | Self-raising gantry crane |
CN2450198Y (en) * | 2000-07-03 | 2001-09-26 | 天津三建东滨机械施工有限公司 | Safety self-lifting type lifter |
CN2557501Y (en) * | 2001-12-26 | 2003-06-25 | 董延凯 | Self-lifting door frame lift |
JP2007176643A (en) * | 2005-12-27 | 2007-07-12 | Sansei Kenki Kk | Top sheave device in climbing construction method of elevators for work |
CN200954972Y (en) * | 2006-08-07 | 2007-10-03 | 徐香顺 | Portal-type construction lifter for both person and goods |
CN204265181U (en) * | 2014-12-04 | 2015-04-15 | 赣州赣铁建筑机械设备有限公司 | A kind of material fast elevator applying Large Construction |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021072769A1 (en) * | 2019-10-16 | 2021-04-22 | 歌拉瑞电梯股份有限公司 | Authorization management system for traction-type building construction elevator |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202988612U (en) | Flat arm type tower crane | |
CN203855328U (en) | Novel hoisting machine | |
CN101293624A (en) | Stacking machine | |
CN104140037A (en) | Wallboard lifting system | |
CN103072877A (en) | Single-well and double-car elevator | |
CN204265181U (en) | A kind of material fast elevator applying Large Construction | |
CN103058069A (en) | Horizontal arm tower-type crane | |
CN103754778A (en) | Counterweight balance equipment of crane | |
CN104477737A (en) | Rapid material hoister used for large-scale construction | |
CN204417064U (en) | The efficient bont of a kind of material buttress code | |
CN204689441U (en) | A kind of electric hoist double-girder hoisting crane | |
CN101549819A (en) | Energy-conserving elevator counterbalancing method | |
CN105016233A (en) | Electric hoist of crane | |
CN207844796U (en) | The new vertical of material conveys elevator | |
CN204823877U (en) | Travelling crane with walking dolly and hoisting gear | |
CN204185124U (en) | A kind of hoisting crane entablatrance | |
CN204057812U (en) | The two reel wiring system of duplex | |
CN202465196U (en) | Tunnel stacker crane | |
CN201660377U (en) | Special gantry crane for overlength and large-tonnage parts | |
CN202880727U (en) | Lifting device for large lifting platform | |
CN204079279U (en) | A kind of engineering gauntry crane jack up unit | |
CN204490336U (en) | A kind of all-hydraulic constitutional formula load carrier with multiple hold-down arm | |
CN203938366U (en) | Wallboard Lift-on/Lift-off System | |
CN204125117U (en) | A kind of vehicle for construction material lifting table | |
CN205275132U (en) | Forklift lifting tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150401 |