CN104460353A - Electric energy meter and centralized meter reading and load control terminal integrated debugging device - Google Patents
Electric energy meter and centralized meter reading and load control terminal integrated debugging device Download PDFInfo
- Publication number
- CN104460353A CN104460353A CN201310429246.6A CN201310429246A CN104460353A CN 104460353 A CN104460353 A CN 104460353A CN 201310429246 A CN201310429246 A CN 201310429246A CN 104460353 A CN104460353 A CN 104460353A
- Authority
- CN
- China
- Prior art keywords
- meter
- debugging
- debugging unit
- unit
- collection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/04—Programme control other than numerical control, i.e. in sequence controllers or logic controllers
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R35/00—Testing or calibrating of apparatus covered by the other groups of this subclass
- G01R35/04—Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current
Abstract
The invention relates to an electric energy meter and centralized meter reading and load control terminal integrated debugging device. The integrated debugging device is composed of a three-phase meter debugging unit, a single-phase meter debugging unit, a centralized meter reading terminal debugging unit, a I-type load control debugging unit, a II-type load control debugging unit, an analog and load controller, a signal device, a debugging diagnosis unit, and an instrument support. Due to the arrangement of the three-phase meter debugging unit, the single-phase meter debugging unit, the centralized meter reading terminal debugging unit, the I-type load control debugging unit, the II-type load control debugging unit and the debugging diagnosis unit, integrated debugging of centralized meter reading, load control and metering can be carried out. Due to the arrangement of the signal device, the debugging process is quicker and more convenient. Due to the arrangement of the analog and load controller, loading and switching can be simulated during diagnosis and debugging, and the debugging result is more accurate. As the instrument support is provided with a universal roller set and is convenient to move, the debugging device is more suitable for on-site first-aid repair to eliminate faults. The debugging device is compact in structure and convenient and accurate in use, and thus, has great practical and popularization values.
Description
Technical field
The present invention relates to a kind of electric power debugging apparatus, specifically for electric system a kind of electric energy meter and collection is copied, negative control terminal integrated debugging device.
Background technology
Through retrieval Patent documents of interest, not yet retrieve a kind of electric energy meter for electric system identical with structure of the present invention at present and collection is copied, negative control terminal integrated debugging device.In electric system, robotization digital collection covers use comprehensively, heavier owing to gathering building-up work task, in collecting work on-site terminal and measurement meter producer more and copy field adjustable work to collection and bring larger workload, the field adjustable time of some fault handlings is longer; Due to load-control equipment upgrading delayed, load-control equipment model is many and the instability of terminal operating, obviously increase to the workload of load-control equipment field adjustable; Sometimes, because the Incomplete matching of terminal called copied by measurement meter and collection collection, cause field adjustable difficulty, and existing commissioning device function singleness, debugging and the processing requirements of on-the-spot complex fault can not be met, so, completely by being necessary to design a kind of electric energy meter and collection is copied, negative control terminal integrated debugging device meets the demands.
Summary of the invention
The object of the invention is to be provided for a kind of electric energy meter of electric system and collection is copied, negative control terminal integrated debugging device.
Technical characteristic of the present invention is: can meet on the quick debugging of on-the-spot complex fault and the basis of process in consideration and be designed to by three-phase meter meter debugging unit, single-phase meter meter debugging unit, terminal debugging unit copied by collection, I type negative control debugging unit, II type negative control debugging unit, unitor, simulation and load controller, telltale, Debugging unit, a kind of electric energy meter and the collection of instrument support composition are copied, negative control terminal integrated debugging device, three-phase meter meter debugging unit and collection are copied terminal debugging unit and are connected in series, single-phase meter meter debugging unit and collection are copied terminal debugging unit and are connected in series, three-phase meter meter debugging unit and I type be negative to be controlled debugging unit and is connected in series, single-phase meter meter debugging unit and I type be negative to be controlled debugging unit and is connected in series, three-phase meter meter debugging unit and II type be negative to be controlled debugging unit and is connected in series, single-phase meter meter debugging unit and II type be negative to be controlled debugging unit and is connected in series, below rear and unitor parallel with one another is respectively connected in series, simulation and load controller, telltale, Debugging unit is connected, described simulation and load controller are the simulation of a load and the simulation of control and switch and the device of control, described telltale is a telltale shown with wigwag form, described Debugging unit is one have signal receiving function and with debugging and the operation of diagnostic system and display device, three-phase meter meter debugging unit, single-phase meter meter debugging unit, collection are copied terminal debugging unit, I type negative control debugging unit, II type negative control debugging unit, unitor, simulation and load controller, telltale, Debugging unit and are all arranged on instrument support.
Described three-phase meter meter debugging unit measures examination gatherer by three-phase meter meter switch, three-phase meter and forms, and three-phase meter meter switch-linear hybrid is above three-phase meter measurement examination gatherer.
Described single-phase meter meter debugging unit measures examination gatherer by single-phase meter meter switch, single-phase meter and forms, and single-phase meter meter switch-linear hybrid is above single-phase meter measurement examination gatherer.
Described collection copies that terminal debugging unit copies switch by collection, collection is copied terminal test gatherer and formed, and collection is copied switch-linear hybrid and copied above terminal test gatherer at collection.
Described unitor is connected with load controller, telltale, Debugging unit with simulation by the connection wire arranged.
Described instrument support is made up of skeleton, cabinet, universal rolling wheel group, and cabinet is arranged on the below of skeleton, and universal rolling wheel group is arranged on the below of skeleton.
During use, needs carry out three-phase meter meter collection copy debugging time, use three-phase meter meter debugging unit and collection to copy terminal debugging unit to be connected in series and same unitor, simulation and load controller, telltale, the connection of Debugging unit, debugged element is arranged on respectively three-phase meter meter debugging unit and collection copy terminal debugging unit three-phase meter measurement examination gatherer and collection copy on terminal test gatherer, switch on power, switch copied by close three-phase meter meter switch and collection, the signal using Debugging unit to receive the transmitting of debugged element carries out diagnosing and debugs, simulation and load controller is used to load during debugging, debug results is shown by the debugging of telltale and Debugging unit and diagnostic system, needs carry out single-phase meter meter collection copy debugging time, use single-phase meter meter debugging unit and collection to copy terminal debugging unit to be connected in series and same unitor, simulation and load controller, telltale, the connection of Debugging unit, debugged element is arranged on respectively single-phase meter meter debugging unit and collection copy terminal debugging unit single-phase meter measurement examination gatherer and collection copy on terminal test gatherer, switch on power, switch copied by close single-phase meter meter switch and collection, the signal using Debugging unit to receive the transmitting of debugged element carries out diagnosing and debugs, simulation and load controller is used to load during debugging, debug results is shown by the debugging of telltale and Debugging unit and diagnostic system, when needs carry out the negative control debugging of three-phase meter meter I type, three-phase meter meter debugging unit and I type negative control debugging unit is used to be connected in series and same unitor, simulation and load controller, telltale, the connection of Debugging unit, debugged element is arranged on respectively on three-phase meter measurement examination gatherer and I type negative control debugging unit that three-phase meter meter debugging unit and I type bear control debugging unit, switch on power, close three-phase meter meter switch, the signal using Debugging unit to receive the transmitting of debugged element carries out diagnosing and debugs, simulation and load controller is used to load during debugging, debug results is shown by the debugging of telltale and Debugging unit and diagnostic system, when needs carry out the negative control debugging of single-phase meter meter I type, single-phase meter meter debugging unit and I type negative control debugging unit is used to be connected in series and same unitor, simulation and load controller, telltale, the connection of Debugging unit, debugged element is arranged on respectively on single-phase meter measurement examination gatherer and I type negative control debugging unit that single-phase meter meter debugging unit and I type bear control debugging unit, switch on power, close single-phase meter meter switch, the signal using Debugging unit to receive the transmitting of debugged element carries out diagnosing and debugs, simulation and load controller is used to load during debugging, debug results is shown by the debugging of telltale and Debugging unit and diagnostic system, when needs carry out the negative control debugging of three-phase meter meter II type, three-phase meter meter debugging unit and II type negative control debugging unit is used to be connected in series and same unitor, simulation and load controller, telltale, the connection of Debugging unit, debugged element is arranged on respectively on three-phase meter measurement examination gatherer and II type negative control debugging unit that three-phase meter meter debugging unit and II type bear control debugging unit, switch on power, close three-phase meter meter switch, the signal using Debugging unit to receive the transmitting of debugged element carries out diagnosing and debugs, simulation and load controller is used to load during debugging, debug results is shown by the debugging of telltale and Debugging unit and diagnostic system, when needs carry out the negative control debugging of single-phase meter meter II type, single-phase meter meter debugging unit and II type negative control debugging unit is used to be connected in series and same unitor, simulation and load controller, telltale, the connection of Debugging unit, debugged element is arranged on respectively on single-phase meter measurement examination gatherer and II type negative control debugging unit that single-phase meter meter debugging unit and II type bear control debugging unit, switch on power, close single-phase meter meter switch, the signal using Debugging unit to receive the transmitting of debugged element carries out diagnosing and debugs, simulation and load controller is used to load during debugging, debug results is shown by the debugging of telltale and Debugging unit and diagnostic system.
Advantage of the present invention is: owing to being provided with three-phase meter meter debugging unit, single-phase meter meter debugging unit, collecting and copy terminal debugging unit, I type negative control debugging unit, II type negative control debugging unit and Debugging unit simultaneously, can carry out collection and copy, bear control, table meter integrated debugging; Owing to being provided with telltale, debug process can be made faster; Owing to being provided with simulation and load controller, can to examine in examination, simulation loading when debugging, make debug results more accurate; Be convenient to mobile because instrument support is provided with universal rolling wheel group, be more suitable for scene rush to repair to fix a breakdown; Due to compact conformation, easy to use, accurate, so there is very large practical and popularizing value.
Accompanying drawing explanation
Below with reference to accompanying drawing, the present invention is described further:
Accompanying drawing 1 is that a kind of electric energy meter of the present invention is copied with collection, the structural representation of negative control terminal integrated debugging device;
Accompanying drawing 2 is that the A of accompanying drawing 1 is to structural representation.
Embodiment
With reference to accompanying drawing 1, accompanying drawing 2, a kind of electric energy meter of the present invention and collection is copied, negative control terminal integrated debugging device, it is copied terminal debugging unit 3, I type negative control debugging unit 4, II type negative control debugging unit 5, unitor 6, simulation and load controller 7, telltale 8, Debugging unit 9, instrument support 10 formed by three-phase meter meter debugging unit 1, single-phase meter meter debugging unit 2, collection, three-phase meter meter debugging unit 1 and collection are copied terminal debugging unit 3 and are connected in series, single-phase meter meter debugging unit 2 and collection are copied terminal debugging unit 3 and are connected in series, three-phase meter meter debugging unit 1 and I type be negative to be controlled debugging unit 4 and is connected in series, single-phase meter meter debugging unit 2 and I type be negative to be controlled debugging unit 4 and is connected in series, three-phase meter meter debugging unit 1 and II type be negative to be controlled debugging unit 5 and is connected in series, single-phase meter meter debugging unit 2 and II type be negative to be controlled debugging unit 5 and is connected in series, below rear and unitor 6 parallel with one another is respectively connected in series, simulation and load controller 7, telltale 8, Debugging unit 9 is connected, described simulation and load controller 7 are the simulation of a load and the simulation of control and switch and the device of control, described telltale 8 is a telltale shown with wigwag form, described Debugging unit 9 is one have signal receiving function and with debugging and the operation of diagnostic system and display device, three-phase meter meter debugging unit 1, single-phase meter meter debugging unit 2, collection are copied terminal debugging unit 3, I type negative control debugging unit 4, II type negative control debugging unit 5, unitor 6, simulation and load controller 7, telltale 8, Debugging unit 9 and are all arranged on instrument support 10, three-phase meter meter debugging unit 1 measures examination gatherer 12 by three-phase meter meter switch 11, three-phase meter and forms, and three-phase meter meter switch 11 is arranged on the top of three-phase meter measurement examination gatherer 12, single-phase meter meter debugging unit 2 measures examination gatherer 22 by single-phase meter meter switch 21, single-phase meter and forms, and single-phase meter meter switch 21 is arranged on the top of single-phase meter measurement examination gatherer 22, collection copies that terminal debugging unit 3 copies switch 31 by collection, collection is copied terminal test gatherer 32 and formed, and collection is copied switch 31 and is arranged on the top that terminal test gatherer 32 copied by collection, unitor 6 is connected with load controller 7, telltale 8, Debugging unit 9 with simulation by the connection wire 61 arranged, instrument support 10 is made up of skeleton 101, cabinet 102, universal rolling wheel group 103, and cabinet 102 is arranged on the below of skeleton 101, and universal rolling wheel group 103 is arranged on the below of skeleton 101.
Claims (6)
1. an electric energy meter and collection are copied, negative control terminal integrated debugging device, it is by three-phase meter meter debugging unit (1), single-phase meter meter debugging unit (2), terminal debugging unit (3) copied by collection, I type negative control debugging unit (4), II type negative control debugging unit (5), unitor (6), simulation and load controller (7), telltale (8), Debugging unit (9), instrument support (10) forms, it is characterized in that: three-phase meter meter debugging unit (1) and collection are copied terminal debugging unit (3) and be connected in series, single-phase meter meter debugging unit (2) and collection are copied terminal debugging unit (3) and are connected in series, three-phase meter meter debugging unit (1) and I type be negative to be controlled debugging unit (4) and is connected in series, single-phase meter meter debugging unit (2) and I type be negative to be controlled debugging unit (4) and is connected in series, three-phase meter meter debugging unit (1) and II type be negative to be controlled debugging unit (5) and is connected in series, single-phase meter meter debugging unit (2) and II type be negative to be controlled debugging unit (5) and is connected in series, below rear and unitor (6) parallel with one another is respectively connected in series, simulation and load controller (7), telltale (8), Debugging unit (9) is connected, described simulation and load controller (7) are the simulation of a load and the simulation of control and switch and the device of control, described telltale (8) is a telltale shown with wigwag form, described Debugging unit (9) is one have signal receiving function and with debugging and the operation of diagnostic system and display device, three-phase meter meter debugging unit (1), single-phase meter meter debugging unit (2), collection are copied terminal debugging unit (3), I type negative control debugging unit (4), II type negative control debugging unit (5), unitor (6), simulation and load controller (7), telltale (8), Debugging unit (9) and are all arranged on instrument support (10).
2. a kind of electric energy meter according to claim 1 and collection is copied, negative control terminal integrated debugging device, it is characterized in that: described three-phase meter meter debugging unit (1) measures examination gatherer (12) by three-phase meter meter switch (11), three-phase meter and forms, and three-phase meter meter switch (11) is arranged on the top of three-phase meter measurement examination gatherer (12).
3. a kind of electric energy meter according to claim 1 and collection is copied, negative control terminal integrated debugging device, it is characterized in that: described single-phase meter meter debugging unit (2) measures examination gatherer (22) by single-phase meter meter switch (21), single-phase meter and forms, and single-phase meter meter switch (21) is arranged on the top of single-phase meter measurement examination gatherer (22).
4. a kind of electric energy meter according to claim 1 and collection is copied, negative control terminal integrated debugging device, it is characterized in that: described collection copies that terminal debugging unit (3) copies switch (31) by collection, collection is copied terminal test gatherer (32) and form, collect and copy switch (31) and be arranged on the top that terminal test gatherer (32) destroyed by collection.
5. a kind of electric energy meter according to claim 1 and collection is copied, negative control terminal integrated debugging device, is characterized in that: described unitor (6) is connected with load controller (7), telltale (8), Debugging unit (9) with simulation by the connection wire (61) arranged.
6. a kind of electric energy meter according to claim 1 and collection is copied, negative control terminal integrated debugging device, it is characterized in that: described instrument support (10) is made up of skeleton (101), cabinet (102), universal rolling wheel group (103), cabinet (102) is arranged on the below of skeleton (101), and universal rolling wheel group (103) is arranged on the below of skeleton (101).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310429246.6A CN104460353A (en) | 2013-09-22 | 2013-09-22 | Electric energy meter and centralized meter reading and load control terminal integrated debugging device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310429246.6A CN104460353A (en) | 2013-09-22 | 2013-09-22 | Electric energy meter and centralized meter reading and load control terminal integrated debugging device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104460353A true CN104460353A (en) | 2015-03-25 |
Family
ID=52906594
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310429246.6A Pending CN104460353A (en) | 2013-09-22 | 2013-09-22 | Electric energy meter and centralized meter reading and load control terminal integrated debugging device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104460353A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106652416A (en) * | 2017-01-10 | 2017-05-10 | 国电南瑞三能电力仪表(南京)有限公司 | Debugging output method suitable for centralized meter reading terminal |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101149425A (en) * | 2007-10-29 | 2008-03-26 | 哈尔滨电工仪表研究所 | Electronic electric energy meter debugging, checkout automated system |
CN101373211A (en) * | 2007-08-24 | 2009-02-25 | 江苏林洋电子有限公司 | Method for debugging three-phase electrical energy meter |
CN201408257Y (en) * | 2009-05-04 | 2010-02-17 | 河南省电力公司郑州供电公司 | Fault judging auxiliary system of load control terminal |
DE102011050346A1 (en) * | 2011-05-13 | 2012-11-15 | mat Maschinen- und Anlagentechnik Dr. Hans A. Becker GmbH | Method and circuit arrangement for fault diagnosis in isolated high and medium voltage networks |
CN203535398U (en) * | 2013-09-22 | 2014-04-09 | 国家电网公司 | Electric energy meter and automatic-reading load-control terminal integrated debugging device |
-
2013
- 2013-09-22 CN CN201310429246.6A patent/CN104460353A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101373211A (en) * | 2007-08-24 | 2009-02-25 | 江苏林洋电子有限公司 | Method for debugging three-phase electrical energy meter |
CN101149425A (en) * | 2007-10-29 | 2008-03-26 | 哈尔滨电工仪表研究所 | Electronic electric energy meter debugging, checkout automated system |
CN201408257Y (en) * | 2009-05-04 | 2010-02-17 | 河南省电力公司郑州供电公司 | Fault judging auxiliary system of load control terminal |
DE102011050346A1 (en) * | 2011-05-13 | 2012-11-15 | mat Maschinen- und Anlagentechnik Dr. Hans A. Becker GmbH | Method and circuit arrangement for fault diagnosis in isolated high and medium voltage networks |
CN203535398U (en) * | 2013-09-22 | 2014-04-09 | 国家电网公司 | Electric energy meter and automatic-reading load-control terminal integrated debugging device |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106652416A (en) * | 2017-01-10 | 2017-05-10 | 国电南瑞三能电力仪表(南京)有限公司 | Debugging output method suitable for centralized meter reading terminal |
CN106652416B (en) * | 2017-01-10 | 2019-08-20 | 国电南瑞三能电力仪表(南京)有限公司 | A kind of debugging output method suitable for centralized automatic meter-reading terminal |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101576595B (en) | Online monitoring and electricity testing method of switch cabinet lightning arrester and device for realizing same | |
CN103176142A (en) | Grid-connection adaptability testing system and method for photovoltaic power stations | |
CN203502580U (en) | Checking system for online insulation monitoring device | |
CN103472331A (en) | Photovoltaic power generation fault diagnosis system based on photovoltaic physical model | |
CN103969546B (en) | Four wye voltage transformer secondary polarity intelligent testers | |
CN203535398U (en) | Electric energy meter and automatic-reading load-control terminal integrated debugging device | |
CN104020376A (en) | Three-remote automatic testing method for power distribution terminal | |
CN103728510B (en) | Excitation unit on-site test system and method | |
CN201622316U (en) | Capacitive equipment current-leaking measuring device | |
CN204086435U (en) | A kind of microcomputer relay protection tester | |
CN104034977B (en) | Capacitance type potential transformer live detection instrument | |
CN104460353A (en) | Electric energy meter and centralized meter reading and load control terminal integrated debugging device | |
CN106533360A (en) | Portable outdoor power test device and test method for photovoltaic assemblies | |
CN202854318U (en) | Current transformer 10% error checking system | |
CN100416282C (en) | Virtual detector for variable frequency speed regulator | |
CN203949980U (en) | The charged detector of capacitance type potential transformer | |
CN203894400U (en) | GIS instrument transformer interference source testing apparatus enabling analog quantity and digital quantity mixed acquisition | |
CN104749463A (en) | Distribution transformer sampling examination test comprehensive system based on virtual instrument technology | |
CN104571200A (en) | Three-phase electricity multi-channel controller | |
CN205210294U (en) | Portable collection terminal Test device | |
CN202421438U (en) | On-line diagnosis device of relay protective device | |
CN203759150U (en) | Capacitance discharge tester | |
CN102735894B (en) | Plug-in contact resistance measurement chuck | |
CN203616457U (en) | Power supply box detecting device | |
CN203870183U (en) | Three-remote automatic test equipment for power distribution terminal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150325 |